Loading...
HomeMy WebLinkAbout73-1103-25RSTATE OF WASHINGTON County of Jefferson In the Matter of Jefferson County's Adoption of the 2026 Annual Road Program RESOLUTION NO. 7 3 -110 3 - 2 5 R WHEREAS, RCW 36.81.130 and Ch. 136-16 WAC call for the County Engineer, on or before the first Monday in October, to file with the County Legislative Authority for consideration and adoption, a recommended plan for laying out, construction, and maintenance of county roads for the ensuing fiscal year; and, WHEREAS, the Annual Road Program was provided to the Board for a workshop with Public Works held on September 22, 2025; and, WHEREAS, the Annual Road Program consists of three components, an Annual Construction Program and cost thereof, an annual maintenance plan and cost thereof, and a road equipment purchases and major repairs plan and cost thereof; and, WHEREAS, the Annual Construction Program's content meets Ch. 136-16-020 WAC and, conforms as nearly practicable to the county's long range road program contained in the 2025-2030 Six Year Transportation Improvement Program; and, WHEREAS, the Annual Construction Program indicates whether such work is to be done by County Forces or by publicly advertised contract; and, WHEREAS, the Board has considered the Annual Road Program consisting of the Annual Construction Program, an annual maintenance plan, and a road equipment purchase and major repair plan, and revisions and changes were made and, shall adopt an Annual Road Program any time prior to the adoption of the county road budget; and, WHEREAS, any appropriations contained in the county road budget shall be void unless the county's Annual Road Program is adopted prior to such appropriation; and, WHEREAS, the Annual Road Program shall not hereafter be changed except by unanimous vote of the Board members present and, the modifications shall be by Resolution or Ordinance; and, WHEREAS, the County Road Administration Board (CRAB) has clarified that the intent of WAC 136-16-035 is for adoption of the road maintenance plan to be at the overall level rather than at the activity/detail level in order to give the program flexibility to adjust activity spending based on need; and, WHEREAS, the Jefferson County 2026 Annual Road Program including the (1) Annual Construction Program; (2) annual maintenance plan and; (3) equipment purchase and major repair plan is attached hereto; and, WHEREAS, the 2026 Annual Construction Program shall be filed with the County Road Administration Board within 30 days after adoption but not later than December 315t of each year. NOW, THEREFORE, THE BOARD OF COUNTY COMMISSIONERS OF JEFFERSON COUNTY, WASHINGTON, HEREBY RESOLVE AS FOLLOWS: Section 1. Whereas Clauses are Findings of Fact. The Jefferson County Board of Commissioners hereby adopts the above "Whereas" clauses as Findings of Fact. Section 2. Purpose. The purpose of this Resolution is to adopt the 2026 Annual Road Program for Jefferson County, Washington. Section 3. Adoption of 2026 Annual Road Program. Jefferson County Board of Commissioners hereby approves and adopts the 2026 Annual Road Program in accordance with WAC 136-16-018. Section 4. Severability. If any section, subsection, sentence, clause, phrase or section of this Resolution or its application to any person or circumstance is held invalid, the remainder of this Resolution or its application to other persons or circumstances shall be fully valid and shall not be affected. Section 5. SEPA Categorical Exemption. This Resolution is categorically exempt from the State Environmental Policy Act under WAC 197-11-800 (19). Section 6. Effective Date. This Resolution shall take effect and be in full force immediately upon passage by the Board of County Commissioners. (SIGNATURES FOLLOW ON THE NEXT PAGE) 2 APPROVED and ADOPTED this SEAL: ERS0 'Y �c� ••GpMMIs • . �, m' co S H IN qG� ATTEST:) / 1 G 4"e, , (x 2 � Caroly allaway, CMC ate Clerk dMe Board ' day oAOw Pk "�, 2025. JEFFERSON COUNTY BOARD OF COMMISSIONERS , Chair Member -Nollette, Member Jefferson County 2026 (A) Total Est. Construction $2,544,626.00 (B) Total Est. County Forces Construction $0.00 (C) Computed County Forces Limit $1,262,437.50 Project Name 6 Year Program Number Annual Program Number Project Type Code Road Number BMP EMP Completed Length Projects us1o1 Road Name 294.6o From 295.00 To 0.4o FFC Project Name 6 Year Program Number Annual Program Number Project Type Code Road Number BMP EMP Completed Length Project Name 6 Year Program Number Annual Program Number Date of Final Adoption Ordinance/Resolution Number Road Information & Other Funding Quilcene Complete Streets - Phase 1 PE & CE $60,000.00 Right of Way $0.00 1 Construction 1 Contract $948,117.00 County Forces $0.00 P&T - Paths, Trails, Bikeways, etc. Total $1,008,117.00 Highway 101 County Road Funds Amount $10,000.00 294.6 Other Amount $695.350.00 Program Source Ped/Bike-Pedestrian and Bicycle Program 295 Other Amount $302,767.00 Program Source County -Other County Funds (Not Road) 05 - Rural Other Freeways and Expressways 34230 Road Name 1.61 From 1.62 To o.01 FFC Lords Lake Loop Road - Slide Repair PE & CE $51,200.0o Right of Way $0.00 2 Construction 2 Contract $646,922.00 County Forces $0.00 Other - Other Total $698,122.00 Lords Lake Loop Road County Road Funds Amount $34,906.00 x Other Amount $628.310.00 Program Source FEMA-Federal Emergency Management Agency y Other Amount 09 - Rural Local Access Shine Road -Slide Repair PE & CE 3 3 Contract $34,906.00 Program Source $48,000.00 Right of Way Construction $500,000.00 County Forces WA-Misc State Miscellaneous $0.00 Project Type Code Road Number BMP EMP Completed Length 50540 Road Name 0.84 From 1.59 To 0.75 FFC Other- Other Shine Rd x y 09 - Rural Local Access Total $548,000.00 County Road Funds Amount $400.00 Other Amount $425,200.00 Program Source FEMA-Federal Emergency Management Agency Other Amount $1oo,000.00 Program Source County -Other County Funds (Not Road) Other Amount $22,400.00 Program Source WA -Mist State Miscellaneous Project Name Little Quilcene River Bridge Replacement PE & CE $100,000.00 Right of Way $0.00 6 Year Program Number 4 Construction Annual Program Number a Contract $o.00 County Forces $0.00 Project Type Code BR - Short- span or Locally Funded Total $100,000.00 Road Number 9315o Road Name Center Rd. County Road Funds Amount $0.00 BMP 14.55 From x Other Amount $1oo,000.00 Program Source BR -Bridge Replacement/Bridge Rehabilitation Program EMP 14.7o To y Completed Length o.15 FFC 07 - Rural Major Collector Project Name Oil City Road Engineering Assessment - FLAP Project PE & CE $1,0oo.00 Right of Way $0.00 6 Year Program Number 5 Construction Annual Program Number 5 Contract $o.00 County Forces $0.00 Project Type Code Other- Other Total $1,000.00 Road Number 13430 Road Name Oil City Rd. County Road Funds Amount $1,000.00 BMP 8.5o From x EMP 1o.98 To y Completed Length 2.48 FFC os - Rural Local Access Project Name 6 Year Program Number Annual Program Number Project Type Code Road Number SR19 Road Name BMP 9.56 From EMP 1o.10 To Completed Length 0.54 FFC Rhody Drive Ped-Bike Improvements - North Segment PE & CE $64,930.00 Right of Way 6 Construction 6 Contract $397,705.00 County Forces P&T - Paths, Trails, Bikeways, etc. Total Rhody Dr County Road Funds Amount x Other Amount $461,135.00 Program Source y 05 - Rural Other Freeways and Expressways $0.00 $0.00 $462,635.00 $1, 500.00 TAP(R)-Transportation Alternatives Program - Rural Project Name 6 Year Program Number Annual Program Number Project Type Code Road Number SR19 Road Name BMP 8.94 From EMP 9.56 To Completed Length 0.62 FFC Project Name 6 Year Program Number Annual Program Number Project Type Code Project Name 6 Year Program Number Annual Program Number Project Type Code Road Number BMP EMP Completed Length Rhody Drive Ped-Bike Improvements - South Segment PE & CE $275,000.00 Right of Way $60,000.00 7 Construction 7 Contract $o.00 County Forces $0.00 P&T - Paths, Trails, Bikeways, etc. Total $335,000.00 Rhody Dr County Road Funds Amount $10,089.00I x Other Amount $64,643.00 Program Source TAP(R)-Transportation Alternatives Program - Rural y 05 - Rural Other Freeways and Expressways Other Amount $260,268.00 Program Source Olympic Discovery Trail - PS2P Project PE & CE $270,000.00 Right of Way 8 Construction 8 Contract $0.00 County Forces WA-Misc State Miscellaneous $0.00 $0.00 P&T - Paths, Trails, Bikeways, etc. Total $270,000.00 County Road Funds Amount $0.00 Other Amount $270,000.00 Program Source Fed Misc-Miscellaneous Federal Sources Big Quilcene River Bridge Replacement Project PE & CE $1o,000.00 Right of Way $0.00 9 Construction 9 Contract $o.00 County Forces $0.00 FA - Federal -Aid Bridge Total $10,000.00 30130 Road Name Linger Longer Rd. County Road Funds Amount $0.00 0.42 From x Other Amount $10,000.00 Program Source Fed Misc-Miscellaneous Federal Sources 0.43 To y 0.01 FFC 09 - Rural Local Access Project Name 6 Year Program Number Annual Program Number Project Type Code Road Number SR2o Road Name BMP 9.56 From EMP 9.82 To Completed Length 0.26 FFC Port Townsend Gateway Project PE & CE 10 10 Contract IS - Intersection Total State Route 20 County Road Funds Amount x y 05 - Rural Other Freeways and Expressways $1o,5oo.00 Right of Way $0.00 Construction $o.00 County Forces $0.00 $10, 500.00 $10,500.00 Project Name Upper Hoh Road - Dolosse Monitoring PE & CE $41,600.00 Right of Way $0.00 6 Year Program Number Annual Program Number Project Type Code Road Number BMP EMP Completed Length Project Name 6 Year Program Number Annual Program Number Project Type Code Road Number BMP EMP Completed Length Project Name 6 Year Program Number Annual Program Number Project Type Code Road Number BMP EMP Completed Length Project Name 6 Year Program Number Annual Program Number Project Type Code Road Number BMP EMP Completed Length 11 Construction 11 Contract $o.00 County Forces Other- Other Total 9142o Road Name Upper Hon Rd. County Road Funds Amount 3.5o From x Other Amount $o.00 Program Source 7.90 To y 4.30 FFC 07 - Rural Major Collector $0.00 $41,600.00 $0.00 Federal Lands Access Program -Discretionary Upper Hoh Road - ER Mitigation PE & CE $1,559.00 Right of Way 13 Construction 12 Contract $13,441.00 County Forces K - Environmental Mitigation Total 9142o Road Name Upper Hon Rd. County Road Funds Amount 7.90 From x Other Amount $12,975.00 Program Source 8.00 To y o.10 FFC 07 - Rural Major Collector $0.00 $0.00 $15,000.00 $2,025.00 ER -Federal Emergency Relief - FHWA Upper Hoh Road Spruce Creek Mitigation PE & CE $1,559.00 Right of Way 14 Construction 13 Contract $13,441.00 County Forces K - Environmental Mitigation Total 9142o Road Name Upper Hon Rd. County Road Funds Amount 9.7o From x Other Amount $12,975.00 Program Source 9.8o To y 0.10 FFC 07 - Rural Major Collector $0.00 $0.00 $15, 000.00 $2, 025.00 ER -Federal Emergency Relief - FHWA Donkey Creek Tributary Culvert Replacement, Clearwater Road PE & CE $6,oco.00 Right of Way 15 Construction 14 Contract $o.00 County Forces DR - Drainage Structure Total 10750 Road Name Clearwater Rd. County Road Funds Amount 1.35 From x Other Amount $6,000.00 Program Source 1.36 To y 0.o1 FFC 08 - Rural Minor Collector $0.00 $0.00 $6, 000.00 $0.00 Fed Misc-Miscellaneous Federal Sources Project Name 6 Year Program Number Annual Program Number Project Type Code Road Number BMP EMP Completed Length Project Name 6 Year Program Number Annual Program Number Project Type Code Road Number BMP EMP Completed Length Project Name 6 Year Program Number Annual Program Number Project Type Code Road Number BMP EMP Completed Length Project Name 6 Year Program Number Annual Program Number Project Type Code Road Number BMP EMP Oil City Rd. -Unnamed Tributary Culvert Replacement PE & CE $8,500.o0 Right of Way $26,000.00 16 Construction 15 Contract $o.00 County Forces $0.00 DR - Drainage Structure Total $34,500.00 13430 Road Name Oil City Rd. County Road Funds Amount $0.00 6.73 From x Other Amount $34,500.00 Program Source Fed Misc-Miscellaneous Federal Sources 6.74 To y o.01 FFC 09 - Rural Local Access Oil City Rd. -Six Mile Creek Culvert Replacement PE & CE $2,500.00 Right of Way $26,000.00 17 Construction 16 Contract $o.00 County Forces $0.00 BR - Short- span or Locally Funded Total $28,500.00 1343o Road Name Oil City Rd. County Road Funds Amount $0.00 5.96 From x Other Amount $28,500.00 Program Source Fed Misc-Miscellaneous Federal Sources 5.97 To y 0.01 FFC 09 - Rural Local Access Upper Hoh Road Pavement Preservation - FLAP Project PE & CE $o.00 Right of Way $2,000.00 18 Construction 17 Contract $o.00 County Forces $0.00 2R - Resurface and Restore Total $2,000.00 9142o Road Name Upper Hoh Rd. County Road Funds Amount $2,000.00 o.00 From x 12.04 To y 12.04 FFC 07 - Rural Major Collector Upper Hoh Road Bank Stabilization - FLAP Project PE & CE $2,o00.00 Right of Way $45,000.00 19 Construction 18 Contract $o.00 County Forces $0.00 Other- Other Total $47,000.00 9142o Road Name Upper Hon Rd. County Road Funds Amount $47,000.00 7.90 From x 8.2o To y Completed Length o 3o FFC 07 - Rural Major Collector Project Name Oil City Rd. Culvert Replacement (Bridge) MP 0.5 - FLAP Project PE & CE $5,400.00 Right of Way $0.00 6 Year Program Number 20 Construction Annual Program Number 19 Contract $o.00 County Forces $0.00 Project Type Code DR - Drainage Structure Total $5,400.00 Road Number 13430 Road Name Oil City Rd. County Road Funds Amount $5,400.00 BMP 0.5o From x EMP 0.51 To y Completed Length o.o1 FFC 09 - Rural Local Access Project Name Center Road Culvert Correction - Chimacum Creek PE & CE $265,0o0.00 Right of Way $14,000.00 6 Year Program Number 21 Construction Annual Program Number 20 Contract $o.00 County Forces $0.00 Project Type Code DR - Drainage Structure Total $279,000.00 Road Number 93150 Road Name Center Rd. County Road Funds Amount $0.00 BMP 3.23 From x Other Amount $237,150.00 Program Source FBRB-Fish Barrier Removal Board EMP 3.24 To y Other Amount $41.850.00 Program Source NFPP-National Fish Passage Program Completed Length o.o1 FFC 07 - Rural Major Collector Project Name 6 Year Program Number Annual Program Number Project Type Code Road Number BMP EMP Completed Length Project Name 6 Year Program Number Annual Program Number Project Type Code Road Number BMP Paradise Bay Road Overlay PE & CE $6o,000.00 Right of Way 22 Construction 21 Contract $0.00 County Forces 2R - Resurface and Restore Total 5036o Road Name Paradise Bay Rd County Road Funds Amount 3.74 From x Other Amount $54,000.00 Program Source 6.00 To y 2.26 FFC 08 - Rural Minor Collector $0.00 $0.00 $60,000.00 $6,000.00 RAP -County Road Administration Board Rural Arterial Program West Valley Road Safe Routes to School Project PE & CE $212,000.00 Right of Way 23 Construction 22 Contract $o.00 County Forces P&T - Paths, Trails, Bikeways, etc. Total 51410 Road Name West Valley Road County Road Funds Amount o.00 From x Other Amount $247.000.00 Program Source $35,000.00 $0.00 $247, 000.00 $0.00 SRTS-Safe Routes to School EMP 0.21 To Completed Length 0.21 FFC y 09 - Rural Local Access Project Name Duckabush Estuary Restoration -Realignment Project PE & CE $1,500.o0 Right of Way $0.00 6 Year Program Number 24 Construction Annual Program Number 23 Contract $0.00 County Forces $0.00 Project Type Code Other- Other Total $1,500.00 Road Number Us1o1 Road Name Hwy 101 County Road Funds Amount $1,500.00 BMP 309.88 From x EMP 310.5o To y Completed Length 0.62 FFC 05 - Rural Other Freeways and Expressways Project Name Snell Creek Culvert Replacement, Upper Hoh Road PE & CE $1,000.00 Right of Way $0.00 6 Year Program Number 25 Construction Annual Program Number 24 Contract $o.00 County Forces $0.00 Project Type Code DR - Drainage Structure Total $1,000.00 Road Number 9142o Road Name Upper Hoh Rd County Road Funds Amount $0.00 BMP 2.74 From x Other Amount $1,000.00 Program Source Fed Misc-Miscellaneous Federal Sources EMP 2.75 To y Completed Length ao1 FFC 07 - Rural Major Collector Project Name Rick Tollefson Trail - Ballfield Connection PE & CE $1,000.00 Right of Way $0.00 6 Year Program Number 26 Construction Annual Program Number 25 Contract $o.00 County Forces $0.00 Project Type Code P&T - Paths, Trails, Bikeways, etc. Total $1,000.00 County Road Funds Amount $1,000.00 Project Name Tarboo Creek Culvert Replacement PE & CE $5,000.00 Right of Way $0.00 6 Year Program Number 27 Construction Annual Program Number 26 Contract $o.00 County Forces $0.00 Project Type Code BR - Short- span or Locally Funded Total $5,000.00 Road Number 40390 Road Name Coyle Rd. County Road Funds Amount $750.00 BMP 1.15 From x Other Amount $4,250.00 Program Source FBRB-Fish Barrier Removal Board EMP 1.23 To y Completed Length o.os FFC 08 - Rural Minor Collector Project Name Oil City Road- Ruby Creek Culvert Replacement PE & CE $1,Ooo.Oo Right of Way $0.00 6 Year Program Number 28 Construction Annual Program Number 27 Contract $0.0o County Forces $0.00 Project Type Code BR - Short- span or Locally Funded Total $1,000.00 Road Number 1343o Road Name Oil City Rd. County Road Funds Amount $1.000.00 BMP 8.76 From x EMP 8.77 To y Completed Length o.01 FFC 09 - Rural Local Access Project Name Oil City Road MP 8.8-8.9 Permanent Repair PE & CE $1,Oo0.0o Right of Way $0.00 6 Year Program Number 29 Construction Annual Program Number 28 Contract $0.00 County Forces $0.00 Project Type Code Other - Other Total $1.000.00 Road Number 13430 Road Name Oil City Rd. County Road Funds Amount $1,000.00 BMP 8.8o From x EMP 8.90 To y Completed Length o.10 FFC 09 - Rural Local Access Project Name Countywide Bridge Heavy Maintenance Program PE & CE $10,000.00 Right of Way $0.00 6 Year Program Number 36 Construction Annual Program Number 29 Contract $o.00 County Forces $0.00 Project Type Code BR - Short- span or Locally Funded Total $10,000.00 County Road Funds Amount $10,000.00 Project Name Countywide Various Road Improvements PE & CE $10,000.00 Right of Way $5,000.00 6 Year Program Number 37 Construction Annual Program Number 30 Contract $25,000.00 County Forces $0.00 Project Type Code Other- Other Total $40,000.00 County Road Funds Amount $40,000.00 2026 - Annual Maintenance Plan Days of Work Code Work Description Annual Accomplishment Accomplishment Labor Per Year Equipment Per Year TotalMisc Materials Per Year Annual Cost $ 1.00 110 Preliminary Engineering 20 Days 20 $ 15,000 $ - $ $ 12,000 $ 27,000 115 Pavement Management 10 Days 10 $ 30,000 $ 2,000 $ $ $ 12,000 300 Undstributed Equip. Rental 250 Days 250 $ - $ 300,000 $ $ - $ 300,000 301 Misc. Contracted Services 6 Days 6 $ $ - $ $ 2,700 $ 2,700 320 Asphalt Hand Patching 100 Tons 33 $ 112,667 $ 31,667 $ 12,500 $ - $ 156,833 330 Crack Sealing 10 Crew Days 10 $ 40,000 $ 2,000 $ 3,375 $ 2,500 $ 47,875 340 Grading Gravel Roads 250 Road Miles 83 $ 155,000 $ 171,667 $ 110,000 $ $ 436,667 350 Dust Control 40 Road Miles 4 $ 2,480 $ 1,400 $ $ $ 3,880 360 Shoulder Spot Repairs 12 Crew Days 12 $ 33,120 $ 12,600 $ 5,280 $ $ 51,000 370 BST Seal Coating 220,000 Square Yards 15 $ 119,240 $ 179,667 $ 385,000 $ $ 683,907 380 Asphalt Pre Leveling 350 Tons 18 $ 72,275 $ 58,625 $ 35,000 $ $ 165,900 385 Pavement Digout/Machine 500 Tons 17 $ 89,500 $ 55,000 $ 70,083 $ 41,667 $ 256,250 390 Fog Sealing 220,000 Square Yards 7 $ 22,293 $ 11,733 $ 73,333 $ - $ 107,360 410 Spot Ditching 30 Crew Days 30 $ 120,000 $ 79,500 $ $ $ 199,500 412 Catch Basin Cleaning 40 Each 7 $ 19,533 $ 91000 $ $ $ 28,533 420 Grader Ditching 45 Shoulder Mile 30 $ 123,900 $ 108,000 $ $ $ 231,900 420 Shoulder Grading 65 Shoulder Mile 7 $ 26,000 $ 24,700 $ $ $ 50,700 430 Culvert Maint. 100 Each 33 $ 112,667 $ 65,000 $ $ $ 177,667 440 Install Culverts 250 Linear Foot 8 $ 31,292 $ 16,667 $ 24,083 $ $ 72,042 450 & 460 Stream & Flood Control 15 Sites 3 $ 6,420 $ 6,450 $ - $ $ 12,870 470 Install Curbs 50 Linear Foot 1 $ 1,690 $ BW $ 335 $ $ 2,825 480 Install Catch Basins 2 Each 2 $ 6,270 $ 4,000 $ 900 $ $ 11,170 500(a11) Bridge Maintenance 7 Each 14 $ 29,960 $ 2,800 $ 1,400 $ $ 34,160 610 & 620 Sidewalks and Paths 15 Each 15 $ 32,100 $ 15,750 $ 7,500 $ $ 55,350 630 Street Lighting 365 Days 365 $ $ $ - $ 14,600 $ 14,600 640 Roadway Signage 750 Each 188 $ 346,875 $ 75,000 $ 37,500 $ $ 459,375 641 Roadway Striping 200 Road Mile 7 $ 6,167 $ - $ 126,667 $ 150,000 $ 282,833 641 RPM's 2 Road Mile 0 $ 220 $ - $ - $ 1,200 $ 1,420 642 Guardrail Repair 200 Linear Foot 4 $ 16,000 $ 4,200 $ 2,000 $ 2,000 $ 24,200 660 De-Ice/Sanding 1,200 Man Hours 15 $ 74,400 $ 93,000 $ 108,000 $ $ 275,400 660 Snow Plowing 800 Man Hours 10 $ 49,600 $ 44,000 $ - $ $ 93,600 670 Roadway Sweeping (Elgin) 2S0 Lane Mile 25 $ 15,500 $ 25,000 $ $ $ 40,500 670 Roadway Sweeping (Broce) 1,000 Lane Mile 50 $ 31,000 $ 22,500 $ $ $ 53,500 671 Storm Cleanup 35 Crew Days 35 $ 262,850 $ 211,750 $ $ $ 474,600 710 Mowing 2,500 Shoulder Mile 167 $ 103,333 $ 75,000 $ $ $ 178,333 720 IMachineBrushcutting 225 Shoulder Mile 281 $ 364,219 $ 154,688 $ $ $ 518,906 730 Manual Brush/Weed Control 20 Crew Days 20 $ 9,000 $ $ $ $ 9,000 740 Tree Trimming 500 Hours 50 $ 169,000 $ 45,000 $ $ $ 214,000 760 Road Slide/Washout Repair 10 Days 30 $ 33,800 $ 26,500 $ 81000 $ $ 68,300 770 Landscape Maintenance 15 jDays 15 $ 6,750 $ 4,800 $ 1,500 $ $ 13,050 780 Litter Patrol 10 Days 10 $ 9,000 $ 2,000 $ - $ $ 11,000 910 & 913 Maintenance Admin. / Super. 170 Days 170 $ 378,250 $ $ $ 102,000 $ 480,250 930 Accounting 200 Days 200 $ 88,000 $ $ $ - $ 88,000 940&950 Staff Trai n i ng 200 Days 200 $ 124,000 $ $ $ $ 124,000 960 Staff Meetings 5 Each 5 $ 70,850 $ $ $ $ 70,850 980-990 Radios&Tools 250 Days 250 $ - $ $ $ 25,000 $ 25,000 Legend Fillable Cell IFormula Locked Annual Cells Total Annual Units Approx. FTE's $ 3,340,220 $ 1,942,463 $ 1,012,457 $ 353,667 $ 6,672,883 Formula 32.2 To: From: Date: Subject Department of Public Works Jefferson County, Washington MEMORANDUM Board of County Commissioners 623 Sheridan Street Port Townsend, WA 98368 360-385-9160 Monte Reinders, P.E., Public Works Director/County Engineer 9/16/2025 2026 Annual Roads Equipment Purchase/Replacement Plan In accordance with RCW36.81.130 and Ch. 136-16-030 WAC, the following Roads equipment replacement/purchase plan is submitted as part of the 2026 Annual Road Program. Department Item Description New/Replace Unit Cost JCSO Ford Explorer Interceptor (#941) R $ 90,000 JCSO Ford Explorer Interceptor (#991) R $ 90,000 Roads Wheeled Brush Cutter (#892/893) R $ 300,000 Roads Simex Asphalt Float Attachment R $ 25,000 Roads TKT50LP Trailer N $ 60,000 Roads Ford F-450 Sign Truck (#917) R $ 100,000 Roads S-Yard Chipper Box (#965) R $ 25,000 Roads Brush Cutter Head for Case 14S (#1012) R $ 40,000 Parks John Deere Mower (#844) R $ 60,000 JV Ford Explorer (funding from JV) N $ 70,000 Total: $ 860,000 Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Josh Peters, County Administrator From: Monte Reinders, PE, Public Works Director/County Engineer Agenda Date: November 3, 2025 Subject: Adoption of the 2026 Annual Road Program Statement of Issue: Adoption of Jefferson County's 2026 Annual Road Program Analysis / Strategic Goals / Pros Et Cons: The Annual Road Program consists of three elements, which are attached hereto: • Annual Construction Program • Annual Road Maintenance Plan • Road Equipment Purchases/Major Repairs Plan The Board was briefed on the Annual Road Program in a workshop conducted on September 22, 2025. In accordance with WAC 136-16-018, the county legislative authority shall adopt the Annual Road Program at any time prior to adoption of the county budget. Fiscal Impact / Cost -Benefit Analysis: • Annual Construction Program: $4,311,114 • Annual Road Maintenance Plan: $6,672,883 • Road Equipment Purchases Plan: $ 550,000 Recommendation: Please review and then approve the attached Resolution which adopts the 2026 Annual Road Program. Department Contact: Monte Reinders, P.E. Public Works Director/County Engineer ext. 242 Reviewed By: a2d 1b, Jos Peters, County Administrator Date