Loading...
HomeMy WebLinkAboutBLD2005-00688 1UILDING PERMIT APPLICAT'ON MLLA05 0064E Review Type: I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD05-00688 Received Date: 11/2/2005 SITE ADDRESS: DOUGLAS WAY PORT TOWNSEND, 98368 OWNER: TIMOTHY J MC GUIRE PHONE: 360-379-6681 KIMBERLY R MC GUIRE 152 DOUGLAS PORT TOWNSEND WA 983689102 HERON POND RANCH SUBDIVISION: Block: Lot: 7 PARCEL NUMBER: 959000007 Section: 29 Township: 30 N Range: 01 W CONTRACTOR: REALITY HOMES INC PHONE: (253)926-6310 1308 ALEXANDER AVE E FIFE WA 98424 Contractor's License REALIH1984CN Expires 2/15/2006 REPRESENTATIVE: PHONE: PROJECT DESCRIPTION NSFR W/ATT GAR TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 1,767 VALUATION 169,784.00 ADD'L: HEAT TYPE: EEE CODE EDITION: 2003 HEAT BASE: HEAT TYPE: _ OCCUPANCY: R-3 UNHEATED: # OF STORIES OCCUPANCY: OTHER: CONST TYPE: 5N SHORELINE: CONST TYPE: GARAGE: 484 SETBACK: DECK: BANK HEIG T: SEWAGE DISPOSAL: CON WATER SYSTEM: 2WELL BEDROOMS: BATHROOMS: Exist: 0 Exist: 0 Prop: 3 Prop: 2 Total: 3 Total: 2 Routing Date: z 6 (40 Type Amount Paid By: Date: Receipt: APP' . fAtEl, State Building Code $4.50 SLE 11/02/05 77191 Plan Check $900.73 SLE 11/02/05 77191 JAN 31 2006 Permit $1,385.75 SLE 11/02/05 77191 Jefferson County Planning Total: $2,290.98 & Building Department e , ���So,v cow JEFFERScOUNTY 1l ' 4 `i', l ' DEPARTMENT OF COMMUNITY DEVELOPMENT ; i 1 al = i 621 Sheridan Street • Port Townsend •Washington 98368 ff i, f ;' ' "" 2 '1 i l, 360/379-4450 • 360/379-4451 Fax i } 'T�q 0 www.co.jefferson.wa.us/commdevelopment I ,r- Master Permit Application MLA. 05 - -- Project Description (include separate sheets as necessary): rv._., c 1 _) - .---, L�' /,�1 T1 f-j c 61-7--• Tax Parcel �(, Property Number: /-� O()C CO 7 Size: ,12. I 3 ,qc/-,es (acres/square feet) Site Address and/or Directions to Property: (",�.:/\)„2,,,- pre.."K,�,i ter. ))! its 1-.,tj 4-Cse.lc 1e11-4,4t_1 `N. ;V)::.t . ,a Property Owner(s)of Record: I;n-t a Kt rv- . (Yt . , Y Telephone =0 .:,-79tLoki..c' a Fax: email:/ri'5h i- , 1e ,04.. a,,.C% c .e iww'. i Mailing Address: % �. �j Pcct-TUt.�:v•• z-". 7 L.1 tit �> k'.� Applicant/Agent(if different from owner): Telephone: Fax: email: Mailing Address: What kind of Permit?(Check each box that applies) Riuilding ❑Variance(Minor,Major or Reasonable Economic Use) ❑ Demolition Permit ❑ Conditional Use[C(a),C(d),or C]** iiItingle Family-----_. ❑ Discretionary"D"or Unnamed Use Classification Ernarage I Attached O Detached ❑ Special Use(Essential Public Facilities)** ❑ Manufactured ome ❑ Boundary Line Adjustment ❑ Modular ❑ Short Plat** ❑ Commercial* ❑ Binding Site Plan** ❑ Change of Use ❑ Long Plat** I l Address ❑ Road Approach 0 Planned Rural Residential Development(PRRD)/Amendments** ❑ Propane ❑ Plat Vacation/Alteration** ❑Allowed"Yes"Use Consistency Analysis ❑ Shoreline Master Program Exemption/Permit Revisions-- ❑ Stormwater Management ❑ Shoreline Management Substantial Development** ❑ Site Plan Approval Advance Determination(SPAAD)* ❑ Shoreline Management Variance ❑Temporary Use ❑ Comprehensive Plan/UDC/Land Use District Map Amendment ❑Wireless Telecommunication* ❑Jefferson County Shoreline Master Program Amendment ❑ Forest Practices Act/Release of Six-Year Moratorium *May require a Pre—Application Conference _ **Requires a Pre-Application Conference Please identify any other local,state or federal permits required for this proposal, if known: • DESIGNATION OF AGENT I hereby designate ,'U/,'i 4,e,,,,,_,e_ to act as my agent in matters relating to thhi �is application for permit(s). OWNER SIGNATURE t `1? 'i'' Date: C5 i < /0By signing this application form,the owner/agent ga attests that the information provided herein,and in anyttachments,is true and correct to the best of his,her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attomey's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application review and any required lat inspections.Access and 'ght of entry to this property shall be requested and shall occur only during regular business hours. Signature:_� l r�c.9 / ' `' ` e!-e—*- L /C'• Date: V /24 i- The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)even if you are in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual and non-transferabl lesponsi Ility for adh g to and complying with the ESA. The Applicant has read this disclaimer nd signs and dates it below. Signature: ice_ /-i L-4- — Date: iyim/<2 4� < lib y G:\PermitCenter\FORMS\DRD FORMS\Master Permit Application 7-8-04.doc • • • • BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD05-00688 Received Date 11/2/2005 SITE ADDRESS: 232 DOUGLAS WAY Issue Date 01/31/2006 PORT TOWNSEND, 98368 APPLICANT: TIMOTHY J MC GUIRE PHONE: 360-379-6681 KIMBERLY R MC GUIRE 152 DOUGLAS PORT TOWNSEND WA 983689102 SUBDIVISION: HERON POND RANCH Block: Lot: 7+ PARCEL NUMBER: 959000007 Section: 29 Township: 30 N Range: 01 W CONTRACTOR: REALITY HOMES INC PHONE: (253)926-6330 1308 ALEXANDER AVE E FIFE WA 98424 (253) 926-8515 Contractor's License: REALIHI984CN Expires: 2/15/2006 PROJECT DESCRIPTION: NSFR W/ATT GAR CALL IN FOR THE QUIRE 1►y�PECTIONS THAT APPLY TO YOUR PROJECT. SETBACKS: , 13�/ U : Footing: Y/AD Found tion:A'>z,geot off nc-sloft ,N L ilitnES 34 Stormwater FINAL Approval: 1- ,rall 4)ee,5:L.3/ p6 Underground Plumbing: / Underground Insulation: Shear Wall : —I- -2- -( j 4.) ( i Sheathing: �(_25 -OG LAW Framing:,. )n�;-4(Y 'cx S/2,4 6, /L. 5 ///C. Plum bing: 5 Propane T nk/ Li s: ___ Insulation: c-�' 7 2 --f-f3/ Sheetroc : L- -- 3/� Septic Sytefn Final Approval (If not on sewer): Road Approach Final Approval: Zoning Final Approval: MPS cupancy Approval: op/) EALTH DEPARTMENT AND PUBLIC WORKSP ROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY - SEE REVERSE SPECIAL CONDITIONS FOR CAS# BLD05-00688 • • 1.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 2.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 3.) A Stormwater Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 4.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 5.) Not more than two(2) unlicensed or inoperable vehicles shall be stored on any lot less than one-half acre unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Unified Development Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage) yard and allowed as a Permitted Use in Table 3-1 of the UDC, and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area (ESA). 6.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 7.) The building height is not to exceed 35 feet. 8.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 9.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 10.) Setback from Douglas Way right-of-way is no less than 20 ft., setback from Green Way side right-of-way is no less than 20 ft. and rear setbacks are no less than 5 ft. If an environmentally sensitive area (ESA) is present, then the more restrictive setback shall apply. 11.) A minimum of two (2) on-site parking spaces is required for the single-family residence. 12.) A stormwater site plan dated July 25, 1995 has been prepared for the site by a registered professional engineer, licensed by the state of Washington, and filed for record with the Jefferson County Auditor under Auditor's file number 396611. Runoff from roof drains, from residences, and appurtenant structures on this lot shall be routed to infiltration trenches sized and constructed as per the requirements of appendices XIV and XV of the stormwater site plan. Prior to the commencement of any land disturbing activities and prior to issuance of a building permit, a Small Parcel Erosion and Sediment Control Plan shall be developed to the standards of the Washington State Department of Ecology Stormwater Management Manual (Current Edition) and be submitted to the department of Public Works for approval. Temporary erosion and sedimentation control measures shall be employed during construction. I:\F_BLD_Permit_Buildng.rpt 10/29/1999 •-• ,:. • _.4.1 aikerrf.ecw,..A.., \_,44).' 4,_, ...4 cri .Y ,Yttl - 1 f<Pte-T Lf. r-f)e v t --ci. ,r--- ...--------1 ' ,-..:.,.....-..„,.. • *004°OW''0**WU Ns ....... ...... ••• •416. %Or ' : ) • 1U • ItZ. 44.4% —,„„...... 2 18 8 '-',<-1.':";? JAi ) 1 2 2006 1 • -.... _ r4 ir lir,N. etik /72.777,fee 1 rn u'v t.... r'••••... ,t ..-------- / . 1 4 , .• \I i q \ l k ...:1- A • 4 ' --fr ,,,,....•\ -.i..;.• / "444.6# >4i, (eq' si.,. -•-- ' ei ./e= ti of. 1 4 "I•4:s t 1.•• ' , /C • ' ,,,, 42'5.'(''P1)4 9,4f 15. OA •. 1'3 W ft'( .:T. &t- I , —1--,A. , a" et•-•%' 1 NA • / \ 1.-1- -. , . ' # I r4:: • 4 .. \ rs, vl-t-k.s 4'..,t ,..' it ..._ I ‘'‘ "*441 , /.. , • • r A , /i imi ..' .-.. , 0 0 *-. k / '17 1 4N. ..... . "zzlet 4 i 11: 4; i ak, ( - . _ Zs. ..... Ilk% . --, _. , e" 1' .1 4-- i I INk, 6* ) / Ce ;.,,, •• 4r .....00 Aor I' 1— •,- -: --- -,•.--- --- = • 4-- .„. k ti 41, 0(4_,AT...r Lou,- - c x l --1 s,t•it 1 ® .s.rut *ftik NOV - 2 2005 I . '! ....... ...... .... • imr•*mob WY*AM* abr. • _.: I f` ...... _ ________ _____.;_,__ . % 9 . wet 1 ......................r 4:zw ......./..1 40.8. ...1........root oft,NI+. ,.,4,,,,..., • /CI I Ott 1 °r. f• ‘.. '-' 4 !!; ..' . 1.... ft),A vr 4- sr 30 ti- - 19137 i tel . . . 4.a*. d'''''' d"'"*."."":........Z.n........,......... ....ftwow 11 it) li. "el .. '4.7—Z*.- ... • '.S. ..-..... 4.•-."._ : . •. ir ..... 7--- PLA ,) Isl ............----)er 1...`,15.. r VIct.?::A,. LAir -7 -.a •-i-..y.•-•,. f? •,4c.,,t, so\...)4,„,,i s,;•••••, ..5t, V,i d = JAN 2 7 2C06 i At 1,,,Ni r MIA) iit t-S: k)t.,Q .41 c• k,. .,c, .-,..' 'TT I,•-, r'i,.176,L.-. i. c, ,f,A•,4...' 1:•4*..),',e.)1‘;p ....', tr.,) tiV% P A f--.4< t '..`-) JEFFEk lo.., stINTY 'r'e.)74 -T-c,‘-..-:, - .. 54 LAJ.',.1,Nre‘4:1±:r ri:\-e. r,A $',,',, , DEPT.OF CO 17.#(7t1Ntt ...,, SIGNATURE: / 7... . ,,�30N 0O JEFFERSON COUNTY ', DEPARTMENT OF COMMUNITY DEVELOPMENT' Nov _ 20C 4 621 Sheridan Street• Port Townsend • Washington 98368 cto 360/379-4450 • 360/379-4451 Fax http://www.co.jefferson.waus/commdevelopmentl STORMWATER SITE PLAN SUBMITTAL TEMPLATE I MLA# PROJECT/APPLICANT NAME: —Tim itt t ,� b�C rat. pet�'U��'�.. Please answer all of the following questions to the best of your ability. Where the question calls for depiction on a site map, the applicant may choose to either incorporate the elements into the general plot plan for the Master Land Use Application or to submit a separate stormwater site plan map. Project Overview 1. Describe the proposed developed conditions of the site. Indicate position and relative size of proposed improvements on the site map. Existing Conditions Summary 2. Describe the existing topography. Indicate contours on the site map. CA, aryILA,NA VV.... }rstalitkn,lt:1-Y4 St t E + rep 3. Describe the existing vegetation. Indicate native vegetation areas on the site map. 4. Describe the existing soils. Indicate sod type on the site map. 5. Describe the existing site hydrology(i.e.,drainage;behavior of water on the site above, below, and on the ground). Indicate existing stormwater drainage to and from the site on the site map. Depict separate drainage basins on the site map, if applicable,and indicate acreage of each. ' ,. i.d tsa^ `,r rim 6. Describe any excess levels of noise generated by the propos use N ems) STORMWATER PLAAj JAN 2 7 2006 stormwater site plan te:plate-rev.la1/2003 J FFERS TY ter PT.car c v !4t: T SIGNATURE. 1+ __ 7. Describe significant geographic features and critical areas (i.e., environmentally sensitive areas such as wetlands, streams, steep slopes,etc.)on the site. Indicate location on the site map. f .t...9 8. Describe the general vicinity of the site,including adjacent land uses and structures, utilities,roads, and sensitive/critical areas (streams,wetlands,lakes,steep slopes,etc.). ' t t"Jsx/. t _ piO4,, $, 4, iw } L Lrr" �f Tom$"'} ,° > 1,E, 4 e eta 64 �' t 'Y_ ,r` $§ '- ..^ A pt et y Z3 Permanent Stormwater Control Plan This portion of the Stormwater Site Plan consists of the selection and installation of the appropriate stormwater control BMPs and facilities to remain in place after construction of the project is completed. "Medium" size projects are required to have the totals calculated of all impervious surfaces, pollution-generating impervious surfaces, and pollution-generating pervious surfaces to verify that the thresholds for treatment facilities and flow control facilities are not exceeded. g, Describe the developed site hydrology, as proposed. Indicate whether stormwater will be fully dispersed (i.e., per BMP T5.30 in the Manual)or,if not,what types of stormwater flow control will be utilized for the site or specific threshold discharge areas within the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. 10. If the project requires the use of stormwater treatment facilities,describe the types of stormwater treatment facilities proposed for use on the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. [This is normally for large"projects or projects that involve the potential for dispersion of contaminants] 11. Describe the performance goals and standards applicable to the project. ek) Pt 12. Describe the flow control system. t stormwater site plan template—rev 1411/2003 6 13. Describe the water quality system. NOV - 14. Describe the conveyance system analysis and design. 15. Describe the source of fill material,physical characteristics of fill material,and deposition of excess material. 16. Proposed methods of placement and compaction consistent with the applicable standards on Appendix Chapter 33 of the Uniform Building Code. p 17. Describe the proposed surfacing material. 18. Describe methods for restoration of the site. 19. An Operation and Maintenance Manual is required for each flow control and treatment facility. [This is normally required for large"projects only and only those for which facilities are required to control flow or treat runoff.] If included,list the Manuals here. 20. List here and include any special reports or studies conducted to prepare the Stormwater Site Plan. 21. List other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals include conditions that affect the drainage plan or contain more restrictive drainage-related requirements,describe those conditions or restrictions here. 1,1`j storrwater site plan template—rey.16'1/2003 CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN(SWPPP) The Construction SWPPP addresses sediment and erosion control during construction. The BMPs indicated by the applicant in the template that follows must be installed on the ground during all construction phases of the project. The proponent is responsible for preventing sediment and erosion impacts to environmentally sensitive areas and off-site areas. Consult the Construction Stormwater Pollution Prevention (SWPP) Best Management Practices (BMPs) Packet for guidance, particularly with rural residential development. SECTION I—CONSTRUCTION SWPPP NARRATIVE 1. Construction Stormwater Pollution Plan Elements. Describe how each of the Construction SWPPP elements has been or will be addressed. Identify the type and location of BMPs used to satisfy the required element. If an element is not applicable to the proposal,justify in writing. Descriptions of the 12 Elements are found at section 2.5.2 of the Manual(beginning on page 2-15). 12 Required Elements—Construction SWPPP 1. Mark Clearing Limits. ,-- 2. Establish Construction Access. 3. Control Flow Rates. S .1 0 ,A ,I, 4. , . 0 < - . i 1 4. Install Sediment Controls. r 5. Stabilize Soils. , CI •,'' ,' .c -e i,4 ,,-- Al - ,' r A %, ' A t t l'•--- 4'''' 6. Protect Slopes. t'l 14:i ... , 7. Protect Drain Inlets. i N i b.... NOV - 2 2005 stpnrwaier site plan template—rev.10/1/2003 8 12 Required Elements—Construction SWPPP(continued) 8. Stabilize Channels and Outlets. -NOV - 2 1005 9. Control Pollutants. • 10. Control De-Watering(the act of pumping groundwater or stonnwater away from an active construction site). 11. Maintain Best Management Practices(BMPs). 12. Manage the Project. LA.it L 2. Adjacent Areas. a. Description of the adjacent areas that may be affected by site disturbance (e.g., streams, lakes, wetlands, residential areas, roads). C 1 A b. Description of the downstream drainage path leading from the site to the receiving body of water(minimum distance of 400 yards). t1/441/4 3. Environmentally Sensitive Areas. a. Description of environmentally sensitive areas that are on or adjacent to the site. /A stommatee srte plan template—rev 10/1/2003 9 M1 1 . - b. Description of special requirements for working in or near environmentally sensitive areas. : t1: 4. Erosion Problem Areas. Description of potential erosion problems on site in the context of the characteristics of the on-site soils(e.g.,erodibility,settleability,permeability,depth,texture,soil structure). t P, 5. Construction Phasing. a. Construction sequence t ;1 C" 4,..,'.. f'E r 4...);:ii.,., A. sA it, I , :r4#j i A* , b. Construction phasing(if proposed) 6. Construction Schedule. Wet season is October 1 through April 30(page 2-21 of the Manual). I. Provide a proposed construction schedule. y .t . c)r ,c , . t., 't.4. .; )'-`�- f t s .!e;4, s"a; Ys a IL Wet Season Construction Activities. a. Proposed wet season construction activities. b. Proposed wet season construction activities for environmentally sensitive areas. f l - 7. Financial/Ownership Responsibilities. a. identify the property owner responsible for the initiation of bonds and/or other financial securities. e1 +-- b. Describe bonds and/or other evidence of financial responsibility for liability associated with erosion and sedimentation impacts. Al 8. Engineering Calculations. Provide Design Calculations on a separate sheet for the following,if applicable. , :,, a. Sediment Ponds/Traps. Alsi/1 _ .._... b. Diversions. Al/A c. Waterways. IV/ _ _ :.... 9 L . , d. Runoff/Stormwater Detention Calculations NOV * � ' ' ' stamnvater sae plan template—rev.10/1/2009 _ 0 Stormwater Site Plan Changes If the designer wishes to make changes or revisions to the originally approved Stormwater Site Plan,the proposed revisions shall be submitted to DCD prior to construction. The submittal shall include substitute pages that include ail proposed changes, revised drawings showing any structural changes,and any other supporting information that explains and supports the reason for the change. Final Corrected Plan Submittal If the project included construction of conveyance systems,treatment facilities,flow control facilities, or structural source control BMPs (not standard on-site stormwater management BMPs),the applicant shall submit a final corrected plan("as-builts")when the project is completed. These should be engineering drawings (stamped by a licensed civil engineer) that accurately represent the project as constructed. APPLICANT SIGNATURE By signing the Construction SWPPP worksheet, I as the applicant/owner attest that the information provided herein is true and correct to the st of my knowledge I also certify that this application is being made with the full knowledge and consent of all owners of th ected property. 16 / 1 ( NER OR AUTHORIZED ATIVE SIGNATURE) (DATE) THIS SPACE MAY BE USED FOR ADDITIONAL NOTES,IF NEEDED: NOV - 2 208 stomtwater site piers template—rev.10/1/2003 12