Loading...
HomeMy WebLinkAboutBLD2005-00690V OUILDING PERMIT APPLICION MRLA05 00647 eview ype: I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD05-00690 Received Date: 11/2/2005 SITE ADDRESS: FIR CIR PORT HADLOCK, 98339 OWNER: BISHOP LOGGING COMPANY PHONE: 360-301-1979 371 BISHOP HILL RD CHIMACUM WA 983259709 BISHOP ACRES SUBDIVISION: Block: Lot: 36 PARCEL NUMBER: 932300036 Section: 2 Township: 29 N Range: 01 W CONTRACTOR: BISHOP BROTHERS CONSTRUCTION PHONE: (360)301-1979 371 BISHOP HILL RD CHIMACUM WA 98325 Contractor's License BISHOBC093D6 Expires 1/11/2007 REPRESENTATIVE: PHONE: PROJECT DESCRIPTIOr NSFR W/ATT GARAGE TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 1,254 VALUATION 135,000.00 ADD'L: HEAT TYPE: EEE CODE EDITION: 2003 HEAT BASE: HEAT TYPE: OCCUPANCY: R-3 UNHEATED: # OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N SHORELINE: CONST TYPE: GARAGE: 493 SETBACK: DECK: BANK HEIGHT: SEWAGE DISPOSAL: CON WATER SYSTEM: PUD BEDROOMS: BATHROOMS: Exist: 0 Exist: 0 Prop: 3 Prop: 2 Total: 3 Total: 2 Routing Date: t ( 3 0� L We) Type Amount Paid By: Date: Receipt: /��:�,pa3 Permit $773.34 SLE 11/02/05 77192 lr�E� Plan Check $1,189.75 SLE 11/02/05 77192 State Building Code $4.50 SLE 11/02/05 77192 DEC g 2005 Potable Water Application $53.00 SLE 11/02/05 77192 Jefferson County Planning Total: $2,020.59 & Building Department /4/1 t) 6116/ • BUILDING PERMIT S Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD05-00690 Received Date 11/2/2005 SITE ADDRESS: 83 FIR CIRCLE Issue Date 12/8/2005 PORT HADLOCK, 98339 APPLICANT: BISHOP LOGGING COMPANY PHONE: 360-301-1979 371 BISHOP HILL RD CHIMACUM WA 983259709 SUBDIVISION: BISHOP ACRES Block: Lot: 36 PARCEL NUMBER: 932300036 Section: 2 Township: 29 N Range: 01 W CONTRACTOR: BISHOP BROTHERS CONSTRUCTION PHONE: (360)301-1979 371 BISHOP HILL RD CHIMACUM WA 98325 Contractor's License: BISHOBC093D6 Expires: 1/11/2007 PROJECT DESCRIPTION: NSFR W/ATT GARAGE CALL IN FOR THE REQUIRED INSPECTIONS THAT APPLY TO YOUR PROJECT. SETBACKS: p9(L_t-(a--o 6 ` UFFER: dtG- 4-4.,-OG v Footing: 0/6_t-67-06 3 Foundation: Stormwater FINAL Approval: / -17-'m 6 Underground Plumbing: Undergroun Insulation:. Shear Wall : A/4/16),,, Sheathing:Framing: i c4.. /-iq 06,�22/6/D6 Plumbing• - 0G (I Propane T k/ Ines /O�/T 3�J6� Insulation: p/ Sheetrock: Septic Sytem Final Approval (If not on sewer): Road Approach Final Approval: Zoning Final Approval: Final/Occupancy Approval. --S 12 C(7 HEALTH DEPARTMENT AND UB IC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY-SEE REVERSE SPECIAL CONDITIONS FOR 411 E BLD05-00690 • 1.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 2.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 3.) A Stormwater Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 4.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 5.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less than one-half acre unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Unified Development Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage) yard and allowed as a Permitted Use in Table 3-1 of the UDC, and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area (ESA). 6.) Pre-existing legal lots of record less than one acre in size in Rural Residential districts are subject to the stormwater requirements in UDC Section 6.7 and must meet the "Area of Impervious Surface Coverage"to the maximum extent practicable as determined by the Administrator." Lot coverage is defined as amount of impervious surface, which includes rooftops, driveways, concrete, etc. 7.) Stormwater shall be retained and infiltrated on site. The owner shall control all sedimentation and erosion on the property. 8.) The building height is not to exceed 35 feet. 9.) Exterior lighting for residential uses shall not exceed twenty feet (20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 10.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 11.) Setback from Fir Circle right-of-way is no less than 20 ft., side and rear setbacks are no less than 5 ft. If an environmentally sensitive area (ESA) is present, then the more restrictive setback shall apply. 12.) A minimum of two (2) on-site parking spaces is required for the single-family residence. I:\F_BLD_Permit_Buildng.rpt 10/29/19 �w4`SoN cod JEFFERSOOUNTY l� C �` j DEPARTMENT OF COMMUNITY DEVELOPMENT 111! f'L III621 idan Street• Port Townsend •Washington 98368 I360/379-4450 • 360/379-4451 Fax ' troy .. 2005 L::,.) ��y p3 www.co.jefferson.wa.us/commdeveloprnent S` NG �ErFER.SON COUNTY Master Permit Application c, `' .,-.- ProjectvEif' `'a 'ELOPMENT PP MLA: � Description(include separate sheets as necessary): ) Tax Parcel ., Property ^ Number: -3 0 0 -p 3 6 Size: 7 4-- -10 (acres/square feet) Site Address and/or Directions to Property: F, Ci'"c /e- / -f 1101o4 Property Owner(s)of Record: 8'54, ,8,-o 14-.-s fo.,sr`- _ Telephone: 360 -3d/-/9 7 9 Fax: 3 6U -73-1- "/` 'J email: Mailing Address: 32/ /3.,sgp/6, ,'-/, // / ..to C/,.,,a c k e^ / 8%,-'.4 - cre3,25 Applicant/Agent(if different from owner): Telephone: Fax: email: Mailing Address: What kind of Permit?(Check each box that applies) Building ❑Variance(Minor,Major or Reasonable Economic Use) ❑ Demolition Permit ❑Conditional Use[C(a),C(d),or C]** ❑ Single Famil ❑ Discretionary"D"or Unnamed Use Classification 'Garage Attached Detached ❑Special Use(Essential Public Facilities)** ❑ Manufactured Home ❑ Boundary Line Adjustment Ll Modular 0 Short Plat** ❑ Commercial* 0 Binding Site Plan** ❑ Change of Use ❑ Long Plat** ❑Address Li Road Approach ❑Planned Rural Residential Development(PRRD)/Amendments-- ,'X Propane 0 Plat Vacation/Alteration** ❑Allowed"Yes"Use Consistency Analysis ❑Shoreline Master Program Exemption/Permit Revisions** ❑ Stormwater Management ❑Shoreline Management Substantial Development** 0 Site Plan Approval Advance Determination(SPAAD)* ❑Shoreline Management Variance 0 Temporary Use ❑Comprehensive Plan/UDC/Land Use District Map Amendment ❑Wireless Telecommunication* 0 Jefferson County Shoreline Master Program Amendment 0 Forest Practices Act/Release of Six-Year Moratorium *May require a Pre—Application Conference **Requires a Pre-Application Conference Please identify any other local,state or federal permits required for this proposal, if known: DESIGNATION OF AGENT I hereby designate . m , to act as my agent in matters relating to this application for permit(s). OWNER SIGNATURE c:% i �k.- 7�-- Date: //-/ -O i By signing this application torm,,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of his,her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attomey's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application review and any required later inspections.Access and rightof entry to,this property shall be requested and shall occur only during regular business hours. / Signature: -! /�j )....-- •. . Date: // / —O The action or actions Applicant will undertake as a result of the issuance of thig•permit may negatively impact upon one or more threatened or endangered species and could lead.to a potential"take"of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)even if you are in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual and non-transferable responsibility for adhering to and complying with the ESA. The Applicant has read this disclaimer and signs and dates it below. Signature: .ie1L -J Date: / l— / —O S G:\PermitCenter\FORMS\DRD FORMS\Master Permit Application 7-8-04.doc • OWNER BUILDER STATEMENT Li • ,. L' `, I The signer of this statement does hereby certify that they are the Owners of the parcel referenced tFe iI,tha the are not licensed and that they wilt)e assuming csponsibiity of the General Contractor for the proposed project. ;j I,1 — 2 2005 ; ".) Signature: Date: —j y� Q 4E�7' ��[Ciii:KLh Cr�, �Jl ITTI GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE:• 8„54,4 .3.-01/e•s Co., s7 (36 ) )30/ -/y2 (360) 73,z y9j5 MAILING ADDRESS: 3 7/ ig e_ (2/e::f //, /r le 6 EMAIL: CONTRACTOR'S LICENSE C At• •►-, C -•-e , 61....-04 WAINS NUMBER: ,a-75yU.48C D93 D 4 NUMBER ARCHITECT/ENGINEER: PHONE ( ) FAX:( ) MAILING ADDRESS: EMAIL Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal: X New )4 Wood Existing: D 0 Sewer O Addition 0 Steel Proposed: �2 Bank ❑ Community System O Alteration/Remodel 0 Concrete Total: „-. Height: ❑ Individual System O Repair 0 Masonry SEP Permit# SC/-9`7'`o '67 O Demolition 0 Other: Bedrooms: Water Supply: Existing: 0 Setback: ❑ Private well ❑ Two Party Type of Heat: Proposed: .3 X Public k/ -c �, c Total: 3 Name of System: P 0 0 If this is a Commercial Project you must answer the following: Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply: ❑ Underground Tank k Above ground Tank Size of Propane Tank: 57 C u O Heat Stove X Cook Stove ❑ Woodstove ❑ Fireplace Insert KHot War Tank ❑ Pelle11Stove ❑ Other Is this appliance being installed in a Manufactured I Mobile Home? Yes / oV1� When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines,tank location and size,distances from the propane tank to all property lines,buildings and septic system components, including the reserve area. Square Footage For Office Use Only Current Proposed Amount Main Floor Consistency Review: � � 2F1D Floor Base fee: it �q.I S ,,((gg ' yyy1, K i '.t'.I'l ¢ t V gy ley t 0 3`0 Floor Additional Section: Mezzanine: Plan Check fee: 113. 34 Heated Basement State Surcharge fee: /L Unheated Basement 'PotWater Review fee: C S g CO Other Unheated 911/Rd Approach fee: .� APPUOP K'Q Garage/Carport 4/93 LI 620.0( TOTAL $ '1 p3 . • Decks eceipt Number: --t 1 (. q2• Other Cash/Check Number: z104Q ESTIMATED . : '`: c Date:.Fair ma, - v. • all labor and materials • ndation to finish 41 (2- (OS- /3C 0°0 Initials: _Pi2.13. ' :\PemutCenter\FORMS\DRD FORMS\Master Permit Application 7-8-04.doc • 4( I r-------2-.. I--H..._,,_.....!. :,..,_, lc It ' 1 ce # n � JEFFERSON COUNTY ) , It .,4 DEPARTMENT OF COMMUNITY DEVELOPMENT ,r' `, NOV - i ,� 621 Sheridan Street • Port Townsend • Washington 98368 1 L.. _ 1 360/379-4450 • 360/379-4451 Fax # r € �` NO http://www.co.Jefferson.wa.us/commdevelopment/ a Cr,"' r,r:y r., :r.. ;- :zj.,,,_ Nr STORMWATER SITE PLAN SUBMITTAL TEMPLATE Pe NAMt: 044'7/! 75 1 i11?, j I Please answer all of the following questions to the best of your ability. Where the question calls for depiction on a site map, the applicant may choose to either incorporate the elements into the general plot plan for the Master Land Use Application or to submit a separate stormwater site plan map. Project Overview 1. Describe the proposed developed conditions of the site. Indicate position and relative size of proposed improvements on the site map. , Existing Conditions Summary ; ,;.:_4... r ;p .. ; ' t c0 i v 2. Describe the existing topography. Indicate contours on the site map ... 3. Describe the existing vegetation. Indicate native vegetation areas on the site map.p 4. Describe the existing soils. Indicate soil type on the site map. ` 5. Describe the existing site hydrology(i.e.,drainage;behavior of water on the site above,below, and on the ground). Indicate existing stormwater drainage to and from the site on the site map. Depict separate drainage basins on the site map, if applicable,and indicate acreage of each. J g� 1 /} 6. Describe any excess levels of noise generated by the proposed us 3 or activii y PPRO\E9 STORMWATER PLAN €C - 6 4--- mil JEFFERSON CO N Y s:on..aSer site plan ter-plate-rev,7CY712003 t)t'PT.OF{7I Y ;t,(?PiKis 5 �� 7. Describe significant geographic features and critical areas (i.e., environmentally sensitive areas such as wetlands, streams, steep slopes, etc.)on the site. Indicate location on the site map. 8. Describe the general vicinity of the site, including adjacent land uses and structures, utilities, roads, and sensitive/critical areas (streams,wetlands,lakes,steep slopes,etc.). Permanent Stormwater Control Plan This portion of the Stormwater Site Plan consists of the selection and installation.of.the appropriate stormwater control BMPs and facilities to remain in place after construction of the project is completed. "Medium" size projects are required to have the totals calculated of all impervious surfaces, pollution-generating impervious surfaces, and pollution-generating pervious surfaces to verify that the thresholds for treatment facilities and flow control facilities are not exceeded. 9. Describe the developed site hydrology, as proposed. Indicate whether stormwater will be fully dispersed(i.e., per BMP T5.30 In the Manual)or,if not,what types of stormwater flow control will be utilized for the site or specific threshold discharge areas within the site. Locate these facilities on the silo plan and differentiate proposed facilities from existing facilities. 4.) 4 3 sf 4,-r1 S D v' 10. If the project requires the use of sto t facilities,describe the types of stormwater treatment facilities proposed for use on the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. [This is normally for large'projects or projects that involve the potential for dispersion of contaminants.) I /f 11. Describe the performance goals and standards applicable to the project. NOV�} ## 12. Describe the flow control system. _ I. 44�t -11 i r stormwater site plan template-ore IYYSP1fAe Y t !,!:'• 1;:`. 1. r • - 13 De c:ribe the water quality stun sy It 1 ;t S."" -.. C. :,�..,:i` per:i 14. Describe the conveyance system analysis and design. c,rtr' ,tyi �;Z ?�; �Y -i4 4< fi 15. Describe the source of fill material,physical characteristics of fill material,and deposition of excess material. t0, 1 _). r .1 16. Proposed methods of placement and compaction consistent with the applicable standards on Appendix Chapter 33 of the Uniform Building Code. 17. Describe the proposed surfacing material. 18. Describe methods for restoration of the site. 19. An Operation and Maintenance Manual is required for each flow control and treatment facility. [This is normally required for "large"projects only and only those for which facilities are required to control flow or treat runoff.] If indudedJist the Manuals here. �.., - fr 20. List here and include any special reports or studies conducted to prepare the Stormwater Site Plan. 21. List other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals include conditions that affect the drainage plan or contain more restrictive drainage-related requirements,describe those conditions or restrictions here. e stommwater site plan template—rev_15/12003 7 CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN(SWPPP) The Construction SWPPP addresses sediment and erosion control during construction. The BMPs indicated by the applicant in the template that follows must be installed on the ground during all construction phases of the project. The proponent is responsible for preventing sediment and erosion impacts to environmentally sensitive areas and off-site areas. Consult the Construction Stormwater Pollution Prevention (SWPP) Best Management Practices (BMPs) Packet for guidance, particularly with rural residential development. SECTION I—CONSTRUCTION SWPPP NARRATIVE 1. Construction Stormwater Pollution Plan Elements. Describe how each of the Construction SWPPP elements has been or will be addressed. identify the type and location of BMPs used to satisfy the required element. If an element is not applicable to the proposal,justify in writing. Descriptions of the 12 Elements are found at section 2.5.2 of the Manual(beginning on page 2-15). 12 Required Elements—Construction SWPPP 1. Mark Clearing Limits. 2. Establish Construction Access. r • 3. Control Flow ties. ,/ 4. Install Sediment Controls. f J. 0)ofi f"" f S' vt' •71'a „'. 4: 4 •? t„' ' •"*.,e- of ..r ",a 1*'"* 40 Z v5 ,: 4":0 ;s Ci Wt 4 ;j 11-j✓ en, s t- �.4�a� d t "C�� �r`i` Z'6.�. r' 5a .. 5. Stabilze Soils. f tr(1.— ¢ e o,04 / :° ii G► 7:1:F 1 / 6. Protect Slopes. 'CI V _ 2 200 7. Protect Drain Inlets. stem-water silo plan termlate-rev.10,1/2003 8 1^ Q'Yiufm`i r-P,,"r.ntS r(---,-uvtton SWPPP(contin,.-4) 8. Stabilize Channels and Outlets. .')t 9. Control Pollutants. • 6 I, J s (- , c 10. Control De-Watering(the act of pumping groundwater or stormwater away from an active construction site). ,00 11 set' -..e* 40 st),-,„1 6 $ 4 rae '1 /a 11. Maintain Best Management Practices(BMPs). et 6-a c do. 7 )4 to.e „ 12. Manage the Project. 774 p • DP, L/1 9:nhti e A •"; SP 114 7' e /7, /e r1. 2. Adjacent Areas. a. Description of the adjacent areas that may be affected by site disturbance (e.g., streams, lakes, wetlands, residential areas,roads). b. Description of the downstream drainage path leading from the site to the receiving body of water(minimum distance of 400 yards). e r NOV 2005 3. Environmentally Sensitive Areas. a. Description of environmentally sensitive areas that are on or adjacent to the site. • - C, wormwater sue plan ten:Rate-rev.10/1,2003 9 b. Description of special requirements for working in or near environmentally sensitive areas. _ - 4. Erosion Problem Areas. Description of potential erosion problems on site in the context of the characteristics of the on-site soils(e.g.,erodibility,settleability,permeability,depth,texture,soil structure). 5. Construction Phasing. a. Construction sequence 4, / n 17) CrT b. Construction phasing(if proposed) 8. Construction Schedule. Wet season is October 1 through April 30(page 2-21 of the Manual). . r, Provide a proposed construction schedule. , E - 2 2005 II. Wet Season Construction Activities. a. Proposed wet season construction activities. 01 Mita ' • b. Proposed wet season construction activities for environmentally sensitive areas. 7. FinanciallOwnership Responsibilities. a. Identify the property owner responsible for the initiation of bonds and/or other financial securities. b. Describe bonds and/or other evidence of financial responsibility for liability associated with erosion and sedimentation impacts. 4/4 8. Engineering Calculations. Provide Design Calculations on a separate sheet for the following,if applicable. a. Sediment Ponds/Traps. b. Diversions. / c. Waterways. d. Runoff/Stormwater Detention Calculations s'orrnwator site plan template—rev 10/112003 10 Stormwater Site Plan Changes If the designer wishes to make changes or revisions to the originally approved Stormwater Site Plan, the proposed revisions shall be submitted to DCD prior to construction. The submittal shall include substitute pages that include all proposed changes, revised drawings showing any structural changes,and any other supporting information that explains and supports the reason for the change. Final Corrected Plan Submittal If the project included construction of conveyance systems,treatment facilities, flow control facilities,or structural source control BMPs (not standard on-site stormwater management BMPs),the applicant shall submit a final corrected plan ("as-builts")when the project is completed. These should be engineering drawings (stamped by a licensed civil engineer) that accurately represent the project as constructed. APPLICANT SIGNATURE By signing the Construction SWPPP worksheet, I as the applicant/owner attest that the information provided herein is true and correct to the best of my knowledge. I also certify that this application is being made with the full knowledge and consent of all owners of the affected property. (LANDOWNER OR AUTHORIZED RET ENTATIVE SIGNATURE) (DATE) THIS SPACE MAY BE USED FOR ADDITIONAL NOTES, IF NEEDED: NOV - 2 2005 I wr r ,UN COUNTY ..'v,11IV.'i 1 UEVELOP: ENT (i' stemmata(site plan template—rev.101'112003 12 9' , • 0 I- -- 1'Y ....1 IND J •j , 17 > ,,-,'"'"/ 01 :--- ITIcil 1.14:4,,,,,e"At'O.,05.45, t 7.4 i mod 4 t-.,,1 , • f� f m 12 co i r ! g i c-4-- .... ' \''1' t . 1 . V,%.,14 C) 11 IAA/ 01 z ( ,cat £' tk) CI ''' 9 ? _ C, . z 4,5 0 °-C7 ,,, m A , , li 49 . ,..,1 0 0- g rn .o r _rn Y 77 , 77 m _ . _ I 1'1:4 ,.,.._:-..::....-.7.::...-......: - ,, . 1 ‘",,„),,b/ e i ;',1 ,A ,...# rt,/,,AC tea,;)., ?A.r.41c