HomeMy WebLinkAboutBLD2005-00745 ItUILDING PERMIT APPLICA MLA05-692 N Review Type: I
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD05-00745 Received Date: 11/30/2005
SITE ADDRESS: 32 S STROMBERG AVE
PORT TOWNSEND, 98368
OWNER: DAVID TONKIN PHONE: 360-385-2468
KAREN SAMUELSON
32 S STROMBERG AVE
PORT TOWNSEND WA 983682548 IRON DALE
SUBDIVISION: Block: 145 Lot: 1-4
PARCEL NUMBER: 962114501 Section: 35 Township: 30 N Range: 01 W
CONTRACTOR: BUILDING BROKERS CONST PHONE: (360)683-6216
P 0 BOX 3831
SEQUIM WA 98382-5071
Contractor's License BUILDBCO"'I MG Expires 7/8/2006
REPRESENTATIVE: BUILDING BROKERS INC PHONE: (360) 683-6216
PO BOX 3831
SEQUIM WA 98382
PROJECT DESCRIPTION
TYPE OF WORK GAR SQUARE FOOTAGE:
TYPE OF IMP NEW MAIN:
VALUATION 8,694.00 ADD'L: HEAT TYPE: UH
CODE EDITION: 2003
OCCUPANCY: HEAT BASE: HEAT TYPE:
OCCUPANCY: UNHEATED: # OF STORIES:
CONST TYPE: OTHER: SHORELINE:
CONST TYPE: GARAGE: 540 SETBACK:
DECK: BANK HEIGHT:
SEWAGE DISPOSAL: CON
WATER SYSTEM: PUD
BEDROOMS: BATHROOMS:
Exist: 0 Exist: 0
Prop: 0 Prop: 0
Total: 0 Total: 0
Routing Date: t ty grAl
Type Amount Paid Bv: Date: Receipt: Approved/Date`'
Permit $167.25 SLE 11/30/05 77465 APPRO M
Plan Check $108.72 SLE 11/30/05 77465
State Building Code $4.50 SLE 11/30/05 77465 DECa3 2005
Total: $280.47 Jefferson County Planning
&Building Department
• •
BUILDING PERMIT
Jefferson County Department of Community Development
621 Sheridan Street, Port Townsend, WA 98368
(360)379-4450 FAX (360)379-4451
PERMIT #: BLD05-00745 Received Date 11/30/2005
SITE ADDRESS: 32 S STROMBERG AVE Issue Date 12/23/2005
PORT TOWNSEND, 98368
APPLICANT: DAVID TONKIN PHONE: 360-385-2468
KAREN SAMUELSON
32 S STROMBERG AVE
PORT TOWNSEND WA 983682548
SUBDIVISION: IRONDALE Block: 145 Lot: 1-4+
PARCEL NUMBER: 962114501 Section: 35 Township: 30 N Range: 01 W
CONTRACTOR: BUILDING BROKERS CONST PHONE: (360)683-6216
P 0 BOX 3831
SEQUIM WA 98382-5071
360-683-6001
Contractor's License: BUILDBC011MG Expires: 7/8/2006
PROJECT DESCRIPTION: CARPORT, UNHEATED, NO PLUMBING
CALL IN FOR THEUIRED INSPECTIONS THAT APPLY TO YOUR PROJECT.
SETBACKS:J�J�
UFFER:
Footing: ( j Its . -..1(/,0-h
Foundation:
Stormwater FINAL Approval:
Underground Plumbing:
Underground Insulation:
Shear Wall :
Sheathing:
Framing: eV /27/.L
Plumbing:
Propane Tank/ Lines:
Insulation:
Sheetrock:
Septic Sytem Final Approval (If not on sewer):
Road Approach Final Approval:
Zoning Final Approval:
Final/Occupancy Approval: -Por -Gina J 3/4-744t/
HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
Office Hours 9:00 a.m. -4:30 p.m.
HOT LINE AVAILABLE 24 HOURS A DAY
SPECIAL CONDITIONS APPLY - SEE REVERSE
SPECIAL CONDITIONS FOR CASE A BLD05-00745 •
1.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water
quality degradation. The submitted proposal does not require additional aquifer
protection measures. However, during construction the project shall follow the Best
Management Practices (BMPs) and facility design standards as identified and defined in
the Stormwater Management Manual for the Puget Sound Basin.
2.) To help prevent seawater from intruding landward into underground aquifers, all new
development activity on Marrowstone Island, Indian Island and within 1/4 mile of any
marine shoreline shall be required to infiltrate all stormwater runoff onsite.
3.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIPZ:
Water conservation measures:
1. Roof and other intercepted precipitation shall be routed to on-site detention ponds
and/or other approved means and allowed to be released to the soil slowly.
2. Water collected from Storm water and roof catchments may be used for watering
lawns and gardens. Unless catchment water has been treated to meet drinking water
standards, there shall be no cross connections allowed between the potable supply and
impounded water.
3. Water withdrawn from wells on each property shall not be used for watering of lawns
and/or gardens.
4. Ground water withdrawn from each property shall be restricted to a rate of three (3)
gallons per minute.
5. Installation of water conserving fixtures such as low flow toilets, faucets and shower
restrictors and other water saving plumbing fixtures.
6. Landscaping plan (xeriscaping, native vegetation with minimal amounts of irrigation).
Please NOTE that the above listed measures are not intended to be exhaustive, but rather
is intended to be illustrative of the types of water conservation measures.
4.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIPZ:
1. Installation of a flow meter.
2. On-going well monitoring for chloride concentration.
3. Submittal of monitoring data to County.
5.) MANDATORY MEASURES FOR COASTAL SIPZ:
1. For proof of potable water on a building permit application, applicant must utilize
DOH-approved public water system if available.
2. If public water is unavailable, a qualifying alternative system may be used as proof of
potable water or an individual well may be used as proof of potable water subject to the
following requirement:
a. Chloride concentration of a laboratory-certified well water sample submitted with
building permit application.
3. If public water is unavailable, a qualifying alternative system may be used as proof of
potable water.
6.) The property owner shall comply with Water Conservation Measures (per list maintained
by the UDC Administrator).
7.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater,
erosion and sediment during construction. BMPs shall address permanent measures to
stabilize soil exposed during construction, and in the design and operation of stormwater
and drainage control systems.
8.) Outdoor residential storage shall be maintained in an orderly manner and shall create no
fire, safety, health or sanitary hazard.
�
9.) Not more than two (2) unliceried or inoperable vehicles shall be stored on any lot less
than one-half acre unless totally screened from view of neighboring dwellings and
rights-of-way. Such screening shall meet all applicable performance and development
standards specific to the district in which the storage is kept, and shall be in keeping with
the character of the area. Screening shall meet the requirements of Unified Development
Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable
vehicles is prohibited except in those districts where specified as an automobile wrecking
yard or junk (or salvage) yard and allowed as a Permitted Use in Table 3-1 of the UDC,
and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any
such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area
(ESA).
10.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of
impervious surface which includes roof tops, driveways, concrete, etc.
11.) The building height is not to exceed 35 feet.
12.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the
finished grade, excepting when such lighting is an integral part of a building or structure.
Ground level lighting is encouraged.
13.) Lighting fixtures shall be designed and hooded to prevent the light source from being
directly visible from outside the boundaries of the property. The intensity or brightness of
all lighting, during construction and after project completion shall not adversely affect the
use of surrounding properties or adjoining rights-of-way.
14.) fMinimum setback from East Stromberg Avenue the right-of-way is 20 feet. Minimum
setback from Prospect Avenue right-of-way is 20 feet. Minimum side and rear setbacks
are 5 feet.
I:\F_BLD_Permit_Buildng.rpt 10/29/1999
.I
,i coj4.,, JEFFER•N COUNTY •
/4k ---,
�` DEPARTMENT OF COMMON{ r OP�IIENT tv >-
621 Sheridan Street• Port To Waalfiin' ton198 68
r
4. .'' 360/379-4450. 360/379-4451 Pax-,
fp www.co.jefferson.wa.usicommdev*ornent E
�t7Na'
Master Permit Application MLA: (ram U
Project Description(include separate sheets as necessary): _
,'?0 A .;2 ?- X & C'R 'i i2 /
Tax Parcel /', ` Property- _-- --_
Number. %&2// �:5 O/ Size: ,(7• 5((J( (acre uare feet)
Site Address and/or Directions to Property: 6 l 'GIB .� /"4 . Y* 1 • / �.✓A J
Property Owners)of Record: c0 /Q111<<//U El k-: 6,9/796'CLSC Ai
Telephone: <3(c;O— 305'.`f tii g Fax: email:
Mailing Address: 3. 5. St? OO/) G L ny e: .
Applicant/Agent(if different from owner): ''
(,)LCA 16 O
) o ""
Telephone:g (' "- 5 .7_L�a / ' : Fax: 5 -'D (" -) (c O )/ email:
Mailing Address: 0, x' 7' /j St. /i7J1,, / c/ (f k,5S
Ilhat kind of Permit?(Check each box that applies)
Building 0 Variance(Minor,Major or Reasonable Economic Use)
❑ Demolition Permit 0 Conditional Use[C(a),C(d),or Cj**
O mgle Family ❑ Discretionary"D"or Unnamed Use Classification
a D Atta ted, 'tached• (/ }�)e I—
X 0 Special Use(Essential Public Facilities)**
anufadured Home 0 Boundary Line Adjustment
❑ Modular 0 Short Plat**
❑ Commercial* 0 Binding Site Plan**
CI Change of Use ❑ Long Plat**
O Address +Road Approach 0 Planned Rural Residential Development(PRRD)/Amendments**
0 Propane ❑ Plat Vacation/Alteration**
CI Allowed`Yes"Use Consistency Analysis 0 Shoreline Master Program Exemption/Permit Revisions**
O Stormwater Management ❑ Shoreline Management Substantial Development**
Ci Site Plan Approval Advance Determination(SPAAD)* 0 Shoreline Management Variance
0 Temporary Use 0 Comprehensive PlanlUDC/Land Use District Map Amendment
❑ Wireless Telecommunication* 0 Jefferson County Shoreline Master Program Amendment
O Forest Practices Act/Release of Six-Year Moratorium -
*May require a Pre—Application Conference **Requires a Pre-Application Conference
Please identify any other local,state or federal permits required for this proposal, if known:
T) S. ATION OF AGENT -
I hereby designate '/ ')/L.CJ/A-'C � C o act as my agent in matters relating to this application for permit(s).
OWNER SIGNATURE , i. _ Date: //i��
By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of
his,her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet
may result in this permit being null and void.
1 further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments.court costs,reasonable attorney's fees and
expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit.
I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application
review and any q d later insp 'ons ccess a right of entry to this property shall be requested and shall occur only during regular business
ign
hours.
Signature: /Pk-. Date: p-3 e) �0S
The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or
endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the
"Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this
permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your
action(s)even if you are in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual
and non-tra a responsibilityo ering and complying with the ESA. The Applicant has read this disclaimer and signs and dates it below.
Signature: 0— Date: J/"g O Q S
C:\Documents and Settings\mochil\Desktop\Master Permit Application 7-8-04.doc
* • •
OWNER BUILDER STATEMENT ,
The signer of thi ement does hereby certify that ey are the Owners of the parcel referenced herein,that they are not licensed contractors and that
they will be a ming a resp•Iy bi' e Gen r I Contractor for the proposed project.
Signature: "% � Date: /l 5� Os
GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: FAX:
rJ Li''L,i)) (: :.) 7 "C (.? ,) , _.7- 6,2( LS'Ex)) < ,-ter
MAILING ADDRESS: 77L. :: . sd/,�E a.21/7�11-+-f, `7'''' ?EMAIL:.-20,c.0:i�-Eygi_'L: t"%` ,C'-2:_ -'c=k-, Ccro'7
CONTRACTOR'S LICENSE / WAINS
NUMBER: ' L r// � . - f a ✓)2 ,, NUMBER
ARCHITECT/ENGINEER: c 7�i>/ PHONE (co )j 9s--./. .;0FAX:((,'ci )C/j S7,2r)t)
' MAILING ADDRESS: pc,Q' J?c%f 1�) ,o ri 0 , EMAIL
ject Type: F me Type: Bathrooms: Shoreline: Type of Sewage Disposal:
New Wood Existing: n Sewer
Addition L7 Steel Proposed: Bank U Community System
D Alteration/Remodel 0 Concrete Total: Height: A Individual System
Li Repair 0 Masonry SEP Permit# SE Pt-�-0022
Bedrooms: Water Supply:
'Li Demolition is Other: PP Y:
Existing: Setback: H Private well i Two Party
Type of Proposed: /N Public ,
Name of System:
Total: �I--'-Li
If this is a Commercial Project you must answer the following:
Number of Parking Spaces: Current: Proposed: Number of ADA.Barki ig Spaces:
Number of occupants(includes owne , enants,employees,etc) Current posed
IBC Occupancy: Type of construction: Will yo ave Food Service? Yes / No
If this is a Propane Tank and/or Au• - nce Installation permit,mark all items below that appl�:-
I Underground Tank I Above • •nd Tank Size of Propane Tank: ��
I Heat Stove I Cook Stov- Woodstove I Fireplace Insert I Hot Water Tank ellet Stove I Other
Is this appliance being nstalied in a Manufactured/Mobhe Home? Yes / No
When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property
lines,tank location and size,distances from the propane tank to all property lines,buildings and septic system components,
including the reserve area.
Square Footage For Office Use Only
Current Proposed Amount
Main Floor r Consistency Review: `i qr,
2N'Floor Base few__ . _. r ---i f/ '7 5
r - i r,.,:t,
3'Floor i , Additional Sec ton:4 I 1 r .
Mezzanine: r' Plan Check fee F
;, I 0E5 '1
Heated Basement State Surcharge fee:
Unheated Basement Pot Water Review fee:
_
Other Unheated 911/Rd Approach fee: `klccA
gamoitarport ] /c' i36)(LI-CC TOTAL: $ 3 �•Li7'
Decks • Receipt Number: `7,l L.] (J
Other iCash/Check Number: 11
1 It
ESTIMATED COST(REQUIRED) Date: I eL?0,,,,165
.Fair market value of all labor and materials foundation to finish
- Initials: �.
ji )¢6.
C:\llocumcnts and Settings\mochil\Desktop\Master Permit Application 7-8-O4.doc
•
..... i ,.44 ' -. F.;"-..:::::-::::-1-•-•,M,
(4 W Z "" Imo ;:1 B0:2 9
. rALIIIIIIIIILN !,.--7.-,..,1 c, _. ', 1
ti W . 4. ,,;�, f oLO z (v1
tJ p"4cluir.71 o wr oo� ' s
w< 1 �s Z „n
Q0 rt \
ti vs oc.
Q'I
a
7,<, z
0
0
w
a
a
n
z
w
Z .—
0
I
c\D
)o r g Feioyis
N
w --<
ov
Q �`)
M AI
Q
Z
� u
( ...'-)
Y
03
t.,L\ ( •,-. \
i .., 1, .,�hi
� -�
o 1�N,--1 .
s 1 I- , � ?
F ' '4
_ V M c•ra
w Luu)ctvk
cn
._, kc
,.
, „ a N
a
w
a
J
f - 3O Q