Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD2005-00786
411UILDING PERMIT APPLICAtN MRLA05 00742 eview Type:I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD05-00786 Received Date: 12/23/2005 SITE ADDRESS: 251 VICTORIA LOOP RD PORT TOWNSEND, 98368 OWNER: LEROY E RAMEY PHONE: 360-379-0984 CAROLYN A RAMEY 251 VICTORIA LOOP PORT TOWNSEND WA 98368 CAPE GEORGE COLONY DIV 1 SUBDIVISION: Block: 1 Lot: 16 PARCEL NUMBER: 937800116 Section: 12 Township: 30 N Range: 02 W CONTRACTOR: OWNER/BUILDER PHONE: REPRESENTATIVE: PHONE: PROJECT DESCRIPTIOP NEW 16x20 DECK TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP DEK MAIN: VALUATION 7,542.00 ADD'L: HEAT TYPE: CODE EDITION: 2003 OCCUPANCY: HEAT BASE: HEAT TYPE: OCCUPANCY: UNHEATED: # OF STORIES: OTHER: CONST TYPE: GARAGE: SHORELINE: CONST TYPE: DECK: 320 SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: WATER SYSTEM: BEDROOMS: BATHROOMS: Exist: Exist: Prop: Prop: Total: Total: Routing Date: /a/an/C Type Amount Paid Bv: Date: Receipt: Approved/Date Permit $153.25 LYK 12/23/05 77281 APPROVED Plan Check $99.61 LYK 12/23/05 77281 State Building Code $4.50 LYK 12/23/05 77281 JAN `$ 2006 Total: $257.36 Jefferson County Planning & Building Department BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD05-00786 Received Date 12/23/2005 SITE ADDRESS: 251 VICTORIA LOOP RD Issue Date 01/18/2006 PORT TOWNSEND, 98368 APPLICANT: LEROY E RAMEY PHONE: 360-379-0984 CAROLYN A RAMEY 251 VICTORIA LOOP PORT TOWNSEND WA 98368 SUBDIVISION: CAPE GEORGE COLONY DIV 1 Block: 1 Lot: 16 PARCEL NUMBER: 937800116 Section: 12 Township: 30 N Range: 02 W CONTRACTOR: OWNER/BUILDER PHONE: PROJECT DESCRIPTION: NEW 16x20 DECK CALL IN FOR THE REQUIRED INSPECTIONS THAT APPLY TO YOUR PROJECT. SETBACKS: UFFER: Footing: Foundation: Stormwater FINAL Approval: Underground Plumbing: Underground Insulation: Shear Wall : Sheathing: Framing: Plumbing: Propane Tank/ Lines: Insulation: Sheetrock: Septic Sytem Final Approval (If not on sewer): Road Approach Final Approval: Zoning Final Approval: Final/Occupancy Approval: {. ?,0--O(- HEALTH DEPARTMENT.AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY -SEE REVERSE • • SPECIAL CONDITIONS FOR CAGE t BLD05-00786 1.) A vegetative buffer of 30-feet shall be permanently maintained from the top or edge of the Landslide Hazard Area. All buffers shall be measured perpendicularly from the top of the Landslide Hazard Area. 2.) An Addendum to the Update Geotechnical Report was submitted in conjunction with this application on March 24, 2005. The report addressed the stability of the geologic hazard area. A setback of 73-feet shall be measured perpendicularly from the top or toe of the geologic hazard to the foundation footprint"of the single-family residence. 3.) Landslide Hazard Areas and their associated buffers shall remain naturally vegetated. Should buffer disturbance occur during construction, the Unified Development Code (UDC)Administrator shall require replanting with native vegetation. No alterations shall be made to the Landslide Hazard Area or its associated buffer without prior authorization by the UDC Administrator. 4.) Prior to and during approved construction activities, the perimeter of the landslide hazard area buffer shall be marked with a temporary sign. The sign shall be placed in such a manner that it can be directly observed from the construction area. The sign shall contain the following statement: "Landslide Hazard Area and Buffer- Do not Remove or Alter Existing Vegetation." 5.) All construction activities shall not encroach upon the buffer. This includes the storage or preparation of materials. 6.) The applicant shall permanently separate the boundary of the Landslide Hazard Area Buffer from the remainder of the subject property through installing logs, trees, a hedge row, or any other prominent physical marking approved by the UDC Administrator. 7.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 8.) To help prevent seawater from intruding landward into underground aquifers, all new development activity on Marrowstone Island, Indian Island and within 1/4 mile of any marine shoreline shall be required to infiltrate all stormwate- runoff onsite. 9.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIP? Water conservation measures: 1. Roof and other intercepted precipitation shall be routed to on-site detention ponds and/or other approved means and allowed to be released to the soil slowly. 2. Water collected from Storm water and roof catchments may be used for watering lawns and gardens. Unless catchment water has been treated to meet drinking water standards, there shall be no cross connections allowed between the potable supply and impounded water. 3. Water withdrawn from wells on each property shall not be used for watering of lawns and/or gardens. 4. Ground water withdrawn from each property shall be restricted to a rate of three (3) gallons per minute. 5. Installation of water conserving fixtures such as low flow toilets, faucets and shower restrictors and other water saving plumbing fixtures. 6. Landscaping plan (xeriscaping, native vegetation with minimal amounts of irrigation). Please NOTE that the above listed measures are not intended to be exhaustive, but rather • is intended to be illustrative of the types of water conservation measures. 10.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIPZ: 1. Installation of a flow meter. 2. On-going well monitoring for chloride concentration. 3. Submittal of monitoring data to County. 11.) MANDATORY MEASURES F .1 COASTAL SIPZ: • 1. For proof of potable water on a building permit application, applicant must utilize DOH-approved public water system if available. 2. If public water is unavailable, a qualifying alternative system may be used as proof of potable water or an individual well may be used as proof of potable water subject to the following requirement: a. Chloride concentration of a laboratory-certified well water sample submitted with building permit application. 3. If public water is unavailable, a qualifying alternative system may be used as proof of potable water. 12.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 13.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 14.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less than one-half acre unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Unified Development Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage) yard and allowed as a Permitted Use in Table 3-1 of the UDC, and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area (ESA). 15.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 16.) The building height is not to exceed 35 feet. 17.) Minimum setback from Victoria Loop right-of-way is 20 ft. Minimum side yard setbacks are 5 ft. Minimum setback from the bluff to the proposed deck is 50 ft. Environmentally Sensitive Areas further impact setbacks. 18.) Exterior lighting for commercial and industrial uses shall not exceed thirty feet (30') in height from the finished grade. Exterior lighting for residential uses shall not exceed twenty feet (20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 19.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 20.) A minimum setback of 73 feet from the top of the bluff to the"foundation footprint" shall be required. 21.) Maintaining ground cover will help reduce erosion from surface runoff. Any bare areas that develop should br revegetated. Native vegetation that requires little or no irrigation would be the most beneficial. 22.) Surface water should not be allowed to flow over the face of the bluff and cause erosion of the bluff face. This can be controlled with vegetation and using berms or swales to direct runoff to a drainage system. 23.) Surface runoff from hard surfaces such as roofs, driveways, walkways and patios should be controlled and routed to the beach via tightline. Surface water discharge to adjacent properties should not exceed predevelopment conditions. 24.) Silt fences or other sediment control devices may be needed during construction so that sedimentation onto adjacent properties does not exceed predevelopment conditions. 25.) Heavy irrigation or other activities that would contribute large quantities of water to the soil should be avoided. One cause of landslides is the presence of excessive groundwater in the soil near the bluff. 26.) All drainage control devices should be maintained in good working order and inspected at • 27.) An ENGINEERED DRAINAGCONTROL PLAN should be developed for this property to address items 2, 3, 4 &6 of said Geotechnical Report dated July 15, 2002. A contractor knowledgeable in the construction of these types of features should be retained for this work. 28.) The drainage ditch along Victoria Loop should be improved if necessary in order to prevent roadway runoff from flowing across the property. 29.) Information from other reports indicates that residents have noticed ground cracks along the edge of the bluff prior to slide events It would be prudent to develop a monitoring program in order to be aware of the possible development of such cracks. It would also be helpful to monitor the rate of bluff recession by establishing a benchmark and taking regular measurements. 30.) NO LIMBING, TRIMMING, TOPPING, CUTTING OR REMOVAL OF ANY VEGETATION WITHOUT PRIOR REVIEW AND WRITTEN APPROVAL 13Y JEFFERSON COUNTY. 31.) To mitigate the effects of the construction of this project, it is recommended that all runoff from the site be routed to a conveyance system, constructed per the construction details included at the end of the Drainage, Erosion, and Sediment Control Plan dated April 2005 prepared by Northwestern Territories Inc. 32.) Site Specific Construction Phase BMPs: The following BMPs shall be implemented in addition to and that may later be necessary due to changing or unforeseen site conditions: 1. Silt fencing shall be installed beyond the the limits of construction on the lower side of the project (west and south sides) and maintained in place until the soils disturbed by construction have been successfully revegetated. 2. A stormwater conveyance system shall be constructed per the plans at the back of the Drainage, Erosion, and Sediment Control Plan dated April, 2005 prepared by NTI. 3. Runoff from the site shall be routed to the conveyance system. 4. Other appropriate BMPs such as limitations on access routes, minimization of soil disturbing activties shall be implemented if necessary to accompolish the objectives of the Drainage, Erosion, and Sediment Control Plan dated April, 2005 prepared by NTI. 33.) Applicant shall construct a shallow interception ditch across the southwestern edge of the parcel, beginning 20 feet northwest of the roadside ditch at Victoria Loop and connecting to the interception ditch (described immediately below) across the top of the bluff. The ditch shall be a minimum of 6 inches deep and may be gently sloped and grassed (mowable) or rock lined. 34.) Applicant shall construct a second shallow interception ditch across the northwestern edge of the building site, parallel to and a minimum of 30 ft back from the bluff. This ditch shall also be a minimum of 6 inches deep and gently sloped and grassed (mowable) or rock lined. 35.) Roof drains shall be tightlined to one or both of the interception ditches. Discharge points where roof drains enter the ditches shall be armored with quarry spalls or splash blocks or other suitable devices for protection from erosion. 36.) Great care shall be taken that the collection system (roof drains and interception ditches) cannot allow concentrated discharges to flow over the bluff. 37.) The Detention System Specifications shall be built according to Appendix II of the approved Drainage, Erosion and Sediment Control Plan dated April, 2005 prepared by Northwestern Territories, Inc. 38.) The project shall comply with Construction Stormwater Pollution Prevention (SWPP) Elements #1 through #12 of the Department of Ecology's Stormwater Management Manual for Western Washington to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 73 • • . , / • • . ;• . = g.. i: : s '-.P. • -s: _____ •:,,•4 m • a • C c . • • • • .... ._,\ (----• \,,. A,.... , .0 . vd - • 1-4\ istf.--, ! „,.____( G ram- ___ -g -- -„ .-('" .1. `� r _. • tiff: S 4) 1 ,... .: 7o O L `. __ ► -rJ m — . --.-)•c• _..0;-=.',.,--,,,,,t-i-1— . ..•. z �C. • ,,fly L .. . . g K n v I :. „a ?^ LI- -- . os$ON o°A JEF�SON COUNTY • 6rzi ' 4, DEPARTMENT OF COMMUNITY DEVELOPMENT ` 1.4 621 Sheridan Street• Port Townsend•Washington 98368 360/379-4450 • 360/379-4451 Fax ©� www.co.jefferson.wa.us/commdevelopment ' 4`SB �IN . ' i Master Permit Application 11 Lt► -7 0 5 ! - Proi,,rt rincrrinfinn find'trip ccnaratn shn.Ats as nnra.n.1• Tax perty N Parcelu :J BUJ //� Pro Size: �)' / X /�'S y- (acres/square feet) Site Address and/or Directions to Property: 2 S j f/( -7Tch2i/4 Gck,), Property Owner(s)of Record: -cYw V 4' —(q/--04.-5,A) 72.4 67 Telephone: 3 7i'-0� elf- Fax: ( email: Mailing Address: S'4 1'7 c Applicant/Agent(if different from owner): Telephone: Fax: email: Mailing Address: What kind of Permit?(Check each box that applies) 1 Building ❑Variance(Minor,Major or Reasonable Economic Use) ❑Demolition Permit ❑Conditional Use[C(a),C(d),or C]** ❑Single Family ❑ Discretionary"D"or Unnamed Use Classification ❑Garage Attached/Detached ❑Special Use(Essential Public Facilities)** ❑Manufactured Home ❑Boundary Line Adjustment ❑Modular 7�ZKi ve-, ❑Short Plat** ❑Commercial* ❑Binding Site Plan** ❑Change of Use ❑Long Plat** ❑Address ❑ Road Approach ❑Planned Rural Residential Development(PRRD)/Amendments** ❑ Propane ❑ Plat Vacation/Alteration** ❑Allowed"Yes"Use Consistency Analysis ❑Shoreline Master Program Exemption/Permit Revisions** ❑Stormwater Management ❑Shoreline Management Substantial Development-- ❑Site Plan Approval Advance Determination(SPAAD)* ❑Shoreline Management Variance ❑Temporary Use ❑Comprehensive Plan/UDC/Land Use District Map Amendment ❑Wireless Telecommunication* ❑Jefferson County Shoreline Master Program Amendment a Forest Practices Act/Release of Six-Year Moratorium *M -•uire a Pre . •.lication Conference **Requires a Pre-Application Conference Please identify any other local,state or federal permits required for this proposal, if known: DESIGNATION OF AGENT I hereby designate to act as my agent in matters relating to this application for permit(s). OWNER SIGNATURE CE:-,:... ..._ 4. ,.'t--7-. Date: By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of his,her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application review and any uired later inspection.Access and right of entry to this property shall be requested and shall occur only during regular business hours.Signature: �k'�fr,.,:..--f Date: The action or actions Applicant will undert4 as a result of the issuance of this permit may negatively impact upon one or more threatened or endangered species and could lead to a potential"take of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the' SA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)evpri if you are in compliance - the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual and non-trafera „jbifity for dhering to and complying with the ESA. The Applicant has read this disclaimer and signs and dates it below. Signature: ( —.. ..., *fi-v. _ Date: — i G:\PemmitCenter\FORMS\DR_n FORMS\Mast Pemit Application 7-8-04.dcc • OWNER BUILDER STATEMENT • The signer of this sta ors her y certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that they will be assum responsibii' of the General Contractor for the proposed project. Signature: 4.1 7.,..E Date: GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: FAX: ) ( ) MAILING ADDRESS: EMAIL: CONTRACTOR'S LICENSE WAINS NUMBER: NUMBER ARCHITECT/ENGINEER: PHONE ( ) FAX:( ) MAILING ADDRFSS: EMAIL Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal: 0 New p Wood Existing: ❑ Sewer ❑ Addition ❑ Steel Proposed: Bank ❑ Community System ❑ Alteration/Remodel ❑ Concrete Total: ('i Height: ❑ Individual System ❑ Repair ❑ Masonry SEP Permit# ❑ Demolition ❑ O Bedrooms: Water Supply: Existing: Setback: ❑ Private well ❑ Two Party Type of Heat: Proposed: 0 Pubic Total: e Name of System: if this is a Commercial Project you must answer the following: Number of Parking Spaces: Current Proposed: Number of ADA Parking Spaces: Number of omrpants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply: 0 Underground Tank 0 Above ground Tank Si7e of Propane Tank: ❑ Heat Stove ❑ Cook Stove ❑ Woodstove ❑ Fireplace Insert ❑ 1-lot Water Tank ❑ Pellet Stove ❑ Other Is this appliance being installed in a Manufactured/Mobile Home? Yes / No When applying fora permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines,tank location and size,distances from the propane tank to all property lines,buildings and septic system components, including the reserve area. Square Footage To1r r n1y • '3 ;? :a Current Proposed n . " s= ,, Main Floor tev -� x4 , .. . x 11 i 2rvu Floor :::� i3a t ^l: -.c. ,, •{• �-f 31°Floor - ' teal=Sectiofi '` • ''.' tot \ 1. t'�a Mezzanine: ` '� flan Cheeky Heated Basement ` Mate Surcharge fee ' .n '• t ¢ -. ' - r ::: Unheated Basement ..b 1 • �,-;/ Other Unheated 7 f i-' > i3 , ' _ -`�a y. dy'!. ? �'l- +' '3,{r $7 ';:f...:::',.' Garage/Carport r , .J. *T .Y S r '1� Decks ,� �-, ,., , f/'��11 1� t � db � � Other • .� `r r, y ��.�� NUmb.r' n•e. i . sue[ ESTIMATED COST REQUIRED C, i ' :4s , .`` = �,' `., ) D ui ° .Fair market value of all labor and materials foundation to finish 1 l �^f za;' � .: G:\Perin Center\FORMS\DRD FORMS\Master Permit Application 7-8-04.doc "