HomeMy WebLinkAboutBLD2006-00217 0 0
BUILDING PERMIT
Jefferson County Department of Community Development
621 Sheridan Street, Port Townsend, WA 98368
(360)379-4450 FAX (360)379-4451
PERMIT #: BLD06-00217 Received Date 04/27/2006
SITE ADDRESS: 40 COMBS ST Issue Date 07/5/2006
PORT TOWNSEND, 98368
APPLICANT: LON ZIMMERMAN PHONE: (907) 258-4511
JOAN ZIMMERMAN
1409 G ST
ANCHORAGE AK 99501-5049
SUBDIVISION: OCEAN GROVE ESTATES#2 Block: 4 Lot: 20-21
PARCEL NUMBER: 977100416 Section: 24 Township: 30 N Range: 02 W
CONTRACTOR: OWNER/BUILDER PHONE:
PROJECT DESCRIPTION: NEW SFR W/ATTACHED GARAGE
CALL IN FOR THE QUIRED INSPECTIONS THAT APPLY TO YOUR PROJECT.
SETBACKS: 9'/S'—Oe
UFFER: 4. — l8'Of�
Footing./ .-I g.-196
Foundati n: 'ill( iffx
Stormwater FINAL Approval: fb /6J pot/
Underground Plumbing: , /Q3IL
Underground Insulation:
Shear Wall : 1=frr-124 L5t-t0
Sheathing: ) '-1 ct—o(
Framing: d. • O\ I o-vq--4, b-AiL bnQL t4Z °Icy 1 z-2F1 %. 2/7-3/6-7Plumbing: . .-1.io-t 1000. TUE IX. 16/$P/0
Propane TAnk/ Lines: • l
Insulation:c 2 s— 07 k-iirtif-- 47_3/07 OAu.S �E' Ft zest$ OK /D/ � "fl
Sheetrock:� 2. 3/O✓7
Septic Syt Fin I Ap royal MUST be obtained before final of structure can be attempted.
Road App oach Final Approval:
Zoning Final Approval:
Final/Occupancy Approval:
HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
Office Hours 9:00 a.m. -4:30 p.m.
HOT LINE AVAILABLE 24 HOURS A DAY
SPECIAL CONDITIONS APPLY - SEE REVERSE
•
03
BUILDING PERMIT APPLICATION MRAOWOO Type:
I
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD06-00217 Received Date: 4/27/2006
SITE ADDRESS: 40 COMBS ST
PORT TOWNSEND, 98368
OWNER: LON ZIMMERMAN PHONE: (907)258-4511
JOAN ZIMMERMAN
1409 G ST
ANCHORAGE AK 99501-5049 OCEAN GROVE ESTATES#2
SUBDIVISION: Block: 4 Lot: 20-21
PARCEL NUMBER: 977100416 Section: 24 Township: 30 N Range: 02 W
CONTRACTOR: OWNER/BUILDER PHONE:
REPRESENTATIVE: PHONE:
PROJECT DESCRIPTIOr NEW SFR W/ATTACHED GARAGE
TYPE OF WORK RES SQUARE FOOTAGE:
TYPE OF IMP NEW MAIN: 1,296
VALUATION 257,295.00 ADD'L: HEAT TYPE: RAD
CODE EDITION: 2003 HEAT BASE: 1,288 HEAT TYPE: WOD
OCCUPANCY: R-3 UNHEATED: # OF STORIES:
OCCUPANCY:
CONST TYPE: 5N OTHER: SHORELINE:
CONST TYPE: GARAGE: 392 SETBACK:
DECK: 698 BANK HEIGHT:
SEWAGE DISPOSAL: CON
WATER SYSTEM: PUD
BEDROOMS: BATHROOMS:
Exist: Exist:
Prop: 2 Prop: 3
Total: 2 Total: 3
Routing Date: ' a 7 /06 6)),
Type Amount Paid Bv: Date: Receipt: AP
,1V ‘�u•.j:j t� /EPermit $1,878.55 KAS 04/27/06 80993
Plan Check $1,221.06 KAS 04/27/06 80993 JUL 5 2006
State Building Code $4.50 KAS 04/27/06 80993
Potable Water Application $55.00 KAS 04/27/06 80993 Jefferson County Planning
Total: $3,159.11 &Building Department
•
10.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less
than one-half acre unless totally screened from view of neighboring dwellings and
rights-of-way. Such screening shall meet all applicable performance and development
standards specific to the district in which the storage is kept, and shall be in keeping with
the character of the area. Screening shall meet the requirements of Unified Development
Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable
vehicles is prohibited except in those districts where specified as an automobile wrecking
yard or junk (or salvage) yard and allowed as a Permitted Use in Table 3-1 of the UDC,
and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any
such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area
(ESA).
11.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of
impervious surface which includes roof tops, driveways, concrete, etc.
12.) Minimum setback from Combs Street right-of-way shall be 20 feet. Minimum side
setbacks shall be 5 feet. Minimum setback from steep bank shall be 43 ft as indicated on
the approved site plan. Environmentally Sensitive Areas further impact setbacks.
13.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the
finished grade, excepting when such lighting is an integral part of a building or structure.
Ground level lighting is encouraged.
14.) Lighting fixtures shall be designed and hooded to prevent the light source from being
directly visible from outside the boundaries of the property. The intensity or brightness of
all lighting, during construction and after project completion shall not adversely affect the
use of surrounding properties or adjoining rights-of-way.
15.) The building height is not to exceed 35 feet.
16.) A minimum of two (2) on-site parking spaces shall be provided for the single family
residence.
17.) IF A STRUCTURE IS TO BE BUILT ON THE STEEPER SECTIONS OF THE
PROPERTY ON THE SLOPES OF 30 DEGREES OR STEEPER, A GEOTECHNICAL
ENGINEER SHALL REVIEW AND APPROVE ANY FOUNDATION OR RETAINING
WALL STRUCTURES.
18.) ROOF DRAINAGE AND ANY STORMWATER CATCH BASINS MUST NOT BE
INTRODUCED INTO THE PERIMETER FOOTING DRAIN. ROOF DRAINS AND ANY
OTHER DRAINAGE SHALL BE DISCHARGED TO A WATER INFILTRATION SYSTEM
THAT WILL DISTRIBUTE WATER INTO THE GROUND AT THE SITE.
19.) SITE GRADING SOILS OR DEBRIS, LANDSCAPE DEBRIS, OR ANY OTHER
MATERIAL SHALL NOT BE DISPOSED OF ON THE STEEPER PORTION OF THE
SLOPE. TREES AND BRUSH ON THE GENTLE SLOPING PORTION OF THE
PROPERTY MAY BE REMOVED WITHOUT POSING A RISK OF INCREASING BLUFF
EROSION OR INSTABILITY.
20.) TREES AND BRUSH ON THE STEEPER SLOPE SHOULD BE DISTRUBED AS LITTLE
AS POSSIBLE UNLESS THE DISTURBED ARA WILL BE PART OF AN ENGINEERED
DESIGNED BUILDING AREA. TREES MAY BE THINNED OR LIMBED FOR VIEW
PURPOSES ON THE STEEP SLOPE AS LONG AS AT LEAST ONE MATURE TREE IS
LEFT PER 30-FOOT CENTER.
VEGETATION REMOVAL, TREE LIMBING, TREE TOPPING, TREE THINNING, ETC.
SHALL BE REVIEWED BY JEFFERSON COUNTY DCD ADMNISTRATOR AND
APPROVED PRIOR TO VEGETATION DISTURBANCE.
I:\F_BLD_Permit_Buildng.rpt 10/29/1999
•
SPECIAL CONDITIONS FOR CASE # BLD06-00217
1.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water
quality degradation. The submitted proposal does not require additional aquifer
protection measures. However, during construction the project shall follow the Best
Management Practices (BMPs) and facility design standards as identified and defined in
the Stormwater Management Manual for the Puget Sound Basin.
2.) To help prevent seawater from intruding landward into underground aquifers, all new
development activity on Marrowstone Island, Indian Island and within 1/4 mile of any
marine shoreline shall be required to infiltrate all stormwater runoff onsite.
3.) VOLUNTARY MEASURES OF COASTAL&AT RISK SIPZ:
Water conservation measures:
1. Roof and other intercepted precipitation shall be routed to on-site detention ponds
and/or other approved means and allowed to be released to the soil slowly.
2. Water collected from Storm water and roof catchments may be used for watering
lawns and gardens. Unless catchment water has been treated to meet drinking water
standards, there shall be no cross connections allowed between the potable supply and
impounded water.
3. Water withdrawn from wells on each property shall not be used for watering of lawns
and/or gardens.
4. Ground water withdrawn from each property shall be restricted to a rate of three (3)
gallons per minute.
5. Installation of water conserving fixtures such as low flow toilets, faucets and shower
restrictors and other water saving plumbing fixtures.
6. Landscaping plan (xeriscaping, native vegetation with minimal amounts of irrigation).
Please NOTE that the above listed measures are not intended to be exhaustive, but rather
is intended to be illustrative of the types of water conservation measures.
4.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIPZ:
1. Installation of a flow meter.
2. On-going well monitoring for chloride concentration.
3. Submittal of monitoring data to County.
5.) MANDATORY MEASURES FOR COASTAL SIPZ:
1. For proof of potable water on a building permit application, applicant must utilize
DOH-approved public water system if available.
2. If public water is unavailable, a qualifying alternative system may be used as proof of
potable water or an individual well may be used as proof of potable water subject to the
following requirement:
a. Chloride concentration of a laboratory-certified well water sample submitted with
building permit application.
3. If public water is unavailable, a qualifying alternative system may be used as proof of
potable water.
6.) The property owner shall comply with Water Conservation Measures (per list maintained
by the UDC Administrator).
7.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater,
erosion and sediment during construction. BMPs shall address permanent measures to
stabilize soil exposed during construction, and in the design and operation of stormwater
and drainage control systems.
8.) A Stormwater Site Plan has been submitted and approved by the Department of
Community Development. Once the subject permit has been issued the applicant shall
fully implement the provisions of the submitted plan and contact the Jefferson County
Department of Community Development to arrange a schedule to inspect the property for
plan compliance. A Certificate of Occupancy will not be issued until the Department
verifies plan compliance. No clearing for roadways or utilities shall occur on the project
site until clearing necessary for the installation of temporary sedimentation and erosion
control measures have been completed.
9.) Outdoor residential storage shall be maintained in an orderly manner and shall create no
fire, safety, health or sanitary hazard.
44.4).voN CO O . JEFFERSON COUNTY f v
4' DEPARTMENT OF COMMUNITY DEVELbPMENT
621 Sheridan Street • Port Townsend •Washington,t'fS . 7
_ 360/379-4450 • 360/379-4451 Fax Ht'fi L 2006
138
S N0A O www.co.jefferson.wa.us/commdevelopment
._J
Master Permit Application _ MLA: %_aCZ
Project Description (include separate sheets as necessary):
--. . .-• F e-- to/ 6iA-A__
7 7 7/ a Property S
Tax Parcel Number: 4{ / � Size: CI pok r p$ (acres/square feet)
Site Address and/or Directions to Property: (it, C c, c, S'.*
Property Owner(s)of Record: L. G .i -o��,-. Z.‘ v.".Q,.<-,,-,o,v-,.,,� 2
Telephone: 9 67 ,...�s Li s- t( Fax: Ct O'1 7.S`Sa 4 L r. $nail: L X-',c d e0 c.,,C,.. r _
Mailing Address: i 4 0 9 G S + P.V\Cc, Q.\ C. C A L ASk -'t 9 Sa Z
Applicant/Agent(if different from owner): ei-IVUG l UT .)1 L CT-- F� o ( yv-\
Telephone: -j(�(7 . 543 2. / G 0 u Fax: �J15 I, Q/2-3 email:
Mailing Address: /6 fi/ /-Awt/ /0 f 1,J _ 4'J f t'r j,ir4 g k38 L
What kind of Permit?(Check each box that applies)
,"Building ❑Variance(Minor, Major or Reasonable Economic Use)
❑ Demolition Permit ❑ Conditional Use[C(a), C(d),or C]**
WI Single Famil ❑ Discretionary"D"or Unnamed Use Classification
T Garage (1I Detached ❑ Special Use(Essential Public Facilities)**
❑ Manufact -. *ome ❑ Boundary Line Adjustment
❑ Modular ❑ Short Plat**
❑ Commercial* ❑ Binding Site Plan**
❑ Change of Use ❑ Long Plat**
❑Address ❑ Road Approach ❑ Planned Rural Residential Development(PRRD)/Amendments**
❑ Propane ❑ Plat Vacation/Alteration**
❑Allowed"Yes" Use Consistency Analysis ❑ Shoreline Master Program Exemption/Permit Revisions**
❑ Stormwater Management 0 Shoreline Management Substantial Development**
❑ Site Plan Approval Advance Determination(SPAAD)* ❑ Shoreline Management Variance
❑ Temporary Use ❑ Comprehensive Plan/UDC/Land Use District Map Amendment
❑Wireless Telecommunication* ❑ Jefferson County Shoreline Master Program Amendment
❑ Forest Practices Act/Release of Six-Year Moratorium
*May require a Pre-Application Conference **Requires a Pre-Application Conference
Please identify any other local, state or federal permits required for this proposal, if known:
((Z lS\ DESIGN
OF AGENT
V. 4�
I hereby designate h0 to act as my agent in matters relating to this appli tion for permit(s).
OWNER SIGNATURE (� V/D-0
Date: 2d�
.
By signing this appl c tion form,the ner/agent attests that the information provided herein,and in any attachments, is rue and correct to the best of
his,her or it's kno dge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may
result in this permit being null and void.
I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs, reasonable attorney's fees and
expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit.
I further agree to,'brovide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application
review and any(equired later in�pe'ctions.Access and right of entry to this property shall be requested and shall occur only durng regular business
hours. /j`jy�\ L q ,�,y
Signature:/ � /40/�a/l/NU' t`— iii,41., o v• Date: v
The action-Or actions Applicant wi undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or
endangered species and could Lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the
"Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit
has been issue regarding
not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species re
9 p 9 g your action(s)
even if you are n compliance wi the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual and non-
transferable iponsibility ford er g to and complying with the ESA. The Applicant has read this disclaims d suns andgates it below/
Signature: �..C��n�, 2, V
�`���' Date: / t5 a...tno
GAP nrrnirr,...m-\......c\r.DT vest.rots . .. • . . .___ _
• •
BUILDER STATEMENT
The signer of thi J ateme es hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that
they will be ass ing thg'r ponsibility ofthe_GerIeral Contractor for the proposed roject.
a t.i
Signature: Date: Rd/'-2.e2'3 '14
GENERALONTRACTOR 6 MANUFACTURED HOME INSTALLER: PHONE: FAX:
( ) ( )
MAILING ADDRESS: EMAIL:
CONTRACTOR'S LICENSE WAINS
NUMBER: NUMBER
ARCHITECT/ENGINEER: PHONE ( ) FAX:( )
MAILING ADDRESS: EMAIL
Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal:
t New ftl'.Wood Existing: ❑ Sewer
❑ Addition ❑ Steel Proposed: Bank Height: 1,i'Community System
❑ Alteration/Remodel ❑ Concrete Total: 2, ,Q, ❑ Individual System
❑ Repair ❑ Masonry �'r \." SEP Permit# (a 6,-G f
❑ Demolition ❑ Other: Bedrooms: Water Supply:
Existing: 49_ Setback: ❑ Private well ❑ Two Party
T of at: Proposed: 'Z. ,�;'Public
a„S (� Total: y _ Name of System:L.L( b * 3
N4ST1h‘.S LobP
o 441
If this is a Commercial Project you must answer the following:
Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces:
Number of occupants(includes owners,tenants,employees,etc) Current Proposed
IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No
If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply:
❑ Underground Tank ❑ Above ground Tank Size of Propane Tank:
❑ Heat Stove ❑ Cook Stove X'Woodstove ❑ Fireplace Insert 0 Hot Water Tank ❑ Pellet Stove ❑ Other
Is this appliance being installed in a Manufactured/Mobile Home? Yes / No
When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property
lines, tank location and size, distances from the propane tank to all property lines,buildings and septic system components,
including the reserve area.
r
Square Footage Current Proposed For Office Use Only Amount . evrsabf r
Main Floor Heated .4 EH BId App Review:
t2\1` I4io. . Les
2-Floor Heated Consistency Review: l 5 3
Other Heated Base fee: I V t1?,
Mezzanine Additional Section: .------
Heated Basement a i ryi 4 Plan Check fee: + aa` p f1P_
i30.$B t11"i 1 / L.
Unheated Basement State Surcharge fee:
Other Unheated Pot Water Review fee: --
Garage/Carport -717 r,. 4`� SUBTOTAL
Decks 911/Rd Approach fee:
COVe) P 1D�; . t 2 -- L=xts-tir~s'
O her Elf 123/
c�ciVe,te a � _ _.__— OTAL: $ 2 t
r rT o�rrd `. V J1 D,
�! ,.., .R ceipt Number: 8o Lv;
6t^ ( ,$sh/Check ber: I
ESTIMATED COST(REQUIRED) � � _-=�' Date: 21 � ���-���
.Fair market value of all labor and materials fo to finish - T l f 3 i 10( _
Initials:
I60 l 0(90 �''I:1Eti
G:\PertnitCenter\FORMS\DRD FORMS\Master Permit Annitratinn 17-'I)-OS,ley-
Y . •
gr I I 1?.2, JEFFERSON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
, . 621 Sheridan Street • Port Townsend •Washington 98368
O 360/379-4450 • 360/379-4451 Fax
` 7N0 http://www.co.jefferson.wa.us/commdevelopment/
STORMWATER SITE PLAN SUBMITTAL TEMPLATE
MLA# PROJECT/APPLICANT NAME: 1, C r1 iil\ t;NN<-Ee ,i"`�
Please answer all of the following questions to the best of your ability. Where the question calls for depiction on a site map, the
applicant may choose to either incorporate the elements into the general plot plan for the Master Land Use Application or to submit a
separate stormwater site plan map.
Project Overview
1. Describe the proposed developed conditions of the site. Indicate position and relative size of proposed improvements on the
site map.
.� 1 'T.c-\f 'c�"x w..•k 1 r�Sv c''IN" 1 b c-a:4 -2r:} QC-t v 4_'- C -e\a- 6 r'
S V o 1 --
Existing Conditions Summary
2. Describe the existing topography. Indicate contours on the site map. i.
<--t • s 1 I 0 ,V<& '-'1"J, (s c�.9-.�*ky i o -V I e 1
i'��� L .L c,-t Tv-� '� i c�t^ to T ; C 11.r c ( p `' 1: -s
3. Describe the existing vegetation. Indicate native vegetation areas on the site map.
4. Describe the existing soils. Indicate soil type on the site map.
•
5. Describe the existing site hydrology(i.e., drainage;behavior of water on the site—above,below, and on the ground). Indicate
existing stormwater drainage to and from the site on the site map. Depict separate drainage basins on thWite map, if
applicable,and indicate acreage of each. ,
.� o, \vim a c S L-o �� ) Ni--'� {!�,, ;
6. Describe any excess levels of noise generated by the proposed use or activity:
` .kI . tCi)\ (` U S` 's- (At \i Ckt`, 1 v ' l APPRO E
D
STORMWATER PLAN
Storiwater MAY 2 6 2006
stormwater site plan template—rev.10/1/2003 quire 5
�e U JEFFERS° O N Y
DEPT.OFC- , I @ ME T
SIGNATURE:
• •
7. Describe significant geographic features and critical areas (i.e., environmentally sensitive areas such as wetlands, streams,
steep slopes,etc.)on the site. Indicate location on the site map.
8. Describe the general vicinity of the site, including adjacent land uses and structures, utilities, roads,and sensitive/critical areas
(streams,wetlands,lakes,steep slopes,etc.). h • \
` \ f
4' y"v i S k CT i �i 6z 1 G L C } 1)' C \d `�<� t�S 1 1"i-
-� �' tl ! e 1 C'i j1 -cc \/\ Y""�.Q \A- k= ‘;
Permanent Stormwater Control Plan
This portion of the Stormwater Site Plan consists of the selection and installation of the appropriate stormwater control BMPs
and facilities to remain in place after construction of the project is completed.
"Medium" size projects are required to have the totals calculated of all impervious surfaces, pollution-generating impervious
surfaces, and pollution-generating pervious surfaces to verify that the thresholds for treatment facilities and flow control
facilities are not exceeded.
g. Describe the developed site hydrology, as proposed. Indicate whether stormwater will be fully dispersed (i.e., per BMP T5.30
in the Manual)or,if not,what types of stormwater flow control will be utilized for the site or specific threshold discharge areas
within the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilitie�,
L.. e'.y' �-�C,:.' v'aA L c}A 4 • k cc
o_ T J
10. If the project requires the use of stormwater treatment facilities, describe the types of stormwater treatment facilities proposed
for use on the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. [This is
normally for large"projects or projects that involve the potential for dispersion of contaminants.]
11. Describe the performance goals and standards applicable to the project.
0 '�( W`^\ v
12. Describe the flow control system.
•
.c ,J (.-A-kk
- 1
stormwater site plan template—rev.10/1/2003 6
• •
13. Describe the water quality system.
'c- l a;- . . is , `_Vo� v ��Z.
" ,,--- rt .,Vy L.,, 1— 1.\ ‘,..\ 6... •C
14. Describe the conveyance system analysis and design
,5.f4« wN,.- `;,- A_''`'-i
15. Describe the source of fill material,physical characteristics of fill material,and deposition of excess material.
[�` v� ` e;�( � <` v ./Y� \ter rk ,(-T..:A �.-)4'is x �,.t`
16. Proposed methods of placement and compaction consistent with the applicable standards on Appendix Chapter 33 of the
Uniform Building Code.
17. Describe the proposed surfacing Taterial.
cl-c a 0; \ 0!•;-k 'J-
18. Describe methods for restoration of the site. \\
., \y�\- L, L• '�! V''''','A:S l (,'s: !'` 's-`„ .\r`G..: < c:� t ..:.ry.. 6, --kci-'V--
( L' A,.1,C i'� C' . (0 s- \1
19. An Operation and Maintenance Manual is required for each flow control and treatment facility. [This is normally required for
"large"projects only and only those for which facilities are required to control flow or treat runoff.] If included,list the Manuals
here.
1— 1
20. List here and include any special reports or studies conducted to prepare the Stormwater Site Plan.
\c\ t\
21. List other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals include
conditions that affect the drainage plan or contain more restrictive drainage-related requirements,describe those conditions or
restrictions here.
stormwater site plan template-rev.10/1/2003 7
• •
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN(SWPPP)
The Construction SWPPP addresses sediment and erosion control during construction. The BMPs indicated by the applicant in the
template that follows must be installed on the ground during all construction phases of the project. The proponent is responsible for
preventing sediment and erosion impacts to environmentally sensitive areas and off-site areas. Consult the Construction Stormwater
Pollution Prevention (SWPP) Best Management Practices (BMPs) Packet for guidance, particularly with rural residential
development.
SECTION I—CONSTRUCTION SWPPP NARRATIVE
1. Construction Stormwater Pollution Plan Elements. Describe how each of the Construction SWPPP elements has been or
will be addressed. Identify the type and location of BMPs used to satisfy the required element. If an element is not applicable
to the proposal,justify in writing. Descriptions of the 12 Elements are found at section 2.5.2 of the Manual(beginning on page
2-15).
12 Required Elements—Construction SWPPP
1. Mark Clearing Limits.
15 ( ( - v'? t' t" Nc-r.)vA,r, t'— °IA?' -12
2. Establish Construction Access.
�cd-ramp' Ctra.. 1 V\ZileSS ;� oa s >� —}- r 11 VszC." c,
3. Control Flow Rates. .4-
ii t
vti..4,,-R.J P t o a.,J Of.w,r- k*t~ C ,4 v"v
�"N"s4..
4. Install Sediment Controls.
4.1 C art"' .w
5. Stabilize Soils.
6. Protect Slopes.
O to G
tJ
7. Protect Drain Inlets. _+
8
stormwater site plan template—rev.10/1/2003
•
12 Required Elements—Construction SWPPP(continued)
8. Stabilize Channels and Outlets.
9. Control Pollutants.
4 ti aoti.d`c.+. C coy.. N 10 v--. so,\P 1`1 5 k*• O "N
10. Control De-Watering(the act of pumping groundwater or stormwater away from an active construction site).
11. Maintain Best Management Practices(BMPs).
3z) Acp ow\tzat� c�%�
12. Manage the Project. j,,,
,ut.yx-,- cop-.s''f`v‘t.,. 0 t.'
e LA t kse Covc-\- cy-
s.4-t C 4- 4.._ vv't G v� 1A-ev---
2. Adjacent Areas.
a. Description of the adjacent areas that may be affected by site disturbance (e.g., streams, lakes, wetlands, residential
areas, roads). S
retr �`jiY+v .krl`w + / ' euL.f.V. i,- f t � ✓ 3
b. Description of the downstream drainage path leading from the site to the receiving body of water(minimum distance of 400
yards).
VI t,v \cfr T\-
3. Environmentally Sensitive Areas.
a. Description of environmentally sensitive areas that are on or adjacent to the site.
stormwater site plan template-rev.10/1/2003
9
•
b. Description of special requirements for working in or near environmentally sensitive areas.
4. Erosion Problem Areas. Description of potential erosion problems on site in the context of the characteristics of the on-site
soils(e.g.,erodibility,settleability,permeability,depth,texture,soil structure).
e„pirr = 6 at vim. ax i k S,
5. Construction Phasing.
a. Construction sequence
t
b. Construction phasing(if proposed)
r\
6. Construction Schedule. Wet season is October 1 through April 30(page 2-21 of the Manual).
Provide a proposed construction schedule.
II. Wet Season Construction Activities.
a. Proposed wet season construction activities.
b. Proposed wet season construction activities for environmentally sensitive areas.
csedki
7. Financial/Ownership Responsibilities.
a. Identify the property owner responsible for the initiation of bonds and/or other financial securities.
b. Describe bonds and/or other evidence of financial responsibility for liability associated with erosion and sedimentation
impacts.
8. Engineering Calculations. Provide Design Calculations on a separate sheet for the following,if applicable.
a. Sediment Ponds/Traps.
b. Diversions.
c. Waterways. \
d. Runoff/Stormwater Detention Calculations
stormwater site plan template—rev.10/1/2003 10
• • •
Stormwater Site Plan Changes
If the designer wishes to make changes or revisions to the originally approved Stormwater Site Plan, the proposed revisions shall be
submitted to DCD prior to construction. The submittal shall include substitute pages that include all proposed changes, revised
drawings showing any structural changes,and any other supporting information that explains and supports the reason for the change.
Final Corrected Plan Submittal
If the project included construction of conveyance systems,treatment facilities,flow control facilities,or structural source control BMPs
(not standard on-site stormwater management BMPs),the applicant shall submit a final corrected plan ("as-builts")when the project is
completed. These should be engineering drawings (stamped by a licensed civil engineer) that accurately represent the project as
constructed.
APPLICANT SIGNATURE
By signing the Construction SWPPP worksheet, I as the applicant/owner attest that the information provided herein is true and
correct to the best of my knowledge. I also certify that this application is being made with the full knowledge and consent of all
owners • the affected,property.
k.0/za.)
(LAN•s WNER OR AUTHOR ATIVE SIGNATURE) ( ATE)
' � f
THIS SPACE MAY BE USED FOR ADDITIONAL NOTES, IF NEEDED:
r '7
APFk '
stormwater site plan template—rev.10V1/2003 12