PERMIT #: BLD06-00243 Received Date 05/9/2006
SITE ADDRESS: 50 RAINIER LN Issue Date 06/22/2006
PORT LUDLOW, 98365
APPLICANT: R KENT HOOD PHONE: 360-297-7115
HELEN A HOOD
PO BOX 1262
KINGSTON WA 983461262
SUBDIVISION: PORT LUDLOW NO 2 AREA 2 Block: Lot: 3
PARCEL NUMBER: 990600203 Section: 8 Township: 28 N Range: 01 E
CONTRACTOR: SILVERWOOD HOMES INC PHONE: 360-297-8750
P.O. BOX 1262
KINGSTON WA 98346
Contractor's License: SILVEHI040L4 Expires: 1/4/2007
PROJECT DESCRIPTION: NEW DETACH GARAGE W/STORAGE HTD 2ND FLOOR
CALL IN FOR THE REQUIRECTJONS THAT APPLY TO YOUR PROJECT.
SETBACKS: dk 7 AL
UFFER: AY
Footing: OTC 7/z
Foundation: ax /z 0,6
Stormwater FINAL Approval:
Underground Plumbing: OR 9/6/Ci
Underground Insulation:
Shear Wall :
Sheathing:
Framing: DEC 9/t4/()7
Plumbing: Ok /2/8/44
Propane Tank/ Lined:Insulation: , C -V o LE Si.4 T #7L/ /
Sheetrock: 11f� !/!S7
Septic Sytem Final p rova MUST be obtained before final of structure can be attempted.
Road Approach Final Approval:
Zoning Final Approval: ,
Final/Occupancy Approval: 4/73 f) 0
HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL RE CJIRED PRIOR
Q O TO FINAL INSPECTION
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
Office Hours 9:00 a.m. -4:30 p.m.
HOT LINE AVAILABLE 24 HOURS A DAY
SPECIAL CONDITIONS APPLY - SEE REVERSE
SPECIAL CONDITIONS FOR CASE A BLD06-00243
1.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater,
erosion and sediment during construction. BMPs shall address permanent measures to
stabilize soil exposed during construction, and in the design and operation of stormwater
and drainage control systems.
2.) A stormwater plan for a medium project has been submitted and approved by the
Department of Community Development. Once the subject permit has been issued the
applicant shall fully implement the provisions of the submitted plan and contact the
Jefferson County Department of Community Development to arrange a schedule to
inspect the property for plan compliance. A Certificate of Occupancy will not be issued
until the Department verifies plan compliance. No clearing for roadways or utilities shall
occur on the project site until clearing necessary for the installation of temporary
sedimentation and erosion control measures have been completed.
3.) All stormwater from patios and/or sidewalks shall be dispersed of on site. The driveway
shall be at such a grade as to allow the stormwater to enter into the county road ditch and
shall not be allowed to drain onto neighboring properties.
4.) Outdoor residential storage shall be maintained in an orderly manner and shall create no
fire, safety, health or sanitary hazard.
5.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less
than one-half acre unless totally screened from view of neighboring dwellings and
rights-of-way. Such screening shall meet all applicable performance and development
standards specific to the district in which the storage is kept, and shall be in keeping with
the character of the area. Screening shall meet the requirements of Unified Development
Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable
vehicles is prohibited except in those districts where specified as an automobile wrecking
yard or junk (or salvage)yard and allowed as a Permitted Use in Table 3-1 of the UDC,
and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any
such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area
(ESA).
6.) Maximum lot coverage is not to exceed 45%. Lot coverage is defined as amount of
impervious surface which includes roof tops, driveways, concrete, etc.
7.) Minimum setback from Rainer Ln right-of-way is 20 ft. Minimum side and rear setbacks
are 5 ft.
8.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the
finished grade, excepting when such lighting is an integral part of a building or structure.
Ground level lighting is encouraged.
9.) Lighting fixtures shall be designed and hooded to prevent the light source from being
directly visible from outside the boundaries of the property. The intensity or brightness of
all lighting, during construction and after project completion shall not adversely affect the
use of surrounding properties or adjoining rights-of-way.
10.) The building height is not to exceed 35 feet.
11.) Per MPR Code Section 3.17, Accessory dwelling units (ADU's) shall not be allowed in the
MPR-SF zone.
I:\F_BLD_Permit_Buildng.rpt 10/29/1999
MLA06-00229
•UILDING PERMIT APPLICATIN ReviewType: I
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD06-00243 Received Date: 5/9/2006
SITE ADDRESS: 50 RAINIER LN
PORT LUDLOW, 98365
OWNER: R KENT HOOD PHONE: 360-297-7115
HELEN A HOOD
PO BOX 1262
KINGSTON WA 983461262 PORT LUDLOW NO 2 AREA 2
SUBDIVISION: Block: Lot: 3
PARCEL NUMBER: 990600203 Section: 8 Township: 28 N Range: 01 E
CONTRACTOR: SILVERWOOD HOMES INC PHONE: 360-297-8750
P.O. BOX 1262
KINGSTON WA 98346
Contractor's License SILVEHI040L4 Expires 1/4/2007
REPRESENTATIVE: CHRIS KLUMPER PHONE: 360-239-5131
PO BOX 1262
KINDSTON WA 98346
PROJECT DESCRIPTIOr NEW DETACH GARAGE W/ STORAGE HTD 2ND FLOOR
TYPE OF WORK GAR SQUARE FOOTAGE:
TYPE OF IMP NEW MAIN:
VALUATION 100,000.00 ADD'L: 1,050 HEAT TYPE:
CODE EDITION: 2003 HEAT BASE: HEAT TYPE:
OCCUPANCY: UNHEATED: # OF STORIES:
OCCUPANCY:
OTHER: 102
CONST TYPE: GARAGE: 1,050 SHORELINE:
CONST TYPE: DECK: SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL: SEW
WATER SYSTEM: LUDLOW
BEDROOMS: BATHROOMS:
Exist: 0 Exist: 0
Prop: 0 Prop: 1
Total: 0 Total: 1
Routing Date:
* CG
Type Amount Paid By: Date: Receipt: Approved/Date
Permit $993.75 LYK 05/09/06 81216 }
Plan Check $645.94 LYK 05/09/06 81216 JUNK 2006
State Building Code $4.50 LYK 05/09/06 81216
Jefferson County Planning
Total: $1,644.19 & Building B'eperfment
oLjijir___ o r. �'1 , iJ✓i2wo ' S,,.. CAS
�,— -�r6 pop- Lt/Ou3 Iva. 2
V `Q
—
wirtt i..i.-Ar
. ,4\vi_
i \:4] C :w,�y ra f di4✓;eZ
..-_-- 1.1-o" ) , ,
4 ". , i. ,I
v ain._-rc.�-- 'g"
` .9 i ti/ayt _.:-Clt i.= f i t/6tttcc 6 6mrcc
q . E.,r, izo 61\L
1 . . 1 u piueri..14., 1
\ ,
(-:_)
A Lk-if I a 1,,(..c4...,za y
0 1 O'-'<<_ F
W 1
! "b__ .-c.' . APPROVED
V ! ? t; SITE PLAN
31, ti JUN - 62006
11 P
11 >
` ' ! JEFFERSON COUNTY
°� DEPT.d M UNITY D LOB' ( .�
I //. SIGVATUR ��
I
_-- =_ ., . - -°'/ 16
PERMIT # BAD
\ MAY - 8 2006
i: : : '. - -- ,,,,:::----2..- ----------' - JEff llSON COUNTY
I - exs,s pkii„'�'�kr) . ► .,✓rL A-A'Al � l ,
S-rat - •- - -
r .
• -..
JEFFERSON COUNTY
1 # f `frit . ' DEPARTMENT OF COMMUNITY DEVELOPMENT
MAY -- 8 2006
• 4 621 Sheridan Street . Port Townsend •Washington 98368
360/379-4450 •360/379-4451 Fax
O http://www.co.jefferson.wa_us/commdevelopmentl
L . ,`r_OPi.4cNI"
STORMWATER SITE PLAN SUBMITTAL TEMPLATE
MLA# 1,l('-- ,ci PROJECT/APPLICANT NAME: X 1 eArr H-/J �
Please answer all of the following questions to the best of your ability. Where the question calls for depiction on a site map, the
applicant may choose to either incorporate the elements into the general plot plan for the Master Land Use Application or to submit a
separate stormwater site plan map.
Project Overview
1. Describe the proposed developed conditions of the site. Indicate position and relative size of proposed improvements on the
site map.
I%9tu1.1r 111i . t bt.- 15 A Aktg. Pi 0 tiSt tikf Q ‘, t--. 1.-i rS; '+r e°.:.
Al- j2- eiic.I'' AS',it VAe r LAYS *N- C. Qi r Sat., . `l '..I qte,-
. Figattm .5 4-ta "
Existing Conditions Summary
2. Describe the existing topography. Indicate contours on the site map.
3. Descrbe the existing vegetation. Indicate native vegetation areas on the Qa9.»ten
4. Describe the existing soils. Indicate soil type on the site map
t
5. Describe the existing site hydrology(i.e.,drainage;behavior of water on the site—above,below,and on the ground). Indicate
existing stormwater drainage to and from the site on the site map. Depict separate drainage basins on the site map, if
• applicable,and indicate acreage of each.
f K is i)M&5 T • 7 'i- src 7N. £ e `.
,
6. Describe any excess levels of noise generated by the proposed use or activity:
jIEcii' ra. � � r; � r..i.. , �s-
.,ail.- OSit�A,, - -
TOR TAWAr �L
t ell 4 him
— 0 2 4 JUN - S 2006
stom.w tersitev�tanpi.Ve—tey.ionizoos s
JEIF RSON COUNTY DCI JEFFERSON COUNTY
DEPT OF COMMUNITX p( ELOrm .T
SIGNATURt U
•
7. Describe significant geographic features and critical areas (i.e., environmentally sensitive areas such as"Wetlands, streams,
steep slopes,etc.)on the site. Indicate location on the site map.
MAY — 8 2006
•
8. Describe the general vicinity of the site,including adjacent land uses and structures,utilities,roads,and sehsauratica!areas
(streams,wetlands,lakes,steep slopes,etch
( Fittk ' , t 1 -fq- nits') wci. "i 5 . 6,4 Z(LEI , f rrl Z01
cEss o ifo 12 1 . Srr4 r.t, + . r <S►tsk_ giPoitelTh
Permanent Stormwater Control Plan
This portion of the Stormwater Site Plan consists of the selection and installation of the appropriate stormwater control BMPs
and facilities to remain in place after construction of the project is completed.
"Medium" size projects are required to have the totals calculated of all impervious surfaces, pollution-generating impervious
surfaces, and pollution-generating pervious surfaces to verify that the thresholds for treatment facilities and flow control
facilities are not exceeded.
g. Describe the developed site hydrology,as proposed. Indicate whether stormwater will be fully dispersed(i.e.,per BMP T5.30
in the Manual)or,if not,what types of stormwater flow control will be utilized for the site or specific threshold discharge areas
within the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities.
pcittA.At.leats- C vfr® (oV IL L 5 ix,orA&Li )
10. If the project requires the use of stormwater treatment fealties,describe the types of stormwater treatment facilities proposed
for use on the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. [This is
normally for large"projects or projects that involve the potential for dispersion of contaminants.]
A4/141
11. Describe the performance goals and standards anoliicahln to the oroiect.
KUiL1 A jr;-,uijL4 (e)try.. Lai j'i! y :,()>" € : / [y,i, L .
i J
12. Describe the flow control system.
s
stormwater site plan template—rev.10/12003
• •
13. Describe the water quality system.
MAY - 8 2006
i
14. Describe the conveyance system analysis and
tplesign
15. Describe the source of fill material,physical characteristics of fill material,and deposition of excess material.
16. Proposed methods of placement and compaction consistent with the applicable standards on Uniform Building Code. Appendix Chapter 33 of the
17. Descrbe the proposed surfacing material
/"V 57-ALL Dit-1r/((Jfiy tl-u'1 L.J&.j4 t Ay_i, g-csfICt, /1 o..wra poet/Li)/
_)
18. Describe methods for restoratior}of the site.
//,D,evs kEo /srad c-t> / 4-01,4:;'C4 4,
•
19. An Operation and Maintenance Manual is required for each flow control and treatment facil
ity. [This is normally required for
large"projects only and only those for which facilities are required to control flow or treat runoff.) If Included,list the Manuals
here.
20. List here and include any special reports or studies conducted to prepare the Storrnwater Site Plan.
�S r
21. List other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals Include
condtions that affect the drainage plan or contain more restrictive drainage-related requirements,describe those conditions or
restrictions here.
AJ,t j
stonraler so p 20
an template—rev.10/103
7
m
•
• •
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN(SWPPP)
The Construction SWPPP addresses sediment and erosion control during construction. The BMPs indicated by the applicant in the
template that follows must be installed on the ground during all construction phases of the project. The proponent is responsible for
preventing sediment and erosion impacts to environmentally sensitive areas and off-site areas. Consult the Construction Stormwater
Pollution Prevention (SWPP) Best Management Practices (BMPs) Packet for guidance, particularly with rural residential
development.
SECTION I—CONSTRUCTION SWPPP NARRATIVE
1. Construction Stonnwater Pollution Plan Elements. Describe how each of the Construction SWPPP elements has been or
will be addressed. Identdy the type and location of BMPs used to satisfy:the required element. If an element is not applicable
to the proposal,justify ifn writing. Descriptions of the 12 Elements are found at section 2.5 2 ofthe"ManiiaT(beginning on page
2-15).
12 Required Elements—Conduction SWPPP
1. Mark Clearing Limits.
2. Establish Construction Access.
3. Control Flow Rates.
A l/P
4. . Install Sediment Controls.
5)L r Fz.,c&s
5. Stabilize Soils.
s F ACES/$'TAAL-)
6. Protect Slopes.
5`T4>it.'
7. Protect Drain Inlets.
5)L�" 5oc/`5 64— TIC;,&&t-- i4 (e..
8
storTnwater site pan template—rev.10t1no03
12 Required Elements—Construction SWPPP(continued)
13. Stabilize Channels and Outlets.
9. Control Pollutants.
10. Control De-Watering(the act of pumping groundwater or stormwater away from an active construction site).
11. Maintain Best Management Practices(BMPs).
,Cito5,PA/ Nait,
12. Manage the Project.
2t
C`lctv1,10Lft—V._
2. Adjacent Areas.
a. Description of the adjacent areas that may be affected by site disturbance (e.g., streams. lakes, wetlands, residential
areas,roads). g ,f
rill
b. Description of the downstream drainage path leading from the site to the receiving body of water(minimum distance of 400
yam)-
3. Envinonmentally Sensitive Areas.
a. Description of environmentally sensitive areas that are on or adjacent to the site.
stemmata"site plan template—rev.10/12003 9
t
b. Description of special requirements for working in or near environmentally sensitive areas.
oh/1S-
4. Erosion Problem Areas. Description of potential erosion problems on site in the context of the characteristics of the on-site
soils(e.g.,erodibility,settleablty,permeability,depth,texture,soil structure).
5. Construction Phasing.
a. Construction sequence
F. /
P X 6Avifl -c, /F�ot,/Ar9Arte„( /� „!kIA/1, `5l a-/pc,t#M tg n ,:rr (n /fhe/iL /,Ill.+t �, tf,-4..4.%-c,
DIU.lk/Ai-t.: / ,i31 / r,rai... ic2 . • !/(
b. Construction phasing(if proposed)
6. Construction Schedule. Wet season is October 1 through April 30(page 2-21 of the Manual).
I. Pmu^rt3 a proposed construction schedule.
;1ncn"_(71-15 (rtiti!i- .J 'tk 17- i 5 J SS 6, :.
II. Wet Season Construction Activities.
a. Proposed weir season construction activities.
'ftxeAvA%fit /
I��rcl�1--i OA FAAitt tom. L //tier- /ci' .
b. Proposed wet season construction activities for environmentally sensitive areas.
it-//ii
7. Financial/Ownership Responsibilities.
a. Identify the property owner responsible for it-lie
�initiation of bonds and/or other financial securities.
i
b. Describe bonds and/or other evidence of financial responsibility for liability associated with erosion and sedimentation
impacts.
8. Engineering Calculations. Provide Design Calculations on a separate sheet for the following,if applicable.
a. Sediment Ponds/Traps. A.`!:4
b. Diversions. '- !
rA
c. Waterways. &'/A
d. Runoff/Stormwater Detention Calculations /\-'/,A
storm ter site plan template—rsv.10/1/2O03 10
•
• • + .
St rnnwater Site Plan Changes
If the
wishes
to ma•ke or revisions to the orgmary approved Stortrwirater Site Plan,th• e proposed.revisions shad.be .
submitted to DCD:prior to,oonsbUction. 'i'he shah ndude:subsfil e�p than include al proposed.cages, revised.
drawings s �hi9� � and any supporting irdomragori._Utat e> ins and;supports the reason for the change.
Final Card Plum Submittal
If the project inducted construction of�_at , f ,trtoar4rotrt nt tomes,or structural source control BMPs
(flift.itztndatd. n4ife storm water`managemert BMPS).the eppj ahal a doffed plan("as-bulits")When_the project is
'(hese:should be iondineering drawings (a raped by a ti ed ciit+engtnoet).that accurately represent the project as
•
APPLICANT SIGNATURE
By signing the Construction SWPPP worksheet, I as the applicant/owner attest that the information provided herein is true and
correct ttr:the best C# knowledge. I also certify that this application is being made with the full knowledge and consent of all
owners it o
c57 gie)
OnAU HOreZED REPRESENTATIVE SIGNATURE) (DA
THIS SPACE MAY BE USED FOR ADDITIONAL NOTES,IF NEEDED:
1.:, v
stonrerater site plan template—rev.10/1/2003 12
��� oN cow JEFFER COUNTY •
W \g DEPARTMENT OF COMMUNITY DEVELOPMENT fit?
~' •N o Pq 621 Sheridan Street• Port Townsend • Washington 98368'
•
1
; www co.jeffe son.wa/usc om5mdevelo ment 4/
1141NCi2 P MAY ,2006
Master Permit Application MLA: C6 _
Project^-scription (include separate sheets as f ecessary): ,- . .L Vt i.OPMENT ,
CZ, iCt4'c, ("r Wcetto(c Iry S76$20 Hjvw*' , A 1-iZ
Q Property
I
Tax Parcel Number: f 6 (4 c o 70.3 Size: (It £C tO Z ,F.'¢ (acres/square feet)
er-
Site Address and/or Directions to Property: 5� f2,iNfu,kit_ t (c,. POP--;- L. 'ct �,. tA,tq 9$ 3 to
Property Owner(s)of Record: 2• m(.,%,7 14 ab'y�
Telephone:Cr;b O) 2 9-7 - 7 (t S �b Fbx:( C),) (2-4) - `7�(-1....- email:
Mailing Address: P. C)- 73 u 7- (2..(4L ' k/Itr�,6r ‹Tw, (MA • 98r 3Y�
Applicant/Agent(if different from owner): C ►,4i,\5 Cjtiur xeL
Telephone: (70 c, ,�'S 1 " J )3) Fax: `"f. email: "71
Mailing Address: Fi 0. aGX +2(( 2. Kl)..lUSit,.. r -�-fi•
• What kind of Permit?(Check each box that applies)
U Building ❑ Variance (Minor, Major or Reasonable Economic Use)
r] Demolition Permit ❑ Conditional Use[C(a),C(d),or C]**
❑ Single Family; ❑ Discretionary"D"or Unnamed Use Classification
1 Garage Detach ❑ Special Use(Essential Public Facilities)**
❑ Manufactureu flume — ❑ Boundary Line Adjustment
❑ Modular ❑ Short Plat**
❑ Commercial* ❑ Binding Site Plan**
❑ Change of Use ❑ Long Plat**
❑Address I] Road Approach ❑ Planned Rural Residential Development(PRRD)/Amendments**
❑ Propane ❑ Plat Vacation/Alteration**
❑Allowed"Yes"Use Consistency Analysis El Shoreline Master Program Exemption/Permit Revisions**
❑ Stormwater Management ❑ Shoreline Management Substantial Development**
0 Site Plan Approval Advance Determination(SPAAD)* ❑ Shoreline Management Variance
❑ Temporary Use ❑ Comprehensive Plan/UDC/Land Use District Map Amendment
❑Wireless Telecommunication* 0 Jefferson County Shoreline Master Program Amendment
❑ Forest Practices Act/Release of Six-Year Moratorium
*May require a Pre—Application Conference **Requires a Pre-Application Conference
Please identify any other local, state or federal permits required for this proposal, if known:
DESIGNATION OF AGENT
I hereby designate 94 (7-(S I'((, di . .__ to act as my agent in matters relating to this application for permit(s).
X OWNER SIGNATURE i ;t'L�� ) 54� ,c,G
Date:
By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of
his,her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may
result in this permit being null and void.
I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and
expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit.
I further agree to provide access and right of entry to Jefferson County and its employees, representatives or agents for the sole purpose of application
review and an req ired later inspections.Access and right of entry to this property shall be requested and shall occur only during regular business
hours. ',, +g
..0 Signature: VA t Date: l r ' F
The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or
endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the
"Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit
has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)
even if you are in omplianc ,with th Jefferson County development code.The Applicant acknowledges that he,she or it holds individual and non-
transferable nsibUUiitty o adheri to and complying with the ESA. The Applicant has read this disclaimer and sign and d tes it below.
) •
Signature: tar 1 Date:.,
/j1--, G
,
G:\PermitCenter\FORMS\DRD FORMS\Master Permit Application 12-30-05.doc
BUILDER STATEMENT
The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that
they will be assuming the responsibility of the General Contractor for the proposed project.
Signature: Date:
77-8 — ' Yti'1i
GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: FAX:
a . Rki.,Ly ( 51LtigALtw6 144, 1,,45) (360 'L35 - "71 l'-' ( 3‘0) 297- 73-6Z_
MAILING ADDRESS: CJ a 13 n,,,. 4-1(c,I- '<w-l'S , (,y$EMAIL:
CONTRACTORS LICENSE 9$3Yf0WAINS
Si
NUMBER: r(y��I� f(O t.� .a. L NUMBER
ARCHITECT/ENGINEER: PHONE ( ) Fax: ( )
MAILING ADDRESS: EMAIL
Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal:
it" New 1E-'Wood Existing: fI Sewer
❑ Addition ❑ Steel Proposed: 1 Bank Height: ii Community System
❑ Alteration/Remodel 0 Concrete Total: ❑ Individual System
O Repair ❑ Masonry SEP Permit#
❑ Demolition 0 Other: Bedrooms: Water Supply:
Existing: Setback: ❑ Private well n Two Party
Type of Heat: • Proposed: L' Public
Total: Name of System[:�( Ly IJ.C.
t,-,`";'r,.. ' .s C.4A!! v
If this is a Commercial Project you must answer the following:
Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces:
Number of occupants(includes owners,tenants,employees,etc) Current Proposed
IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No
If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply:
O Underground Tank 1_1 Above ground Tank Size of Propane Tank:
0 Heat Stove ❑ Cook Stove ❑ Woodstove 11 Fireplace Insert ❑ Hot Water Tank ❑ Pellet Stove LI Other
Is this appliance being installed in a Manufactured/Mobile Home? Yes /'No
When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property
lines, tank location and size, distances from the propane tank to all property lines,buildings and septic system components,
including the reserve area.
Square Footage Current Proposed For Office Use Only Amount Revision
M_:- Elnnr Heated EH Bld App Review: ,--.
I 1 v
1"°FIoo(Heated' Consistency Review: I
sr.ILN�� ftCz-t) �8544/Other Heated Base fee: Q Q • '15
Mezzanine Additional Section: l l
Heated Basement Plan Check fee: `/Q`�^ 5
G'
Unheated Basement State Surcharge fee:
k.5
Other Unheated Pot Water Review fee:
. . Trcio mrialD06loa(n
Garage argort W SUBTOTAL
. 6 �� s�:, , , 111 . '
Decks 911/Rd Approach fee:
xcS-h t1.
O er
COOTAL: $
p44.,ek,o TjRria2A /0Z r ..-. _ _ 101
►,"ton.
1 Receipt Number: 't Q.1 6
, Cash/Check Number:
a , G` MAY - , .1'1,0 57��
ESTIMATED COST(RE I ate: /8/
.Fair market o all labor and materials fou tion to finish I
r ' nn Initial6:
ll0( QOIQ c � .Yt!.ur'MENT
G:\P 1 Center\FORMS\DRD FO ermit Application 12-30-05.doc
7
-.77 t36
17
- - --------
U27
.1, -
AEG, Epl
LID
CT
VaE,
STATE r
GMfv
L