Loading...
HomeMy WebLinkAboutBLD2006-00271 •ILDING PERMIT4 MLA06-00254 APPLICATION Review Type:I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD06-00271 Received Date: 5/18/2006 SITE ADDRESS: N. STROMBERG AVE OWNER: MERIDIAN MTG INVESTORS FUND II PHONE: 206-621-9301 PO BOX 21646 SEATTLE WA 98111 IRON DALE SUBDIVISION: Block: 151 Lot: 45-48 PARCEL NUMBER: 962115130 Section: 35 Township: 30 N Range: 01 W CONTRACTOR: MERIDIAN GREENFIELD LLC PHONE: (206)621-9301 605 5TH AVE S STE 850 SEATTLE WA 98104-4438 Contractor's License MERIDGL973BG Expires 1/11/2007 REPRESENTATIVE: PHONE: PROJECT DESCRIPTIOr NSFR W/ATT GARAGE & A/G 120 GAL PROP TANK TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW VALUATION 207,461.00 MAIN: 1,242 CODE EDITION: 2003 ADD'L: 633 HEAT TYPE: EEE OCCUPANCY: R-3 HEAT BASE: HEAT TYPE: OCCUPANCY: UNHEATED: #OF STORIES: CONST TYPE: 5N OTHER: SHORELINE: CONST TYPE: GARAGE: 624 DECK: 392 SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: CON WATER SYSTEM: OTHER BEDROOMS: BATHROOMS: Exist: 0 Exist: 0 Prop: 3 Prop: 3 Total: 3 Total: 3 Routirq Date: lqPCO Type Amount Paid By: Date: Receipt: Approved/Date Permit $1,598.55 LYK 05/18/06 81356 APPH-- . - ` Plan Check $673.75 LYK 05/18/06 81356 ''` "� State Building Code $4.50 LYK 05/18/06 81356 AUG D 2006 Potable Water Application $55.00 LYK 05/18/06 81356 Jefferson Corny Planning Total: $2,331.80 & Building Department • BUILDING PE RMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD06-00271 Received Date 05/18/2006 SITE ADDRESS: 230 N. STROMBERG AVE Issue Date 08/8/2006 APPLICANT: MERIDIAN MTG INVESTORS FUND II PHONE: 206-621-9301 PO BOX 21646 SEATTLE WA 98111 SUBDIVISION: IRONDALE Block: 151 Lot: 45-48 PARCEL NUMBER: 962115130 Section: 35 Township: 30 N Range: 01 W CONTRACTOR: MERIDIAN GREENFIELD LLC PHONE: (206)621-9301 605 5TH AVE S STE 850 SEATTLE WA 98104-4438 Contractor's License: MERIDGL973BG Expires: 01/11/2007 PROJECT DESCRIPTION: NSFR W/ATT GARAGE &A/G 120 GAL PROP TANK CALL IN FOR THE REQUIRED INSPECTIONS THAT APPLY TO YOUR PROJECT. SETBACKS: ,--(7-o 6 UFFER: Footing: P-I 7r66F1Q Foundation: w-3 c, Stormwater FINAL Approval: Underground Plumbing: Underground Insulation: Shear Wall : CAT Sr/EA,�. 7d 4/uN4 4 _`x,z ' 0/4 =/Jo7 p Jr 6$ o ,/jz1dj/l Sheathing: �J' Framing: Uy t.. -a' hoaS -Dvz DK 4/ , f' car.&/4t' 'l`17� 1744- Plumbing: kaEr.0.uL1t Ok 4/O/a7f ( Propane Tank/Lines: P- - '4 e-LL OK • fg ,,'A'- (A t I) -If carizEqdhas Insulation: I i _ AMC; •a_ D . _ • r i Q7 'ace eEW Sheetrock:pAM10sE (49(1.-V►J 'STA411-; n7 (o-may— - �� C—'.��(ZA4.,f� , .4. 7/14 P �? 7�'7 OK Septic Sytem Final Approval MUST be obtained before final of structu e an be attempted. ' Road Approach Final Approval: Toning Final Approval: ) t7r 'Final/Occupancy Approval: pproz565 PASSE 5l 1908 p c i, rfr r'CgcA1 r3 � HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY - SEE REVERSE • SPECIAL CONDITIONS FOR CASE BLD06-00271 1.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 2.) To help prevent seawater from intruding landward into underground aquifers, all new development activity on Marrowstone Island, Indian Island and within 1/4 mile of any marine shoreline shall be required to infiltrate all stormwater runoff onsite. 3.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIPZ: Water conservation measures: 1. Roof and other intercepted precipitation shall be routed to on-site detention ponds and/or other approved means and allowed to be released to the soil slowly. 2. Water collected from Storm water and roof catchments may be used for watering lawns and gardens. Unless catchment water has been treated to meet drinking water standards, there shall be no cross connections allowed between the potable supply and impounded water. 3. Water withdrawn from wells on each property shall not be used for watering of lawns and/or gardens. 4. Ground water withdrawn from each property shall be restricted to a rate of three (3) gallons per minute. 5. Installation of water conserving fixtures such as low flow toilets, faucets and shower restrictors and other water saving plumbing fixtures. 6. Landscaping plan (xeriscaping, native vegetation with minimal amounts of irrigation). Please NOTE that the above listed measures are not intended to be exhaustive, but rather is intended to be illustrative of the types of water conservation measures. 4.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIPZ: 1. Installation of a flow meter. 2. On-going well monitoring for chloride concentration. 3. Submittal of monitoring data to County. 5.) MANDATORY MEASURES FOR COASTAL SIPZ: 1. For proof of potable water on a building permit application, applicant must utilize DOH-approved public water system if available. 2. If public water is unavailable, a qualifying alternative system may be used as proof of potable water or an individual well may be used as proof of potable water subject to the following requirement: a. Chloride concentration of a laboratory-certified well water sample submitted with building permit application. 3. If public water is unavailable, a qualifying alternative system may be used as proof of potable water. 6.) The property owner shall comply with Water Conservation Measures (per list maintained by the UDC Administrator). 7.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 8.) A Stormwater Site Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 9.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. • IP 10.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on than one-half acre unless totally screened from any and less rights-of-way. Such screening shall meet all pplicable performancedwellingsoring and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Unified Development Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage) yard and allowed as a Permitted Use in Table 3-1 of the UDC, and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area (ESA). 11.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 12.) Minimum setback from North Stromberg Avenue right-of-way shall be 20 feet. Minimum side and rear yard setbacks shall be 5 feet. 13.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 14.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 15.) The building height is not to exceed 35 feet. 16.) A minimum of two (2) on-site parking spaces shall be provided for the single family residence. I:\F_BLD_Permit_Buildng.rpt 10/29/1999 • PERMIT # IMIstorniwate B s c 0 0 . Require r l 4,s• , cc-A, 'on • APPROVED 'JEFFERSON COUNTY STORMWATER PLAN 4er il . .DEPARTMENT OF COMMUNITY DEVELOPMENT cO621 Sheridan Street • Port Townsend • Washington 98368 JUN 1 9 2006 360/379-4450 • 360/379-4451 Fax http://www.co.jefferson.wa.us/commdevelopment/ STORMWATER SITE PLAN SUBMITTAL, 1 FER1'1 N*� PMF.N MLA# Ofo- 4 i °a PROJECT/APPLICANT NAME: " /-4.% 1 v(�(..({ L Please answer all of the following questions to the best of your ability. Where the question calls for depiction on a site map, the applicant may choose to either incorporate the elements into the general plot plan for the Master Land Use Application or to submit a separate stormwater site plan map. • Project Overview 1. .Describe the proposed developed conditions 2the site. Indicate Dosition and relative size of prnonsed improvements on the site map. �� � /� ./.,,../6-�� ��91✓/• .�s5. = 2- , o2t✓>! e h D Sc.e� r ' �/f�-1D Existing Conditions Summary 2. Describe the existing topography. Indicate contours on the site map. Iz.5 .4 ti;.ze .w,.1% ._i4I7 si ,i , 6o;1 14c. s, 3, Describe the existing vegetation. Indicate native vegetation areas onS M Spthe site map. ][p 0 i lc- '1p"\ s\a� - i QQ 4 rc�� w7 wle c,rc.11:1n v Z1; tO H 4, Describe the existing soils. Indicate soil type on the site map.�•Ss<1\ary 1 tx Sa.vtki itavv- . doe �-t4.1.-p) 1.-kc er y�, J Int:Oc Ii(-t 161 • 5. Describe the existing site hydrology(i.e., drainage; behavior of water on the site—above, below,and on the ground). Indicate existing stormwater drainage to and from the site on the site map. Depict separate drainage basins on the site map, if applicable,and indicate acreage of each. $et c c11Pc Mco- .{r• s�k.4 •Thi,,, , -A-, ,,- hacks 143+ 1. --1 6. r Descri e any excess levels of noise generated by the.proposed use or activity: `1-k,.v s.l ee.ol a,,,a ,�,G ,,, 1.5 , t x i . I ' i i stormwater site plan template.doc—rev.10/12/2003 5 . • • • • • • ' 7. Describe significant geographic features and critical areas (i.e., environmentally sensitive areas such as wetlands, streams, stee slo es,etc. on the site. Indicate location on the site ma . • • • 8. Describe the general vicinity of the site, including adjacent land uses and structures,utilities, roads, and sensitive/critical areas streams,wetlands, lakes,stee slo es,etc. . 111k Irancl �ivi•stovt. , ' w% • Permanent Stormwater Control Plan • This portion of the Stormwater Site Plan consists of the selection and installation of the appropriate stormwater control BMPs and facilities to remain in place after construction of the project is completed. "Medium" size projects are required to have the totals calculated of all impervious surfaces, pollution-generating impervious surfaces, and pollution-generating pervious surfaces to verify that the thresholds for treatment facilities and flow control facilities are not exceeded. • g, Describe the developed site hydrology, as proposed. Indicate whether stormwater will be fully dispersed (i.e. BMP T5.30 in the Manual)or, if not, what types of stormwater flow control will be utilized for the site or specific threshold discharge areas ( within the site. Locate these facilities on the ite plan and differentiate propose facilities from e isting facilities. G ti_ )tQM 1 1 to C�a410.4 I 6 c. J h l • 10. If the project requires the use of stormwater treatment facilities, describe the types of stormwater treatment facilities proposed for use on the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. [This is normally for"largeprojects or projects that involve the po ential for dispersion of contaminants.] Ssza 4,42 14A0-Qicv 3 c• • 11. Describe the performance goals and standards applicable to the project. 2C.NA-cc,‘"\QU ✓. • • • • • • • 12. Describe the flow control system. • r i• • • • • stormwater site plan template.doc—rev.10/12/2003 • . 6 • • • 13. Describe the water quality s ste . GS r 14. Describe the conveyance system analysis and design. 2 o.44-ed- • • 15. Describe the source f fill material,physical characteristics of fill material,and deposition of excess material. • • 16. Proposed methods of placement and compaction consistent with the applicable standards on AppendixChapter 33 Uniform Buildipg odes of the • 17. Describe the propos d surfacing material. ' 370 • 18. Describe methods for restoration of the site. u ti Irta fes iStLla GCa(,LJas-SL, V- 19. An Operation and Maintenance Manual is required for each flow control and treatment facility. large"projects only a only those for which facilities are required to control flow or treat runoff.] If included,list the iManuals here. • • • 20. List here and include an special eports or st die conducted to prepare the Stormwater Site Plan. k. • • • • 21. List other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals conditions that aff ct the drainage plan,or contain more restrictive drainage-related requirements,describe those conditions or restrictions here.• P include • • stormwater site plan template.doc—rev.10/12/2003 .. 7 • • • • CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN(SWPpp) The Construction SWPPP addresses sediment and erosion control during construction. The BMPs indicated by the applicant in the template that follows must be installed on the ground during all construction phases of the project. The proponent is responsible for preventing sediment and erosion impacts to environmentally sensitive areas and off-site areas. Consult the Construction Stormwater Pollution Prevention (SWPP) Best Management Practices (BMPs) Packet for guidance, particularly with rural residential development. SECTION I—CONSTRUCTION SWPPP NARRATIVE 1. Construction Stormwater Pollution Plan Elements. Describe how each of the Construction SWPPP elements has been or will be addressed. Identify the type and location of BMPs used to satisfy the required element. If an element is not applicable • to the proposal,justify in writing. Descriptions of the 12 Elements are found at section 2.5.2 of the Manual(beginning on page 2-15). 12 Required Elements—Construction SWPPP 1. Mark Clearing Li its. r r 4- `` a,. cc'31ph —tViro • t.�c 2. Establish Construction Access. C r ' co., L•c� racy a t.: • • 3. Control Fl w Rates. • 4. Install Sediment Controls. • co,-) • • 5. Stabiliz Soils. r � • • 6. Protect Slo es. • • •7. Protect Dr in Inlets. `" ... 111411 • - r 1 .• v i; stormwater site plan temptate.doc—rev.10/12/2003 - -- 8 • ! •. 12 Required Elements—Construction SWPPP(continued) 8. Stabilize Channels and Outlets. A- 9. Control Pollutants. • Qrec- c2 • 10. Control De-Watering(the act of pumping groundwater or stormwater away from an active construction site). 11. Maintain Best Management Practices(BMPs). 12. Manage the Project. • ' 2. Adjacent Areas. a. Description of the adjacent areas that may be affected by site disturbance (e.g., streams, lakes, wetlands, resid areas,roads). ential b. Description of the downstream drainage path leading from the site to the receiving body of water(minimum distance yards). of 400 • 3. Environmentally Sensitive Areas. a. De ription of environmentally sensitive areas that are on or adjacent to the �� � tUSUN COUNTY DCD l rlr U Ll: stommwater site plan template.doc—rev.10/12/2003 9 • • b. Description of special requirements for working in or near environmentally sensitive areas. 4. Erosion Problem Areas. Description of potential erosion problems on site in the context of the characteristics of the o - soils(e.g.,erodibility,settleability,permeability,depth,texture,soil structure). n site • 5. Construction Phasing. a. Construction sequence b. Construction phasing(if proposed) 6. Construction Schedule. Wet season is October 1 through April 30(page 2-21 of the Manual). • I• Provide a or000sed construction schedule il. Wet Season Construction Activities. a. Proposed wet season construction activities. • b. Proposed wet season construction activities for environmentally sensitive areas. PT— 7. Financial/Ownership Responsibilities. • a. Identify the property owrLer responsible for the initiation of bonds and/or other financial securities. b. Describe bonds and/or other evidence of financial responsibility for liability associated with erosion and sedimentation impacts. 8. Engineering Calculations. Provide Design Calculations on a separate sheet for the following, if applicable. a. Sediment Ponds/Traps. b. Diversions. c. Waterways. P E = t I 11 _ d. Runoff/Stormwater Detention Calculations ����,, " --- ' s t�CSI c.� .vim , • stormwater site plan template.doc—rev.10/12/2003 10 • • • • • • Stormwater Site Plan Changes If the designer wishes to make changes or revisions to the originally approved Stormwater Site Plan, the proposed revisions shall be submitted to DCD prior to construction. The submittal shall include substitute pages that include all proposed changes, revised drawings showing any structural changes,and any other supporting information that explains and supports the reason for the change. Final Corrected Plan Submittal If the project included construction of conveyance systems, treatment facilities,flow control facilities, or structural source control BMPs (not standard on-site stormwater management BMPs), the applicant shall submit a final corrected plan ("as-builts")when the project is completed. These should be engineering drawings (stamped by a licensed civil engineer) that accurately represent the project a constructed. P 1 s • APPLICANT SIGNATURE • • By signing the Construction SWPPP worksheet, I as the applicant/owner attest that the information provided herein correct to the best of my knowledge. I also certify that this application and consent of all owners of the affected property. is true and is being made with the full knowledge • DOwNE ORIZED SIGNATURE) (DATE) THIS SPACE MAY BE USED FOR ADDITIONAL NOTES, IF NEEDED: • • • • • PERMIT # BID 02 .7 lEf ftilsDN COUNTY DCD • l 11 t i rill ..^....-.,...-...-tW---�_.� _�.__- • l MAY 1 J stormwater site plan template.doc—rev.10/12/2003 . . _. 12 • MASTER BASIN PLAN • DATE PREPARED: February 26, 2003 PREPARED BY: Meridian —Greenfield in conjunction with Quadra Engineering SUBJECT PROPERTY: The Vineyards at Kala Point: Block 143, lots 1 through 32 and lots 37 through 48 plus vacated portions of Division Avenue and block 151, lots 1 through 48 plus vacated portions of Division Avenue, excepting lots 17, 18, 31 and 32 of block 151 Irondale Subdivision; a portion of the NW 1/4, Section 35, Township 30 North, Range 1 West, Willamette Meridian. The following is a narrative for small parcel development within an existing plat. The existing plat was entitled prior to requirements for stormwater management. Therefore we are establishing a master basin plan for the parcels (building sites) where we will be building homes to the small parcel erosion and sediment control requirements. PROJECT DESCRIPTION, SEQUENCE, EXISTING CONDITIONS Project Description ❑ Single-family residence with detached garage clustered around an interior auto court. o On site sewage treatment system. o On site stormwater management via infiltration trenches and biofiltration Construction Sequence o Establish silt fence and construction entrance o Clear and grade.site PERMIT # BED o Construction of structure(s) o Construct drainage facilities in conjunction with impervious surface , '• 0 7 1 o Construction of septic system o Re-vegetate and landscape Jtjr1A COUNTY BCB Existing Conditions 4 o Existing cleared lot with minimal native vegetation and large areas of exposed soil conditions. o Minimal slope to southeast. ❑ No sensitive areas on lot or adjacent. o Sandy Soils • BEST MANAGEMENT PRACTICES (BMP's) Each of the 20 sites within these two blocks will contain the following BMP's toward the goal of controlling erosion and sedimentation control. Construction Stormwater Pollution Prevention Plan o Stabilized construction access: Limit construction entrance to one designated location per building site constructed with crushed rock. ❑ Minimize land disturbing and preserve existing vegetation: Establish clearing limits. Mark trees and vegetation to be saved. • • ❑ Protection of adjacent properties and existing roadside ditches from sediment deposition: Install siltation fencing at low edge of clearing limits. ❑ Stabilization of stock piled soils using plastic sheeting and placement of material away from roads and property lines ❑ Establish concrete truck wash area. ❑ Regularly inspect and maintain these BMP's. Inspect.following any significant storm event. MAINTENANCE PROCEDURES Permanent Stormwater Management Plan ❑ Install an infiltration trench or infiltration depression designed per the attached Reference #1. o General procedures: Water run-off created form impervious surfaces will be"tight-lined" from downspouts and catch basins to the infiltration mechanism. o Location parameters (in accordance of chapter 246-272 WAC/On-site sewage systems) ■ Set-back from a drain field (down gradient) 30 feet ■ Set-back from a drain field (up gradient) 10 feet ■ Set-back from a building foundation: 5 feet o Catch basin: The catch basin is to catch the water from the parking area. Placement of the catch basis shall be a minimum of 12 feet from the parking area to provide for bio- filtration for pollution control. ❑ Install permanent native growth to reduce erosion potential and promote storm water infiltration on site. ❑ Restore majority of the lot to native vegetation with the use of drought resistant native grasses, shrubs and trees with minimal lawn area. PERMIT # BID JEtsU COUNT OCU • REFERENCE #1 BASIS OF DESIGN The USDA Soil Survey of Jefferson County Area, Washington identifies the soils in the area of the subject project as both: Cassolary,a sandy loam with Unified Soil Classification of SM and a permeability of 2.0 to 6.0 in/hr; and - Hoypus, a gravelly/very gravelly sand and loamy sand with a Unified Soil Classification of GW-GM /GM and a permeability of 6.3 to 20.0 in/hr Based on the descriptions provided on the Soil Evaluations for the Onsite Sewage Disposal System Design of the Septic Design Application it is reasonable to identify the soils as Cassolary. Use 2.0-in/hr soil permeability for infiltration calculations (minimum indicated in Soils Survey) Disturbance of native vegetation outside of the building envelopes will be minimized. Disturbed areas will be re-vegetated with native plants. The project is not tributary to a creek. • Design storm is 25yr-24hr event with a depth of 2.1 inches as found on the isopluvials in N#13 1.0 Atlas 2, Volume IX SITE SPECIFIC STORM WATER MANAGEMENT a ta in Flows from impervious surfaces will be conveyed to an infiltration depression or one,of threatTI !JCII infiltration trenches. The different options are provided as equal alternative to allow flexibility depending on the specific configuration of each site. Contractor's Option 1: Infiltration Depression An infiltration depression can be constructed to provide 0.004 acre-feet*43560ft/acre = 174.2 cu feet. See"Subcatchment 1 S: Developed"on page three of this Reference. Exact sizing (length, width and depth)will be determined based on the site Contractor's Option 2: Infiltration Trench Sections Three trench sections (types) are provided to allow for site variations. The typical features of these are: All 3 types of trenches shall be: - 2-ft wide x 2-ft deep (excluding cover) x L(where L=the length as provided below) - . placed"on contour" with 0% longitudinal slope - lined with filter fabric on all sides and have a minimum overlap at seams of 8-inches or as specified by manufacturer - Back-filled with drain rock Trenches using Section 1 or 2 shall be no closer than 5-feet(edge to edge)from any other stormwater,infiltration trench Trench Section 3 can be placed side by side and connected via a manifold if adequate area is available"on contour" G:1Projects\The Vineyards\Design&Engineering\reference 2-quadra storm water.doc 1 of 6 REFERENCE #1 • Trench Calculation: The calculations that follow are for a unit of impervious surfacing (measuring 1000 square-foot) that drains to an infiltration trench. The calculations where performed using HydroCAD®by Applied Microcomputer Systems using the following methodologies to address and to compensate for limitations of the software: All Sections: - Are 2-ft wide x 2-ft deep (excluding cover) x L (where L= the length as provided below) Soil permeability was converted from 2.0-inch/hour to feet/minute(per unit algebra) 2.0-in/hr x 1-foot/12 inches x 1-hour/60-mj s= 0.003-ft/hr - A 30%void space(detention volume)was used for the drain rock; this is shown as"open %" in the pond calculation summary. Section 1 - Is a_conventional drain rock filled trench with a 4"perforated pipe. The storage volume of the pipe is considered negligible and is therefore not included in the calculations. Except as noted above in"All Sections"no compensation was required. Section 2 - Includes the use of a 12-inch pipe for additional storage volume. The void space is adjusted to account for the additional volume provided by the pipe. The calculations include adjustments at the IA, 1/2, and 3/4 depths of the pipe. - The"irregular section" method of calculation was used to address the irregularities/variations in the void space. Section 3 - Addresses a possible requirement of a single large infiltration"mat"; where multiple segments/lengths of"trench"are joined using a 4"pipe manifold by branching - Each ; where a number of"trenches"are constructed side by side . Infiltration in this section is calculated through the base only. Trench Construction: The Developer shall construct infiltration trench(es) based on the total units of impervious surface on each parcel. The following trench lengths (L)are to be applied as applicable: Section 1.: L = 18-LF per 1000-sf of impervious surfacing (2-ft x 2-ft trench with 4-in perforated pipe) • Section 2: perp PERMIT fR ci L = 15-LF 1000-sf of impervious surfacingR 8111 (2-ft x 2-ft trench with 12-in perforated pipe) Section 3: sr �O 7 L = 24-LF per 1000-sf of impervious surfacing U. (2-ft x 2-ft trench constructed as a mat 4-in perforated pipe) �UUIY�� "BCD Example: - For a residence with a 1500-sf home,600-sf garage, 200-sf patios &walks, and 1200-sf of driveway & parking for a total impervious area of 3,500-sf using Section 2. - The total length of trench required is: _ (3500-sf total impervious area/ 1000-sf unit impervious area)x 15 linear feet of trench = 52.5 linear feet of trench G:\Projects\The Vineyards\Design&Engineering\reference 2-quadra storm water.doc 2 of 6 REFERENCE #1 • Vineyards_25yr-24hr Type IA 24-hr Rainfall=2.1" (AMC=2) Page 1 2/24/03 Subcatchment 1S: DEVELOPED Runoff = 0.01 cfs @ 7.88 hrs, Volume= 0.004 of Runoff by SBUH method,Time Span=0.01-24.00 hrs,dt=0.01 hrs Type IA 24-hr Rainfall=2.10" Area(sf) CN Description 1,000 98 Paved parking&roofs Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 5.0 Direct Entry,Assumed • • PERMIT # RED • O - 027 JEFFERSON COUNTY OCO G:\Projects\The Vineyards\Design&Engineering\reference 2-quadra storm water.doc 3 of 6 • . • REFERENCE #1 • Vineyards_25yr-24hr Type IA 24-hr Rainfall=2.1" (AMC=2) Page 1 2/24/03 • Pond 1 P: SECTION#1 (2'x 18'trench w/4" pipe) Inflow = 0.01 cfs® 7.88 hrs, Volume= 0.004 af Outflow = 0.00 cfs @ 8.63 hrs, Volume= 0.004 af, Atten=62%, Lag=44.9 min Discarded= 0.00 cfs® 8.63 hrs, Volume= 0.004 af Routing by Star-Ind method,Time Span= 0.01-24.00 hrs,dt= 0.01 hrs Peak Elev= 1.98' Storage=21 cf • Plug-Flow detention time=35.6 min calculated for 0.004 af(100% of inflow) Storage and wetted areas determined by Pyramidal sections Elevation Surf.Area Open Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (%) (cubic-feet) (cubic-feet) (sq-ft) • 0.00 36 30.0 0 0 • 36 2.00 36 30.0 22 22 84 Discarded OutFlow (Free Discharge) • L1=Infiltration • # Routing Invert Outlet Devices 1 Discarded 0.00' 0.003000fpm Infiltration over entire Wetted area • • • • • • • • • PERMIT # .DID • " 0 9 7 1 • JEEffHSDN COUNTY DCD • • • rF .i i> f:._ f' is • • G:\Projects\The Vineyards\Design&Engineering\reference 2-quadra storm water.doc 4 of 6 • • REFERENCE #1 Vineyards_25yr-24hr Type IA 24-hr Rainfall=2.1"(AMC=2) Page 1 2/24/03 Pond 1 P: SECTION #2 (2'x 15' trench w/12" pipe) • Inflow = 0.01 cfs 7.88 hrs, Volume= 0.004 af Outflow = 0.00 cfs @ 8.39 hrs, Volume= 0.004 af, Atten=57%, Lag=30.3 min Discarded = 0.00 cfs @ 8.39 hrs, Volume= . 0.004 af Routing by Stor-Ind method,Time Span=0.01-24.00 hrs,dt=0.01 hrs Peak Elev=1.92' Storage=21 cf • Plug-Flow detention time=32.5 min calculated for 0.004 of(100%of inflow) Storage and wetted areas determined by Irregular sections Elevation SurfArea Perim. Open Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (%) (cubic-feet) (cubic-feet) (sq-ft) 0.00 30 34.0 30.0 0 0 30 0.50 30 34.0 30.0 5 5 47 0.75 30 34.0 38.0 ' 3 7 56 1.00 30 • 34.0 58.0 4 12 64 1.25 30 34.0 38.0 3 15 73 1.50 30 34.0 30.0 2 17 81 2.00 30. 34.0 30.0 5 21 98 • Discarded OutFlow (Free Discharge) t1=infiltration # Routing Invert Outlet Devices 1 Discarded 0.00' 0.003000 fpm Infiltration over entire Wetted area • • PERMIT # BLD • Q e a 2 7 JEFFERSON COUNTY OCD • • • G:Projects\The Vineyards\Design&Engineering\reference 2-quadra storm water.doc 5 of 6 • REFERENCE #1 Vineyards_25yr-24hr Type IA 24-hr Rainfall=2.1" (AMC=2) Page 1 2/24/03 Pond 1 P: SECTION #3 (2'x 24' branch of mat) • Inflow = 0.01 cfs @ 7.88 hrs, Volume= 0.004 af Outflow = 0.00 cfs @ 6.08 hrs, Volume= • 0.004 af, Atten=78%, Lag=0.0 min Discarded= 0.00 cfs @ 6.08 hrs, Volume= 0.004 af Routing by Stor-Ind method,Time Span=0.01-24.00 hrs,dt=0.01 hrs • • Peak Elev=1.90' Storage=27 cf • Plug-Flow detention time=84.5 min calculated for 0.004 of(100%of inflow) • Storage and wetted areas determined by Pyramidal sections • Elevation SurfArea Open Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (%) (cubic-feet) (cubic-feet) (sq-ft) 0.00 48 30.0 0 0 48 2.00 48 30.0 29 29. 103 Discarded OutFlow (Free Discharge) t-1=lnfi ltratio n # Routing Invert Outlet Devices • 1 Discarded 0.00' 0.003000 fprn Infiltration over entire Surface area • • • • • • • • • • • PERMIT # BED 027• • • JEiR HSUN COUNTY BCD • G:\Projects\The Vineyards\Design&Engineering\reference 2-quadra storm water.doc 6 of 6 r ~d ( C 1312 Y c;Z . CD o > rri 1 11�o`ijf j�. i � CD CD Now rri PrI 71 CO 01,,,),z..../..„9_. c),I, ,.....4m,.....,,,„Itt. 1.4-LI'34)1 ----Tisi—r.repo wci, tri pill 0 -;,z; -� z � ^: . pp- 0 ... tv . cr, 1 ,fit --, 3'%st3,-0Acir C' r •• t 41.‘ t.1 9 Z. r, .41. ,.. a f I Th I - 1 WI- -0 ut • • - 40.00 1 1 ,f I , 0 . A\ v 3OVav9 3OVINdV0 I I J, 11• '` I � , r...., ..t. g . \\... v3ad HsvM ' xonNl 31.1VON0. k . - r t i - o . 0. r, , . A i — �h i avid , Oa t � 1: r C 7 L . 01 fir — i ,... . _ 1 1 ss_,- • • . • - ..„..... ,______L 7.7.-t:,-----;;::,,,. [i, ts Ltl.,,,, It , ,, ..._,.. ;oz —,r MAY 18 2006:,;. • • 1 A • �G , , CQ JEFFERSON COUNTY '�" DEPARTMENT OF COMMUNITY DEVELOPMENT non 98368 ..... _ Sheridan Street• Port Townsend8 2006 �, .� 621 MAY 1 360/379-4450 • 360/379-4451 Fax , 40 www.co.jefferson.wa.uslcommdevelopment �S�3IN�� MLA. 06-a--3 Master Permit Application Project Description(include separate sheets as necessary): + 6s4h � I��(jam�<—D Y� ("1 5,�Tax Parcel Property ����� (acres/square feet) ��Z��� 3d • Size: Number: • Site Address and/or Directions to Property: .nFrrOlaVL']f2�41hC'� ""� ��r i �_ email: nP r � Property Owner(s)of Record: 2�{• „ , A+t•,i Fax.�--- Telephone:� S.... �"� Mailing Address: , aent(if different from owner): email: ApplicantlAg ( a Telephone: Mailing Address: Check each box that applies) Major or Reasonable Economic Use) What kind of Permit? ❑ Variance(Minor, I or C]** ❑ Conditional Use[C(a),C(d), C"—O Demolitioneg 0 Conditional Hal "D"or Unnamed Use Classification `❑ Permit ❑ Special Use(Essential Public Facilities) Single Familyt 0 Boundary (E Adj(Essential Public S;arage Attached/Detached 0 Short Plat** ❑ Manufactured Home ❑ Binding Site Plan** ❑ Modular p Long Plat** ❑ Commercial* ❑ Planned Rural Residential Development(PRRD)IArnendments ❑ Change of Use i Road Approach---- 0 Plat Vacation/Alteration*" De_ Address 0 Shoreline Master Program Exemption/Permit Revisions** Predane ❑ Shoreline Management Substantial Exemption/Permit Rev** ❑ Allowed"Yes"Use Consistency Analysis ❑ Shoreline Management Variance Amendment ❑ Site Plan Management Approval Advance Determination(SPAAD)* 0 Comprehensive Plan/UDC/Landreline aster a District Program Map Amendment ❑ Site Plan 0 Jefferson County ❑ Temporary Use ❑ Wireless Telecommunication t *`Requires aPre-Application Conference ❑ Forest Practices Act/Release of cabbn Conference ix-Year Moratorium *May require a Pre—App proposal,if known: Please identify any other local,state or federal permits required for this p P DESIGNATION OF AGENT for permit(s). to act as my agent in matters relating to this application .�.r 64. designate r �- •� Date: � - I hereby •9 -�. OWNER S MATURE .. �___ application packet e byandthe in owner/agent ct attachments,wit respect to this attests that the information provided herein, d ei in any is true and correct to the best of By signing this n wiedge. Any materialform, he owner/agentomission of a material fact falsehood or any s fees and his,her or it's knowledge. �Ynull and void. against all liabilities,judgments,court costs,reasonable attorney' may result in ehio permitv beingpermit. and hold harmless Jefferson County purpose of application I further agree to save,indemnify against Jefferson County as a result of or in consequence of the granting of this p regular business in any way accrue representatives or agents for the sole expensesh welch may to Jefferson County and its employees, ruin de access and right of entry nd right of entry to this property shall be requested and shall occur only during I further agree to p inspections. - - �/3l�(0 review and any required later insp Date: hours. J�' Sign. - impact upon one or more or negatively endangered s nd action or species and could to undertakepot potential a result of the issuance agre of thispermit m applicant that the actions that the federal t known as the this ate as "res l ah e n eo ph es i tmay terms ely defined inp law threatened the T act ns could lead to a pendangeredundertaken species i your can file a lawsuit behalf of an endang permit"Endangeredabeen issued will" not"ESA."violate the ESA. . Any individual, n vidual,group oragency the Applicant on behalf of an ng,she or it regardingla al development code.The Ap li has read owlthis diges that�'n and he or and dates it individual permit has been l y fr adhering the Jefferson County with the ESA. The Applicant3 � action(s)even if you are in compDate: w. and non-transferab responsibility for adhering to and complying Signature: mochil\Desktop\Master Permit Application 7-8-04.doc gents and Settings\ • • -e•TV f:1 OWNER BUILDER STATEMENT The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that they will be assuming the responsibility of the General Contractor for the proposed project. Signature: _ Date: GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: FAX: MEgib% 4-61c.-44 Flap (Zo(o )to?a 9-c) 1 caax) cdj R MAILING ADDRESS: EMAIL: Ti An(IL— rier1Aiavk9 reed b ell-(4„ CONTRACTORS LICENSE WAINS NUMBER: t, t,!\ 1 .LCkl-S95- NUMBER ARCHITECT/ENGINEER: �.t-��1r-1 PHONE ( 1,, )(�3_33 fl_FAX: ( ) t-AMAILING ADDRESS: EMAIL Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal: i . New < Wood Existing: 0 ❑ Sewer Addition ❑ Steel Proposed: 3 Bank U Community System ❑ Alteration/Remodel ❑ Concrete Total: I Height: Individual System C1 Repair ❑ Masonry _ S Permit# I Demolition ❑ Other: Bedrooms: Water Supply: Existing: 0 Setback: [1 Private well ii Two Party Tye of Heat: Proposed: 3 Public Total: 3kAiltC-"TF►L Name ppf S m:T' at` rsy If this is a Commercial Project you must answer the following: Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: • IBC Type of construction: Will you have Food Service? Yes / No If this is a Propane Tank arid/or Appliance Installation permit,mark all items below that apply: i Underground Tank i Aboveground Tank" Size of Propane Tank: l Z-o ✓vY -P i Heat Stove i Cook Stove i Woodstove i Fireplace Insert i Hot Water Tank i Pellet Stove i Other Is this appliance being installed in a Manufactured/Mobile Home? Yes / No When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines,tank location and size, distances from the propane tank to all prope y lines,buildings andsetip system components, including the reserve area. -- — ;�..: r 'fi—Ol1 V( Cl-V1 Square Footage For Office Use Only Current Proposed .I-/f 7-E(/ Amount (6• tt) Main Floor `2 2— i f 13� Consistency Re iew: y of 2Nu Floor Cvc C_ -� Base fee: - &33 a IL5N 3fO Floor Additional Section: .0„..._ , _.„ Mezzanine: 119iZ t:',r' Plan Check fee: Heated Basement State Surcharge fee: 4l16 Unheated Basement MAY 1 $ 11 I Pot Water Review fee: I C5° Other Unheated 4 j (911/Rd Appr ch fee: (5) . Garage/Carport )y707 row?- TOTAL: $ a(136. St) Decks Co )Q.•f"1-4&Q(`ccin c 1L-'� 3z1Icw Receipt Number:tudI $ ` Other Svc 4�1_-I �' Cash/Check Number: it(1i a-193 4,5 ESTIMATED COST(REQUIRED) V'2 7.' (��l U1) Date: I 'Fair market value of all labor and materials found ion to finish - I C4 l8 2 7.50 Initials: C:\Documents and Settings\mochil\Desktop\Master Permit Application 7-8-04.doc * )w`` ``c\, `oC 5 Ste- €11`°4 C Ul NCB 0'(\4\ SHEAR WALL SCHEDULE WALL SHEATHING G7 0 -7ZL OSB W/ 8d a 6' OC I EDG 12' OC F iv W/ 3/4'1 A OC Q OB W/8d03'OC EDGE 12' 0 W/ 3/4' AND M ENDS \ ® 0 7/16' OSB W/ 8d • 4' OC EDGES AND 12' OC FIELD BOTH SIDES W/ 3/4' AB 6 16' OC AND 12' FROM ENDS 6' OSB BOTH SI�3GRID 4 3' 0 ALL M3/4' AB o ! HDR AND� ENDS Q 0 7/16' OSB W/ 8d 0 4' OC EDGES AND 12' OC FIELD W/ 3/4' AB 0 48' OC AND 12' FROM ENDS ALL PANEL EDGES SHALL BE BLOCKED NOTE: SILL AND OTHER MEMBERS RECEIVING EDGE NAILING SHALL BE A SINGLE 3X MEMBER MINIMUM. 0 io I I R 0' 7'-O' 14'-0' 7,-O' L? I 3-OX5-0 SH I Q/ 3-OX5_0 SH Q Al r n ^VA . I 1 — STRAP HWT i i W PER UPC 1310 I 1 I o-t--2-1/2'1 STL I i i BOLLARD I _� i URNERS AND XNi i ELEMENTS MIN. 18' 1/2' GWB AT WALLS >t o' X ABOVE FLOOR 5/8' TYPE X GWB 6 Inc X o ALL BEAMS, POSTS. o A `� AND CLG. N-Ir ¢r ' r 6'-2' 4' THICK CONC. GARAGE SLAB SLOPE MIN I i g� P 1/8'/ FT G1�G GPe TOWARDS O.H. DRS. Oyu 6 IN I �G ro ,10 3\\ r��\VO ° i I 6'-8 1/2' FOR INSI y i r fll ILL' a 110 V " 0; I 3-0 n I ' i 2-OX2-6 FXD 4,-8. I I I I I I I I I I I I I I I I r_ ___ I I I I I I I�I I �IYWWWY(ii/ 1 _ _ 10 T 22X30 N ATTIC �I ACCESS =J PANEL -4 c wZ I a �& I 3' cV iD N Z 0 N :r r i ALT. DOOR LOCATION W/ SUNPORCH OR BREEZEWAY 4'-4' 9'-0' 1/2' ,FIRST FLOOR PLAN 28'-0' 16'X8' OH DR OPTIONAL PAIR OF 8'X8' DRS 16'-3' 1/4" • 1' O" I I I I I I I I I N 1'-4 1/2' N I O Go GARAGE 672 S.F. RESIDENCE MAIN FLOOR 64 S.F. UPPER FLOOR 569 S.F. TOTAL E33 S.P. MAR 12 2007, JE(fif�l�ll�i��� r JEFFERSON Eflar'000 3/�a7 MA MITHUN Ambitects+Deslgnera+Warmers MV 56 T2m Alxlmn Way sun. 200 Seattle, WA 9giol m =6 ft3W Faso66zp7oog CARRIAGE HOUSE LL ELEVATION A V: KALA POINT COTTAGES PROJECT: Kala Point Cottages LoanoN: Port Townsend, WA PREPARED FOR; - Meridian Partnership Management, Inc. Ml DATE REMON IRC UPDATE 01/07/05 PARTNER IN CHARGE WK PROJECT MANAGER Bj PROIECT ARCHITECT PROECT BS TEMI MEMBER FYC CHEM FB PROFMONAL SEAL STATE OF WASHINGTON FOR PERMI- ONLY THIS DOCUMENT HAS BEEN PREPARED FOR PERMEAPPEJCATION AND IS SUBJECT TO REVIEW AND MODIFICATIONS BY GOY MRMEfTALAGE3HOEs TIRE MAIN FLOOR PLAN PROJECT N0. 0238700 DATE 04/28/03 PROJECT NETM PAIN S:`2002\023W000 CadW \Base-Drawings\Plans \carriage-PLdwg ETIEEf NWBER 2ACD SET NOT FOR CONSTRUCTION COPYRIGHT ®2O0T MrrHUN, INC. 4 SECOND FLOOR PLAN 1/4" • T-0" r UPPER FLOOR 569 S F. 140 i\\ w 1 2 W AmpfAuiiruc l II�IE�C�g� IEu 1'L' �V- Of wgg,,�- = Co z 23347 U� �F��C/STGFLF'� C)�i SS�ONAL EXPIRES JAN 15, 200 y lbW MITHUN Amhftecte+Designers+P'Ienners PbF 56 i2m ALs1uI Wry Sub 200 } same, WA 98101 in 2o6 fiia344 �r11 a i. Fa 2o6 623.7oo5 ® . CARRIAGE HOUSE W ELEVATION A 5 KALA POINT COTTAGES PROJECT: Kala Point Cottages LOCATION: Port Townsend, WA PREPARED FOR: Meridian Partnership Management, Inc. NO. DATE REVISION IRC UPDATE 01 /07/05 PARTNER IN CHARGE WK PROJECT MANAGER BS PROJECT ARCHITECT BS PROJECT TEAM MEMBER FYC CHFaG FB PROFESSIONAL SE& R WI,TE STATE OF WASHINGT0;1 FOR PERMIT ONLY THIS DOCUMENT HAS BEEN PREPARED FOR PERMIT Ai .IUCAMON AND IS SUBJECT TO REVIEW AND MODIFICATIONS By RUPPER FLOOR PROJECT NO 0238700 LATE 04/28/03 PROJECT NETM PATH S:\-2002\0238700\Cad\A \Base-Drawings\fans \carriage -PI -mg SHEET NUNBER , . — AAACD SET NOT FOR CONSTRUCTION COPYRIGHT 0 2001 MrrHUN,INC. SHEAR WALL SCHEDULE WALL SHEATHING Qj 0 7/16' OSB W/ 8d 0 6' OC EDGES AND 12' OC FIELD W/ 3/4'0 AB 0 48' OC AND 12' FROM ENDS Q 0 7/16' OSB W/ 8d 0 3' OC EDGES AND 12' OC FIELD W/ 3/4' x 12' 0 24' OC SILLS AND ALL MEMBERS RECEIVING EDGE NAILING SHALL BE 3X OR LARGER Q3 O 7/16' OSB W/ 8d 0 4' OC EDGES -- AND 12' OC FIELD BOTH SIDES W/ 3/4' X 12' AB 16' OC AND 12' FROM ENDS SILLS AND ALL MEMBERS RECEIVING EDGE NAILING SHALL BE 3X OR LARGER ® � APA LATERAL RESTRAINT PANEL PER DETAIL 5/S1 ALL PANEL EDGES SHALL BE BLOCKED 0 � 7/16' OSB W/ 8d 0 4- OC EDGES AND 12' OC FIELD W/ 3/4' AB B 48' OC AND 12' FROM ENDS ALL PANEL EDGES SHALL BE BLOCKED am v 0 r N m 0 oD N (V 0 <V Do i� 40' O' CT 14'-0' 14'-0' T-O' T-O' 6-6 1/2' T-5 1/2' 3J- 1'-8 1/2' 1 0' T-2 1/2' z k,3 Ua A �.�•'� PATIO w ��� ,. ;:� alha 1s. �OD7 �o 141 3-OX6-0 SH CONCRETE Cn co (4) O vi = N N 1 1/2'X ' T&G ox N o S FFIT W I m Tu cD N El OX ,n > cn O N 1 2-OX6- 0 2-0X6-0 10 1/ 'h` 1'-1 1/2' _ -- SH t SH ------- UL LISTED DIRECT VENT GAS SG 1'-0' TRANSOM I ; > FIREPLACE W/ 16' FLUSH } STORE DNS. N I HEARTH & MIN. 6' SQ. IN O.S. MIN 5 I 3'TYP N o xo 0 COMB. AIR. INSTALL PER MFR. 1 Fq CFM W.H. 0 0 INSTRUCTION. WSEC 81 VIAQC , FAN W/ D DINING LIVING TIMER ^ O HDWD 1 2-OX2-6 VTOS � tK HDWD STRAP , 13 L V,T.O_S: __ CSM .-_______J�1 P Co� PER UPC 10 rT 1/2'X4' T 1 LE o __ - ----_ 3N SOFFIT El: r 3'-7 3/8' 4'-2 5/8' 2'-10 1/2' W W V. S. f i PORCH NOTE: x x 1 CONC. SEE SUNPORCH OR o IL NI I I 2-8 BREEZEWAY PLANS MIN 50 22X30 30X30 �, 11 H SLOPE ON 0 FOR PORCH `' ATTIC CRAWL i Pam' °', I UTILITY �� w ELEVATIONS 7 VINYL 6' RISERS VTOSFAN st ACCESS SPACE � dry' pW oii ?2-6 PANEL ACCESS in 4g o s AND 12' ---- --- ------ - ---- o o 1 TR EAD TO o 5 SH. ; GRADE Io N • - TP 8X3 r� i PANTRY xto oDO S R I i RA KITCHEN ^ • 6' IL --3-OX -0 SH --- 1? I LOW i HDWD Fill 3• i I I I ,p I BATH I I 8X20 qq0o {- HDWD I _ \ I i X36H RANGE 6 HOO 1 rr' TB `�..,. 3'-0 1 `" y i MIN NND100�FM_ '. 3♦�0• 6�-0• x El' N MPtJ 5VOT05 Ali 1 3_p _ g.p• o T =! w x I M CFM FAN i :,� cc N o n i I 12'-0' VTO j 115 N N J N N I 1 _ Ilx -REF 1 24, 1 1 ` 2-6 eq In tD ' so c a an M A, ox 110V 1 N 1'_4 1 61-0. 3'-8' 2'-7' 8'-8' 6Ox32 Ln ' IK BATH SHWR so HDWD ENCL i ' 10V TB 1 El:`: MASTER NTR ti Ras HDWIb 5 SH. 1 BEDROOM ; ------ it - CARPET `4 I s 4-0 BF\Vc F 1 0 2' Xx 2' 3' sO 3 A _5 E � O IL 110V N 0 N 1 3' TYP o o x El � ' EGRESS a ' / Qj 121 3-0 5-0 SH � 0 1 PARLOR DEN �0 0 1/2'X4' T8 G 1 CARPET �❑ J SOFFIT PORCH a T Of VAULTED C.G. W/ CONC. o ¢ ~ ;'� N o W OPT. SCISS R N W Q ; o IL D2 ": TRUSSES N Lu w 1 '" N E a I 1 0 / +36 RAIL �' . EGRESS 1[i� I Z ONO 1- y-. 1 121 3-OX5-0 SH -1 1'-4 1/2' 1'-4 1/2' 5'-8' 5'-4'1 Qe- 1 Q 5'-6' MAY 18 2006 5'-6' I 1 MAIN FLOOR PLAN ELEVATION 13 MAIN FLOOR 1242 SF MITHun An:hRmetr+DutlgmRs+W�nners Pier 56 T2m AIuken %y SMNe too Sedit WA 98im IM% 2" 623-7" PLAN 1 ELEVATION B KALA POINT COTTAGE; PROJECT: Kala Point Cottages LOCATION: Port Townsend, WA PREPARED FOR: Meridian Partnership Management, Inc. NO. DATE ON CONST. SET 04/21/03 CORRECTIONS 9/8/03 IRC UPDATE 2/05/05 PARTNER IN CHARGE BK PROJECT MANAGER DB PROJECT ARCHITECT DB PROJECT TEAM MENBDt MI CHECK DB PROFESION,LL SEAL 3689 4STATE REGISTERED IBCTECTE L. WILLIAMS OF WASHINGTON TITLE MAIN FLOOR PLAN PROJECT NO. 0238700 DATE 12/17/02 PROJECT NETWORK PATH S:\2002\0238700\CADD A\BASE-DWG\PLAN 1 SHEET NUMBER A=2B 1/4" . 1'-0" CONSTRUCTION SET