Loading...
HomeMy WebLinkAboutPROS Plan Update Vision PROS Plan “Goals and Resources” PRELiMINARY DRAFT 1 Big Picture Schedule 2 Big Picture Background 3 Resources JCPRAB volunteer time Very limited staff time No funds for consultant 4 Goals Work within our resources Maintain RCO eligibility Clarify big picture goals Document maintenance backlog (CIP) List park and facility needs (CIP) Illustrate revenue options Demonstrate our effectiveness and productivity 5 Basic Process Study the current plan. (Both) Update the CIP. (JCPRAB) Integrate tour program. (JCPRAB) JCPRAB meeting discussions. (JCPRAB) Gather BoCC input in a workshop. (Both) Re-write using existing as (Both) Review drafts. (JCPRAB) Final recommendation. (JCPRAB) Present to the BoCC. (JCPRAB) Participate in public hearing. (Both) Who Does What (Both=Staff and JCPRAB) 6 Optional Review examples from other agencies. Invite stakeholders to JCPRAB meetings. Reach-out to stakeholders and go to their meetings, or interview them. Design and conduct a survey and analyze it. Review and Update Policies. These are some ideas the JCPRAB could consider to enhance the process. Staff will not be able to assist with these efforts. 7 2026 Action Steps Study the current PROS. Hold discussions at regular JCPRAB meetings. Suggest changes. Recruit a member to lead the CIP update process. BoCC workshop. 8 2027 Action Steps Continue work in regular JCPRAB meetings. Finalize CIP by October Re-write existing to produce a first draft. 9 2028 Action Steps Produce a draft. JCPRAB review. JCPRAB final recommendation (June) Present to BoCC. Public hearing. Adoption by BoCC. 10