HomeMy WebLinkAboutBLD2006-00304 ItILDING PERMIT APPLICATN ML v
Reviewiew T Ty 281
ype:
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD06-00304 Received Date: 5/31/2006
SITE ADDRESS: 202 OAK SHORE DR
PORT TOWNSEND, 98368
OWNER: HOWARD B DUGDALE PHONE: 541-595-2134
MARGARET K DUGDALE
PO BOX 8100
SISTERS OR 97759 KALA POINT#7
SUBDIVISION: Block: Lot: 354
PARCEL NUMBER: 965000239 Section: 27 Township: 30 N Range: 01 W
CONTRACTOR: TERHUNE CUSTOM HOMES PHONE: (360) 681-8898
PO BOX 3125
SEQUIM WA 98382
Contractor's License TERHUCH9B4MA Expires 07/01/2006
REPRESENTATIVE: TERHUNE CUSTOM HOMES PHONE: (360)681-8898
PO BOX 3125
SEQUIM WA 98382
PROJECT DESCRIPTIOI NEW SFR W/ATTACHED GARAGE
ALSO A/G 120 GAL PROPANE TANK
TYPE OF WORK RES SQUARE FOOTAGE:
TYPE OF IMP NEW MAIN: 2,000
VALUATION 237,000.00 ADD'L: HEAT TYPE: HTP
CODE EDITION: 2003 HEAT BASE: HEAT TYPE: PRO
OCCUPANCY: R-3 UNHEATED: #OF STORIES:
OCCUPANCY: OTHER:
CONST TYPE: 5N GARAGE: 660 SHORELINE:
CONST TYPE: DECK: 293 SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL: CON
WATER SYSTEM: KALA PT
BEDROOMS: BATHROOMS:
Exist: Exist:
Prop: 3 Prop: 2
Total: 3 Total: 2
Routing Date: IP1 l dt) V
Type Amount Paid By: Date: Receipt: Approved/Date
Permit $1,760.95 KAS 05/31/06 83422 LAP . D
Plan Check $1,144.62 KAS 05/31/06 83422
State Building Code $4.50 KAS 05/31/06 83422 JUL
2006
Potable Water Application $55.00 KAS 05/31/06 83422 Jefferson County Planning
Total: $2,965.07 & Building Department
Cisazol
• •PERMIT
BUILDING PE
Jefferson County Department of Community Development
621 Sheridan Street, Port Townsend, WA 98368
(360)379-4450 FAX (360)379-4451
PERMIT #: BLD06-00304 Received Date 05/31/2006
SITE ADDRESS: 202 OAK SHORE DR Issue Date 07/7/2006
PORT TOWNSEND, 98368
APPLICANT: HOWARD & MARGARET DUGDALE PHONE:
PO BOX 8100
SISTERS OR 97759
SUBDIVISION: KALA POINT#7 Block: Lot: 354
PARCEL NUMBER: 965000239 Section: 27 Township: 30 N Range: 01 W
CONTRACTOR: TERHUNE CUSTOM HOMES PHONE: (360) 681-8898
PO BOX 3125
SEQUIM WA 98382
Contractor's License: TERHUCH984MA Expires: 7/1/2008
PROJECT DESCRIPTION: NEW SFR W/ATTACHED GARAGE
ALSO A/G 120 GAL PROPANE TANK
CALL IN FOR THE R Q IRED INSPECTIONS THAT APPLY TO YOUR PROJECT.
SETBACKS:,9- 3—ct
UFFER: ;'�3�
Footing: 't- ) (t .3 orrEieuxe, OST ForiAMS aelk 8/0744
Foundation: tOK id GdKa�Zlon gig/oft
Stormwater FINAL Ap royal:
Underground Plumbing:
Underground Insulation:
Shear Wall : F,*. .2.►-9(0
Sheathing:
Framing: (f fS-Z2-mfo P,F,-setAtc ricurr .c. to-I.Z--o6
Plumbing: /O —5--,176
LI—
Propane T Ik/ Lines: /
- Insulation: :-L'�_ Sc l rZAc%IJL k- /g1rob fN it)in c #X j/AKLi-n Gemnuc Dk' //�44
Sheetrock: 111' /i / n6
Septic Sytem Final • provt�I MUST be obtained before final of structure can be attempted.
Road Approach Final Approval:
Zoning Final Approval:
Final/Occupancy Approval: ;. I - /-,;.-- 7
HEALTH DEPARTMENT AfID PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
Office Hours 9:00 a.m. -4:30 p.m.
HOT LINE AVAILABLE 24 HOURS A DAY
SPECIAL CONDITIONS APPLY - SEE REVERSE
•
SPECIAL CONDITIONS FOR CASE t BLD06-00304
1.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water
quality degradation. The submitted proposal does not require additional aquifer
protection measures. However, during construction the project shall follow the Best
Management Practices (BMPs) and facility design standards as identified and defined in
the Stormwater Management Manual for the Puget Sound Basin.
2.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater,
erosion and sediment during construction. BMPs shall address permanent measures to
stabilize soil exposed during construction, and in the design and operation of stormwater
and drainage control systems.
3.) A Stormwater Site Plan has been submitted and approved by the Department of
Community Development. Once the subject permit has been issued the applicant shall
fully implement the provisions of the submitted plan and contact the Jefferson County
Department of Community Development to arrange a schedule to inspect the property for
plan compliance. A Certificate of Occupancy will not be issued until the Department
verifies plan compliance. No clearing for roadways or utilities shall occur on the project
site until clearing necessary for the installation of temporary sedimentation and erosion
control measures have been completed.
4.) Outdoor residential storage shall be maintained in an orderly manner and shall create no
fire, safety, health or sanitary hazard.
5.) Not more than two(2) unlicensed or inoperable vehicles shall be stored on any lot less
than one-half acre unless totally screened from view of neighboring dwellings and
rights-of-way. Such screening shall meet all applicable performance and development
standards specific to the district in which the storage is kept, and shall be in keeping with
the character of the area. Screening shall meet the requirements of Unified Development
Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable
vehicles is prohibited except in those districts where specified as an automobile wrecking
yard or junk (or salvage) yard and allowed as a Permitted Use in Table 3-1 of the UDC,
and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any
such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area
(ESA).
6.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of
impervious surface which includes roof tops, driveways, concrete, etc.
7.) Minimum setback from Oak Shore Drive right-of-way shall be 20 feet. Minimum side and
arear yard setbacks shall be 5 feet.
8.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the
finished grade, excepting when such lighting is an integral part of a building or structure.
Ground level lighting is encouraged.
9.) Lighting fixtures shall be designed and hooded to prevent the light source from being
directly visible from outside the boundaries of the property. The intensity or brightness of
all lighting, during construction and after project completion shall not adversely affect the
use of surrounding properties or adjoining rights-of-way.
10.) The building height is not to exceed 35 feet.
11.) A minimum of two (2) on-site parking spaces shall be provided for the single family
residence.
I:\F_BLD_Permit_Buildng.rpt 10/29/1999
•
Cb. JEFFERSON COUNTY u Y , i.
i . .' j DEPARTMENT OF COMMUNITY DEVELOPMENT
•.*" `.4 621 Sheridan Street• Port Townsend•Washington 98368
. �'..-r "' 360/379-4450. 360/379-4451 Fax r'r (� COUNTY I
q �� www.co.jefferson.wa.us/commdevelopment " fO I (l
Master Permit Application MLA: 0 6 r I
Project Description(include separate sheets as necessary):
_ ay-Ns-Ay u�-&-- 0. B t ►Ic,i Le. $-toy't-1 -3J be_eircDo WI. She- �/G,firACl/U2A 9 a..vac e_.-
Tax Parcel Property
Number. -IOr _C )()�`y�l/�, 2'3'�,� �-7) �, Size: 00/ t9 00 (acre square fee
Site Address and/or Directions to Property: �.Jft.✓c?%C)O'. \ I�)Oi', l7r 1(1 1 WWI Pc J'i-,i lA • -I5�Cc' '
Property Owner(s)of Record: t OXO '� 111(6'1e, D' )6,0 P: . -.- - ,
Telephone-i I •- ` - Z j 34 Fax: email:
Mailing Address:-P.O• )c Z 1 CC...) c�t S ✓ J - ��E;
Applicant/Agent(if different from owner): Jt feV I'\u jl a. f b-1 +D Ir &X)S
Telephone: 560-k$1-$$Gl2 Fax: 10 8 t--1 `5(G1 email:
Mailing Address: F. 0• Bt >e 9-1 CSI,t_a�. lkI, k.t=ok•aB3E2.
What kind of Permit?(Check each box that applies)
xBuilding U Variance(Minor,Major or Reasonable Economic Use)
L1 Demolition Permit U Conditional Use[C(a),C(d),or CI**
,A11 Single Family Li Discretionary"D"or Unnamed Use Classification
,e3)Garage ttach _ Detached U Special Use(Essential Public Facilities)"`
U Manufactured Home U Boundary Line Adjustment
u Modular U Short Plat**
u Commercial* U Binding Site Plan**
u Change of Use u Long Plat**
) Address *oad Approach U Planned Rural Residential Development(PRRD)/Amendments'*
LEA Propane U Plat Vacation/Alteration'*
u Allowed"Yes"Use Consistency Analysis U Shoreline Master Program Exemption/Permit Revisions'*
U Stormwater Management U Shoreline Management Substantial Development**
U Site Plan Approval Advance Determination(SPAAD)* U Shoreline Management Variance
U Temporary Use u Comprehensive Plan/UDC/Land Use District Map Amendment
L1 Wireless Telecommunication* U Jefferson County Shoreline Master Program Amendment
u Forest Practices Act/Release of Six-Year Moratorium
*May require a Pre-Application Conference "Requires a Pre-Application Conference
Please identify any other local,state or federal permits required for this proposal,if known:
DESIGNATION OF AGENT
I hereby designate to act as my agent in matters relating to this application for permit(s).
OWNER SIGNATURE Date:
By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of
his,her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet
may result in this permit being null and void.
I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attomey's fees and
expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit.
I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application
review and any uCir dater inspections.Access and right of entry to this property shall be requested and shall occur only during regular business
hours. n /�
SignatU • sP J , µ ,X�1 . — Date: —0
The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or
endangered species and could lead to a potential lake"of an endangered species as those terms are defined in the federal law known as the
"Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this
permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your
action(s)even if you are in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual
and non-transferable responsibility for adhering to and complying with the ESA. The Applicant has read this disclaimer and signs and dates it below.
Signature: l 'i . ":1- f- A Date: J (- -C- "'
•
C:\Documents and Settings\mochil\Desktop\Master Permit Application 7-8-04.doc
1.. LUU6 3: 39NM IEKH�INE CUSTOM HOMES SEQUIN, WA • No, 9137 P. 3
F
owNER BUILDER ST
The aig - if this state .nt does h.::,certify that • y are the• :Aim panel referen.••- erein,th
Ui- •• be aaSUm - r .•,.,•. , of tha Gen- 'I Contra . • the proposed are not coo0actora and that
P Pied project.
,. Signature;
�• Role"
GEAI�L CON RACToR
PHORE: FAX:
Y EtO) )
e MA LING ADDREss: rT p+ c't� L
CONTRACTOR'S LICENSE
MAWR: Tait WAINS
AFtC>lITECr/BNOI ��h — 1 C3 r NUMBER
MAILING Atgg: PHONE( ) F, ,
EMAIL
'Project Type: Frame T
1 ' � Wood Existing:
Bathrooms, Shoreline e-T -0i#ew`
r n Wer.1
/=sefattoNRem Steel Proposed: 2. Bank U Cotnmunity System '�L
Octet U Concrete :rota!: .
'- Repair ❑ Z' Height U Indivldual.System
Refion Masonry �-_ SEP Permit#
U Other.__ -Bedrooms: + .Water Su l .
Existing: _� Setback: y�
ll — pinpo�: u Private well U TWO party
FF' Total: _ .5 '��Public rryy
rrl Ci l j, i.i'j1�4 i j`
l this is Comm " ro ct u t ust an er the follOwm%
Number of P g Sp s: Crrreq
N f occupa Gn wners,tenon m Plvpas ADA p g Spaces:
>» ,etc) Gwent
this
Oupaa r • IBC Type etion: WIII you have ood Service? Yes., o Tan nd/or ian nsfallat ric ail s below that apply;
I Heat
Tank Aboveground Tan Size of Propane Tank: t
feart Stove I Cook Stove FWoodstove Fireplace 1 1 Hot Water Tank I Pellet Stove I Other
is this aDpl ance belna installed in a Manufactured 1 Mobile Home? Yes I ) �—-
'W applyinghen or anda et distances
�tall a propane you must also submit a site plan showing all Of the buildings,all puppy
_'^^,i ng Ji a re�etve a,aa. propane tank toad property Urea,buildings and septic sY m rompor er,
Square Footage 4 -k
I Current Proposed For Offk'e USe .�
1 Main Floor Y' >. ..-. �; Amount Revjiltsit .f
' EH Bid App Review: G-
Poor iciA1 ' to +) o()
m consistency Review:
Boor
McTzanine: t s�a tt e;'" I /l/Jl9. 95
5
•^mac+Bat+ Went --, - Additional Section:
j Unheated Basementgn Check fee: l i j 1 l
h,t unheated 1 10-4 , 0l
State. G,
3;,.gelCaryaortWct
� � V r l�j surcharge fee: ` Ll�
Y' ti 1 Pot Water Review fee:
90
rzi ych ., �t Decks
SUBTOTAL
I ESTIMATED COST uIRED t 911/Rd Approach fee:
�/ LSCa� ndatf�a E.A5A-I n
�.
- -__ TOTAL: $ Q
c•\Do".cats'aas a aulweakloplrterP�,;c . Cash/Check Number:Receipt Number:
� ��
Date: 5l' 1
ndation to finish 5 lb} 'b(0
Initials: 6)
ao1b�1.5\
• a
rLfiV, JEFFERSON COUNTY
A DEPARTMENT OF COMMUNITY DEVELOPMENT
621 Sheridan Street • Port Townsend • Washington 98368 ItHi 1 # DLO
0 360/379-4450 • 360/379-4451 Fax
http://www.co.Jefferson.wa.us/commdevelopment/ 0 3
STORMWATER SITE 0 J
PLAN SUBMITTAL TEMPLATES fit'
MLA# ()ll " f;% \ PROJECT/APPLICANT NAME: V
Please answer all of the following questions to the best of your ability. Where the question calls for depiction on a site map, the
applicant may choose to either incorporate the elements into the general plot plan for the Master Land Use Application or to submit a
separate stormwater site plan map.
Project Overview
1. Describe the proposed developed conditions of the site. Indicate position and rel fe'sIz of ro��osec 4mpfovements on the
site map. p
J :
Existing Conditions Summary IT
2. Describe the existing topography. Indicate contoLi9 on the site map.
3. Describe the existing vegetation. Indicate native vegetation areas on the site map.
•
4. Describe the existing soils. Indicate soil type on the site map.
5. Describe the existing site hydrology(i.e., drainage;behavior of water on the site—above, below, and on the ground). Indicate
existing stormwater drainage to and from the site on the site map. Depict separate drainage basins on the site map, if
applicable,and indicate acreage of each.
6. Describe any excess levels of noise generated by the proposed use or activity: A PP R1J V E D
N3C � STORMWATER PLAN
•
' \, MN 1 3 2906
Stormwater B ,,t s, ...>'
stormwater site plan template—rev.10/1/2003 Required /
DEFT.OF �,`' lEFF. ; (INQ�NTy
ITV UgVE OPMENT5,
SIGNATIJR I : _ •it. s
I •
7. Describe significant geographic features and critical areas (i.e., environmentally sensitive areas such as wetlands, streams,
steep slopes,etc.)on the site. Indicate location on the site map.
8. Describe the general vicinity of the site,including adjacent land uses and structures, utilities, roads,and sensitive/critical areas
(streams,wetlands,lakes,steep slopes,etc.).
240 Q COL— hov (--N •
0
_ r
Permanent Stormwater Control Plan
This portion of the Stormwater Site Plan consists of the selection and installation of the appropriate stormwater control BMPs
and facilities to remain in place after construction of the project is completed.
"Medium" size projects are required to have the totals calculated of all impervious surfaces, pollution-generating impervious
surfaces, and pollution-generating pervious surfaces to verify that the thresholds for treatment facilities and flow control
facilities are not exceeded.
g. Describe the developed site hydrology, as proposed. Indicate whether stormwater will be fully dispersed (i.e., per BMP T5.30
in the Manual)or, if not,what types of stormwater flow control will be utilized for the site or specific threshold discharge areas
within the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities.
iTyl-CC_A• LAVLIQ_Lt 'CA/IA 0 a (
Y CJ e
10. If the project requires the use of stormwater treatment facilities, describe the types of stormwater treatment facilities proposed
for use on the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. [This is
normally for"large"projects or projects that involve the potential for dispersion of contaminants.]
11. Describe the performance goals and standards applicable to the project.
12. Describe the flow control system....,.1 f'
•
•9 6
storrnwater site plan template—rev.10/12003
• •
13. 'Describe the water quality system.
lam' A6c-
14. Describe the conveyance system analysis and design.
15. Describe the source of fill material,physical characteristics of fill material,and deposition of excess material.
16. Proposed methods of placement and compaction consistent with the applicable standards on Appendix Chapter 33 of the
Uniform Building Code.
17. Describe the proposed surfacing material.
18. Describe methods for restoration of the site.
19. An Operation and Maintenance Manual is required for each flow control and treatment facility. [This is normally required for
large"projects only and only those for which facilities are required to control flow or treat runoff.] If included,list the Manuals
here.
7/ra
20. List here and include any special ecial reports or studies P conducted to prepare the Stormwater Site Plan.
21. List other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals include
conditions that affect the drainage plan or contain more restrictive drainage-related requirements,describe those conditions or
restrictions here.
stormwater site plan ten-plate—rev.10/1/2003
7
• •
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN(SWPPP)
The Construction SWPPP addresses sediment and erosion control during construction. The BMPs indicated by the applicant in the
template that follows must be installed on the ground during all construction phases of the project. The proponent is responsible for
preventing sediment and erosion impacts to environmentally sensitive areas and off-site areas. Consult the Construction Stormwater
Pollution Prevention (SWPP) Best Management Practices (BMPs) Packet for guidance, particularly with rural residential
development.
SECTION I—CONSTRUCTION SWPPP NARRATIVE
1. Construction Stormwater Pollution Plan Elements. Describe how each of the Construction SWPPP elements has been or
will be addressed. Identify the type and location of BMPs used to satisfy the required element. If an element is not applicable
to the proposal,justify in writing. Descriptions of the 12 Elements are found at section 2.5.2 of the Manual(beginning on page
2-15).
12 Required Elements—Construction SWPPP
1. Mark Clearing Limits.
2. Establish Construction Access.
3. Control Flow Rates.
-- V Q 4—" C\N l v at&)0_, rz Val)Y\ @
4. Install Sediment Controls.
t-a �ln S 1, CNN.U ,l �- l(PCX.A-1.)\-12A
5. Stabilize Soils.
hat eV cv-1 (Lac pinse
6. Protect Slopes.
PCX‘PJL rAA AI 1 r 'CX).64.1-1--0.10
t. .� ♦.0�yr
7. Protect Drain Inlets. l
8
stormwater she plan template—rev.10/1/2003
• I
12 Required Elements—Construction SWPPP(continued)
8. Stabilize Channels and Outlets.
M/P r t n-fv -Wri
9. Control Pollutants.
10. Control De-Watering(the act of pumping groundwater or stormwater away from an active construction site).
11. Maintain est Ma agement Practices(BMPs .
12. Manage the Project.
2. Adjacent Areas.
a. Description of the adjacent areas that may be affected by site disturbance (e.g., streams, lakes, wetlands, residential
areas, roads).
•
A-
b. Description of the downstream drainage path leading from the site to the receiving body of water(minimum distance of 400
yards).
lV
3. Environmentally Sensitive Areas.
a. Description of environmentally sensitive areas that are on or adjacent to the site.
M /Ps--
stormwater site plan template—rev.10/1/2003
9
• •
b. Description of special requirements for working in or near environmentally sensitive areas.
A'\--
4. Erosion Problem Areas. Description of potential erosion problems on site in the context of the characteristics of the on-site
soils(e.g.,erodibility,settleability,permeability,depth,texture,soil structure).
Ni dk
5. Construction Phasing.
a. Construction e/ 110 t *-1 Li
b. Construction phasing(if proposed)
6. Construction Schedule. Wet season is October 1 through April 30(page 2-21 of the Manual).
I. Prov'de a constru schedule. `'��
--°- r.�-�k4) —1IuL�1/
II. Wet Season Construction Activities.
a. Pro osed wet season construction activities.
I VA.\ . IR`, _sv,�--}-- OcAzG,, � ,��tc ma (' k jU,. fit.
b. Proposed wet season construction activities for environmentally sensitive areas.
7. Financial/Ownership Responsibilities.
a. Identify the property owner responsible for the initiation of bonds and/or other financial securities.
F6k Axe rs ----k nUL,q —L
b. Describe bonds and/or other evidence o inancial responsibility for lability associated with erosion and sedimentation
impacts.
8. Engineering Calculations. Provide Design Calculations on a separate sheet for thkf of owing,ig ppticable.,
lily it r � 4-, \'
a. Sediment Ponds/Traps.
b. Diversions. [ I\ r<�.f' cx
c. Waterways. .4. ...o 4
d. Runoff/Stormwater Detention Calculations
Jift t�?;i iiilitf
10
stormwater site plan template—rev.10/1/2003
•
Stormwater Site Plan Changes
If the designer wishes to make changes or revisions to the originally approved Stormwater Site Plan,the proposed revisions shall be
submitted to DCD prior to construction. The submittal shall include substitute pages that include all proposed changes, revised
drawings showing any structural changes,and any other supporting information that explains and supports the reason for the change.
Final Corrected Plan Submittal
If the project included construction of conveyance systems,treatment facilities,flow control facilities,or structural source control BMPs
(not standard on-site stormwater management BMPs),the applicant shall submit a final corrected plan ("as-builts")when the project is
completed. These should be engineering drawings (stamped by a licensed civil engineer) that accurately represent the project as
constructed.
APPLICANT SIGNATURE
By signing si nin the Construction SWPPP worksheei, I as the applicant/owner attest that the information provided herein is true and
correct to the best of my knowledge. I also certify that this application is being made with the full knowledge and consent of all
owners of the affected property.
sC CJ.� JC k� ell —0(°
(LAND WNER OR AUTHORIZED REPRESENTATIVE SIGNATURE) (DATE)
THIS SPACE MAY BE USED FOR ADDITIONAL NOTES,IF NEEDED:
rt
�` , " 1`
'* .)
JEfff 8SON i0 ifY C(i
12
stormwater site plan template—rev.10/12003
Cris
rri
'TO 7 ,.10
O n'I
= O� Z O
Z
_ I
a O
Z W O
10 0. 00' 6 0W_ � 7
?S, •
jl
ELEV.
350
67'-0"
I \ 1 /
___
10'
6
RESERVE DRAINFIELD
Lu I •�I /
0
N PRIMAPY DRAINFIELD
N
d-
z ocr)
Y 1
ti) I Ii CO VERED K
c N� PORCH
10y-•� - PROPOSED 3
BEDROOM
RESIDENCE
ax...1 Lu / 1P.'''';:‘
SQUARE FQQTA 5 o o Z
LIVING 1999.5 GES: 1 Na
COVERED 293
PORCH Cp ERED PARCH75
ES ¢ '+�
��
=a Ct
, 1 :
\_____ - 1---- A
I ,_
, ,-,
: N
• W
Approx.
Drywall
Location Q k SITI— D L nH \
w s
0 SCALE 1" = 20'—0"
ELEV. 0 0' (Ni HOWARD & MARGARET DUGDALE
348 cr 2 PARCEL # 965-000-239
°- KALA POINT #7 LOT# 354
R. 500' .48 ACRES
SEC. 27 TWP 30N RG 1W
Q44C 2o' ELEV.
202 OAK SHORE DRIVE p n
SH
349 PORT i iini4A4tnA- (0(4)nS rtC1 OR TERHUNE CUSTOM HOMES
360—681—8898
wilt DRIvE 5 17 06 LR
oF '. y ,.....,*0 c, g ( 0u . F- (--06 IQ _
= . Q tL4)O b - 304
-0 S eP 0(o--
t