Loading...
HomeMy WebLinkAboutBLD2006-00310 • • BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD06-0031 0 Received Date 06/1/2006 SITE ADDRESS: 30 GOLIAH LN Issue Date 06/30/2006 PORT LUDLOW, 98365 APPLICANT: AB GENERAL CONTRACTORS INC PHONE: 206-226-6173 PO BOX 4466 FEDERAL WAY WA 98063 SUBDIVISION: PORT LUDLOW NO. 2 Block: Lot: PARCEL NUMBER: 990600281 Section: 9 Township: 28 N Range: 01 E CONTRACTOR: A B GENERAL CONTRACTORS, INC PHONE: 206-226-6173 PO BOX 4466 FEDERAL WAY WA 98063 Contractor's License: ABGENCI981 DE Expires: 3/6/2008 PROJECT DESCRIPTION: NSFR WI ATT GARAGE &A/G 120 GAL PROP TANK CALL IN FOR THE REQUIRED INS ECT 'NSTIAT APPLY TO YOUR PROJECT. SETBACKS: 40k /'� of , - ld &Wd/ion UFFER: OK 8,4i t. t Footing: /}g 8/2/ 44/ 7 / L'�iyld/Z/a/1 Foundation: 014/2r5A,‘ Stormwater FINAL Approva. Underground Plumbing: Underground Insulation: Shear Wall : Ex`r Dk q,%2/oL Sheathing: , OR f/zz�D,GJ � . i Framing: ///FfRA/➢,1/i &/ - %f-%�vs ac?lurk/ce ) 9/!/4LJ� OA' 01AZf Plumbing:// oo( 90z7``�eh# Propane Tank/ Lines: . , -4.- •. i3. ak ' z. ._. i Insulation: ;c i_ MAW L A. k7174 . .., :► H41L4? L filr Sheetrock: a 10`4//F4 df4 9/f1 Septic Sytem Final Approva MUST be obtained before final of structure can be attempted. Road Approach Final Approval: Zoning Final Approval:Final/Occupancy Approval: /Jk( -tnn 01r 46 HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL RE UIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY - SEE REVERSE • • SPECIAL CONDITIONS FOR CASE t BLD06-00310 1.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 2.) A Stormwater Site Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 3.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 4.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less than one-half acre unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Unified Development Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage) yard and allowed as a Permitted Use in Table 3-1 of the UDC, and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area (ESA). 5.) Maximum lot coverage is not to exceed 45%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 6.) Minimum setback from Goliah Lane right-of-way shall be 20 feet. Minimum side and rear yard setbacks shall be 5 feet. 7.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 8.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 9.) The building height is not to exceed 35 feet. 10.) A minimum of two (2) on-site parking spaces shall be provided for the single family residence. 11.) Per MPR Code Section 3.17, Accessory dwelling units (ADU's) shall not be allowed in the MPR-SF zone. I:\F_BLD_Permit_Buildng.rpt 10/29/1999 • • MLA06-00287 BUILDING PERMIT APPLICATION ReviewType:l Jefferson County Department. of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD06-00310 Received Date: 6/1/2006 SITE ADDRESS: GOLIAH LN PORT LUDLOW, 98365 OWNER: AB GENERAL CONTRACTORS INC PHONE: 206-226-6173 PO BOX 4466 FEDERAL WAY WA 98063 PORT LUDLOW NO. 2 SUBDIVISION: Block: Lot: PARCEL NUMBER: 990600281 Section: 9 Township: 28 N Range: 01 E CONTRACTOR: A B GENERAL CONTRACTORS, INC PHONE: 206-226-6173 PO BOX 4466 FEDERAL WAY WA 98063 Contractor's License ABGENCI981DE Expires 3/6/2008 REPRESENTATIVE: PHONE: PROJECT DESCRIPTIOr NSFR W/ATT GARAGE & ANG 120 GAL PROP TANK TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 2,067 VALUATION 206,855.00 ADD'L: HEAT TYPE: HTP CODE EDITION: 1997 HEAT BASE: HEAT TYPE: OCCUPANCY: R-3 UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N GARAGE: 679 SHORELINE: CONST TYPE: DECK: 237 SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: SEW WATER SYSTEM: LUDLOW BEDROOMS: BATHROOMS: Exist: 0 Exist: 0 Prop: 3 Prop: 2 Total: 3 Total: 2 Routing Date: (0[210(r, — Type Amount Paid By: Date: Receipt: A Approved/Date / F Permit $1,592.95 LYK 06/01/06 81390 ! . Plan Check $1,035.42 LYK 06/01/06 81390 JUN*20;615 State Building Code $4.50 LYK 06/01/06 81390 Potable Water Application $55.00 LYK 06/01/06 81390 Jefferson County Planninu & Building Department Total: $2,687.87 AI 0. n • CvQTiAN o(ZAtt J D cn cn le". ._ m m ( NO3'27'08" 65.00' (hut€ o r ( o L� 55 U) I oo aav r*, r oo 00 4� o Mil p ��,, a I SS Pa' - s ( N Q o °' C7 0 I :Q N �I 1 'I, v' o a V w p N ( m �- Q(67 SqI rri63 I to ptu ti pcse I .7I II 0o O ay. c vj o I r 4•' �t �, I CA I Ia�O CO, P ,�,M co t=0 1 z y b w w E O N P0;3fR v ! Bei aI n/ ,IOi 's'<o C'' C i O °a° 56i -to.• 1 G14,cL 5zt oPp,(� ir.l r� �' .emu iv +i C :_; 00 _'221'5 'E 76.55' 6- 10nE.O ;/ to _, _., 'Natkt N 2(1.4 ? (D `l I86.00 ---N_127'08- N04'10'S2"W [''� CD Ci. E N04'10'S2"W �'� 40.03- 40.03' S7.00' �y ' !N GOLIAN LANE N P W.IIT # OLD nr ma, - 0 6 - 0 3 1 0 P , fit .40 , ,.) CD 'SON COUNTY WA jEfFEDSUN COUNTY DC -, 0 u nMD Q ?r P A � l= C D tU 0 I C" W 16,..,! (4:, ., 9.,,,,. N.,_ , Atkg;t: . ,,,)P-4: v z. v CO i. o cn a ono O r i Q 1 ., ,dal ^^�� N C+d ci, lif P, \.� i,, o i �„ y r l__ - s i k, i)-- N C°� JEFFERS N COUNTY \q DEPARTME F COMMUNITY DEVELOPMENT • • i•C 621 Sheridan Street • Port Townsend •Washington 98368 360/379-4450 • 360/379-4451 Fax q�, No�p www.co.jefferson.wa.us/commdevelc�f�menf j ���n Master Permit Application MLA: 0(0-Qg---) Project Description (include separate sheets as necessary): R�y-;OCR ti. iA,so:1; " t,., "\-1-i ,cf1-GKC5:p G-,i' -16,- &67 /--z° 12D C P Tax Parcel Number: GGC(06 00 2- 1 Property Size: % 3[ falM square feet) Site Address and/or Directions to Property: I; -OLt,A l-14 L pour L._00Loi,,i Property Owner(s)of Record: A 6-5.r�-p. .fki5;" A-c)A-1 (1�L-S Telephone: la') Z26--C.,i"l3 Fax: L,L6i3) C21-'izirf`i email: cL.c{.tc.w—b._ I00E,HS74,0ora Mailing Address: ?,0,(;07r L C-.7121k1 W A-( t,j 4 Clg t : Applicant/Agent(if different from owner): AOekM pAZ,1h Telephone: Fax: email: Mailing Address: What kind of Permit?(Check each box that applies) Li Building ❑Variance(Minor, Major or Reasonable Economic Use) U Demolition Permit ❑ Conditional Use[C(a), C(d),or C]** Single Fam' ❑ Discretionary"D"or Unnamed Use Classification Garage Attached Detached ❑ Special Use (Essential Public Facilities)** ❑ Manufac, me ❑ Bo undary Line Adjustment ❑ Modular ❑ Short Plat** ❑ Commercial* ❑ Binding Site Plan** O Change of Use ❑ Long Plat** ❑ Address 0 Road Approach ❑ Planned Rural Residential Development(PRRD)/Amendments** Propane ❑ Plat Vacation/Alteration** ❑ flowed"Yes"Use Consistency Analysis ❑ Shoreline Master Program Exemption/Permit Revisions** ❑ Stormwater Management ❑ Shoreline Management Substantial Development** ❑ Site Plan Approval Advance Determination (SPAAD)* ❑ Shoreline Management Variance ❑ Temporary Use El Comprehensive Plan/UDC/Land Use District Map Amendment ❑Wireless Telecommunication* ❑ Jefferson County Shoreline Master Program Amendment ❑ Forest Practices Act/Release of Six-Year Moratorium *May require a Pre—Application Conference **Requires a Pre-Application Conference Please identify any other local, state or federal permits required for this proposal, if known: N1( - DESIGNATION OF AGENT I hereby designate to act as my agent in matters relating to this application for permit(s). OWNER SIGNATURE 4,"A"—' MA ¶)Q,. oc 4( Ce. INr— Date: 7 f 3i`OC, By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of his,her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and its employees, representatives or agents for the sole purpose of application review and any required later inspections.Access and right of entry to this property shall be requested and shall occur only during regular business hours. Signature: A---444 Piz Pizt, 4 4-g &L, it - Date: S/3 i/oL The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s) even if you are in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual and non- transferable responsibility for adhering to and complying with the ESA. The Applicant has read this disclaimer and si ns and dates it below. Signature: /,2L.(t4. QQi3 ct iA `-'�--L� Date: 6 3j GS. G:\PermitCenter\FORMS\DRD FORMS\Master Permit Application 12-30-05.doc BUILDER STATEMENT The signer of this statement does herebyrtify that they are the Owners of the parcel reference Herein,that they are not licensed contractors and that they will be assuming the responsibility of the eneral Contractor for the proposed project. At Signature: _PV'd Date: I Si/a, GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: FAX: Az GENC-1At.. con.rr 'o2s /nor. (2 , ) 20G-603 (2C3 ) G27-WeK- MAILING ADDRESS: PQ i j( ( ,66 1:6=19,----iz-4-z. 1.f„ 't /4,4 EMAIL: (2..GI141.44a._Iv_100e hiSni,Cor-p I CONTRACTOR'S LICENSE q&d,j WAINS I NUMBER: 6G66/ 1Cr qs) O& NUMBER ARCHITECT/ENGINEER: PHONE ( ) FAX: ( ) MAILING ADDRESS: EMAIL Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal: New 'l Wood Existing: y Sewer O Addition ❑ Steel Proposed: Bank Height: ❑ Community System ❑ Alteration/Remodel LI Concrete Total: 0 Individual System ❑ Repair Li Masonry SEP Permit# ❑ Demolition 0 Other: Bedrooms: Water Supply: Existing: Setback: ❑ Private well u Two Party Type of Heat: Proposed: 1 S Public iAGA-cr NvtC' Total: ; Name of System: If this is a Commercial Project you must answer the following: Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply: O Underground Tank '4,Above ground Tank Size of Propane Tank: 12.0 0 Heat Stove Cook Stove ❑ Woodstove Fireplace4mart X Hot Water Tank ❑ Pellet Stove [1 Other Is this appliance being installed in a Manufactured/Mobile Home? Yes /0 When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines, tank location and size, distances from the propane tank to all property lines, buildings and septic system components, including the reserve area. Square Footage Current Proposed For Office Use Only ,r .'u- Amount Revision Main Floor Heated Zc-, I5i521AS 21 EH BId App Review: 2"d Floor Heated AA Consistency Review: Other Heated * Base fee: 1 01,R q Mezzanine N� Additional Section: �I' Heated Basement IAA Plan Check fee: U 4 . Unheated Basement i State Surcharge fee: l Other Unheated Pot Water Review fee: CIO , • Garage/Carport 6-7c4 11v°`-'4 .°3 SUBTOTAL as 13 G1-1 Decks 911/Rd Approach fee: I3 Other QUQ-(.M I P/wo 231 scY/;.aS TOTAL: $36,9-7 .O 1 Receipt Number: $ I O Cash/Check Number: Lonpr- ESTIMATED COST(REQUIRED) & Date: )0(p•Fair market value of all labor,and materials foundation-� 1 /2 00>COO Initials: C c— G:\PermitCenter\FORMS\DRD FORMS\Master Permit Application 12-30-05.doc . S • A9 , , -'% EFFERSON COUNTY ii .i q ►` DEPARTMENT OF COMMUNITY DEVELOPMENT JUN - 1 2006 ' F 1 � 1 621 Sheridan Street • Port Townsend •Washington 98368 360/379-4450 • 360/379-4451 Fax http://www.co.jefferson.wa.us/commdevelopment/ STORMWATER SITE PLAN SUBMITTAL TEMPLATE MLA# 12 • 11. PROJECT/APPLICANT NAME: Please answer all of the following questions to the best of your ability. Where the question calls for depiction p applicant may choose to either incorporate the elements into the general plot plan for the Master Land Use Applicat on ortto map, submitthe a separate stormwater site plan map. Project Overview 1. Describe the proposed developed conditions of the site., Indicate position and relative size of proposed improvements on the site map. IlteetE0 OIL-Cv1 Mr- t..sc- ± cc-ec-ik 140 5-t,;i si.c TO `lie r -t- g • Existing Conditions Summary 2. Describe the existing topography. Indicate contours on the site map. 5 6 `n-4o c-f/a45-6r- 3. Describe the existing vegetation. Indicate native vegetation areas on the site map. 4. Describe the existing soils. Indicate soil type on the site map. •' Solt- 21 L^P ti; i t - - J : II . .I il I r I • 5. Describe the existing site hydrology(i.e., drainage;behavior of water on the site—above, below, and on the existing stormwater drainage to and from the site on the site map. Depict the site map, if applicable, and indicate acreage of each. ground). Indicate separate drainage basins on S %a 1 ' S S r 1' I t L • l'=7J p, 4► " ' S +`4 I I a a . , P 6. Describe any excess levels of noise generated by the proposed use or activity: • ' M ATER PLAN Stornnwa a ;�I1,�I � Am Required II r�. r JEFFERSO • ` DEPT.OF CO ..■1"t ` �� stormwater site plan template—rev.10/1/2003 SIGNATURE: ■� �/�,�=� v • 5 • • r - • 7. Describe significant geographic features and critical areas (i.e., environmentally sensitive areas such as wetlands, streams, steep slopes, etc.)on the site. Indicate location on the site map. 8. Describe the general vicinity of the site, including adjacent land uses and structures, utilities, roads, and sensitive/critical areas (streams,wetlands, lakes,steep slopes,etc.). Permanent Stormwater Control Plan This portion of the Stormwater Site Plan consists of the selection and installation of the appropriate stormwater control BMPs and facilities to remain in place after construction of the project is completed. "Medium" size projects are required to have the totals calculated of all impervious surfaces, pollution-generating impervious surfaces, and pollution-generating pervious surfaces to verify that the thresholds for treatment facilities and flow control facilities are not exceeded. g. Describe the developed site hydrology, as proposed. Indicate whether stormwater will be fully dispersed (i.e., per BMP T5.30 in the Manual) or, if not, what types of stormwater flow control will be utilized for the site or specific threshold discharge areas within the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. 10. If the project requires the use of stormwater treatment facilities, describe the types of stormwater treatment facilities proposed for use on the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. [This is normally for large"projects or projects that involve the potential for dispersion of contaminants.] 11. Describe the performance goals and standards applicable to the project. 5-45'a1 l NI' V IA 6 (.56-C-,gar S Mkt P(1-0 f Q 240Vj 4 F/U o l m z co _i t f P .-0V 7 Q4'YS vcr it Is1 12. Describe the flow control system. - stormwater site plan template—rev.10/1/2003 6 • •• • • 13. Describe the water quality system. w.a-1I . b . ;1- N PL.+-c Tort_ SU z!1 14. Describe the conveyance system analysis and 1,A417.5g.- 15. Describe the source of fill material,physical characteristics of fill material, and deposition of excess material. - SLAt [... e��. t -� , _ 0 i( C_ • •` �� ..atr J�r it �`{ 16. Proposed methods of placement and compaction consistent with the applicable standards on Appendix Chapter 33 of the Uniform Building Code. ` A 17. Describe the proposed surfacing material. 5-0 IL- r\J ' . , r Lid ' a• {�L 18. Describe methods for restoration of the site. Ci rE i.5 i l,t. — C . r. r C° o ' C—L;S Lam tom' jb s 19. An Operation and Maintenance Manual is required for each flow control and treatment facility. [This is normally "large"projects only and only those for which facilities are required to control flow or treat runoff.] If included,list the Manuals here. required for Tr ' r 20. List here and include any special reports or studies conducted to prepare the Stormwater Site Plan. 21. List other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals include conditions that affect the drainage plan or contain more restrictive drainage-related requirements,describe those conditions or restrictions here: ► f : 'Jk- •M stormwater site plan template—rev.10/1/2003 7 • • • • CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN(SWPPP) The Construction SWPPP addresses sediment and erosion control during construction. The BMPs indicated by the applicant in the template that follows must be installed on the ground during all construction phases of the project. The proponent is responsible for preventing sediment and erosion impacts to environmentally sensitive areas and off-site areas. Consult the Construction Stormwater Pollution Prevention (SWPP) Best Management Practices (BMPs) Packet for guidance, particularly with rural residential development. SECTION I-CONSTRUCTION SWPPP NARRATIVE 1. Construction Stormwater Pollution Plan Elements. Describe how each of the Construction SWPPP elements has been or will be addressed. Identify the type and location of BMPs used to satisfy the required element. If an element is not applicable to the proposal,justify in writing. Descriptions of the 12 Elements are found at section 2.5.2 of the Manual(beginning on page 2-15). 12 Required Elements-Construction SWPPP 1. Mark Clearing Limits. `i-4\11ff 6JsIn- Qae !✓ '4 To Qt-.,Ac cQQoso tr_01"nib- oc 1 t 1 l-. M pc 2411 ':Q,*-t QA t�n;rh- Or�� 2. Establish Construction Access. Cc wwvAi tAvonl C3 c.- RA-)d) J P tv-itt► L t� G 2J1 S M 12-4w LY�r ;c.?'tatr Co r'rL4tt1. 3. Control Flow Rates. 6,,1_14_ Li I L i3 t: I' J c4j.t- C.oi--)Mac- ` Ou1 Ru H 4. Install Sediment Controls. ` 5. Stabilize Soils. CA-/l1A,2.124r- -C1t Di- f (1 6. Protect Slopes. 7. Protect Drain Inlets. U GOO 542t ee..- t:~i--aa, stormwater site plan template—rev.10/1/2003 8 • . 12 Required Elements—Construction SWPPP(continued) 8. Stabilize Channels and Outlets. TA-celt4W- i Of.kl t f Q-.o c k, SakAD 9. Control Pollutants. 10. Control De-Watering(the act of pumping groundwater or stormwater away from an active construction site). W L a-evt,--00 'Ft"l.j r , -Pr t3/1-CrS 11. Maintain Best Management Practices (BMPs). 4 L ti j.(.t, h,AtiaPodE 1��1'S 9f j'`A J Otf Q t)9-"t-lbrE 12. Manage the Project. 03/41`1 CA-t ECAL 1}4 c S�1 N cL211t 4C�V�'It.�G fi tYV2 2. Adjacent Areas. a. Description of the adjacent areas that may be affected by site disturbance (e.g., streams, lakes, wetlands, residential areas, roads). b-. Description of the downstream drainage path leading-from the site to the receiving body of water(minimum distance of 400 yards). TS IN TO 1 f S(-O PZ ro jr rtc 3. Environmentally Sensitive Areas. - a. Description of environmentally sensitive areas that are on or adjacent to the site. stormwater site plan template—rev.10/1/2003 9 • • b. Description of special requirements for working in or near environmentally sensitive areas. 4. Erosion Problem Areas. Description of potential erosion problems on site in the context of the characteristics of the on-site soils(e.g., erodibility, settleability,permeability,depth,texture,soil structure). tVv�� 5. Construction Phasing. a. Construction sequence b. Construction phasing (if proposed) 6. Construction Schedule. Wet season is October 1 through April 30(page 2-21 of the Manual). I. Provide a proposed construction schedule. ff L1 II. Wet Season Construction Activities. a. Proposed wet season construction activities. b. Proposed wet season construction activities for environmentally sensitive areas. 7. Financial/Ownership Responsibilities. a. Identify the property owner responsible for the initiation ok'bonds and/or other financial securities. b. Describe bonds and/or other evidence of financial respgnsibility for liability associated with erosion and sedimentation impacts. 8. Engineering Calculations. Provide Design Calculations on a se arate sheet for the following,if applicable. a. Sediment Ponds/Traps. b. Diversions. c. Waterways. d. Runoff/Stormwater Detention Calculations stormwater site plan template—rev.10/1/2003 10 • • Stormwater Site Plan Changes If the designer wishes to make changes or revisions to the originally approved Stormwater Site Plan, the proposed revisions shall be submitted to DCD prior to construction. The submittal shall include substitute pages that include all proposed changes, revised drawings showing any structural changes,and any other supporting information that explains and supports the reason for the change. Final Corrected Plan Submittal If the project included construction of conveyance systems, treatment facilities, flow control facilities, or structural source control BMPs (not standard on-site stormwater management BMPs), the applicant shall submit a final corrected plan ("as-builts")when the project is completed. These should be engineering drawings (stamped by a licensed civil engineer) that accurately represent the project as constructed. APPLICANT SIGNATURE By signing the Construction SWPPP worksheet, I as the applicant/owner attest that the information provided herein is true and correct to the best of my knowledge. I also certify that this application is being made with the full knowledge and consent of all owners of the affected property. M Pa:3 i tc.. I uz 1 -3riao (LANDO ER OR AUTHORIZED REPRESENTATIVE SIGNATURE) (DATE) THIS SPACE MAY BE USED FOR ADDITIONAL NOTES, IF NEEDED: stormwater site plan template—rev.10/1/2003 12 54�o'� Io=o' !E'col' }1'_�n gl ou I / �s zo r 5_0 !_ 5'o"- q+_�„ d-O„ I 3,�„ 41-0' / 3'-0" I1-I_4 t� 1`K / (nEo I m,' !,1z �S ;� 1 'YR O O° "° M SRm 1Z � �a / ZCn zcno Z 3 Z z� c� 3`° mo•d. Q• r / j 5� m - ono N_ , • ��\ W iil O W N • 111 Cib N� �H' YID��/I ��, Z W_ N 1. r - >vr ?:(1 0 r• r--W EF,R '� + 2 ! 'LrG 3' G' sI mzz.� i '37 I / tLiR Pnr1TRY �x - 7„ 3 + I -I \ N Q 1 I 0-) /fir K n 1-� • r--� -c`� (1 T� c ! I I .- I 1 , / \ C` ---- -- rc 110 ,,,_,,:„.,, , ...,„„,z ,,,,,_,,y., : ,„ ,- - . 7_ ,,_ cn O o s-:I CD Q a I 979999 N 1 I • ® O• e—}-( \, Q , N% O ns„ I 1 IN I 1 O .� •\\ .`,. ) l r -,� ! r' O r 1 -- - •, W N o O �o � • / I Z- N -.7C /I I Mr. 1 O ' - - - „1=, =• 3 11 "I 0-o" 'n 6' v , m co �L� r\i,D14 �\, II 1 o j I m BD ' m -p 1 •l..'.I% " O s` ,. 1 , h r ' u 11 ' ,A I - ' r , ; 1 -------- iv 1 31 It \ ® is_ tide 1 = s c D I s O iv , .1.. _-- I s O_ a Z -- m I 1, _ m0 G N -1 r Gi / / �- .a_ I 3 2 COn'f5 " N- � ��r \ i Y-t 'I �1J. ' II g. -1 I.1 t '(I�PJ l�� -y T1 1 'i '/ �-C iD 4-o a 3-8'.4 W HOW6R `P � .(, r ^l' :-A- �,a 'ol a _ O - O ! J y"- i C ' sP_ (s I / r� '+ s nl _ •ate N D Q II It" IZ-o" 3'-G.%¢'' '218" - 814" I m �1 N_ 2 4 I�� ! r - 1 1 Al CD • tn ;. I O f� fR,--:;, I ) �`KM i�- _ c• ITM �_ I �' O ; r - POt.ESN ELf V I I O !� 1 - D ) �= C I y � S v `/- �I 1 at s N z WAR�iZOBE � J ��-'fA I N ' I� INN. it. = • QD I 4 O O I W O- - p11 ! '6 . I `-� y ' I }- *$3� as �S -Im '�-I ,y 0- •r = j ai r=�1� --JJ—, _40 Ai -10 173„ O i av IV----.----_I I� !w m In O I T ' O II Cn �`n I 1 1p= I / / ! cs p oq I -------I- — ----------Q, X-- --- A A / t _ pp m iv R IM I I N N 6` ➢f1r wT 1p m V_ \ - _ r ! 'N I _1- 5,Ou 3O I II,_II11 I 9I I 4=02ro _ ,_O �z l- - ais, - ! 4---, ' , , ® N_ , SHELVES -1-1 r >--,- - 73yO _- ' < LZI ; iLm� c -'-1/2` l0"r 0 to ".D 47 - a L- 0 ,. Jr DtT D I ----- —� L r 1 N 1 {pr .1 • -• i�` y I i . n 0 vQD ,> x p . c.• 1 xle G m=a is S .y;Y� 0 1�2=1.' fli 314," ! N o !:1 0 ! op j 7Tr17T9 . , •ff, 2 1 pCn I I (, W (il A N N 1 , N I m G p• c I O s N II11 ——J7-I -0 6= 6= . \ '° = :al 1s K____-:\ Ibf f Z i i f1 �' m N o_ S IZ o O C h o� I Igi, LIT. • � 4,_ 7, -,,i 1. 1 ril!9,TT9TF,TT ,— ,_ t..11 \ I. Z -1 _ I I 14•-�" ' _ _ D Z I II �ZI,,III I I A / ® wk, a m*.o.� =5.3't'i m p / 2 0 / X II OI / o� m om .6m n II I I II 1), 0 a -G1= .6 1 23 0 4 I o Il / 4 7 5 / 6/ r1` I In 8 p�,t.., a c, Nam,# 4,l' TJ r 0s4.17- 9999 !9TTR9, I —-• 0.7 hi z s ..A N I �'� o Ti y NORTHWEST HOME DESIGNING INC. • m IV = 1 Z <W - 4928 109TH STREET SW. LAKEWOOD WA 98499 (253)584-6309 FAX:(253)588-0607 CO ci WWW.NHDHomePlans.com 73 J A-kI 6-c-- i f\cr-- tm,-) ,. cit-LL. A-s--)Ati 3c, 2.U:, 61 7 I ,r_ ..../ ri tr \A <rt t•) \- - c -r —1 5 0 —h -0 0 XI Cf) 0 —1 cp 2705- ... --, C.C2 = =. 3 iii 5.4): 5 -C3 Wm ....1.,...14.. ....-- iz- 2 a 3 a) Ul. g• °a 1111114W111&s. Illiiitk o 0 ?-61- —.... = c lhIIIIIIIh6, ijiiir c__ _-__ --......_ 1..., ,..• i' rn C4 1111111111111111111 ,..i Aet_t_ tit..7. il)ji --I - 0 0 ` --- = 5- : CD 0 -f 0 -0 1111.71011`. Ilibb > 0 • -ssi•-....-:.* —3 0 .*- 70 < c t. , a) a iP I "0 till 11 6 0 I p.. Er er•Klahro i 6'94) 7- • I — 0 0. r7Z • i 7 a) ....=. - = 41110 oq 3 (116) ' NIIII ' 11 ' , , / I f1 4 111 Nopp-ii iii ii 1 IP0 ". :)4, ry 3 to43c)o,c' CD 00 •0 , • 5 w 0 t = 4.7 ill , r----) ---- 0 , ' / 14 ....., ED 4. ......_.... / 7 . I 7\\ • a) ,-, \c -- „, ' • ,./' N., , ... , = g ••, 0 cp IlL pv,,NIJ K1 4 CD = Ca. . Cr Ihr 9- CA 1110 -TN ....- ......... 75. En __.- ------------- = = ; - = GOLIA H L A N „ ... Tr, ...•• ..,..,t,-l4 01 I.* it I . ' --- .... k.,..m. II imm6-1:08" 12" •s” CI...21;Y Is III ...._••"^ \-__r7 .----- ?). ..N, bi CD ..:- ' , • ',..• . • ,....____ w Li V:::34114.1c Wall 0 Height t, i GUM- )--• t,,, , •,,t r,.,"4 ps, , 4'0") C.... 0 . Pcik:' .. , .v1 1 II V •‘ ttl 0 ----- N....n..........._ oSnoil site . ,;,,,i,t „ I ,1',11.11EatiLL ----"-- ES ( 8. Base Rock .....e. • Perfordted / Drain 0 C't • 0 ,,,,,,, 7/2 Do riot slope‘whoore Mao wok per loot away Isom wall = C, 4:h (.0kot•All). PL----- 11, 011.41,) cAve 2 .., = c..„, .--- ....- I .- ill .........._ ...... '-c ....,.