Loading...
HomeMy WebLinkAboutMemo to Auditor Confirming Posting MEMORANDUM TO: Brenda Huntingford, Jefferson County Auditor FROM: Joshua Thornton, Real Property Specialist DATE: December 3, 2025 RE: Notice of Public Hearing: Bonneville Power Administration (BPA) Franchise The Board of County Commissioners will conduct a public hearing on Monday, December 22, 2025 to consider granting a franchise to the United States of America, Department of Energy, Bonneville Power Administration to survey, install, construct, repair, replace, upgrade, maintain, relocate, modify, extend, remove, operate, inspect, patrol, and operate components of an electricity transmission and distribution system in County Road rights-of-way in eastern Jefferson County. RCW 36.55.040 requires the County Auditor to post notices of the public hearing in three public places in the County seat at least fifteen days prior to the hearing. In the interest of efficiency, you have authorized Public Works to perform this task. On Wednesday December 3, 2025 I caused three copies of the attached NOTICE OF PUBLIC HEARING Bonneville Power Administration (BPA) to be posted at the following locations in Port Townsend:  The official notice board in the Jefferson County Courthouse o 1820 Jefferson St, Port Townsend, WA 98368  The lobby of the Port Townsend City Library o 1220 Lawrence Street, Port Townsend, WA 98368  The lobby of the US Post Office o 1322 Washington St, Port Townsend, WA 98368 Thank you! cc: Monte Reinders, P.E, Public Works Director Eric Kuzma, Asst. Public Works Director / Eng. Services Manager