Loading...
HomeMy WebLinkAboutBLD2006-00376 • • BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD06-00376 Received Date 07/5/2006 SITE ADDRESS: 2 PFTEG SPUR 13 2- fraync 54- Issue Date 07/25/2006 PORT HADLOCK, 98339 APPLICANT: SEVEN BRIDGES PROPERTIES, LLC PHONE: (360) 379-4947 PO BOX 1953 PORT TOWNSEND WA 98368 SUBDIVISION: ANDERSON COURT LONG PLAT Block: Lot: 15 PARCEL NUMBER: 931300015 Section: 2 Township: 29 N Range: 01 W CONTRACTOR: SEVEN BRIDGES PROPERTIES LLC PHONE: (360) 379-4947 PO BOX 1953 PORT TOWNSEND WA 98368 (360) 379-1750 Contractor's License: SEVENBP983JD Expires: 6/24/2008 PROJECT DESCRIPTION: NEW SFR W/ATTACHED GARAGE CALL IN FOR THE REQUIRED INSP TIONS THAT APPLY TO YOUR PROJECT. SETBACKS: a' 94/04 UFFER: LW 01,64e# Footing: 40K 4/4/0,6 Foundation:.-I;Dip im (.. 1-I p 59<_ i - 1 Z.-ob Stormwater FINAL Approval: Underground Plumbing: Underground Insulation: Shear Wall : /1 ,C1 Sheathing: , 1 Framing:(.4p po tv.%s,../krrc)no R-f4e „rfis, C ..1-41-07 fpxlpinoc OA 5NP7 fr Plumbing: aK vZ,07 Propane Tank/ Lines: ,/ Insulation: i,� a< 3/2/O7 / 3 (o/ 7 ;JPr�ts) Sheetrock. 3 Z 2 v 7 Septic Sytem Final Approval MUST be obtained before final of structure can be attempted. Road Approach Final Approval: Zoning Final Approval: 1 Final/Occupancy Approval " O " ,bv-z-s} '- JiS6 s) HEALTH DEPARTMENT AND PU LIC WORKS APPROVAL REQ UIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY - SEE REVERSE • Review T TyILDING PERMIT APPLICATIJ ML y 364 pe: I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD06-00376 Received Date: 7/5/2006 SITE ADDRESS: 82 PETES SPUR PORT HADLOCK, 98339 OWNER: SEVEN BRIDGES PROPERTIES, LI_C PHONE: (360) 379-4947 PO BOX 1953 PORT TOWNSEND WA 98368 ANDERSON COURT LONG PLAT SUBDIVISION: Block: Lot: 15 PARCEL NUMBER: 931300015 Section: 2 Township: 29 N Range: 01 W CONTRACTOR: SEVEN BRIDGES PROPERTIES LLC PHONE: (360) 379-4947 PO BOX 1953 PORT TOWNSEND WA 98368 Contractor's License SEVENBP983JD Expires 06/24/2008 REPRESENTATIVE: PHONE: PROJECT DESCRIPTIOI NEW SFR W/ATTACHED GARAGE TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 1,556 VALUATION 185,000.00 ADD'L: HEAT TYPE: EEE CODE EDITION: 2003 HEAT BASE: HEAT TYPE: OCCUPANCY: R-3 UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N GARAGE: 576 SHORELINE: CONST TYPE: DECK: 192 SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: ALT WATER SYSTEM: PUD BEDROOMS: BATHROOMS: Exist: Exist: Prop: 3 Prop: 2 Total: 3 Total: 2 Routing Date: Type Amount Paid By: Date: Receipt: Approved/Date Permit $1,469.75 KAS 07/05/06 83500 Plan Check $955.34 KAS 07/05/06 83500 APPR OV r State Building Code $4.50 KAS 07/05/06 83500 Potable Water Application $55.00 KAS 07/05/06 83500 JUL 25 2006 Total: $2,484.59 Jefferson County Planning & Building Impartment • SPECIAL CONDITIONS FOR CAS• BLD06-00376 1.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 2.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 3.) A Stormwater Site Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 4.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 5.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less than one-half acre unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Unified Development Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage) yard and allowed as a Permitted Use in Table 3-1 of the UDC, and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area (ESA). 6.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 7.) Minimum setback from Pete's Spur right-of-way is 20 feet. Minimum setback from Megs Way right-of-way shall be 20 feet. Minimum south and east property setbacks shall be 5 feet. 8.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 9.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 10.) The building height is not to exceed 35 feet. 11.) A minimum of two (2) on-site parking spaces are required for the single family residence. I:\F_BLD_Permit_Buildng.rpt 10/29/1999 ., • 4.._ ,______________ i-x.-ir ___ . ..., ,.,, , V` ( / 'J ,„, ----‘1------- — -- — -- V' 1 ,tV LOP!`".1ENT i 7 \'• `..,z1,- i � i (, ,,� , ' V T 7 i 2\11. /: , ./7)i . Stormwoter B �' 1\ Required? m DD n ��� ° ._ i ,o h, f-, ,.,•,,, APPROVED _i ` fiAN_" 7 — SITE PLAN t i t , . _.1 ��iPTtG P\-P-eA ( t JUL 2 t 2uu6 °; { 1 ,� �� S CS 1—! $Y OT( (ti"t� :} i 1 JEF •4 O J i DEPT.OF C o L•P NT ' ( :Su �t GT TU S6r' rkT� i SIGNATURE: JI`AL 011 dill ,_ } i 1 ; 1 , 1 .! 1)i if i IL\. )1(6- 4- : ,. _ ____ , 1.0 . 0' 1-7 1 , ,_, ) /- ),, ,. , , ,,. .,, ,,, .-„, ,, ___ ...... 1/0-T-- i , _koipfzc-.,,,-,-.J 1--(.0 .--r-- 17,Pc-T- ', ,-.,-Y\.- ,,,‘ ,/ - , 0 ci 0376 46v 1---J. it-- �,.. `";)r-- = - -;6 JEff I SOS COUNTY HD $ON0 -- �: 06, JEFFERSON.UNTY --—-----�- ' j DEPARTMENT OF COMMUNITY DEVELOPMENT, ll ,vi 1, �' ` '4 621 Sheridan Street• Port Townsend •Washington 98368 360/379-4450 • 360/379-4451 Fax ' c$ www.co.jefferson.wa.us/commdevelopmenlJUN ' 5 2006 S NG, , Master Permit Application . r • YP (04 -VE Project Description(include separate sheets as necessary): L..-. _/ , , .>v Lc,L ,c Tax Parcel cil j VO ' :_i l l , 7 Property Number: l✓ ` Size: ' ) /Co cq (acres/square feet) Site Address and/or Directions to Pro[2erty: s, p •to S c _ , Property Owner(s)of Record: !!�� u! , • (.. - Telephone: 3 ?C - C CI Fa): --i c email: ` Mailing Address: T i t� -'ici Applicant/Agent(if different from owner): Telephone: Fax: email: Mailing Address: Wh Lkind of Permit?(Check each box that applies) wilding ❑ Variance(Minor, Major or Reasonable Economic Use) 0 Demolition Permit ❑ Conditional Use[C(a),C(d),or C]** 0 Single Family 0 Discretionary"D"or Unnamed Use Classification ❑Garage Attached/Detached ❑ Special Use(Essential Public Facilities)** ❑ Manufactured Home ❑ Boundary Line Adjustment 0 Modular ❑ Short Plat** ❑Commercial* ❑ Binding Site Plan** ❑Change of Use ❑ Long Plat** ❑Address Li Road Approach ❑ Planned Rural Residential Development(PRRD)/Amendments** ❑ Propane ❑ Plat Vacation/Alteration** ❑Allowed"Yes"Use Consistency Analysis ❑ Shoreline Master Program Exemption/Permit Revisions** ❑ Stormwater Management 0 Shoreline Management Substantial Development** ❑ Site Plan Approval Advance Determination(SPAAD)* ❑ Shoreline Management Variance ❑Temporary Use ❑ Comprehensive Plan/UDC/Land Use District Map Amendment ❑Wireless Telecommunication* 0 Jefferson County Shoreline Master Program Amendment ❑ Forest Practices Act/Release of Six-Year Moratorium *May require a Pre—Application Conference **Requires a Pre-Application Conference Please identify any other local, state or federal permits required for this proposal, if known: DESIGNATION OF AGENT I hereby designate_ to act as my agent in matters relating to this application for permit(s). OWNER SIGNATURE Date: By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of his,her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of en i. to Jefferson County and its employees,representatives or agents for the sole purpose of application review and any required later ins•• ns knight of-entry to this properly shall be requested and shall occur only during regular business hours. , ` /� Signatur-. A � ®�. _ Date: 7 5-'-626' The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or endangered species and could lead to a potential"take`of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)even if you e in compli 'th "Jeffe development code.The Applicant acknowledges that he,she or it holds individual and non- nsfe responsi 'I r ng,and plyin with the ESA. The Applicant has read this disclaimer and signs and dates it below. Signature: Date: — -i) G:\PemutCenter\FORMS\DRD FORMS\Master Permit Application 7-8-04.doc I ' It OWNER BUILDER STATEMENT The signer of this statement does hereby certify thy., ey are the Owners of the parcel referenced herein, 4 they are not licensed contractors and that they will be assuming the responsibility of the General Contractor for the proposed project. Signature: Date: GENERAL CONT RAIL44.. OR OR MANUFACTURED HOME INSTALLER: PHONE: FAX: MAILING ADDRESS: v iJi f t-r q h3 EMAIL: CONTRACTOR'S LICENSE d WAINS NUMBER: SE v io b p q Y3 E 0 NUMBER ARCHITECT/ENGINEER: PHONE ( ) FAX:( ) MAILING ADDRESS: a, EMAIL Pr91Ect Type: F Type: Bathrooms: Shoreline: Type of Sewage Disposal: iiY New "Ti Wood Existing: c ❑ Sewer CI Addition ❑ Steel Proposed: ;. Bank ❑ ,Certfnunity System ❑ Alteration/Remodel ❑ Concrete Total: 1 Height: Vf Individual System ❑ Repair ❑ Masonry SEP Permit# C ii og,0.9 ❑ Demolition ❑ Other: Bedrooms: Water Supply: Existing: r/ Setback: a Private well ❑ Two Party Type of Heat: /� Proposed: > n Public L_ L -, r e-ed fit r I� !'Total: 3 Name of System: 1'V Ir1 # 1 If this is a Commercial Project you must answer the following: Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply: ii Underground Tank [1 Above ground Tank Size of Propane Tank: I Heat Stove I] Cook Stove ❑ Woodstove r i Fireplace Insert Li Hot Water Tank LI Pellet Stove ❑ Other Is this appliance being installed in a Manufactured/Mobile Home? Yes / No When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines, tank location and size,distances from the propane tank to all property lines,buildings and septic system components, including the reserve area. Square Footage For Office Use Only c 1.4-C,,,, Current Proposed " ' '-' _.) Main Floor I /) ,; 0�5 Consistency Review: + 2ND Floor (� D Base fee: •4• ',-.' /li (&ri 3`a Floor Additional Section: AP Mezzanine: Plan Check fee: <�55 3 '""- Heated Basement State Surcharge fee: 1 ,q t Unheated Basement Pot Water Review fee: 1 IJ Other Unheated 91 i 4, pproach fee: Garage/Carport S l(0 ( .514. TOTAL: $ (Z1_. 1 b ', Decks igasReceipt Number: e ?JSoo Other 1"--- r, Ched Umber: ESTIMATED COST(REQUIRED) Date: .Fair market value tall labor and tens/ foun tion to fi Ash /0 Initials: G:\PerrnitCenter\FORALNBDFORMS\Masteammit ..lication 7-8-04.doc :Y utVELOPMENT III • _• _ ��. o'r � JEF __ > FERSON COUNTY 14 4. DEPARTMENT OF COMMUNITY DEVELOPMENT j* ,• 621 Sheridan Street • Port Townsend •Washington 98368 360/379-4450 • 360/379-4451 Fax http://www.cojefferson.wa.us/commdevelopment/us/commdevelopment/ STORMWATER SITE PLAN SUBMITTAL TEMPLATE MLA# C10 - ` (241 PROJECT/APPLICANT NAME: Please answer all of the following questions to the best of your ability. Where the question calls for depiction on a site map, the applicant may choose to either incorporate the elements into the general plot plan for the Master Land Use Application or to submit a separate stormwater site plan map. Project Overview 1. Describe th proposed developed onditions of the site. Indicat position and relative size of proposed improvements on the site map. . 4 Lye Existing Conditions Summary PERMIT # RUD 2. Describe the existing topography. Indicate contours on the site map. 3. Describe the existing vegetation. Indicate native vegetation areas on the site map.itritiOUR UPI V ifill Li .',.‘&kitzE.,)--J vc- 1'34cl:6r-1 1,4:_e'. ,) 4. Describe the existing soils. Indicate soil type on the site map. • <1 hvi t �/(�aLL 5. Describe the existing site hydrology(i.e., drainage; behavior of water on the site—above, below, and on the ground). Indicate existing stormwater drainage to and from the site on the site map. Depict separate drainage basins on the site map, if applicable,and indicate acreage of each. fi 1 A (-4 6. Describe any excess levels of noise generated by the proposed use o activity: APPROVED . i ,, , STORMWATER PLAN `" JU1L242006 stormwater site plan template-rev.ttvt/2003 StOCi i to t5 � JEFFERS N(COU kTY Required ed r � DEPT.OF C' S SIGNATURE:' 0 • - 7. Describe significant geographic features and critical areas (i.e., environmentally sensitive areas such as wetlands, streams, steep slopes,etc.)on the site. Indicate location on the site/ map. f� 7e) - 8. Describe the general vicinity of the site, including adjacent land uses and tructures, utilities, roads,and sensitive/critical areas (streams,wetlands, lakes,steep slopes,etc.). -""1 —� - ) 2 5 f /c (-.. cii,vi, ,e a , ..--- Permanent Stormwater Control Plan This portion of the Stormwater Site Plan consists of the selection and installation of the appropriate stormwater control BMPs and facilities to remain in place after construction of the project is completed. "Medium" size projects are required to have the totals calculated of all impervious surfaces, pollution-generating impervious surfaces, and pollution-generating pervious surfaces to verify that the thresholds for treatment facilities and flow control facilities are not exceeded. g. Describe the developed site hydrology, as proposed. Indicate whether stormwater will be fully dispersed(i.e., per BMP T5.30 in the Manual) or, if not,what types of stormwater flow control will be utilized for the site or specific threshold discharge areas within the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. , ,, 1,-) t- e.i.. ,,, tf.../.1,(6 , -ivnt_ ( 11/((-e---iz, ----i 10. If the project requires the use of stormwater treatment facilities, describe the types of stormwater treatment facilities proposed for use on the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. [This is normally for"large"projects or projects that involve the potential for dispersion of contaminants.] 7 6, 1 ri----- 11. Describe the performance goals and standards applicable to the project. it' /-7(F , 12. Describe the flow control system. . p ....) A li_.--) i " , , tsz i R i f j •3. tor=rry atersiteplantemptate—rev:10/1/200.3 „1 p,!,% 6 • S 13. Describe the water quality system. 17 14. Describe the conveyance system analysis and design. c cc y 15. Describe the source of fill material,physical characteristics of fill terial;and deposition of excess material. /6,. /, Ote,ai k7z 16. Proposed methods of placement and compaction jj p n consistent with the applicable stakdards on Appendix Chapter 33 of the Uniform Building Code. 17. Describe the proposed surfacing material. 18. Describe methods for restoration of the site. 19. An Operation and Maintenance Manual is required for each flow control and treatment facility. [This is normally required for "large"projects only and only those for which facilities are required to control flow or treat runoff.] If included,list the Manuals here. 20. List here and include any special reports or studies conducted to prepare the St rmwater Site Plan. // 21. List other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals include conditions that affect the drainage plan or contain more restrictive drainage-related requirements,describe those conditions or restrictions here. stormwater site plan template—rev.10/1/2003 7 • 13. Describe the water quality system. A 7 1 __.._,: 14. Describe the conveyance system analysis and design. / _ 15. Describe the source of fill material,physical characteristics of fill material,and deposition of excess material. 47/ 16. Proposed methods of placement and compaction consistent with the applicable standards on Appendix Chapter 33 of the Uniform Building Code. 17. Describe the proposed surfacing material. 't/ r - 18. Describe methods for restoration of the site. },/,/0-o2-4 19. An Operation and Maintenance Manual is required for each flow control and treatment facility. [This is normally required for "large"projects only and only those for which facilities are required to control flow or treat runoff.] If included,list the Manuals here. ii' /ei- 20. List here and include any special reports or studies conducted to prepare the Stormwater Site Plan. A.' ,! i 21. List other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals include conditions that affect the drainage plan or contain more restrictive drainage-related requirements,describe those conditions or restrictions here. f stormwater site plan template—rev.10/1/2003 7 S S CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN(SWPPP) The Construction SWPPP addresses sediment and erosion control during construction. The BMPs indicated by the applicant in the template that follows must be installed on the ground during all construction phases of the project. The proponent is responsible for preventing sediment and erosion impacts to environmentally sensitive areas and off-site areas. Consult the Construction Stormwater Pollution Prevention (SWPP) Best Management Practices (BMPs) Packet for guidance, particularly with rural residential development. SECTION I-CONSTRUCTION SWPPP NARRATIVE 1. Construction Stormwater Pollution Plan Elements. Describe how each of the Construction SWPPP elements has been or will be addressed. Identify the type and location of BMPs used to satisfy the required element. If an element is not applicable to the proposal,justify in writing. Descriptions of the 12 Elements are found at section 2.5.2 of the Manual(beginning on page 2-15). 12 Required Elements-Construction SWPPP 1. Mark Clearing Limits. 7 2. stablish ConstructiolrAccess. Pic /2 13.- 3. Control Flow Rates. A ,/ / 4/ / r 4. Install Sediment Controls. tt, 5. Stabilize Soils. Al+ I c5t4 6. Protect Slopes. fitli- -h-7// 7. Protect Drain Inlets. 8 storrnwater site plan template—rev.10/1/2003 • 1111 12 Required Elements-Construction SWPPP(continued) r_--{--_ _ _..__ .�._R, _. 8. Stabilize ChannelsaOutlets 1 Z/o 7— ,.L. k. Control ollutants. -lilr(17 4-1 7ZIt II' = 49 ( / &-‘,47 10. Control De-Watering(the act of pu ping groundwater or stormwater away f an active construction site). 11. intain Best Management Practices(BMPs). t / t f A /1-(W 12. Manage th Proje . ,% I�M' £" -- \ 2. Adjacent Areas. a. Description of the adjacent areas that may be affected by site disturbance (e.g., streams, lakes, wetlands, residential areas,roads). ( l+ b. Description of the downstream drainage path leading from the site to the receiving body of water(minimum distance of 400 yards). )- 3. Environmentally Sensitive Areas. a. Description of environmentally sensitive areas that are on or adjacent to the site. stormwater site plan template—rev.10/1/2003 9 I • b. Description of special requirements for working in or clear environmentally sensitive areas. 4. Erosion Problem Areas. Description of potential erosion problems on site in the context of the characteristics of the on-site soils(e.g.,erodibility,settleability,permeability,depth,texture,soil structure). k/i 5. Construction Phasing. .-- i a. Construction sequence / f i$::"--c-i---1, .._ LL '-(l' .b. Construction phasing(if proposed) i ,+ 0. 6. Construction Schedule. Wet season is October 1 through April 30(page 2-21 of the Manual). f I. Provide a proposed construction schedule. <.— r Y s i c )I c.L. i Z c `--C- -1' / ` ✓a f 7_. II. Wet Season Construction Activities. a. Proposed wet season construction activities. A, ,, 1 b. Proposed wet season construction activities for environmentally sensitive areas. ' /1 '/4- 7. Financial/Ownership Responsibilities. a. Identify the prti perry o7 Kier res niible for the init'. io of bonds and/)r •they financial securities. b. Describe bonds and/or other evidence of financial responsibility for liability associated with erosion and sedimentation impacts. /tf i 8. Engineering Calculations. Provide Design Calculations on a separate sheet for the following,if applicable. a. Sediment Ponds/Traps. b. Diversions. i' c. Waterways. it, d. Runoff/Stormwater Detention Calculations 10 stormwater site plan template—rev.10/1/2003 S • Stormwater Site Plan Changes If the designer wishes to make changes or revisions to the originally approved Stormwater Site Plan, the proposed revisions shall be submitted to DCD prior to construction. The submittal shall include substitute pages that include all proposed changes, revised drawings showing any structural changes,and any other supporting information that explains and supports the reason for the change. Final Corrected Plan Submittal If the project included construction of conveyance systems,treatment facilities,flow control facilities, or structural source control BMPs (not standard on-site stormwater management BMPs),the applicant shall submit a final corrected plan ("as-builts")when the project is completed. These should be engineering drawings (stamped by a licensed civil engineer) that accurately represent the project as constructed. APPLICANT SIGNATURE By signing the Construction SWPPP worksheet, I as the applicant/owner attest that the information provided herein is true and correct to the best of my knowledge. o certify that this application is being made with the full knowledge and consent of all owners of the aff ted pro rty. L/J117 J (LANDO R RIZED RESENTATIVE SIGNATUR (DATE) THIS SPACE MAY BE USED FOR ADDITIONAL NOTES, IF NEEDED: - • 11A c. dG 12 stormwater site plan template—rev.10/1/2003 / 4 V Al ._.. .fix '0 3 ro 2-o I r�K6rHf2 GL'sX� �® � Whop-4 bd56® � f nwY So cFM / 1 l IzoC,4rM MhxVietPj `�v�yr�coo� io VI ONY41iTG�ftOtly I M ?n I& lTtoN 'lioopug j gIt4INO IS" A f rA(K. �f e 3 6 L'slfi%f'� R6 REQo N I IrJT6f�loK WkVV 7i�,ir.1G• 0XZ�ot4 •� ° o -a G�R1tC�6 m ?J°S-SN 1 tzoa M O' 4� $ -T r P 6 - x (vW5 0 ® �IVIr1G ° ya No use (5AP- &e WAWA < I �. 2 �aY�Rs wNc-rz> I <ITGNEN i�, I r/ ` fh fR/kMIrJ6 15 �°o�� Q K VC r �6DP00AA ti tip � vw 0 ` I00 MI>dµ / i Rc'-NtriiYh VERIf-i 00 61TIE 5 G p I6' Z-6 E 3-0' 6, 3-0" 6 $-o" 1=0• Siva `f°365 J'�\ Q. S � � FtT7� I — f Ile 8 -o" a 3` o ,a rrI 59 ® 50 CFM R8'; %CFN IKfr s I 9xlii Pf �l0 T, In � � 4 T. Jr MIM ZT,vo'I no ® NOS: S IZ6 - Kci t � M JUN - 5 2006 yam( r ' _ ___