HomeMy WebLinkAboutBLD2006-00448 06-
!UILDING PERMIT APPLICAAN MRL Review Ty
438
ype
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD06-00448 Received Date: 8/3/2006
SITE ADDRESS: 112 HARRINGTON DR
QUILCENE, 98376
OWNER: HERBERT J MILLER PHONE: 360-765-4291
MARJORIE B MILLER
112 HARRINGTON DR
QUILCENE WA 983769616
SUBDIVISION: Block: Lot: TX12
PARCEL NUMBER: 601343009 Section: 34 Township: 26 N Range: 01 W
CONTRACTOR: OWNER/BUILDER PHONE:
REPRESENTATIVE: PHONE:
PROJECT DESCRIPTION 12x12 EXISTING DECK
TYPE OF WORK RES SQUARE FOOTAGE:
TYPE OF IMP DEK MAIN:
VALUATION 3,394.00 ADD'L: HEAT TYPE:
CODE EDITION: 2003
OCCUPANCY: HEAT BASE: HEAT TYPE:
OCCUPANCY: UNHEATED: # OF STORIES:
OTHER:
CONST TYPE: GARAGE: SHORELINE:
CONST TYPE: DECK: 144 SETBACK: 76
BANK HEIGHT: 100
SEWAGE DISPOSAL:
WATER SYSTEM: PWELL
BEDROOMS: BATHROOMS:
Exist: Exist:
Prop: Prop:
Total: Total:
Routing Date: —'
(3Joc451 ----
Type Amount Paid By: Date: Receipt: Approved/Date
Permit $97.25 LYK 08/03/06 83935
Plan Check $63.21 LYK 08/03/06 83935 Atmo $ EL-)\
State Building Code $4.50 LYK 08/03/06 83935
Total: $164.96 AUG 15 2006
Jefferson County Planning
& Building Department
• BUILDING PERMIT •
Jefferson County Department of Community Development
621 Sheridan Street, Port Townsend, WA 98368
(360)379-4450 FAX (360)379-4451
PERMIT #: BLD06-00448 Received Date 08/3/2006
SITE ADDRESS: 112 HARRINGTON DR Issue Date 08/15/2006
QUILCENE, 98376
APPLICANT: HERBERT J MILLER PHONE: 360-765-4291
MARJORIE B MILLER
112 HARRINGTON DR
QUILCENE WA 983769616
SUBDIVISION: Block: Lot: TX12
PARCEL NUMBER: 601343009 Section: 34 Township: 26 N Range: 01 W
CONTRACTOR: OWNER/BUILDER PHONE:
PROJECT DESCRIPTION: 12x12 EXISTING DECK
CALL IN FOR THE REQUIRED INSPECTIONS THAT APPLY TO YOUR PROJECT.
SETBACKS:
UFFER:
Footing:
Foundation:
Stormwater FINAL Approval:
Underground Plumbing:
Underground Insulation:
Shear Wall :
Sheathing:
Framing:
Plumbing:
Propane Tank/ Lines:
Insulation:
Sheetrock:
Septic Sytem Final Approval MUST be obtained before final of structure can be attempted.
Road Approach Final Approval:
Zoning Final Approval:
Final/Occupancy Approval: die . Gr -ce"ha �Z//tit
HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED RIOR TO FINAL INSPECTION
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
Office Hours 9:00 a.m. -4:30 p.m.
HOT LINE AVAILABLE 24 HOURS A DAY
SPECIAL CONDITIONS APPLY - SEE REVERSE
• •
SPECIAL CONDITIONS FOR CASE A BLD06-00448
1.) A vegetative buffer of 30-feet shall be permanently maintained from the top or edge of the
Landslide Hazard Area. All buffers shall be measured perpendicularly from the top of the
Landslide Hazard Area.
2.) Landslide Hazard Areas and their associated buffers shall remain naturally vegetated.
Should buffer disturbance occur during construction, the Unified Development Code
(UDC)Administrator shall require replanting with native vegetation. No alterations shall be
made to the Landslide Hazard Area or its associated buffer without prior authorization by
the UDC Administrator.
3.) Prior to and during approved construction activities, the perimeter of the landslide hazard
area buffer shall be marked with a temporary sign. The sign shall be placed in such a
manner that it can be directly observed from the construction area. The sign shall contain
the following statement: "Landslide Hazard Area and Buffer- Do not Remove or Alter
Existing Vegetation."
4.) All construction activities shall not encroach upon the landslide hazard area buffer. This
includes the storage or preparation of materials.
5.) The applicant shall permanently separate the boundary of the Landslide Hazard Area
Buffer from the remainder of the subject property through installing logs, trees, a hedge
row, or any other prominent physical marking approved by the UDC Administrator.
6.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water
quality degradation. The submitted proposal does not require additional aquifer
protection measures. However, during construction the project shall follow the Best
Management Practices (BMPs) and facility design standards as identified and defined in
the Stormwater Management Manual for the Puget Sound Basin.
7.) To help prevent seawater from intruding landward into underground aquifers, all new
development activity on Marrowstone Island, Indian Island and within 1/4 mile of any
marine shoreline shall be required to infiltrate all stormwater runoff onsite.
8.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIPZ:
Water conservation measures:
1. Roof and other intercepted precipitation shall be routed to on-site detention ponds
and/or other approved means and allowed to be released to the soil slowly.
2. Water collected from Storm water and roof catchments may be used for watering
lawns and gardens. Unless catchment water has been treated to meet drinking water
standards, there shall be no cross connections allowed between the potable supply and
impounded water.
3. Water withdrawn from wells on each property shall not be used for watering of lawns
and/or gardens.
4. Ground water withdrawn from each property shall be restricted to a rate of three (3)
gallons per minute.
5. Installation of water conserving fixtures such as low flow toilets, faucets and shower
restrictors and other water saving plumbing fixtures.
6. Landscaping plan (xeriscaping, native vegetation with minimal amounts of irrigation).
Please NOTE that the above listed measures are not intended to be exhaustive, but rather
is intended to be illustrative of the types of water conservation measures.
9.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIPZ:
1. Installation of a flow meter.
2. On-going well monitoring for chloride concentration.
3. Submittal of monitoring data to County.
410
10.) MANDATORY MEASURES FOR COASTAL SIPZ:
1. For proof of potable water on a building permit application, applicant must utilize
DOH-approved public water system if available.
2. If public water is unavailable, a qualifying alternative system may be used as proof of
potable water or an individual well may be used as proof of potable water subject to the
following requirement:
a. Chloride concentration of a laboratory-certified well water sample submitted with
building permit application.
3. If public water is unavailable, a qualifying alternative system may be used as proof of
potable water.
11.) The property owner shall comply with Water Conservation Measures (per list maintained
by the UDC Administrator).
12.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater,
erosion and sediment during construction. BMPs shall address permanent measures to
stabilize soil exposed during construction, and in the design and operation of stormwater
and drainage control systems.
13.) Outdoor residential storage shall be maintained in an orderly manner and shall create no
fire, safety, health or sanitary hazard.
14.) Not more than 2 unlicensed or inoperable vehicles shall be stored on any lot unless totally
screened from view of neighboring dwellings and rights-of-way. Such screening shall
meet all applicable performance and development standards specific to the district in
which the storage is kept, and shall be in keeping with the character of the area.
Screening shall meet the requirements of Chapter 18.30 JCC. Outdoor storage of 3 or
more junk motor vehicles is prohibited except in those districts where specified as an
automobile wrecking yard or junk (or salvage) yard and allowed as a permitted use in
Table 3-1 or Chapter 18.18 JCC, and such storage shall meet the requirements of JCC
18.20.100, Automobile wrecking yards and junk (or salvage) yards. In no case, shall any
such junk motor vehicles be stored in a critical area.
15.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of
impervious surface which includes roof tops, driveways, concrete, etc.
16.) Minimum setback from Harrigton Drive right-of-way shall be 20 feet. Minimum side yard
setbacks shall be 5 feet. Minimum setback from top of bank shall be 76 feet as depicted
on the approved site plan.
17.) Exterior lighting for residential uses shall not exceed twenty feet (20') in height from the
finished grade, excepting when such lighting is an integral part of a building or structure.
Ground level lighting is encouraged.
18.) Lighting fixtures shall be designed and hooded to prevent the light source from being
directly visible from outside the boundaries of the property. The intensity or brightness of
all lighting, during construction and after project completion shall not adversely affect the
use of surrounding properties or adjoining rights-of-way.
19.) The building height is not to exceed 35 feet.
20.) Residential developers and individual builders shall be required to preserve shoreline
vegetation and reduce the associated risk of erosion during construction and any future
activity which may impact the stability of the shoreline.
21.) The applicant shall fully adhere to all conditions and requirements of the eagle habitat
management plan dated May 25, 2006 by WDFW and May 31, 2006 by applicant.
I:\F_BLD_Permit_Buildng.rpt 10/29/19
„,. ., i ,..,- `- ,....---r 7 : , - r-7 ' •---=''', 7
,,,
6-(g 4:, /Se
t
J i /..4.. ..,? ),..-
L.'it-,it-- /0 NeiL0 bedroom p - .
*pov-6,
11'-----. -) ' ,-- lx
77 t StPT 1 Z:. -N/ aior)1
4.
..... —...\41(,:....4..t.
, /.... , ,
// ---- ,--N..7,-----/:,. V.7 ;--- wi-- ti ” -
kn.e. i'' ... v ,- ' •
\ __.._„,
•--_•- .r,i, ---I'-11-
,.. /
) \, i gc 4 /
, } <
pi,N,oE-I
0,
C4. .
I
\ 1 :
RECEIVED
(0 77'..)i
,_, JEffiliSUN COUNTY PCP PERMIT # Rill ,s Stormwa
0 6 -- 0 4 ' '; Require
) JEffEllSON COUNIY ..00U
r--- ,
, 1
N . APPROVED
-Ths /q AO TL -rAy., ri ....„
sacri aq 3ilf 2, .if .- • SITE PLAN
7-61.4w51110 2.4)., RA466 1,4-)to•Iiii• 7 :
PcifZet. Aie 60/ ,Wy 0 r Y AUG 1 5 2006
. 111. lik
e mAscicci6 tA,:,/,54:.
//a iii/oRk'botgroe viz. JE, "IA pr011
DEPT.OF ••M ' el Odii..1. ,..frii,:
0(4;ic6,0e.., tot) i S'_57 6) SIGNATURE, . t rirALvi kikiii'4IL
imitiiiMmitaia
1 .4 ' • III Iii
ii ELetei 2.vi ' _ r- i _; ____
— :-.1- ---';t:) r--- - ____ _V
/ 6 J In C.: . L" Cat27 *--. 1.-.filit:$C.b 11,%-'7.21„) -:;/-..„
• •
40go1'1
cO0 JEFFERSON COUNTY
W ' . \ DEPARTMENT OF COMMUNITY DEVELOPMENT
ti ` . `Q 621 Sheridan Street• Port Townsend • Washington 98368
360/379-4450 • 9-44 Fax
�q www.co.jefferson.wa.us/co360/37m51mdFeavxe pment
S,�NG�
Master Permit Application MLA: 0(4:1 —43
t 99s00on(include se43 rate 0)egts r(
necess ry)1 j ;�. I -F- n
t.
P o v•c_.., •\ /
l ax Parcel / D r �� Property /
f�Umber CSJ ! / 6 Size: (acres/squarer feet)
+` z4• • cvi• s a c•ee r /! Q H a. v r I o V\ D tr/� A/i , ; 1CC vie WA
t.,.� "4 f' ner s o ''e " . - V' b ev-1 -7 9 a�'�i c v 1 e Y.�
];f r , �� -- 7 6o 5 5 /Fax: -
email:y�t �te a z, wok.Q a or,:.a
< tr r. ldress: i J i 2 Ha v,v,t Y\5fo vA Dr, (i (ce'n.e.. W7d I�'.376
•• icant/Agent(if different from owner):
Telephone: Fax: email:
Mailing Address:
What kind of Permit?(Check each box that applies)
Building ❑Variance(Minor, Major or Reasonable Economic Use)
Ei Demolition Permit ❑Conditional Use[C(a),C(d),or C]**
Single Family °Discretionary"D"or Unnamed Use Classification
Garage Attached/Detached OSpecial Use(Essential Public Facilities)**
0 Manufactured Home °Boundary Line Adjustment
d Modular °Short Plat**
Q Commercial* OBinding Site Plan**
Q Change of Use °Long Plat**
Q Address i Road Approach °Planned Rural Residential Development(PRRD)/Amendments**
Q Propane ❑Plat Vacation/Alteration**
❑Allowed"Yes"Use Consistency Analysis ❑Shoreline Master Program Exemption/Permit Revisions**
❑Stormwater Management OShoreline Management Substantial Development**
❑Site Plan Approval Advance Determination(SPAAD)* ❑Shoreline Management Variance
['Temporary Use ❑Comprehensive Plan/UDC/Land Use District Map Amendment
OWireless Telecommunication* °Jefferson County Shoreline Master Program Amendment
❑Forest Practices Act/Release of Six-Year Moratorium
*May require a Pre Application Conference **Requires a Pre-Application Conference
Please identify any other local,state or federal permits required for this proposal, if known:
DESIGNATION OF AGENT
I hereby designate to act as my agent in matters relating to this application for permit(s).
OWNER SIGNATURE Date:
By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of
his,her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet
may result in this permit being null and void.
I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and
expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit.
I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application
review and any re uired later inspections. Staffs access and right of entry will be assumed unless the applicant informs the County in writing at the
time of the appl tion at he r she/wants prior notice.
f. .
The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or
endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the
"Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this
permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your
action(s)even if ou are in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual
and non-trgn f able resp si Ili fo-,pdhering to and complying with the ESA. The Applicant ha ead this disclaimer and signs and dates it below.
';Iri i��a
D:\PermitCenter\FORMS\DRD FORMS\Master Permit Application 12-30-05-2.doc
•
• •
' 'UrLDER STATEMENT.Y
The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that
they will be assuming the responsibility of the General Contractor for the proposed project.
nature: - p ..'. .‘ ,,-1 C. i , oat
GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: FAX:
( ) ( )
MAILING ADDRESS: EMAIL:
CONTRACTOR'S LICENSE WAINS
NUMBER: NUMBER
ARCHITECT/ENGINEER: PHONE ( ) FAX:( )
MAILING ADDRESS: EMAIL
e 'ypt :4 Bathrooms: 4$1ii5' ;.>.viSV #g bit,
❑ New Wood Existing: a ❑Sewer
.Addition 0 Steel Proposed: Bank Community System
❑ Alteration/Remodel 0 Concrete Total: a Height:/ Individual System
❑ Repair ❑ Masonry I' ° SEP Permit#
❑ Demolition 0 Other: Bedrooms: Water Supply:
Existing: a Setback: "Private well ❑Two Party
Type of Heat: Proposed: t 0 Public
Total: 4 7 Name of System:
0
If this is a Commercial Project you must answer the following:
Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces:
Number of occupants(includes owners,tenants,employees,etc) Current Proposed
IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No
If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply:
0 Underground Tank ❑Above ground Tank Size of Propane Tank:
O Heat Stove ❑Cook Stove ❑Woodstove ❑Fireplace Insert 0 Hot Water Tank 0 Pellet Stove p Other
Is this appliance being installed in a Manufactured/Mobile Home? Yes / No
When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property
lines, tank location and size,distances from the propane tank to all property lines,buildings and septic system components,
including the reserve area.
Square Footage Current For Office Use . 1y„ Amount— Revision
Main Floor Heated EH Bld App Review: (0600
2"a Floor Heated Consistency Review: 1
Other Heated Base fee: : r
Mezzanine Additional Section: C'1
Heated Basement Plan Check fee: ( 3
Unheated Basement State Surcharge fee: .52)
Other Unheated Pot Water Review fee:
Garage/Carport SUBTOTAL 332 Cl/_
4 ,i Y i1 3.3g4 911/Rd Approach fee: tp
Other 7 — TOTAL: $ Z °{D
Receipt Number: 335
T Cash/Check Number:
' ate:
yi 60• Initials:
D:\PermitCenter\FORMS\DRD FORMS\Master Permit Application 12-30-05-2.doc