HomeMy WebLinkAbout2025 Jefferson County HRS ANNUAL REPORT
2025 ANNUAL REPORT
5 YEAR PLAN TO END HOMELESSNESS JEFFERSON COUNTY
Prepared by: Joint City of Port Townsend/Jefferson County Housing Fund Board
Website: https://www.co.jefferson.wa.us/1382/Housing-Fund-Board
1
2025 ANNUAL REPORT 2025 ANNUAL REPORT
JEFFERSON COUNTY
5 YEAR PLAN TO END HOMELESSNESS
CURRENT CONDITIONS (PP 2)
An assessment of current drivers of homelessness
and corresponding response efforts.
DATA STORY (PP 3-5)
A presentation of data on system performance.
PERFORMANCE AGAINST PLAN GOALS (PP 6-9)
A look at goals included in the 2019-2024 plan and
the status of work against those goals.
MAJOR CHALLENGES IN 2025 (PP 10)
A review of the major challenges encountered in
2025.
EMERGING NEEDS AND 2026 PRIORITIES (P 11)
An evaluation of possibilities for addressing
community and individual housing needs.
2025 Priorities
With an upsurge in
homelessness and
steep cuts in funding,
the challenge is to
balance the urgent
need for emergency
shelter beds with
continued focus on
longer-term
permanent housing
solutions.
2
2025 ANNUAL REPORT CURRENT CONDITIONS
Beginning in the second half of 2024, Jefferson County experienced an unexpected
surge in homelessness. Between January 2019 and July 2024, the six-month count
of homeless and unstably housed held fairly steady, ranging from 479 to 528 with an
average of 508 individuals (Snapshot Reports). The January 2025 six-month count
was 725 individuals experiencing homelessness or housing instability, an increase of
nearly 50% in a short time span. While Jefferson County had one of the lowest
percentages of homelessness in Washington in 2024, the state’s rate of
homelessness slowed to a 4.4% increase compared to the extreme jump of 50% In
Jefferson County.
This upsurge in homelessness has severely strained already limited homeless
response system (HRS) resources. In addition, several hard-to-serve populations are
growing and require our focus, including but not limited to:
• Refugees and asylum seekers who might not qualify for federal programs due
to legal status;
• Families who are difficult to serve in existing facilities along the continuum;
• Youth and young adults for whom there are no suitable emergency housing
facilities;
• Our neighbors with intellectual and developmental disabilities who are at
high risk for displacement;
• People suffering from mental health and substance use disorder issues; and
• Individuals identifying as trans and non-binary for whom there is very little
safe space.
While Jefferson County has significantly expanded its capacity to shelter people
experiencing homelessness in emergency and transitional housing in recent years,
the lack of affordable rental housing in Jefferson County continues to drive
increasing levels of homelessness and displacement. In response, there has been a
shift toward prioritizing the development of permanent supportive housing and
planning for affordable rental housing development. With the upsurge in
homelessness and steep cuts in funding, the challenge is to balance the urgent
need for emergency shelter beds with continued focus on longer -term permanent
housing solutions.
In 2025, Jefferson County also increased the breadth and depth of homeless and
affordable housing services. The Coordinated Entry Advisory Board, the Shelter
Coalition, individual service providers and lived experts combined their social and
relational resources to develop new approaches for addressing the complex issues
3
2025 ANNUAL REPORT of homelessness and housing shortages. The newly emerging point-of-service,
client-centered service delivery, and collaborative solution development models are
complementary approaches that focus on meeting the unique needs of individuals
experiencing housing insecurity compassionately and effectively.
DATA STORY
The data tables below describe current conditions in terms of service level impacts,
system performance measures, and racial disparities in service delivery. The
bulleted summaries beneath the tables provide a narrative for the data tables.
Data
Table 1: 2025 Service Impact and Performance Measures
Service 2022 2023 2024
Number of People
Homeless 1044
Percentage of People
Homeless 3.1%
Individuals Sheltered 193 258 442
Section 8 Vouchers 187 185 142
TBRA Vouchers
Rent Assistance Vouchers* 649 578 125
System Entries 86 162 225
Exits to Permanent Housing 54% 33% 37%
Length of Time in
Homelessness (days) 487 300 242
Returns to Homelessness 6% 5% 12%
Source: Washington, Department of Commerce, Washington State Homeless System
Performance: County Report Card and Snapshot of Homelessness Report
Note: Data for SFY 25 not yet published at time of report.
Narrative
• The number of people homeless or unstably housed in Jefferson spiked in 2025.
Both the state’s Point-in-Time counts and the Snapshot Reports showed that the
increase in homelessness slowed in 2025 which is at odds with the Jefferson
County upsurge.
• The sheltered population had continued to grow significantly along with the
number of emergency and transitional housing beds.
• From 2019-2024, there has been considerable volatility in rent assistance
funding. In 2022 and 2023, rent Assistance vouchers included ERAP vouchers.
The ERAP program was discontinued at the end of June 2023.
4
2025 ANNUAL REPORT • Currently rental assistance is static or being cut back. However, Peninsula
Housing Authority increased Tenant-Based Rental Assistance (TBRA) spending in
Jefferson County in FY25 by just over $50,000.
• System-level performance measures are trending in a positive direction with the
exception of returns to homelessness. There is a slight increase in e xits to
permanent housing from 33% in 2023 to 37% in 2024 and a substantial decrease
in the length of time in homelessness from 300 days in 2023 to 242 days in 2024 .
• Returns to homelessness more than doubled in 2024. One possible explanation
is that there is better follow through accounting of people exiting homelessness
giving us a more accurate picture of returns to homelessness.
• Data input for system-level performance measures is still incomplete as
Commerce does not include transitional housing classified as “Other”.
Data
Table 2: 2024 Racial Disparities Measures
Source: Washington, Department of Commerce, Washington State Homeless System
Performance: County Report Card
Narrative
• In 2024, Black, Indigenous and Latinx households are overrepresented in the
homeless population compared to their percentage in Census data, while Black
and Indigenous households are underrepresented in the HMIS population
compared to their representation in the Snapshot population. This indicates a
disparity in service provision for Black and Indigenous households both in
preventing homelessness and providing homeless services. Latinx households
are represented in the HMIS population in the same proporti ons as in the
Snapshot (homeless) population.
• In 2025, the Department of Commerce implemented annualization of their
Snapshot reports. The Snapshot Reports combine client information from three
state agency data systems to provide a comprehensive estimate of the homeless
and unstably housed population in the state. The 2024 Snapshot Report will be
used going forward to benchmark racial disparities and develop trend lines.
5
2025 ANNUAL REPORT Data
Table 3: 2025 Homeless and Affordable Housing Stock
by Housing Continuum Type and Development Stage
Narrative
• Expansion of emergency housing and permanent supportive housing capacity
slowed this year for capital improvements in existing facilities and for initiating
and implementing new development projects.
• The global lease model for opening co-living transitional facilities delivered an
additional 19 new transitional beds in the second half of 2025 (not captured in
the data table above for FY 25). This included a 7 bed-unit sober house for men
with substance abuse disorders and an additional 12 bed-units for Youth.
• Six subsidized rentals for PGM young adults were created as a co-living house.
• Habitat for Humanity of East Jefferson County continues to grow its numbers of
permanently affordable subsidized ownership homes.
Housing
Continuum Type
New
Units
FY 25
Units
End of
FY 25
In
Construc
-tion
In
Planning
Planned
Closing
Total
Existing
&
Planned
HAPT
2045
Total as
% of
HAPT
Emergency Housing # of beds
67 40 30 31 106
Transitional
Housing* # of beds 4 71 19 90
Mixed Emergency
& Transitional
Housing
# of beds 46 46
Emergency
Housing Total # of beds 4 184 59 30 31 242 617 39%
Permanent
Supportive
Housing
# of units 2 65 23 88 264 33%
Subsidized Rentals # of units 6 449 301 750
Subsidized
Ownership # of units 15 76 20 56 162
Subsidized
Affordable
Housing Total*
(<80% AMI)
# of units 21 525 20 356 901 8400
6
2025 ANNUAL REPORT PERFORMANCE AGAINST PLAN GOALS
The 2019-2024 Local Homeless Housing Plan identified development goals. Table 4
below summarizes progress against those goals. All of the goals were met or
exceeded with the exception of subsidized rentals.
Table 4: Five Year Progress against Plan Development Goals
If fully implemented, by 2024 our
county should see an increase of: 2019-2025 Accomplishment
162 apartments 60 permanent supportive and
affordable housing units
30 new Habitat for Humanity homes 32 new Habitat for Humanity homes
28 safe beds 55 new emergency housing beds not
including tiny shelters
40 safe placements for Seniors Not tracked.
20 tiny shelters 44 tiny shelters built and in use
20 safe beds for Youth 27 transitional housing units for
Youth
Operations wise, a continued focus on collaborative action between housing service
providers, local government, state government agencies, community organizations,
builders, home-seekers, advocates, volunteers and donors characterized system
development in 2025.
There were no significant changes to the 2019 -2024 Plan.
Table 5 below summarizes top level actions with respect to the 2019-2024 Plan
Goals followed by a more detailed narrative account of supportive actions.
Table 5 - Top-level look at performance and supportive actions
PLAN GOAL STATUS LEAD 2025
ACCOMPLISHMENTS
1. Quickly identify and
engage people
experiencing
homelessness
Some
success
Coordinated Entry
Advisory Board (CEAB)
Began implementing
point-of-service
Coordinated Entry model.
2. Prioritization of
homeless housing for
people with the highest
needs
Sustained
progress
CEAB, Shelter Coalition Targeted support for
Emergency
congregational shelter to
remain open.
7
2025 ANNUAL REPORT 3. Operate an effective
and efficient homeless
crisis response system
Some
success
Housing Fund Board
(HFB)
Began implementing
financial system
monitoring.
4. A projection of the
number of households &
individuals left
unsheltered
Some
success
HFB Developed 2025-2030
Homeless and Affordable
Housing Services Plan.
5. Address Racial, Ethnic
and Gender Disparities
among People
Experiencing
Homelessness
Needs
attention
CEAB Actions identified and
included in new plan.
6. Supportive Efforts
Aimed at Ending
Homelessness
Sustained
progress
All Advances in AH projects.
Goal 1. Quickly identify and engage people experiencing homelessness.
• Jefferson County is simplifying access to housing services for vulnerable
residents through widening its Coordinated Entry (CE) point-of-service
program. By placing Coordinated Entry (CE) access points in locations where
people already receive services, the county is reducing barriers and making it
easier for participants to find housing assistance throughout the county. This
has not only significantly increased access to housing but has also created a
space in which partners and providers are able to find creative solutions for
individuals that might otherwise fall through the cracks.
• Advocates at Dove House’s Recovery Cafe began doing coordinated entry in
2025, filling out more than 38 risk assessments and assisting 7
individuals experiencing homelessness into permanent housing.
• The Shelter Coalition implemented “Collaborative Solution Development”
practices as a way to organize and invest relational and social resources in
building a mutually beneficial support system for individuals experiencing
complex challenges. This collaboration contributes to better communication
between agencies, community stakeholders, and those suffering housing
instability and helps the Housing Fund Board understand and develop
community values and priorities.
Goal 2. Prioritization of homeless housing for people with the highest needs.
• The HFB’s Shelter Coalition helped keep the American Legion Shelter,
Jefferson County’s overnight emergency shelter, open in 2024 and 2025.
This facility was scheduled to close in 2024 leaving Jefferson County without
8
2025 ANNUAL REPORT an emergency night-by-night shelter while OlyCAP was developing its
Caswell-Brown shelter.
• The Coordinated Entry Advisory Board established a collaborative and
transparent CE process involving not only Housing Service Providers (HSPs)
but Public Health, Community Paramedicine, Veteran's Affairs and Regional
Veterans services, the Winter Welcoming Center, Reach Out, as well as
Believe in Recovery and Discovery Behavioral Healthcare.
o The CEAB worked closely with the Victim Services Provider in
establishing its vulnerability assessment tool.
o It continues to work to secure achievements and ensure long-term
sustainability of its collaborative processes, including finalizing the
streamlining and documenting of processes and reducing the need to
convene the CEAB quarterly instead of monthly.
• Since opening in November 2025, the Winter Welcoming Center has seen
increased numbers of people accessing its services from previous years.
They are expanding their hours through a collaboration with multiple service
providers. The Winter Welcoming Center provides a safe and warm place for
participants to access needed resources including essential basic needs
resources as well as shelter, housing and public health harm reduction
services.
• OlyCAP launched a feasibility study for regional skilled nursing/dementia care
for individuals experiencing homelessness. They recently received the
support of Rep Adam Berbaum as a legislative champion offering legislative
support and pathways to funding.
Goal 3. Operate an effective and efficient homeless crisis response system.
• A broad cross-section of service providers, housing advocates and lived
experts engaged in the 2025-2030 Homeless and Affordable Housing Services
Plan development.
• The CEAB harnessed the expertise of providers and lived experts in improving
CE processes and designing training protocol for CE that is accessible to all
partners and access point providers.
• OlyCAP’s housing specialists improved permanent housing access and
positive exits to permanent housing from Caswell-Brown over the previous
year.
• The Housing Fund Board’s Data and Needs Assessment Committee worked
with housing service providers to standardize inventory and expenditures
reporting.
9
2025 ANNUAL REPORT Goal 4. Provide projections of the number of households & individuals left
unsheltered and the impact of the fully implemented plan on the number of
households and individuals housed.
• The Housing Fund Board continued to build its data model in 2025 and added
the development of financial measures.
• The Housing Fund Board is working with the Continuum of Care lead, OlyCAP, to
establish an annual expenditures protocol for collecting annual expenditures
data.
• The 2025-2030 Homeless and Affordable Housing Services Plan included an
extensive qualitative needs assessment as well as full quantitative data report.
Goal 5. Address Racial, Ethnic and Gender Disparities among People Experiencing
Homelessness
• The need to address racial disparities in homeless service provision was brought
to the forefront in developing the local plan.
• System performance monitoring will include tracking disparities going forward
from 2025.
• By and For Organizations engaged in both the 2024-2025 needs assessment and
local plan development.
Goal 6. Supportive Efforts Aimed at Ending Homelessness
• With an $8.7M grant award from the State, Bayside Housing and Services will
break ground on 32 units of permanent supportive and low-income affordable
housing on the property at 1077 10th Street in Port Townsend, Washington, in
2026. Bayside anticipates the low-rise multi-family building known as Vince’s
Village will be open for tenancy in early 2027.
o The property is currently occupied by a tiny shelter village known as
Pat’s Place. The shelter units will be moved to Peter’s Place Tiny
Village in Port Hadlock.
o Additionally, subject to funding, it is planned to construct another 32 -
unit apartment adjacent to the original, with an opening date in 2028.
• Bayside purchased a property at 320 San Juan Avenue in Port Townsend and
anticipates building a 62-unit workforce housing apartment, along with a child
care center. It is projected to begin construction in 2027-2028.
• Improvements at Caswell Brown Village include a sanitation building with
bathrooms, showers, and laundry facilities and a Community building with a food
preparation facility, offices for case management and a meeting room for peer
support meetings. The Community building is in use and the sanitation building
is scheduled for completion by end of year.
• OlyCAP negotiated a reimagination of the Caswell Brown Congregate shelter
project with the Department of Commerce to be a 31-bed congregate overnight
shelter with a kitchen, bathrooms and laundry facilities. The site will include 8
10
2025 ANNUAL REPORT tiny shelters to accommodate special needs for overnight shelter. OlyCAP is
working towards a year end grant close with construction to start thereafter and
opening in the fall of 2026.
• Community Build is turning its efforts to "next step housing" for people with
incomes less than 80% of the county median, including people who want to
move out of transitional shelters but can't find anything they can afford. They
are applying to WA Labor & Industries for certification as manufacturers of tiny
houses on wheels. They will sell them essentially for the cost of materials to
people who themselves meet income and longer-term affordability restrictions
or who commit to renting their units to peo ple who qualify.
Major Challenges in 2025
An unmanaged and unsanctioned encampment grew over 2025 on land owned by
the City of Port Townsend and a city right-of-way. The city funded dumpsters and
porta-johns to ameliorate health and safety impacts. County Harm Reduction staff
and approximately 16 other partner organizations offered unfunded support and
services to encampment residents.
In November, the city decided to clear the encampment after requesting more
support from the social service agencies and other stakeholders. In response, social
service and health providers, housing service providers and housing activists
questioned displacing the encampment residents. The Housing Fund Board echoed
and amplified the refrain from social service stakeholders for “no displacement
without placement”. Housing service providers made a major effort to enter the
encampment residents into HMIS and expand current facilities to accommodate
additional beds. While some residents of the encampment were placed, most
moved on to less stable environments.
The Housing Fund Board, city and county, as well as social service partners, have
made commitments via the 2025-2028 Homeless and Affordable Housing Services
Plan to develop tools and locations in 2026 and beyond to prevent future
displacement without placement incidents.
Mid- 2025, the Housing Task Force was tasked with finding monies to cover budget
shortfalls due to cuts in federal spending. Looking forward, the proposed HUD
budgets contain drastic cuts in funds in financing affordable housing projects and in
the case of the House budget a 43% cut in housing voucher subsidies. Part of the
proposal is a change in the system so that all funds are allocated to the States as a
block grant and the State then decides on allocation. Block grants of this type tend
to disadvantage rural areas. The funding emergency was taken into account in
crafting the 2025-2030 plan. The Housing Fund Board plans to meet regularly with
service providers to develop funding strategies.
11
2025 ANNUAL REPORT Emerging Needs and 2026 Priorities
In 2026, the Housing Fund Board will begin to develop its implementation plans for
the 2025-2030 Homeless and Affordable Housing Services Plan enacted by the City
of Port Townsend and Jefferson County on December 8 th, 2025.
As part of implementation, the Housing Fund Board’s Shelter Coalition will develop
and put into practice new tools and alternative solutions to address the increasing
numbers of people unhoused or marginally unhoused, including building a local
framework for supported encampments. The 2026 plan goals include locating and
establishing a 30-bed supportive encampment.
To address the continued challenge of funding shortfalls, the Housing Fund Board
will share and network with stakeholder agencies on funding opportunities.
Plan implementation also includes a focus on client -centered service delivery.
• To address the need for client-focused mental health care for individuals
experiencing homelessness, Bayside along with Discovery Behavioral Health care
in Port Townsend are in the initial stages of developing a strategy to build and
operate a Therapeutic Housing facility and program.
• OlyCAP is developing housing supports and services including regional skilled
nursing for Jefferson County’s aging unsheltered population, particularly those
with dementia or significant behavioral health needs that create barrier s to
permanent housing and shelter.
• The CEAB is working towards creating a Homelessness to Housed Intensive Case
Management process that crosses disciplines and harnesses the knowledge of
the community and collaborative partnerships with housing expertise to ensure
an individual is guided through all resources addressing any b arriers and
provides some aftercare after that household initially achieves housing to ensure
sustainability.