2701 Jefferson Street P.O. Box 1180 Port Townsend, Washington 98368
p: (360) 385-0656 | e: info@portofpt.com| f: (360) 385-3988 | w: portofpt.com
December 29, 2025
Greg Ballard
Development Code Administrator
621 Sheridan Street
Port Townsend, WA 98368
RE: SUB2025-00007
Binding Site Plan Application
Port of Port Townsend JCIA Rural Light Industrial Park
Dear Greg,
During the hearing on December 19, 2025, for the above referenced application, a question was
raised regarding the provision of water service to the 24-acre industrial park site. The 2014
Airport Master Plan by Reid Middleton states:
“Initial plans indicate that water service to the Industrial Park will be provided by
utilizing the existing water service from the north side of the Airport” (Alternatives
Analysis and Conceptual Development Plan, p. D.22)
Plans for the industrial park project were conceptual at the time of the writing of the 2014 master
plan. The current proposal submitted for consideration for the Binding Site Plan process has
been designed to the permitting stage after determining the best available source of water for
both potable water and fire suppression for the proposed site. The design process has determined
that the best source for water supply is from Four Corners Road, south of the runway.
The Airport Master Plan is currently being updated by KSA Engineers of Norman, OK, and will
be revised to reflect the current design of the Industrial Park, as amended by any conditions
imposed by the Binding Site Plan process. The updated Master Plan is scheduled to be completed
in 2026.
Sincerely,
Dave Nakagawara, P.E.
Capital Projects Engineer