Loading...
HomeMy WebLinkAboutBLD2007-00391 IIR UILDING PERMIT APPLICAIN BL .4O Revviewiew T Tyype:I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD07-00391 Received Date: 7/19/2007 SITE ADDRESS: 223 W ISLAND VIEW AVE PORT TOWNSEND, 98368 OWNER: RANDOLPH E BISHOP PHONE: 360-301-3765 3051 SIMS WAY PORT TOWNSEND WA 98368 IRONDALE SUBDIVISION: Block: Lot: PARCEL NUMBER: 962111401 Section: 34 Township: 30 N Range: 01 W CONTRACTOR: NOBULL SERVICES PHONE: 360-379-8753 1258 CEDAR ST PORT TOWNSEND WA 98368 Contractor's License NOBULS*944Q1 Expires 11/28/2008 REPRESENTATIVE: PHONE PROJECT DESCRIPTION NEW SFR W/ATTACHED GAR TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 1,200 VALUATION 157,000.00 ADD'L: HEAT TYPE: EEE CODE EDITION: 2006 HEAT BASE: HEAT TYPE: OCCUPANCY: R-3 UNHEATED: # OF STORIES: OCCUPANCY: CONST TYPE: 5N OTHER: 576 SHORELINE: CONST TYPE: GARAGE: 576 SETBACK: DECK: BANK HEIGHT: SEWAGE DISPOSAL: CON WATER SYSTEM: PUD BEDROOMS: BATHROOMS: Exist: Exist: Prop: 2 Prop: 2 Total: 2 Total: 2 Routing Date: --)//c-i 70 7 Type Amount Paid By: Date: Receipt: Approved/Date Permit $1,318.55 CJZ 07/19/07 91433 ��P�� Plan Check $857.06 CJZ 07/19/07 91433 VED State Building Code $4.50 CJZ 07/19/07 91433 AUG 31 21J7 Potable Water Application $58.00 CJZ 07/19/07 91433 Total: $2,238.11 Jefferson County Planning &Building Department • . CONDITIONS for Building Permit# :BLD07-00391 1.) PRIOR TO OCCUPANCY& BUILDING FINAL INSPECTION FINAL APPROVAL OF SEPTIC SEP06-00169 IS REQUIRED. 2.) A MINIMUM OF 10' MUST BE MAINTAINED BETWEEN BUILDING FOUNDATION AND EDGE OF DISPOSAL COMPONENT. 3.) MUST COLLECT AND DIVERT ALL SOURCES OF DRAINAGE AWAY FROM SEPTIC TANK, RESERVE & DRAINFIELD. MUST COMPLY WITH ALL PERMIT CONDITIONS, STATE AND LOCAL CODE. 4.) The application was reviewed by the Jefferson County Department of Community Development staff on August 30, 2007 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: SARPA aquifer recharge area; coastal SIPZ. 5.) Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County. 6.) Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers. 7.) Critical Aquifer Recharge Areas are defined as Seawater Intrusion Areas, and Special Aquifer Recharge Protection Areas and the following land uses located within Susceptible Aquifer Recharge Areas (1)All Industrial Land Uses (2)All Commercial Uses (3)All Rural Residential Land Uses requiring a Discretionary Use or Conditional Use Permit (4)All Rural Residential Land Uses with nonconforming uses that would otherwise require a Discretionary Use or Conditional Use Permit(5) Unsewered Planned Rural Residential Developments (6) Unsewered residential development with gross densities greater than one unit per acre. All of the above listed uses shall be subject to the applicable requirements and standards of the Jefferson County Unified Development Code. 8.) Marine shorelines and islands are susceptible to a condition that is known as seawater intrusion. Seawater intrusion is a condition in which the saltwater/freshwater interface in an aquifer moves inland so that wells drilled on upland areas cannot obtain freshwater suitable for public consumption without significant additional treatment and cost. Maintaining a stable balance in the saltwater/freshwater interface is primarily a function of the rate of aquifer recharge (primarily through rainfall) and the rate of groundwater withdrawals (primarily through wells). The Washington Department of Ecology is the agency with statutory authority to regulate groundwater withdrawal for individual wells in Jefferson County. New development, redevelopment, and land use activities on islands and in close proximity to marine shorelines in particular should be developed in such a manner to maximize aquifer recharge and maintain the saltwater/freshwater balance to the maximum extent possible by infiltrating stormwater runoff so that it recharges the aquifer. 9.) The parcel is located within a coastal SIPZ (seawater intrusion protection zone) according to the County GIS map. There are voluntary and mandatory measures identified in the Jefferson County Seawater Intrusion Policy (Resolution 44-22, effective September 23, 2002) that apply to well drilling proposals and building permit applications on existing lots of record. A Coastal SIPZ is defined as: all islands and area within one-quarter mile of marine shoreline, but no history of chloride concentration above 100 mg/L in groundwater sources within 1000 feet. 10.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 11.) To help prevent seawater from intruding landward into underground aquifers, all new development activity on Marrowstone Island, Indian Island and within 1/4 mile of any marine shoreline shall be required to infiltrate all stormwater runoff onsite. 12.) The property owner shall compl, Water Conservation Measures (per list stained by the UDC Administrator). 13.) The applicant is proposing to create or add 1800 square feet of impervious surface and 1924 square feet of land disturbing activities. JCC 18.30.060 and 18.30.070 require your proposal comply with Minimum Requirement#2 (Construction Stormwater Pollution Prevention) of the Department of Ecology Stormwater Management Manual for Western Washington to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 14.) The project shall comply with Construction Stormwater Pollution Prevention (SWPP) Elements#1 through #12 of the Department of Ecology's Stormwater Management Manual for Western Washington to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 15.) Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act(SEPA) pursuant to WAC 197-11-800(1)(b)(i). 16.) The revised site plan dared July 27, 2007 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated August 30, 2007 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 17.) This approval is for a single family residence with attached garage only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits. 18.) The parcel has been designated as RR 1:5 under the Jefferson County Comprehensive Land Use Map effective August 28, 1998. 19.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 20.) Not more than 2 unlicensed vehicles shall be stored on any lot unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Chapter 18.30 JCC. Outdoor storage of 3 or more junk motor vehicles is prohibited except in those districts where specified as an autormobile wrecking yard or junk (or salvage) yard and allowed as a permitted use in Table 3-1 or Chapter 18.18 JCC, and such storage shall meet the requriements of JCC 18.20.100, Automobile wrecking yards and junk (or salvage) yards. In no case, shall any such junk motor vehicles be stored in a critical area. 21.) A minimum of two (2) on-site parking spaces shall be provided for the single family residence. 22.) The building height is not to exceed 35 feet. 23.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 24.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 25.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 26.) Minimum setback from West Island View Avenue right-of-way shall be 15 feet as approved under an administrative variance by the UDC Administrator on July 12, 2007. Minimum setback from North Wilson Avenue right-of-way shall be 20 feet. Minimum setback from the south and west property boundary shall be 5 feet. 27.) An address of 223 West Island View Avenue, Port Townsend has been assigned to the parcel. West Island View Avenue is private (P397). 28.) The lot was created through the•dale#5 Subdivision on April 2,1910 undeiN 29795. 29.) The parcel is served by the Quimper public water system. 30.) A building permit(BLD06-0647 and BLD06-0648) were withdrawn on November 17, 2006. A septic permit (SEP06-0169) was aproved on June 27, 2006. • Jefferson County Building Division Permit Null: BLD07-00391 Applicant: BISHOP BUILDING PERMIT INSPECTION APPROVALS \pplicable Code: 2006 International Building Codes To schedule inspections, call (360)379-4455 no later than 7:0C AM the day of the inspection. Requests received after 7:00 AM will not be scheduled for that day's inspections. ELECTRICAL PERMITS are issued by the Washington State Department of Labor& Industries. The electrical permit must be signed off by the State Inspector prior to the County's Framing Inspection Inspection Item Date Approval Signature Notes Setbacks SIILi(6s t f Erosion Control Foundation Footing IN Footing Drains Ots Foundation Stem Wall f.--).gan Underground Plumbing Under Floor Framing 0"//y/p Straps(hold downs) 50/05- Ext. Shear Wall Nailing 57"28/16 �✓ Rough-in Plumbing -s-_pg Framing -Dv Blocking U Airseal ( '-j Insulation:Walls -2?_cam (/ Insulation: Floors Insulation: Ceiling Niet LT" Int. Shear Wall Nailing 7 9 Wallboard Nailing Z7Q� Gas Line: Interior Gas Line: Exterior Propane Tank Heat/Chimney Clearance Drywell/Alt Drainage Address Posted FINAL INSPECTION 47/ye P .p - Pci C0t't th0 vote d4'tid .,(3-OfS by SC_ FINAL INSPECTION MUST BE APPROVED PRIOR TO BUILDING BEING OCCUPIED THIS PERMIT IS VALID FOR ONE YEAR .,?,SON c o • rJEFFERS COUNTY ti� kw ' DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street • Port Townsend • Washington 98368 360/379-4450 • 360/379-4451 Fax �qsp� www.co.jefferson.wa.us/commdevelopment JUL 8 2007 H7N_ Master Permit Application MLA: O1 -�01, Project Description(include separate sheets as necessary): `, ` SinJi' j,t �v'iiI Reficheic Ta3�Parcel / —J Property Pei Number: Cj 0 i�� Q Size: /0�o (D, (acres/square feet) Site Address and/or Directions to Property: ` 2 2 3 s% el ri (/‘ ,';�, Ave- , Property Owner(s)of Record: ` r�el.4 z 1 p� E E . .� S'h c p Telephone: 3 6 0 — 3 0/— 3 74 5 Fax: email: Mailing Address: 3 0 5/ 5 rti $ (l/f}.t 'Ps;T Tc S,.,.ri s e•► d j i✓,g, �J F-3 6 S- Applicant/Agent(if different from owner): Telephone: Fax: email: Mailing Address: What-kind of Permit? (Check each box that applies Auilding ❑Variance(Minor,Major or Reasonable Economic Use) ❑ Demolition Permit — 0 Conditional Use[C(a),C(d),or C]** Et ingle Family E Garage Attached etached 0 Discretionary"D"or Unnamed Use Classification ❑ Manufactured Home 0 Modular 0 Special Use(Essential Public Facilities)** ❑ Commercial* 0 Boundary Line Adjustment ❑ Change of Use / 0 Short Plat** ❑ Address Road Approach 0 Binding Site Plan** ❑ Home Business 0 Cottagelndustry 0 Long Plat** 0 Propane 0 Planned Rural Residential Development(PRRD)/Amendments** ❑Sign ❑ Plat Vacation/Alteration** 0 Allowed"Yes" Use Consistency Analysis 0 Shoreline Master Program Exemption/Permit Revisions** 0 Stormwater Management 0 Shoreline Management Substantial Development** ❑Site Plan Approval Advance Determination(SPAAD)* 0 Shoreline Management Variance ❑Temporary Use 0 Comprehensive Plan/UDC/Land Use District Map Amendment ❑Wireless Telecommunication* 0 Jefferson County Shoreline Master Program Amendment ❑ Forest Practices Act/Release of Six-Year Moratorium 0 Tree Vegetaion Request *May require a Pre—Application Conference **Requires a Pre-Application Conference Please identify any other local, state or federal permits required for this proposal, if known: DESIGNATION OF AGENT I hereby designate -� C?1-1/A1 to act as my agent in matters relating to this application for permit(s). OWNER SIGNATURE Date: ! G 7 By signing this application form,the ow er/ gent att that the information provided herein,and in any attachments,is true and correct to the best of his,her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save, indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application review and any require er inspections. Staffs access and right of entry will be assumed unless the applicant informs the County in writing at the time of the applica' t t he or s e wants prior notice. ) `/� Signature: ,4 i �< , Date: L! 1O I The action or actions Applicant wi undertake as ult of the issuance of thispermit mayne tivel impact upon one or more threatened or 9a Y P P endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)even if you are in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual and non-transfera-- •onsibility for adherin• and complying with the ESA. The Applicant has read this disclaimer and signs and dates it below. Signature: , I " _ Date: 777 i'/G7_____ G:\PermitCenter\###FORMS###\DRD FORMS\Master Permit Application 12-19-2006.doc • • BUILDER STATEMENT The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that they will be assu ' the responsibility of the General Contractor for the proposed project. Signature: �`� Date: / d 6 GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: FAX: , it/ -Cr=vr'cr.S (5 ) 37g- 57c3 ( ) MAILING ADDRESS: )'2 S SS- Cc cl i- S'r, 'C,'T i c w rt Sr ii c4 L EMAIL: crr-, „ff...?Tj`81-Li k, tw7 S Y! , C ,,,, CONTRACTOR'S LICENSE f fr 6 S,WAINS .J NUMBER: IJU.8 Lit SA T g Lj Q/ NUMBER ARCHITECT/ENGINEER: 11 11 DYS` ri D+"4'(.1reld PHONE (3 e G )37y_ /)rcdFAX: ( ) MAILING ADDRESS: 2� 1 t!f.e s r A.v L 1;' 1.,.6 S e,14,,tEI�AIL Pr9ject Type: Frame Type: Bathrooms: gtr36 - Shoreline: Type of Sewage Disposal: 8' New ®-"Wood Existing: ❑ Sewer ❑ Addition ❑ Steel Proposed: 2.. Bank ❑ Community System ❑ Alteration/Remodel ❑ Concrete Total: Z Height: P-Iridividual System ❑ Repair ❑ Masonry SEP Permit# ex,- (4,c ❑ Demolition ❑ Other: Bedrooms: Water Supply: Existing: Setback: ❑ Private well ❑ Two Party Tyrf of Heat: Proposed: jblic ee:+riTotal: Z Name of System: If this is a Commercial Project you must answer the following: Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply: I Underground Tank I Above ground Tank Size of Propane Tank: I Heat Stove I Cook Stove I Woodstove I Fireplace Insert I Hot Water Tank I Pellet Stove I Other Is this appliance being installed in a Manufactured/Mobile Home? Yes / No When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines, tank location and size, distances from the propane tank to all property lines,buildings and septic system components, including the reserve area. Square Footage Current Proposed ' 'For�Of• fice Use.Only, , ,.,,, . :s, Amount- ,Revision;=; • Main Floor Heated EH Bld A Review: l2OO , ,33 pp Cog 2nd Floor Heated Consistency Review: I 53 Other Heated Base fee: ._ II J 2 l •55 Mezzanine _ Additional Section: Heated Basement _67- Plan Check fee: 851 O4 Unheated Basement State Surcharge fee: ..41 SO Other Unheated 6 t5- 5-l� of Water Review fee: 9 3 Garage/Carport 6-7` ` 5� SUBTOTAL 11 F� 4 911944 S Decks 911/Rd, Approach fee: E x� r Other lOb.i ,"'7 TOTAL: $ • Receipt Number: J3 Cash/Check Numbe t. ESTED COST(REQUIRED) Date: ".F9ir market value of all labor and mates is foundation to finish `! p i o -7 / w� lnitiai�IL 1 8 2007 G:\PermitCenter\###FORMS###\DRD FORMS\Master Permit Application 12-19-2006.doc _ __-- ap -- --0 7- 0 3 9 1 JEFFERSON COUNTY OCC, un- Im roved rave,L s-C . 25' c� IsLahCl 1— 9d �' _ - Y - . .... Flee Te - IMP o 'lope-) crtA , -f - p rook -7 ex ist t`u c't(t r e i JUL 2 7 2007 — -� -- - --- --" -- --__------- , � roo F drain S�dcke,d Wat(?A- =ke, r 15 et bbrtJf.-u/a/y QA 71� -Si" r RdP05EE-D 2r 624 5(b'F 1 �� 13d.r»�.�n�. Fdn'r�fy IiF..S• 84! o 74,i 6' Se�rt1c I b- 0 OX '1 SO'dr. Ffd, treneEes L � Twb Cvnv4entional Gravity fi 1d Yrer%hcs 3 ,ySo�ej deep t� Pro P c r%t y s F�. 1 o asd sjback From r0P oFGU-t bask i i NO A 2 Via I t Foot In 9 of drain captain 8 raw �- PCrFc)rat(td 50' -- - ---�T rji►- Weeds -Ir? 1)o- 'scalp — Ft i i DO' 2aJIQS �rovn Pcighborlgq We,11 sm uet SC. RLWIsED dated Has been APP by RFM Mff.OFCQWO ProP•22 3 iscand View t k2f'I�o1 dart ior�S o� f e N --� — '6ta I-te-r of- -tlp- NF i t T 3 ti_.i 2' I I. W, M MER1L MARTIN DESIGN DRAFTING I � PORT TOWNSENO, WA PH: 3601379-6806