HomeMy WebLinkAboutCONSENT Onsite Grinder Pump Change Order 4 Department of Public Works O Consent Agenda Page 1 of I Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Josh Peters, County Administrator From: Eric Kuzma, Public Works Director Agenda Date: February 2, 2026 Subject: Change Order No. 4, Phase 4 - Stage 2 On-site Grinder Pump Installation for the PHUGA, Project No. 405-2127-0, Ecology Agreement No. WQC_2024_JCoPWE-00034 and Project No. 405- 2128-0, EPA Grant Agreement No. 02J97501 Statement of Issue: Change Order No. 4 with Earthwork Solutions LLC of Arlington, Washington. Analysis/Strategic Goals/Pro's Et Con's: This change order is for the following changes: additional septic pumping, not included in the original bid; and overruns for two existing bid items (Bid Item No. 10 Pothole Existing Utilities and Bid Item No. 33 Connection of On-site Grinder Pump System to the Existing Building Drain). Fiscal Impact/Cost Benefit Analysis: The amount for Change Order No. 4 is $26,319.59. The contract amount will increase from $1,069,445.55 to $1,095,765.15. NOTE, the cost includes 9.2% sales tax. The project is funded by the Department of Ecology combined funding package (Centennial grant, State Revolving Fund (SRF) loan and SRF forgivable loan) and the FY 2022 and 2023 EPA Community Grant Funds. Recommendation: Public Works recommends that the Board authorize Change Order No. 4 with Earthwork Solutions LLC and return one original to Public Works for further processing. Department Contact: Samantha Harper, P.E., Project Manager, 385-9175. Reviewed)By: Josh Peters, County Administrator Da JEFFERSON COUNTY Sheet 1 of 1 DEPARTMENT OF PUBLIC WORKS Change 4 Date: 1/21/2026 CHANGE ORDER Order No. Ordered by County Engineer under terms of []section 1-04.4 of the Standard Specifications Contract No. Change proposed by Contractor To: Earthwork Solutions LLC E .. Earthwork Solutions, LLC. Josh Frizzell, President 8629 156th St.NE i or Firm Name 01/27/2026 Arlington,WA 98223 •.ftre Date General Manager Title Consent given by Surety:(when required) Project Title Phase 4-Stage 2 On-site Grinder Pump By: Installation for the Attorney-in-fact Dote You are ordered to perform the following described work upon receipt of an approved copy of this change order: The change associated with this change order are for additional septic pumping not included in the original bid;and overruns for two existing bid items(Bid Item No. 10 Pothole Existing Utilities and Bid Item No.33 Connection of On-site Grinder Pump System to the Existing Building Drain). All work materials and measurement to be in accordance with the provisions of the standard specifications and special provisions for the type of construction Involved. ORIGINAL CURRENT ESTIMATED ESTIMATED CONTRACT CONTRACT NET CHANGE CONTRACT TOTAL AMOUNT(incl.9.2%sales tax) AMOUNT(Incl.9.2%sales tax) THIS CO(Incl.9.2%sales tax) AFTER CO(Incl.9.2%sales tax) $ 1,057,906.07 $ 1,069,445.56 $26,31959 $ 1,095,765.15 ORIGINAL CURRENT CONTRACT TIME NEW CONTRACT CONTRACT TIME(working days) CONTRACT TIME CHANGE(Add) TIME 104 170 0 / f 170 APP OVAL ECOMMENDED AP2fLAL C E ED 2?4$* I I I P Manager Date County Engineer Or! tL Works Pf r r Date APPROVAL RECOMMENDED APPROVED 1:V1l'(- Ecology Regional Project Manager Date Choir,Jefferson County Commissioners Dote _ _ a JEFFERSON COUNTY Contract No. Sheet 2 of 2 DEPARTMENT OF PUBLIC WORKS --, Change Date: 1/21/2026 CHANGE ORDER ESTIMATE Order No. 4 i NEW BID ITEMS _ 1 Bid DESCRIPTION Unit Unit Bid Qty Unit Bid Total N/A Additional Septic Pumping LS , $16,358.63 1 $ 16,358.63 $ $ _ CO 04 New item Total $16,358.63 EXISTING BID ITEMS DELETED Bid DESCRIPTION Unit Unit Bid Qty Unit Bid Total $0.00 $0.00 $0.00 CO 04 Ex.Bid Item Deleted Total] $0.00 EXISTING BID ITEMS ADDED Bid DESCRIPTION Unit Unit Bid Qty Unit Bid Total 10 Pothole Existing Utilities EA $262.95 18 $ 4,733.10 33 Connection of On-site Grinder Pump System EA $336.95 9 $ 3,032.55 CO 04 Ex. Bid Item Added Total $ 7,765.65 ESTIMATED NET CHANGE SUBTOTAL: $24,124.28 19.2%Sales Tax $2,195.31 ESTIMATED NET CHANGE TOTAL: $26,319.59 STAGE 2 Properties Property 11 Property Address Owner Nome Septic�40 -ll �ons Notes -- - - 7 711 Ness'Corner Rd Aaron Moore and Deborah Nordberg 1,000 8 670 Ness'Corner Rd Benjamin Richardson 750 — 9 690 Ness'Corner Rd. Thomas D Yarbrough 1,000 22 901 Ness'Corner Rd. New Start Enterprises,LLC(Hadlock Building Supply) 1,000 27 190 Masonic Hall Rd. Mildred F Smith Living Trust 4,000 32 972 Ness'Corner Rd. M&C Building,LLC(Olympic Equipment Rental) 2,000 36 1100 Ness'Corner Rd. Sansome Six United,LLC 4,870 Estimated 1,250gallon for the Nibbler 31 Matheson St. VFW Imoto Post 7498 1,150 47 93 Matheson St. Port Hadlock,LLC Michael Perrow 2,150 62 1871 Irondale Rd. Hadlock Development Company 1,500 63 1893 Irondale Rd. Yam Sunshine WA LTD Lblty Co Renae Gunstone-White(425)646-6117 2,000 Northwest Tool&Trade— Tenant not owner I think there are two tanks(septic and pump tank) 75 10 Oak Bay Rd. 1st Security Bank of Washington 1,000 80 61 Chimacum Rd. A&E Properties,LLC Unknown-the tank looks to be 1,000 gallons 81 81 Chimacum Rd. Paula R McAvoy 2,250 82 103 Chimacum Rd. Vicki J.Kelas 1,250 a 86 40 Chimacum Rd. Barry D Breitweg 1,000 87 50 Old Hadlock Rd. Leesan D Joyce Marlatt 6.150 87A and 87B total 90 150 Chimacum Rd. Schores Optometry Clinic Condo 1,000 95 211 Chimacum Rd. Earl Woodley(.=.arol Fletcher mailing address) 5,250 4 96 265 Chimacum Rd. M T Property,LLC(Amerigas) 1,000 estimate do not have septic permit 98 230 Chimacum Rd. Douglas L Joyce 1,000 102 321 Chimacum Rd. Community United Methodist 1,000_ 108 461 Old Hadlock Rd. Shold Excavating Inc. 1,000 116 121 Pomwell Rd. Shold Excavating Inc. 1,000 126 130 Curtiss St Douglas L Joyce 1,000 45,320 ;total septic to pump(gallons) 26,000 ;Total septic to pump(gallons)-BID TAB ; ____ 19,320 I Difference $ 0.76 !Cost per gallon _ ' $ 14,683.20 subtotal for additional pumping r________ $ 1,761.98 1296 mark-up • $ 16,445.18 Total witout WSST G:\Publicworks\PW_Port Hadlock Sewer\7 Construction\7.4.2 Grinder Pump Installation-Stage 2\11 Change Orders\CO 04\Stage2PumpingVolumes.xlsm