HomeMy WebLinkAboutBLD2007-00511 JILDING PERMIT APPLICATTN ML 546 Rev iew iew T Tyype: I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD07-00511 Received Date: 9/18/2007 SITE ADDRESS: 645 PARKRIDGE DR PORT TOWNSEND, 98368 OWNER: JOHN BARRAS PHONE: (360) 379-1643 EVELYN BARRAS 645 PARKRIDGE DR PORT TOWNSEND WA 98368-2800 WOODLAND HILLS#2 PHASE 2 SUBDIVISION: Block: Lot: 57+ PARCEL NUMBER: 999900157 Section: 27 Township: 30 N Range: 01 W CONTRACTOR: JEREMY VANCE INC PHONE: 360-385-2560 46 VILLAGE WAY PMB 162 PORT LUDLOW WA 98365 Contractor's License JEREMVI001C4 Expires 10/28/2007 REPRESENTATIVE: JEREMY VANCE PHONE: (360) 385-2560 46 VILLAGE WAY/PMB 162 (360) 379-1121 PORT LUDLOW WA 98365 PROJECT DESCRIPTIOI NEW HEATED SUNROOM ADDITION TO EXISTING RESIDENCE AND NEW DECK TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP ADD MAIN: VALUATION 45,801.00 ADD'L: HEAT TYPE: HTP CODE EDITION: 2006 HEAT BASE: HEAT TYPE: OCCUPANCY: UNHEATED: #OF STORIES: OCCUPANCY: OTHER: 440 CONST TYPE: GARAGE: 270 SHORELINE: CONST TYPE: DECK: SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: ALT WATER SYSTEM: PUD BEDROOMS: BATHROOMS: Exist: 3 Exist: 3 Prop: 0 Prop: 0 Total: 3 Total: 3 Routing Date: 9/i q/ a7Q Type Amount Paid Bv: Date: Receipt: Approved/Date Permit $603.35 KAS 09/18/07 93147 APPROVED Plan Check $392.18 KAS 09/18/07 93147 State Building Code $4.50 KAS 09/18/07 93147 OCT019 2007 Total: $1,000.03 Jefferson County Planning &Building Department Jefferson County Building Dig tion Permit Nur: BLD07-00511 Applicant: BARRAS BUILDING PERMIT INSPECTION APPROVALS \pplicable Code: 2006 International Building Codes To schedule inspections, call (360)379-4455 no later than 7:00 AM the day of the inspection. Requests received after 7:00 AM will not be scheduled for that day's inspections. ELECTRICAL PERMITS are issued by the Washington State Department of Labor& Industries. The electrical permit must be signed off by the State Inspector prior to the County's Framing Inspection Inspection Item Date Approval Signature Notes Setbacks t/e7 Erosion Control // Foundation Footing /r_7 07 Footing Drains Q,� Foundation Stem Wall 11-- l,_\EJ t� Under Floor Framing Straps(hold downs) Ext. Shear Wall Nailing 2 14:--.( c -W— i,c , 1 NO Framing 0-2y1 c_ Airseal Insulation:Walls Insulation: Floors r� > Insulation: Ceiling ( ,_ A' _LAG) c.q_ Int. Shear Wall Nailing `C Wallboard Nailing Address Posted i1Prt- 210.10g -- — FINAL INSPECTION FINAL INSPECTION MUST BE APPROVED PRIOR TO BUILDING BEING OCCUPIED THIS PERMIT IS VALID FOR ONE YEAR • • CONDITIONS for Building Permit# :BLD07-00511 1.) No plumbing has been reviewed or approved for this project by Jefferson County Public Health. Additional requirements may apply if plumbing is proposed. 2.) The application was reviewed by the Jefferson County Department of Community Development staff on October 29, 2007 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Special Aquifer Recharge Protection Area and Category II Wetlands. 3.) Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County. 4.) Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers. 5.) Wetlands Buffers are areas that shall be maintained in their natural condition, however, minor pruning or alteration of vegetation may be permitted as long as the function and character of the buffer are not diminished. 6.) Among the native conifer species which may be used in buffers or for re-vegetation include, but are not limited to: Grand Fir(Aibes grandis), Sitka Spruce (Picea sitchensis), Shore Pine (Pinus contorta), Douglas Fir(Pseudotsuga menziesii), Western Red Cedar (Thuja plicata), and Western Hemlock (Tsuga heterophylla). Among native tree species which may be used includes: Vine Maple (Acer circinatum), Big-Leaf Maple (Acer macrophyllum), Red Alder(Alnus rubra), Pacific Madrone (Arbutus menziesii), Quaking Aspen (Populus tremula), Black Cottonwood (Populus trichocarpa), Bitter Cherry (Prunus emarginata), Oregon White Oak (Quercus garryana), Cascara (Rhamnus purshiana), Pacific Willow (Salix lasiandra), and Scouler's Willow (Salix scouleriana). Among the native shrub species which may be used are: Sevice-Berry (Amalanchier alnifolia), Red Osier Dogwood (Cornus stolonifera) Salal (Gaultheria shallon), Ocean Spray (Holodiscus discolor), Indian Plum (Oemlaria cerasiformis), Pacific Ninebark (Physocarpus capitus), Red Flowering Currant (Ribes sanguineum), Wild Rose (Rosa nutkana), Swamp Rose (Rosa pisocarpa), Willows (Salix ssp.), Red Elderberry (Sam bucus racemosa), Snowberry (Symphoricarpos albus), Evergreen Huckleberry (Vaccinium ovatum), Red Huckleberry(Vaccinium parvifolium). 7.) A setback of 50-feet, measured perpendicularly from the wetland edge, shall be permanently maintained as a buffer. No filling, grading, clearing, or other alteration of the wetland or its buffer is allowed. 8.) Buffer perimeters shall be marked with temporary signs at an interval of one per parcel or every one hundred (100) feet, whichever is less. Signs shall contain the following statement: "Wetland & Buffer- Do Not Remove or Alter Existing Vegetation." 9.) A permanent physical separation along the upland boundary of the wetland buffer area shall be installed and permanently maintained. Such separation can include installing logs, trees, a hedgerow, or any other prominent physical marking approved by the UDC Administrator. 10.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 11.) The applicant is proposing to create or add 540 square feet of impervious surface and 462 square feet of land disturbing activities. JCC 18.30.060 and 18.30.070 require your proposal comply with Minimum Requirement#2 (Construction Stormwater Pollution Prevention) of the Department of Ecology Stormwater Management Manual for Western Washington to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 12.) The project shall comply with Ccuction Stormwater Pollution Prevention (VP) Elements #1 through #12 of the Department of Ecology's Stormwater Management Manual for Western Washington to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 13.) Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act(SEPA) pursuant to WAC 197-11-800(1)(b)(i). 14.) The site plan as submitted with the building permit application on September 18, 2007 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated October 29, 2007 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 15.) This approval is for a heated sunroom addition to an existing residence and a new deck only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits. 16.) The parcel has been designated as Rural Residential 1:10 under the Jefferson County Comprehensive Land Use Map effective August 28, 1998. 17.) A Declaration of Restrictive Covenant has been recorded on October 22, 2007 under AFN 528489 recognizing that the septic system serving the residence is sized to accomodate 360 gpd occasional peak use and limit the number of bedrooms on this property to 3. 18.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 19.) Not more than 2 unlicensed vehicles shall be stored on any lot unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Chapter 18.30 JCC. Outdoor storage of 3 or more junk motor vehicles is prohibited except in those districts where specified as an autormobile wrecking yard or junk (or salvage) yard and allowed as a permitted use in Table 3-1 or Chapter 18.18 JCC, and such storage shall meet the requriements of JCC 18.20.100, Automobile wrecking yards and junk (or salvage) yards. In no case, shall any such junk motor vehicles be stored in a critical area. 20.) The building height is not to exceed 35 feet. 21.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 22.) Exterior lighting for residential uses shall not exceed twenty feet (20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 23.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 24.) Minimum setback from Parkridge Drive right-of-way shall be 20 feet. Minimum side and rear yard setbacks shall be 5 feet. Minimum setback from Wetland C as depicted on the face of the plat shall be 50 feet. 25.) Parkridge Drive is a county local access road (C681809). An address of 645 Parkridge Drive, Port Townsend has been assigned to the parcel. 26.) A septic permit (SEP05-00201)was approved on August 9, 2005 for a system of 360 gallons per day. 27.) The subject property is located in the proximity of the Jefferson County International Airport (JCIA). The JCIA is a public, general aviation airport with a hard surfaces 3,000-foot, 12,500 pound weight bearing capacity runway. JCIA experiences frequent landings and take-offs. Structure located in the proximity to the airport will, to varying degrees, be subject to noise and vibration from aircraft during take-off, landing and approach activities. 28.) Wetland buffer shall remain natl. r vegetated except where the vegetation likeen disturbed invaded by highly undesirable species (e.g. noxious weeds), or would substantially benefit from the increased diversity of increased species. Where buffer disturbance has occurred during construction, replanting with native vegetation shall be required. Minor pruning of vegetation and removal of undesirable species (e.g. alders) may be permitted by the administrator on a case by case basis. 29.) The 50-foot wide perimeter buffer shall remain naturally vegetated. 30.) The parcel was created under Woodland Hills No. 2 long plat, filed of recorde June 29, 2004 under AFN 486311 with Jefferson County Auditor's office. I 0 i-- rt 54-• 1 IL, -\•-k-n PANTRY EXTG EXTG __ EXTG ( wils L LL_. - la_-_ ...a \ \ 3060 3060 3060 REMOvE EXTG SIDING 4 TRIM THIS WALL 4 REPLACE w/ `A GWB 4 INTERIOR TRIM TO MATCH EXISTING NEIU ° FAMILY / SUN ROOM O 5I_9" cv I O '4 30613 .1) r .Q N - - — 4050 ?SL \ ---0 26L 4050 4050 21-12 11. 2'-11, 1°" 11 ± IiI410(t2 " A I7ION FLQQ ' i' L 44N SCALE: 1/4" a 1' -O" 440 SF �, . "c-�� JEFFERSO / i 'i DEPARTMENT OF COMMUNITY DEVELOP MENT )PMENT `C 621 Sheridan Street • Port Townsend • Washington 98368 LU� $ 4.4+ 360/379-4450 • ��`S`kIN( p� www.co.jeffersonwaus/commdevelopme360/379-4451Faxnt Master Permit Application MLA: 0 7_ 5LJ(G Project Description(include separate sheets as necessary): C���S-1-14 t..-# Itiitd_ .her�-kr.ck_ ':\/ Iry / Cf r) c-t-rtic4- G C Tax Parcel q q Q ,� Number: 1 t i OC 1 5 ? Property /� q9 `.kc c e -C % 1 ci S u E I • /n� Size: 6 (acres/square feet) Site Address and/or Directions to Property: !` v-\ -( c' % 1,sy.L �` C:0`` 1'` .L/ I'0 r ;lie t le f r'S r c L..c.c,Ad.,2 ;6 - v t rLtU U( . o ( 0!,-r Cer.t r+ 9 3 6 a Property Owner(s)of Record: So k n 17 v'c l y/I (;a,,r a S Telephone: 56 3 7GI 1 6 t.,t Fax: email: Mailing Address: S AA-- Applicant/Agent(if different from owner): •e-r er~,'. L<<c,c C_ Telephone: 36 0 38-S 'S 6 G Fax: 6 O .3 7 [I.).). email: Mailing Address: L/6 U; 1 l& e (a,? •._/ P 0 )6 _. r` G vd_rOw riL./.J -'k3 6 c What kind of Permit?(Check each box that applies [}Building 0 Variance(Minor, Major or Reasonable Economic Use) ❑ Demolition Permit 0 Conditional Use[C(a),C(d),or CI** ❑ Single Family 0 Garage Attached/Detached ❑ Discretionary"D"or Unnamed Use Classification ❑ Manufactured Home 0 Modular ❑ Special Use(Essential Public Facilities)** ❑ Commercial* 0 Boundary Line Adjustment ❑ Change of Use 0 Short Plat** ❑ Address 0 Road Approach 0 Binding Site Plan** ❑ Home Business 0 Cottagelndustry 0 Long Plat** ❑ Propane ❑ Planned Rural Residential Development(PRRD)/Amendments** ❑Sign 0 Plat Vacation/Alteration** ❑Allowed"Yes"Use Consistency Analysis ❑ Shoreline Master Program Exemption/Permit Revisions** ❑Stormwater Management 0 Shoreline Management Substantial Development** ❑ Site Plan Approval Advance Determination(SPAAD)* 0 Shoreline Management Variance ❑Temporary Use 0 Comprehensive Plan/UDC/Land Use District Map Amendment ❑Wireless Telecommunication* 0 Jefferson County Shoreline Master Program Amendment ❑ Forest Practices Act/Release of Six-Year Moratorium 0 Tree Vegetaion Request *May require a Pre—Application Conference **Requires a Pre-Application Conference Please identify any other local, state or federal permits required for this proposal, if known: - DESIGNATION OF AGENT I hereby designate .Cr e'''''`y Vance._ to act as my agent in matters relating to this application for permit(s). OWNER SIGNATURE c'� / """4" / Date: 7 /. •. `t I Q 7 By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of his,her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and its employees, representatives or agents for the sole purpose of application review and any required later inspections. Staffs access and right of entry will be assumed unless the applicant informs the County in writing at the time of the application that he or she wants prior notice. Signature: _ = :`• . Date: The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)even if you are in con)pliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual and non-transferable responsibility for adhering to and complying with the ESA. The Applicant has read this disclain of apd signs and dates it below. Signature: -5"t . '. 7 / ..:. Date: 7 G:\PermitCenter\###FORMS###\DRD FORMS\Master Permit Application 12-19-2006.dor. BUILDER STATEMENT The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that they will be assuming the responsibility of the General Contractor for the proposed project. Signature: Date: GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: FAX: . €Ce' - \Jo-r e i-r\c., (360)3 S . ,56b (360) 371 tt MAILING ADDRE S: If(, V; t\G-i"jI(OaV p r,p t b EMAIL: CONTRACTOR'S LICENSE o c} 1,,,0,.\0 w w 0 5 t3 6 5 WAINS NUMBER: -$E.pEr-,vr 00 I GY NUMBER ARCHITECT/ENGINEER: `\'fcL' fcy n(� Sr,I PHONE (36() ) tfS 6(`(, FAx:(360 ) 4S.Z 706`f MAILING ADDRESS: 3 \ S • Or_6,IpFL S4-. pfj /,c,�,.(;JgMAIL Project Type: Frame Type! Bathroom`: rin 6.Z. Shoreline: Type of Sewage Disposal: ❑ New i(Wood Existing: 3 0 Sewer 0-- 0 Steel Proposed: 0- Bank ❑ Community System ❑ Alteration/Remodel 0 Concrete Total: Heiiht: Erin-clividual Systegi O Repair ❑ Masonry Ai SEP Permit# -srrX 0-)01 O Demolition 0 Other: Bedrooms: Water Supply: Existing: j Setback: ❑ Private well ❑ Two Party Type of Heat: Proposed: ./ P-Public (hw1' ,,p c dr Total: 3 Ai/r Name of System: ND If this is a Commercial Project you must answer the following: Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply: i Underground Tank i Above ground Tank Size of Propane Tank: i Heat Stove i Cook Stove i Woodstove i Fireplace Insert I Hot Water Tank i Pellet Stove i Other Is this appliance being installed in a Manufactured/Mobile Home? Yes / No When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines, tank location and size, distances from the propane tank to all property lines,buildings and septic system components, including the reserve area. Square Footage Current Proposed ':For Office Use,Only:-._- ...Iiiif Amount,,,;; , „ :Revision :, Main Floor Heated ! O EH Bld App Review: // G 2nd Floor Heated Z 3 -c Consistency Review: (5� Other Heated II Base fee: O5 , 55 Mezzanine ,01 Additional Section: Heated Basement },i-` -, rrtQ° Plan Check fee: �r ads r'� A r, ga. IS Unheated Basement fps - '='.0 Y�'"` -€ State Surcharge fee: �a 1�4.•S-IE Other Unheated ,� r� Pot Water Review fee: Garage/Carport 60C SUBTOTAL Decks °Z,70 911/Rd Approach fee: L :I q Sk I n o`Other Sve, revel - (-21,� _ tick 0 �"3'1 ` , 1 ,,-c. TOTAL: $ I ( c�1 . c)3 Receipt Number: G314-7 Cash/Check Number: [4��� r ESTIMATED COST(REQUIRED) r, G1,1i `Date: g Cbn •Fair market value of all labor and materials found tion o�i' 1 „ 3 S/000 -- Initials: J� G:\PermitCenter\###FORMS###\DRD FORMS\Master Permit Application 12-19-2006.doc Fes,. rru N. •. — o t_,;') J N. — \ = Cji `•s19 4 0 CO 457 •...N\,..., •/./ ..,_ --- --.'"N44N,.... ---- 0 Ul / O \ — o Cn i ;::-- %... .'%N..%\\ q 8o " - ---ii Fx.23';g > + o4 o b a \ (CY �y � � N o - �� i .,,\ '> / \\ \ ...t. .... .............. ..... , � 10 P y x\ \ IIcA ' ' x A �= Co I . \ :4c a Elz ` 4 \c",0 _. ��40111100"� �r (. -) *1 \ so 0 St.!4`-' 5 � I \ 30" -4,NIS air y I I %nF,i �� 1 �1IWo��9S'I�'� dal I" / 1 \ \ _________ — _._____ \ \ T -_ C �'_-�- _ ________\ T 5 V\2 -- I. 1 8 •� t- �iti9U0 r5 7 _� z $ 6�S Parke-1Q-r�'c Q c . i o w^s c��SZ `fie-cry Vo"t t_i LA(:. II t y31. Q k- /3w Pc, o g,� ;ci' O( \ I�Nn Lc%l. FOR 13c {— R QL( z LA.)��. 36 S JOHN & EVELYN BARRAS 1 PH (360, b 0 FAX (360)3.79 I I..1,