Loading...
HomeMy WebLinkAboutBLD2007-00618 • • CERTIFICATE OF OCCUPANCY Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 Carl Smith, Director/Building Official PERMIT#: BLD07-00618 SITE ADDRESS: 253 SNOW CREEK RD Issue Date: 04/10/2008 QUILCENE, 98376 Final Date: 11/9/2012 APPLICANT: WAYNE LOUNSBURY PHONE: 425-466-7788 CECILIA LOUNSBURY PO BOX 65191 PORT LUDLOW WA 98365-0191 SUBDIVISION: Block: Lot: 1 PARCEL NUMBER: 802243014 Section: 24 Township: 28 N Range: 02 W PROJECT DESCRIPTION: NEW SFR W/ATTACHED GARAGE HEATED GARAGE 1500 SQ FT/CARPORTS 868 SQ FT THE PROJECT LISTED ABOVE COMPLIES WITH THE REQUIREMENT OF THE BUILDING CODE 2006 EDITION. OCCUPANCY GROUP: R-3 TYPE OF CONSTRUCTION: 5N SPRINKLER SYSTEM yes eo- THE PROJECT PASSED ITS FINAL INSPECTION AND RECEIVED FINAL SIGN OFF ON 11/9/2012 \\tidemark\data\forms\F_BLD_Occupancy.rpt 11/21/2012 Jefferson County Building ivision Permit giber: BLD07-00618 Applicant: LOUNSBURY BUILDING PERMIT INSPECTION APPROVALS applicable Code: 2006 International Building Codes To schedule inspections, call (360)379-4455 no later than 7:00 AM the day of the inspection. Requests received after 7:00 AM will not be scheduled for that day's inspections. ELECTRICAL PERMITS are issued by the Washington State Department of Labor& Industries. The electrical permit must be signed off by the State Inspector prior to the County's Framing Inspection Inspection Item Date Approval Signature Notes Setbacks i//14(p /V/ Erosion Control 5/�/fig G` ' SEE CONDS 2&3 FOR SILT FENCING AND CONSTRUCTION ENTRANCE STANDARDS. Foundation Footing /���Us /1 J ),„,,,Aw 4,in D Ns Vern e.�14.11, LPrioros�,,l f �,,1 Ov U FF�12. /u 3TAcua"fl (vim /1 N1 Footing Drains /, _� _/2_ pil) Foundation Stem Wall 4,krese . /r6�c 4 S/9/46 Z` 4/I109 FbiZMS 4 ItA2DWARC NOT IN tLm_E Underground Plumbing 5///Ub gy e Straps(hold downs) 6 - -/ 1 iii, ExTEg 511.2 Ap's nK gfti Ext. Shear Wall Nailing wi irci. ediif Rough-in Plumbing >/Z i ( p GrNA1=R.S rasa`D,C. S/i�jo / Asi..wsm NYDIt20i,Ic 'IAu ^5 UK V/2/bfiAt Framing 6 ' ..2-/-(Z_. feri? 2- 0Airseal 6 .6 .— ( Z Insulation:Walls 7 `(Ve- - PrD 7�l/Insulation: Floors ( Z /�..� Insulation:Ceiling ft fr%- 1 l (j ii 44 AZ t `t r f // `l ?— /�7�� Int. Shear Wall Nailing 7 // ! ._ lip Wallboard Nailing 7- (3 /U /C 1 Gas Line: Interior '._ ',iz Tiv-) Gas Line: Exterior c( .)/ Lf�vl/ J Propane Tank i'- d,/- /L I Heat/Chimney Clearance -(c /. I L �� ,� Drywell/Alt Drainage lo_) 16 �/ SEE COND.. 1 FOR SPLASHBLOCK STANDARDS. Address Posted t- )- 10 //YDI.om.I r/ ill-:?, NI. FINAL INSPECTION 4 .7 FINAL INSPECTIO MUST BE APPROVED PRIOR TO BUILDING BEING OCCUPIED THIS PERMIT IS VALID FOR ONE YEAR BUILDING PERMIT APPLIC AION ML Review T Ty y 668 pe: I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD07-00618 Received Date: 12/27/2007 SITE ADDRESS: 253 SNOW CREEK RD QUILCENE, 98376 OWNER: WAYNE LOUNSBURY PHONE:425-466-7788 CECILIA LOUNSBURY PO BOX 65191 PORT LUDLOW WA 98365-0191 SUBDIVISION: Block: Lot: 1+ PARCEL NUMBER: 802243014 Section: 24 Township: 28 N Range: 02 W CONTRACTOR: WAYNE LOUNSBURY PHONE: (425) 466-7788 PO BOX 65191 PORT LUDLOW WA 98365 Contractor's License LOUNSW*044QA Expires 4/24/2009 REPRESENTATIVE: PHONE: PROJECT DESCRIPTION NEW SFR W/ATTACHED GARAGE HEATED GARAGE.1600 SQ FT/CARPORTS 868 SQ FT 2£V vs,(At `�- 2-O `1, 4-- TYPE OF WORK RES SQUARE FOOTAGE: �--� TYPE OF IMP NEW MAIN: 1509 </ VALUATION 325,000.00 32-7 00 ADD'L: 1,250 HEAT TYPE: RAD CODE EDITION: 2006 HEAT BASE: HEAT TYPE: PRO OCCUPANCY: R-3 UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N SHORELINE: GARAGE: 868 iC€E CONST TYPE: DECK: 0,3tooSETBACK: 250 BANK HEIGHT: SEWAGE DISPOSAL: CON WATER SYSTEM: PWELL BEDROOMS: BATHROOMS: Exist: Exist: Prop: 2 Prop: 3 Total: 2 Total: 3 Routing Date: UlQS 6 1 Type Amount Paid By: Date: Receipt: Approved/Date Permit $2,253.75 KAS 12/27/07 95534 APPROVED Plan Check $1,464.94 KAS 12/27/07 95534 , I State Building Code $4.50 KAS 12/27/07 95534 APR /0 2008 Potable Water Application $58.00 KAS 12/27/07 95534 Jefferson County Planning Total: $3,781.19 &Building Department • CONDITIONS for Building Permit# :BLD07-00618 1.) CONSISTENT WITH DOE 2005 STORMWATER MANUAL SECTION 3.1.2 "DOWNSPOUT DISPERSON SYSTEMS": A VEGETATED FLOWPATH OF AT LEAST 50 FEET SHOULD BE MAINTAINED BETWEEN THE DISCHARGE POINT AND ANY PROPERTY LINE, STRUCTURE, STEEP SLOPE, STREAM, WETLAND, LAKE, OR OTHER IMPERVIOUS SUFRACE. SENSITIVE AREA BUFFERS MAY COUNT TOWARD FLOWPATH LENGTHS. A MAXIMUM OF 700 SQUARE FEET OF ROOF AREA MAY DRAIN TO EACH SPLASH BLOCK. A SPLASHBLOCK OR A PAD OF CRUSHED ROCK(2 FEET WIDE BY 3 FEET LONG BY 6 INCHES DEEP) SHOULD BE LACED AT EACH DOWNSPOUT DISCHARGE POINT. NO EROSION OR FLOODING OF DOWNSTREAM PROPERTIES MAY RESULT. FOR SITES WITH SEPTIC SYSTEMS, THE DISCHARGE POINT MUST BE DOWNSLOPE OF THE PRIMARY AND RESERVE DRAINFILED AREAS. 2.) CONSISTENT WITH DOE 2TORMWATER MANUAL BMP C233 "SI. ENCE": SILT FENCING SHALL BE INSTALLED AT THE SOUTHERN AND EASTERN END OF THE PROPOSED RESIDENCE TO REDUCE THE POTENTIAL IMPACTS OF SEDIMENT TRANSPORT TO THE WETLANDS AND LAKE. GEOTEXTILE USED SHALL MEET THE STANDARDS AS SPECIFIED IN BMP C233 OF THE 2005 DEPARTMENT OF ECOLOGY MANUAL (SEE ATTACHED SHEET). THE CONTRACTOR SHALL INSTALL AND MAINTAIN TEMPORARY SILT FENCES AT THE SPECIFIED LOCATIONS. THE SILTE FENCES SHALL BE CONSTRUCTED IN THE AREAS OF CLEARING, GRADING, OR DRAINAGE PRIOR TO STARTING THOSE ACTIVITIES. THE SILT FENCE SHALL PREVENT SOIL CARRIED BY RUNOFF WATER FROM GOING BENEATH, THROUGH, OR OVER THE TOP OF THE SILT FENCE, BUT SHALL ALLOW THE WATER TO PASS THROUGH THE FENCE. THE MINIMUM HEIGHT OF THE TOP OF SILT FENCE SHALL BE 2 FEET AND THE MAXIMUM HEIGHT SHALL BE 2 1/2 FEET ABOVE THE ORIGINAL GROUND SURFACE. THE GEOTEXTILE AT THE BOTTOM OF THE FENCE SHALL BE BURIED IN A TRENCH TO A MINIMUM DEPTH OF 4 INCHES BELOW THE GROUND SURFACE. THE TRENCH SHALL BE BACKFILLED AND THE SOIL TAMPED IN PLACE OVER THE BURIED PORTION OF THE GEOTEXTILE, SUCH THAT NO FLOW CAN PASS BENEATH THE FENCE AND SCOURING CANNOT OCCUR. THE FENCE POSTS SHALL BE PLACED OR DRIVEN A MINIMUM OF 18 INCHES. A MINIMUM DEPTH OF 12 INCHES IS ALLOWED IF TOPSOIL. OR OTHER SOFT SUBGRADE SOIL IS NOT PRESENT AND A MINIMUM DEPTH OF 18 INCHES CANNOT BE REACHED. SILT FENCES SHALL BE LOCATED ON CONTOUR AS MUCH AS POSSIBLE, EXCEPT AT THE ENDS OF THE FENCE, WHERE THE FENCE SHALL BE TURNED UPHILL SUCH THAT THE SILT FENCE CAPTURES THE RUNOFF WATER AND PREVENTS WATER FROM FLOWING AROUND THE END OF THE FENCE. ANY DAMAGE TO THE SILT FENCE SHALL BE REPAIRED IMMEDIATELY. SEDIMENT DEPOSITS SHALL EITHER BE REMOVED WHEN THE DEPOSIT REACHES APPROXIMATELY ONE-THIRD THE HEIGHT OF THE SILT FENCE, OR A SECOND SILT FENCE SHALL BE INSTALLED. IF THE FILTER FABRIC (GEOTEXTILE) HAS DETERIORATED DUE TO ULTRAVIOLET BREAKDOWN, IT SHALL BE REPLACED. 3.) CONSISTENT WITH DOE 24TORMWATER MANUAL BMP C105 "S•ILIZE CONSTRUCTION ENTRANCE": CONSTRUCTION ENTRANCES SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTON SITE AND TRAVELING ON PAVED ROADS OR OTHER PAVES AREAS WITHIN 1,000 FEET OF THE SITE:. A MINIMUM LENGTH OF THE ENTRANCE SHALL BE 100 FEET. A SEPARATION GEOTEXTILE SHALL BE PLACED UNDER THE SPALLS TO PREVENT FINE SEDIMENT FROM PUMPING INTO THE ROCK PAD. THE GEOTEXTILE SHALL MEET THE STANDARDS AS SPECIFIED IN BMP C105 (SEE ATTACHED). FENCING SHALL BE INSTALLED AS NECESSARY TO RESTRICT TRAFFIC TO THE CONSTRUCTION ENTRANCE. WHENEVER POSSIBLE, THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM, COMPACTED SUBGRADE. THIS CAN SUBSTANTIALLY INCREASE THE EFFECTIVENESS OF THE PAD AND REDUCE THE NEED FOR MAINTENANCE. QUARRY SPALLS (OR HOG FUEL) SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS. IF THE ENTRANCE IS NOT PREVENT SEDIMENT FROM BEING TRACKED ONTO PAVEMENT, THEN ALTERNATIVE MEASURES TO KEEP THE STREETS FREE OF SEDIMENT SHALL BE USED. THIS MAY INCLUDE STREET SWEEPING, AN INCREASE IN THE DIMENSIONS OF THE ENTRANCE, OR THE INSTALLATION OF A WHEEL WASH. ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED BY SHOVELING OR STREET SWEEPING. THE SEDIMENT C:OLLECRED BY SWEEPING SHALL BE REMOVED OR STABILIZED ON SITE. ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD, WHICH END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY. UPON PROJECT COMPLETION AND SITE STABILIZATION, ALL CONSTRUCTION ACCESSES INTENDED AS PERMANENT ACCESS FOR MAINTENANCE SHALL BE PERMANENTLY STABILIZED. 4.) A setback of 150-feet, measured perpendicularly from the wetland edge, shall be permanently maintained as a buffer. No filling, grading, cleatng, or other alteration of the wetland or its buffer is allowed. 5.) Wetland buffer perimeters shall be marked with temporary signs at an interval of one per parcel or every one hundred (100) feet, whichever is less. S gns shall contain the following statement: "Wetland & Buffer- Do Not Remove or Alter Existing Vegetation." 6.) A permanent physical separation along the upland boundary of the wetland buffer area shall be installed and permanently maintained. Such separation can include installing logs, trees, a hedgerow, or any other prominent physical marking approved by the UDC Administrator. 7.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 8.) A Stormwater Site Plan has AI/submitted and approved by the Departmief Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 9.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 10.) Not more than 2 unlicensed vehicles shall be stored on any lot unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Chapter 18.30 JCC. Outdoor storage of 3 or more junk motor vehicles is prohibited except in those districts where specified as an autormobile wrecking yard or junk (or salvage) yard and allowed as a permitted use in Table 3-1 or Chapter 18.18 JCC, and such storage shall meet the requriements of JCC 18.20.100, Automobile wrecking yards and junk (or salvage) yards. In no case, shall any such junk motor vehicles be stored in a critical area. 11.) The road approach permit(RAP05-0056) must be inspected and.finaled by the Jefferson County Department of Public Works prior to the final inspection/certificate of occupancy of this residence. Contact Terry Duff, Department of Public Works at 360-385-9159 for the final road approach inspection. 12.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 13.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 14.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 15.) The building height is not to exceed 35 feet. • 16.) Minimum setback from Snow Creek Road right-of-way shall be 20 feet. Minimum setback from SR 101 right-of-way shall be 50 feet. Minimum setback from Lake Leland as identified on the revised site plan shall be 557 feet and minimum setback to the west adjacent parcel boundary shall be 5 feet. Minimum setback from the edge of the wetland buffer to the closest point of the house is depicted on the revised site plan as being 133 feet. 17.) The applicant shall fully adhere to all conditions and requirements of the eagle habitat management plan dated January 10, 2008 by WDFW. 18.) PRIOR TO OCCUPANCY& BUILDING FINAL - FINAL APPROVAL OF SEPTIC SEP07-375 IS REQUIRED. MUST MEET ALL CONDITIONS OF SEPTIC PERMIT. � �ON� � k��)1V � ; \ JEFFER. COUNTY 1110 ( 2" DEPARTMENT OF COMMUNITY DEVELOPMENT D C C 2 7 2087 '•' .- 621 Sheridan Street• P Townsend •Washington 98368 360/379-4450 • 9-445Fax `'\1 c/' www.co.jefferso .wa.ustmmdevelment JEFF{8SON CAI JNTY OCD \tl�t � 5f01"w ,e.„ Master Permit Application N ,\►agE IL5`4'a?�` MLA: C/i � , 3 Project Description(include separate sheets as necessary): f,de `li=t(: k e(_Q c4 a LA)i 711 (' p.),V, �;]tk).t^its, T Number. C 0/2 �ax Parcel �'� /�� t'� Property q ) v Size: L cre uare feet f&I -N. i-r� lcik e e l rt:d r c Site Address and/or Directions to Property: ,� r t -l�j h t 1 j na+�- t _ z. f(ra t q 4(- ov) kff i� � c>c3 ) 5� s�C, \ F' -t' -cA . tj i A , c...-e.),1e.- Property Owner(s)of Record: ll3' ' ` Telephone: L C� .- r Fax: j—�(�j L1 ; email: " v Mailing Address: )'•' ( C jct:l r.. 1, .i n/' ) ) , •-/8 26,5 I(y\ V L 4(cep, Applicant/Agent(if different from owner): Telephone: ---- Fax: ----_�` email:----- • - Mailing Address: -- -._,_. WIj)at kind of Permit?(Check each box that applies (Building r Ip't t ` 'J, ❑Variance(Minor, Major or Reasonable Economic Use) ❑ Demolition Permit 0 Conditional Use[C(a),C(d),or C]"" Slagle ranmy" Garage Attach Detached 0 Discretionary"D"or Unnamed Use Classification ❑ Manufactured Home 0 Modular ❑Special Use(Essential Public Facilities)** ❑ Commercial* ❑Boundary Line Adjustment ❑ Change of Use ❑Short Plat'" ❑ Address ❑Road Approach ❑Binding Site Plan** ❑pome Business ❑Cottagelndustry 0 Long Plat** Propane 0 Planned Rural Residential Development(PRRD)/Amendments** ❑Sign ❑Plat Vacation/Alteration** ❑Allowed"Yes"Use Consistency Analysis ❑Shoreline Master Program Exemption/Permit Revisions'"' ❑Stormwater Management ❑Shoreline Management Substantial Development** ❑Site Plan Approval Advance Determination(SPAAD)* ❑Shoreline Management Variance ❑Temporary Use ❑Comprehensive Plan/UDC/Land Use District Map Amendment ❑Wireless Telecommunication* ❑Jefferson County Shoreline Master Program Amendment ❑Forest Practices Act/Release of Six-Year Moratorium 0 Tree Vegetation Request *May require a Pre—Application Conference _ **Requires a Pre-Application Conference Please identify any other local,state or federal permits required for this proposal, if known: DESIGNATION OF AGENT I hereby designate ------ to act as my agent in matters relating to this application for permit(s). OWNER SIGNATURE Date: -z�-----, By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of his,her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application review and any required later inspections. Staffs access and right of entry will be assumed unless the applicant informs the County in writing at the time of the appli ion that he or sh5wants prior IWtice. Signature: t.i U• ESL - 'l?t,.JVt LL,- �/ _ Date: I (/�i//) i The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)even if you are in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual and non-transferable responsibil jy for adherii,(tg to and complying with the ESA. The Applicant has read this disclaimere and gignsiand dates it below. Signature: (..(✓(1,+,-� nit_ v- eAAlliI,A.---i/ Date: ( .//9///n/ G:\PermitCenter\###FORMS###\DRD FORMS\Master Permit Application 12-19-2006.doc - BUILDER STATEMENT The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that they will be assuming the res ). "lily of the Contractor for the proposed project. Signature: W( 1AfZp Jo t� �� _ Date: 171 t Q (07 'J GENERAL CONTRACTOR O MANUFACTURED HOME INSTALLER: PHONE: FAX: e'LlS) LIU -77E- (7,i3b) q. 7 168C- MAILINGADDRESS: &c(q I ±-1,,i `t ;IAqU%5� EMAIL: � fl CC EC , ,,f f, Ilov CONTRACTOR'S LICENSE • WAINS il�SV1 ✓� NUMBER: L.V O5 W) 6cI l Pr- NUMBER ARCHITECT/ENGINEER: Q PHONE ( ) FAX:( ) MAILING ADDRESS: EMAIL Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal: New i 'Wood Existing: ❑ Sewer LI Addition ❑ Steel Proposed: Bank ❑ Community System '' ❑ Alteration/Remodel ❑ Concrete Total: Height: Individual tem o7 �S ii Repair ❑ Masonry e SEP Permit# 'j O 602S 0 I.7 Demolition ❑ Other Bedrooms: Water Supply: Existing: ...0 Setback: k(Private well ❑ Two Party Ty of Heat: Proposed: 2 r ❑ Public 1,.ez;, vt i- F(o r Total: 2-- K( Name of �0.3 r1.System: If this is a Commercial Project you must answer the following: Number of Parking Spaces: Current Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: IBC Type of construction: WiII you have Food Service? Yes / No If this is a Pro.. ..- Tank and/or Appliance Installation permit,mark all items below that apply: i.er.ro nd T.. I Aboveground Tank Size of Pro ne Tan : (' _- ___ .ti•�2a► I Cook Stove stove I Fireplace Insert Hot ater Tan I pellet Stove I Other m I- , is appl .nce being installed in a Manufactured/Mobile Homefi -' When applying for a permit to install a propane tank you must also submit plan showing all of the buildings,all property lines,tank location and size,distances from the propane tank to all property lines,buildings and septic system coinpo en including the reserve area. . I , , 'I_ ' •2 -1 E64 - t212i tCc Square Footage Current Proposed For Office lase Only Amount Revision Main Floor ed !l•_ C ' 1' ti-'EH Bld App Review. 2 I r H atedConsistency Review- rC f4C-7,_ Q 1I$ Too i.55.co Other Heated . ,E. I Base fee: - Mezzanines' Additional Section: Heated Basemelat[C 2 7 2007 Plan Check fee: `4 `r It � 7S Unheated Basement State Surcharge fee: 4-50 `t � Other Unhea :,I jllsON coiWTy DEB Pot Water Review fee: n1 3 DO Garag= arport �31�1 $lj 1 C 1 -?)69 ti.1 vLos- SUBTOTAL ` Decks I 911/Rd Approach fee: Other ( ('„j:> i TOTAL: $ 4 D 51. 1 I I Receipt Number. c 5 5 4 Cjr-1 5(F LI Cash/Check Number: 1 r-T1� , a�s o <<ci ESTIMATED COST(REQUIRED) 6 Date: 2 Fair market value of all labor and " s fou h 1 a ‘a1 CJ - 24 c x / ( C Initials: C G:\PermitCenter\###FORMS###\DRD FORMS\Master Permit Applicationl2-19-2006.doc I r ' • • . ,aON co RJRCI \ � '� e �V JEFFERSON COUNTY g ,14. ,1 DEPARTMENT OF COMMUNITY DEVELOPMENT DEC 2 7 nip „y„ 621 Sheridan Street • Port Townsend •Washington 98368 C C A'.�g tII" Na' p http:/360/3/www.co.jefferrson wa.s/commdevelopment/ ��r�E� N CO�'rN OCD STORMWATER SITE PLAN SUBMITTAL TEMPLATE MLA# 01 -(p l!, g PROJECT/APPLICANT NAME: ± ►\` yr, �,....)(14)Uik 3 Please answer all of the following questions to the best of your ability. Where the question calls for depiction on a site map, the applicant may choose to either incorporate the elements into the general plot plan for the Master Land Use Application or to submit a separate stormwater site plan map. Project Overview 1. Describe the proposed developed conditions of the site. Indicate position and relative size of proposed improvements on the site map. The., OAS e i `is QCd27 bb sy, 1, of Grl r i1,1),1V, 4. of 6e by' + ail 1 rive; i R 6G`5 k Q P,v t 6US "1_ 1 C c �7r-1-16✓) �'1571 U'Q J•� 'e Q h` .. h 4 \L «urea b,5 (a c erS, 1' +S al( rbtazo i� (dui E�1 (Ai vs Existing Conditions Summary 2. Describe the existing topography. Indicate cont rs on the site Tap. f, -Pin., 1 S �� t.vic\ 1 to cL U Ie . tG, 0 . fr 'y 1`10 ka ti i�u,' \,a , r Sy \ ,r4 'c 6994 ,i Le 76 S,k 1-1 eM L,,er-C, S6 Uhl? e_k h(S` (4-1 roatus t e c.a.uci ._ c cr rn. 3. Describe the existing vegeta ion. indicate native vegetation are As on the site map. cpt� V �t/f'.Ue,la� J L ”i E- 30 �-5' nt Svnc 1 ►vvc YID 4. De cribe t existing soils. Indicate spit type on the sit map I c , 6 .tom - 4 (a( t I l , 4o w . (r i s Snf I S t 5. Describe the existing site hydrology(i.e.,drainage;behavior of water on the site—above,below, and on the ground). Indicate existing stormwater drainage to and from the site on the site map. Depict separate drainage basins on the site map, if applicable,and indicate acreage of each. th-rc- iS ' \c5 cu V\tv,9 wckl--x:f- 0V\ pro 6er -heo .-i-kc (khi,- c.e11n kct (.X cIrk k11 e (..,Usti \o.,o,, fie- ori-F APPROVED 6. Describe any excess levels of noise generated by the proposed use or activity: STORMWATER PLAN 5tonnpro p ",I� , MAR 2 6 2008 �►•• Require • • � JEFFERSON Olt DEPT.OF C' Y DEPM.NT stormwater site plan template—rev.10/1,2003 SIGNATURE. 5 i" 1 4 0 7. Describe significant geographic features and critical areas (i.e., environmentally sensitive areas such as wetlands, streams, steep slopes,etc.)on he site. Indicate location on the site map. V-eA I C,t.,J .-Q,i 8. Describe the general vicinity of the site, including adjacent land uses and structures, utilities, roads, and sensitive/critical areas (streams,wetlands,lakes,steep slopes,etc.). ktk (1)0C .. ,fie t e*z v19 11'0 tA te`r,e , -e 4W e 12,v\ j now Crfe RECEIVED Permanent Stormwater Control Plan DEC 2 7 2007 This portion of the Stormwater Site Plan consists of the selection and installation.of the trot BMPs and facilities to remain in place after construction of the project is completed. .4 p N tm} but 1't� ' "Medium" size projects are required to have the totals calculated of all impervious surfaces, pollution-generating impervious surfaces, and pollution-generating pervious surfaces to verify that the thresholds for treatment facilities and flow control facilities are not exceeded. g. Describe the developed site hydrology, as proposed. Indicate whether stormwater will be fully dispersed(i.e., per BMP T5.30 in the Manual)or, if not, what types of stormwater flow control will be utilized for the site or specific threshold discharge areas wity in the site. Locate these facilities on the sit plan an fferentiate proposed facilities from existing facilities. I- 1I S�r� IM i s r.c— w 1 v cal s ��. --t h CS S c� Sv�cx,, is, ,n„,_, ,,V\ ,C-) ac;� s, i 10. If the project requires the use of stormwater treatment facilities, describe the types of stormwater treatment facilities proposed for use on the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. [This is normally for large"projects or projects that invo ve the potential for dispersion of contaminants.] • 11. Describe the performance goals and standards appligable to the project , t2) 1 ecv i �� [ S ( . S no�v tzt f b e4 L) ck �P - _ 12. Describe the flow control system.... _b _ `I 1 ' IA a --�6u/ cw 1fi (AN kir } 1 s f i i 3 f, l t a � e., `` 6 stor�weter lite�lan template=rev 1�Wt/21iO3 � } � • •j 4 • • • RECEIVED DEC2 �ry ?2fl R7 DEC i 13. Describ the water.quality sys em. ;r ..r0-RON CprillY On ,0 , r 14. Describe the conveys ce system an ysis and design. _ I^ 1)dv),AS pOL LA)IA be_ diod zu, - I-3,b i e. So if? Cc 14, ctOrcS13 et a, uo1 ill1 o eNi �c iviAlk_j Sou; 15. Describe th source of fill material,physical characteristics of fill material,arid deposition of excess material. 16. Proposed methods of placement and compaction consistent with the applicable standards on Appendix Chapter 33 of the Uniform Buil ing Code. (� i-0� C1 oAr aA-trriA ;I ( '( Le (ION fAc 'F-eik W`-+k p (ecLe, iX/'l k." 17. Describe th proposed surfacing mate al. Tyi IM14uc - (`ow\ fp e 14m Cr' v__.L_ 18. Describe methods for restoration of the site. S } -;,o% 0-EC.‘ �..4-0`�-l co 2?C�'_e p 4-" --,/,— A t I' 1 rbr-i s a .b u 11CJt w;4 19. An Operation and Maintenance Manual is required for each flow control and treatment facility. [This is normally required for "large"projects only and only those for which facilities are required to control flow or treat runoff.] If included,list the Manuals here. '' nio--, 20. List here and include any s ecial reports or studies conducted to prepare the Stormwater Site Plan. e 1a,,�Q l C. \t tA t et ( 6 '.1 i - , (iS S c)v-to - rtCi t q u e_.1 ee b u-16r- 7 21. List other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals include conditions that affect the drainage plan or contain more restrictive drainage-related requirements,describe those conditions or restrictions here. 51(1..[ t'c_, g Ste„ , CA�l t stormwater site plan template—rev.10/1/2003 7 • • CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN(SWPPP) The Construction SWPPP addresses sediment and erosion control during construction. The BMPs indicated by the applicant in the template that follows must be installed on the ground during all construction phases of the project. The proponent is responsible for preventing sediment and erosion impacts to environmentally sensitive areas and off-site areas. Consult the Construction Stormwater Pollution Prevention (SWPP) Best Management Practices (BMPs) Packet for guidance, particularly with rural residential development. SECTION I—CONSTRUCTION SWPPP NARRATIVE 1. Construction Stormwater Pollution Plan Elements. Describe how each of the Construction SWPPP elements has been or will be addressed. Identify the type and location of BMPs used to satisfy the required element. If an element is not applicable to the proposal,justify in writing. Descriptions of the 12 Elements are found at section 2.5.2 of the Manual(beginning on page 2-15). 12 Required Elements—Construction SWPPP 1. . Mark Clearing Limits. `Th - C l� h- Ut%1-A 13 e e� (t ' .2 --�'_a (�1 'd fr) v�.: a,3 6ktu IP 2. Establish Cons�t `'ction Access. CI t'i i c Control Fl w R tes.- CL 3 e 0( )e. 4— c , --u l.eit i,' • ov\ c jj r e._ q i1 �' IGi i� \-r 1 - � s) VIn tin r a CAN, A U ( (j cr)Goo (x)e17- t 4. Inst II Sediment Controls. REC .-141\E D 5. Stabilize Soils DEC 2 7 2007 YP a dal _sue,., . p) z Ckrr cS IFFfEHSON COUNTY BCD 6. Protect Slopes. + _,i 1 7. Protect Drain Inlets__ s� C i`a.�, h t � els v\ t> -E e stormwater site plan template—rev.10/1/2003 8 • • RECEIVED 12 Required Elements—Construction SWPPP(continued) 8. Stabilize Channels and Outlets. DEC 2 7 2007 414- JEFFERSN [U1 DCD 9. Control Pollutants. • Str\GLLU , ti\a;1--\J(0, \ ouk s1(5‘‘ Stop .9 ur, (CQl St J 10. Control De-W ering(the act of pumpin roundwater or sto ater array from an active construction site). S t4e, l S e Zz � Ter`,(- �,4a q 1 at,rc 5)1 Otr 0. � - )rrFS 1 1- — t00r 1 11. Maintain Best Management practices(BMPs), 1, -tom pt�L `� l '1 U r- G(► 12. Manage the Proj ct. e pS G\r £� 2. Adjacent Areas. a. Description of the adjacent areas that may be affected by site disturbance (e.g., streams, lakes, wetlands, residential areas, roads). Trboht p is . c)-� 3Side,� C S ss �� G b. Description of the downstream drainage path leading from the site to the receiving body of water(minimum distance of 400 yards). a 4t LA) eA- bui-Cer— [-1,p ►roe p�r� If\ 3. Environmentally Sensitive Areas. a. Descriptijn of vironmentally sensiti areas that are on or adjacent to the site. I 1 A � \ � we_i- TLC c- qS I • �� tt;� stormwater site plan template—rev.10/1/2003 9 • b. Description of special requirem entq f9r working in or ear vir mentally sensitive areas. c t v' LtJ �1 �j`S (c CIS at-c, 5 () 4_- 4. Erosion Problem Areas. Description of potential erosion problems on site in the context of the characteristics of the on-site soils(e,g.,erodibility,settleability,permeability,depth,texture,soil structure). v d c-, CEI DEC 2 7 2007 5. Construction Phasing. JEFFERSON CHM DED f Constructio a uen a /n f^ S� L q -Or��, Llli�' 1 t � � ,In'lUC,1 s Fr1Constru n phasing(if proposed) ,l , - Ic&Q'c G v (con S I-)o rti�,e_ t.tea l r ' i 7/ L7t 1'l d� 5 C 1 t J Se& 6. Construction Schedule. Wet season is October 1 through April 30(page 2-21 of the Manual). I. Provide a yroposed construction schedule. te.b. , - rr ru, it) Iti II. Wet Season Construction Activities. a. Proposed wet season construction aptivities. /> E'_XCaUa4-cir (L)I,VI P. (fir► cp/til � V - b. Proposed yiet se son construction activities for n ironmenta sensitive a as R e- ( Yinne. �.1 to Psf t 7. Financial/Ownership Responsibilities. a. Identify the property `owner responsible for the i tiation of b ds and/or other financial securities. P s :� k�c �--ta 1 ( 1 , ' b. Describe bonds and/or other evidence of financial responsibility for liability associated with erosion and sedimentation impacts. \ S (hc ( CI > 8. Engineering Calculations. Provide Design Calculations separate sheet for the following,if applicable. a. Sediment Ponds/Traps. b. Diversions. Vl g P c. Waterways. 1(10 trv,a— d. Runoff/Stormwater Detention Calculations O Vl .RtictL' v1 stormwater site plan template—rev.10/1/2003 10 • • • Stormwater Site Plan Changes If the designer wishes to make changes or revisions to the originally approved Stormwater Site Plan,the proposed revisions shall be submitted to DCD prior to construction. The submittal shall include substitute pages that include all proposed changes, revised drawings showing any structural changes,and any other supporting information that explains and supports the reason for the change. Final Corrected Plan Submittal If the project included construction of conveyance systems,treatment facilities,flow control facilities,or structural source control BMPs (not standard on-site stormwater management BMPs),the applicant shall submit a final corrected plan ("as-builts")when the project is completed. These should be engineering drawings (stamped by a licensed civil engineer) that accurately represent the project as constructed. APPLICANT SIGNATURE By signing the Construction SWPPP worksheet, I as the .:• i••: a 's t,h , information provided herein is true and correct to gthe best of my knowledge. I also certify that thi-�.,1••ft•. t•' "•I-in •_ , ith the full knowledge and consent of all owners of the affecte property. DEC 2 7 2007 17,- Z. /G7 f l PRE ENTATI SIGNATURE) / (LANDOWNER RAUTH�RIZE�RE S JEFFEOS Itti COUNTY HD THIS SPACE MAY BE USED FOR ADDITIONAL NOTES, IF NEEDED: stormwater site plan template—rev.10/1/2003 12 Mil ®\ k 'i C7 CI tii3O = V e C W u u._ P4W - trA 7 1 0 0 k=', 7 \.: 1 1 0 ® ik EF! LI 1 ® 1 k 0.�- 1 0- I/ 0 _Ai I_ Li- t0 0 IhIIununI•j ,. 1L ---) - • 'Q U r- , I v N 1CNI V c 14.1 u.70 C' W 1 i i, 1 Li rr o e A ,.......„ H . • flQ -1-7)) a • r 0 l 0_ = 0 �x , liil r , , / n CY o 0 u_ 0 r <,.... z 0 U lu , , (--- r---- io ' � ,� — 6o 1 8 I . I QC r O • O • J I LI_ 'V Y a , , F.-1 1 z 0 0 v 1 1,,, ► ILI i 1 1 • 1 1 I 1 , - _ gEVT1SED dateit Has been APP by JUMP DEPT. OP,•CO SIGNATUP.B. ZPHASE 1: i ACCESSO' Y APPROX. SEPTIC DWELLING UNIT\ TANK LqCATION /5' IMN. —DS 4S D. . B. I A. -- i --- - - --- i -- i U.J3. ,750ga1. --- -- - i PROPA -_--------oS TAN MIN. \ /r�fm \ \ LTIGHTLINE DS 50, TO DAYLIGHT I � IRRIGFIQN WELL 4 \ 45 ENLARGED VIEW SEPTIC TANK CONFIGURATION SIMILAR FOR PHASE 2 ' V I�Vlew-es, 'th-e � Ill ll S N ot 1ftri ewpc���'rv'�iv� � �L lzV� . �',�► u a W i l l re q V fire- r--wvt w Cwd a,�'lrrya dis�Nbl`n(�M,ynrna 1��-h�es , A p is E uy; E M AY - 2 2008 GENERAL WIz n- 0 o O M 0. In 0 m o M o n Z CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS BEFORE PROCEDING. DO NOT SCALE DRAWINGS PERVIT # 910 07-0C'; 1 8 JEFFEFISON COUNly BED o• Q� 1 " = 5 0.0' S� -0"., / HA PHASE 1: �. SINGLE FAMILY a RESIDENCE 83'4" 12'-0" APPROX. SEP a U,G_ / /1- P -0 PS ' TANK\\\\\\ / IRRIGATION WEL EXISiiNG o DRIVE WAY / o / \ I o vQ I WATER 51 I Irc,°j LINE Q- I E. 1, 81i PRIMARY N APPROX. W34 1y E DW/ 10�NO LOCATION BUILD ZONE \ EtMTING site APPROX. SEPTIC TANK LOCATION Genera outline of old log deck site Non su tioned buffer (Projeded) �\Butter \ Buffer \ \ I \ \ I Buffer \ \ 8 4a 11 to 17a 13a 1i a 22a 20a tea 28a �\ \ 2 24a I� End of boundary marking SEP07-00375 SEPTIC DESIGN AND WELL LOCATIONS AS PROVIDED BY NATHAN CLEAVER SEPTIC DESIGN REVISED DRAWING DATED 1-7-08 NOTE FOR VICINITY MAP, LEGEND, MATERIAL SYMBOLS & SHEET INDEX, SEE SHEET A-1 COVER SHEET, BY 2 W.T. ENGLAND RESIDENTIAL DESIGN Sumer2872 6Ati •5k�� \ y DATED 10-22-07 \, 272 I �° ° \ �� 8 \ 0 I \ \ O 30 \ \ _ 3 9� S ? 33 35 38 \ pp,A�O 7 rp; AFp \ / Buller 3 39 I \ y \ 40aos. 40 TIGHTLINE TO \,y, 4 D.S. ° 4 I sr 150•\ \ 1130.38' 02 \ \ \rr2 Buffer43 I p,. CLEAN OUT E. SEPTIC TANK O \• ' 4aaos C. FILTER SOCK \ p2 'so, s0' 44 L. PUMP TANK rG �\ I E. D-BOX pGc� &45 MO 4,218 ft2 buffer 7s\ 47 expansion area \ for buffer �760, \ 48 averaging for \ single family — 51 resident site. \ J sta, 52881 \ Buffer PHASE 2: PREVIOUS EXCAVATIO ' Buffer �4 's 2a 1a 1 `n 4 3a e 5a 8a 7a Oa \ \ Buffer \ W 2 Buffer 21 , 23 2 183.63' PL. S 88* 59' 53" E 53 I \ 54 \ 55 I 1 ss 57 58 4,218 fta buffer reduction area for buffer averaging for single — family resident site. I \ \ _ J — — — — — — L — — — LAKE LELAND S J a 0 0 0 M M PROJECT DESCRIPTION PHASE 1 OF A 2 PHASE PROJECT: A 11200 S.F. ACCESSORY DWELLING UNIT WITH A 4 CAR GARAGE PROPERTY DESCRIPTION S24 T28 R2Wf, LOT 1 LYING SLY OF SNOW CREEK RD. & HWY 101 LESS TX 19 PARCEL NUMBER 802-243-014 PROJECT DATA JURISDICTION: JEFFERSON COUNTY, WA LAND USE: 9100 - VACANT LAND OCCUPANCY: R-3 CONSTRUCTION TYPE: V-B SITE ADDRESS: 253 SNOW CREEK RD. QUILCENE, WA 98376 LOT AREA: 26 ACRES BUILDING LOT COVERAGE PROPOSED BUIDING PHASE 1: 21845 S.F. PROPOSED BUIDING PHASE 2: 3,767 S.F. TOTAL BUILDING COVERAGE: 6,612 S.F. DRIVEWAY: 25,421 S.F. TOTAL LOT COVERAGE: 32,033 „/ 11080,482 = 2.96% MAXIMUM BUILDING HEIGHT = 35' MAXIMUM BUILDING HEIGHT PROPOSED = 29'-6" UTILITIES WATER: ON SITE WELL SEWER: ON SITE SEPTIC TELEPHONE: T.B.D. ELECTRIC POWER: PUGET SOUND ENERGY CABLE TV: T.B.D. SURVEY THIS SITE PUkN WAS DRAWN USING SURVEY BY WOOD SURVEYING INC. NOTE ON SURVEY SAYS: NO DETERMINATION AS TO THE LOCATION OF LAKE LELAND SITE PLAN WAS MADE AS A PART OF THIS SURVEY 1" = 100.0' WETLAND BUFFER E THIS SITE PUS N WAS DRAWN USING BUFFER VEGETATION PLANTING PLAN DRAWING BY LOGGY SOIL AND WETLAND CONSULTING DATED 10 /10 /07 Kkrs� rr_^^ vl z w V) 00 0 f N I M C9 U Z w �a�Z 1:b0D?j ^� N ��o° I < = ra 00 f U Cj C n'M M p la — Qaarn a cn IP) lD M 00 O1 Q a C) � U o ro") 00 Z U CO J n gV)�� zzoLri O_ N Ln tD m 0 a Si-1— TAMARA NAUIGAN ARCHITECTS 360-385.2620 JERSON cod _bL POI of 8