HomeMy WebLinkAboutBLD2008-00247 • 110
DEMOLITION PERMIT
Jefferson County Department of Community Development
621 Sheridan Street, Port Townsend, WA 98368
(360)379-4450 FAX (360)379-4451
PERMIT #: BLD08-00247 Received Date 6/6/2008
SITE ADDRESS: 251 ROBBINS RD Issue Date 7/25/2008
NORDLAND, 98358
APPLICANT: CHARLES K MCLACHLAN HOINS PHONE: 360-385-5459
PO BOX 195
NORDLAND WA 983580195
T 44
SUBDIVISION: Block: Lot:
PARCEL NUMBER: 921084028 Section: 8 Township: 29N Range: 01 E
CONTRACTOR: OWNER/BUILDER PHONE:
OWNER, CHARLES K MCLACHLAN HOINS PHONE: 360-385-5459
if different: PO BOX 195
NORDLAND WA 983580195
PROJECT DESCRIPTION: DEMO EXIST SFR
Directions SEE DIRECTIONS&MAP IN FILE
To Site:
THIS PERMIT IS VALID FOR ONE YEAR AND IS NOT RENEWABLE.
THE FINAL INSPECTION MUST BE SCHEDULED AND PASSED WITHIN THAT YEAR.
THE EXPIRATION DATE IS 7/25/2009.
REQUIRED INSPECTION:
FinalApproval: I 0--,-(IL,
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
Office Hours 9:00 a.m. -4:30 p.m.
SPECIAL CONDITIONS APPLY - SEE REVERSE
HOT LINE AVAILABLE 24 HOURS A DAY
•UILDING PERMIT APPLICAT!N MRLAO8wTOpe275
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD08-00247 Received Date: 6/6/2008
SITE ADDRESS: 251 ROBBINS RD
NORDLAND, 98358
OWNER: CHARLES K MCLACHLAN HOINS PHONE: 360-385-5459
PO BOX 195
NORDLAND WA 983580195
SUBDIVISION: Block: Lot: T 44
PARCEL NUMBER: 921084028 Section: 8 Township: 29 N Range: 01 E
CONTRACTOR: OWNER/BUILDER PHONE:
REPRESENTATIVE: PHONE:
PROJECT DESCRIPTIOI DEMO EXIST SFR
TYPE OF WORK RES SQUARE FOOTAGE:
TYPE OF IMP DEM
VALUATION MAIN: 650
CODE EDITION: 2006 ADD'L: HEAT TYPE:
OCCUPANCY: HEAT BASE: HEAT TYPE:
OCCUPANCY: UNHEATED: #OF STORIES:
CONST TYPE: OTHER: SHORELINE:
CONST TYPE: GARAGE: SETBACK:
DECK: BANK HEIGHT:
SEWAGE DISPOSAL: ALT
WATER SYSTEM:
BEDROOMS: BATHROOMS:
Exist: 2 Exist: 1
Prop: -2 Prop: -1
Total: 0 Total: 0
Routing Date:
Type Amount Paid By: Date: Receipt: Approved/Date
Permit $52.00 LYK 06/05/08 100329 APPROVE[
State Building Code $4.50 LYK 06/05/08 100329
Total: $56.50 JUL oC2008
Jefferson County Planning
& Building Department
• •
SPECIAL CONDITIONS FOR CASE#BLD08-00247:
1.) The application was reviewed by the Jefferson County Department of Community
Development staff on July 24, 2008 for the potential presence of Environmentally
Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC).
After an initial Geographic Information Systems mapping review and an investigative site
inspection, the following ESAs were confirmed to be present on the subject property:
SARPA aquifer recharge area; coastal SIPZ.
2.) Aquifer Recharge Areas in Jefferson County are characterized by porous geological
formations that allow percolation of the surface water into the soils and the underlying
zone of saturation. Aquifers are geologic formations that contain sufficient saturated
permeable material to yield significant quantities of water to wells and springs. Aquifers
serve as the source of drinking water within most of the rural portions of Jefferson County.
3.) Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions
that promote rapid infiltration of recharge waters to groundwater aquifers.
4.) Critical Aquifer Recharge Areas are defined as Seawater Intrusion Areas, and Special
Aquifer Recharge Protection Areas and the following land uses located within Susceptible
Aquifer Recharge Areas (1)All Industrial Land Uses (2)All Commercial Uses (3)All Rural
Residential Land Uses requiring a Discretionary Use or Conditional Use Permit(4)All
Rural Residential Land Uses with nonconforming uses that would otherwise require a
Discretionary Use or Conditional Use Permit(5) Unsewered Planned Rural Residential
Developments (6) Unsewered residential development with gross densities greater than
one unit per acre. All of the above listed uses shall be subject to the applicable
requirements and standards of the Jefferson County Unified Development Code.
5.) Marine shorelines and islands are susceptible to a condition that is known as seawater
intrusion. Seawater intrusion is a condition in which the saltwater/freshwater interface in
an aquifer moves inland so that wells drilled on upland areas cannot obtain freshwater
suitable for public consumption without significant additional treatment and cost.
Maintaining a stable balance in the saltwater/freshwater interface is primarily a function of
the rate of aquifer recharge (primarily through rainfall) and the rate of groundwater
withdrawals (primarily through wells). The Washington Department of Ecology is the
agency with statutory authority to regulate groundwater withdrawal for individual wells in
Jefferson County. New development, redevelopment, and land use activities on islands
and in close proximity to marine shorelines in particular should be developed in such a
manner to maximize aquifer recharge and maintain the saltwater/freshwater balance to
the maximum extent possible by infiltrating stormwater runoff so that it recharges the
aquifer.
6.) The parcel is located within a coastal SIPZ (seawater intrusion protection zone) according
to the County GIS map. There are voluntary and mandatory measures identified in the
Jefferson County Seawater Intrusion Policy (Resolution 44-22, effective September 23,
2002) that apply to well drilling proposals and building permit applications on existing lots
of record.
A Coastal SIPZ is defined as: all islands and area within one-quarter mile of marine
shoreline, but no history of chloride concentration above 100 mg/L in groundwater sources
within 1000 feet.
7.) To help prevent seawater from intruding landward into underground aquifers, all new
development activity on Marrowstone Island, Indian Island and within 1/4 mile of any
marine shoreline shall be required to infiltrate all stormwater runoff onsite.
8.) The property owner shall comply with Water Conservation Measures (per list maintained
by the UDC Administrator).
9.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water
quality degradation. The submitted proposal does not require additional aquifer
protection measures. However, during construction the project shall follow the Best
Management Practices (BMPs) and facility design standards as identified and defined in
the Stormwater Management Manual for the Puget Sound Basin.
• •
10.) The applicant is proposing to create or add 680 square feet of impervious surface and
1432 square feet of land disturbing activities. JCC 18.30.060 and 18.30.070 require your
proposal comply with Minimum Requirement#2 (Construction Stormwater Pollution
Prevention) of the Department of Ecology Stormwater Management Manual for Western
Washington to control stormwater, erosion and sediment during construction. BMPs shall
address permanent measures to stabilize soil exposed during construction, and in the
design and operation of stormwater and drainage control systems.
11.) The project shall comply with Construction Stormwater Pollution Prevention (SWPP)
Elements#1 through#12 of the Department of Ecology's Stormwater Management
Manual for Western Washington to control stormwater. erosion and sediment during
construction. BMPs shall address permanent measures to stabilize soil exposed during
construction, and in the design and operation of stormwater and drainage control systems.
12.) Jefferson County determined that this proposal is categorically exempt from review under
the State Environmental Policy Act(SEPA) pursuant to WAC 197-11-800(1)(b)(i).
13.) The revised site plan dated July 17, 2008 has been reviewed for consistency under the
UDC, and has been approved by Jefferson County Department of Community
Development. Any modifications, changes, and/or additions to the stamped, approved
site plan dated July 24, 2008 shall be resubmitted for review and approval by Jefferson
County Department of Community Development.
14.) This approval is for a demolition of existing SFR and replacement of new SFR only. Any
future permits on this site are subject to review for consistency with applicable codes and
ordinances and does not preclude review and conditions which may be placed on future
permits.
15.) The parcel has been designated as RR 1:5 under the Jefferson County Comprehensive
Land Use Map effective August 28, 1998.
16.) Outdoor residential storage shall be maintained in an orderly manner and shall create no
fire, safety, health or sanitary hazard.
17.) Not more than 2 unlicensed vehicles shall be stored on any lot unless totally screened
from view of neighboring dwellings and rights-of-way. Such screening shall meet all
applicable performance and development standards specific to the district in which the
storage is kept, and shall be in keeping with the character of the area. Screening shall
meet the requirements of Chapter 18.30 JCC. Outdoor storage of 3 or more junk motor
vehicles is prohibited except in those districts where specified as an autormobile wrecking
yard or junk (or salvage)yard and allowed as a permitted use in Table 3-1 or Chapter
18.18 JCC, and such storage shall meet the requriements of JCC 18.20.100, Automobile
wrecking yards and junk (or salvage) yards. In no case, shall any such junk motor
vehicles be stored in a critical area.
18.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of
impervious surface which includes roof tops, driveways, concrete, etc.
19.) Minimum setback from Robbins Road right-of-way shall be 20 feet. Minimum side and
rear yard setbacks shall be 5 feet.
20.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the
finished grade, excepting when such lighting is an integral part of a building or structure.
Ground level lighting is encouraged.
21.) Lighting fixtures shall be designed and hooded to prevent the light source from being
directly visible from outside the boundaries of the property. The intensity or brightness of
all lighting, during construction and after project completion shall not adversely affect the
use of surrounding properties or adjoining rights-of-way.
22.) The building height is not to exceed 35 feet.
23.) An address of 251 Robbins Road, Nordland has been assigned to the parcel. Robbins
Road is a county local access (C594209).
24.) The parcel is served by the Quimper public water system.
25.) A septic permit (SEP81-0142) if now filed with SEP07-0237 that was approved on
September 4, 2007. A SFR permit(BLD08-0248)will be issued with the demolition permit
(BLD08-0247).
I:\F_BLD_Permit_Propane.rpt 10/29/19
• 6 .
`GstGION 044 Olympic Region Clean Air Agency
oti��,e �`4f, 2940-B Limited Lane NW
ire, Olympia,WA 98502
(360) 586-1044• FAX(360) 491 G308 Demolition Permit
Port Angeles office (360) 417-1466
''`. o RCA A . Raymond Office (360) 789-3652
`' wwww.ORCAA.org
p4,Residential [ I Commercial
Permit fee: $25.00 per structure. Non-refundable.
**10 Working Day wait period**
PROPERTY OWNER
Name: Phone: (360) 38s•s'4zq Email: Clops 04QM.temu
C.1411a%-iS► 14 ( Ck:pZ O 114$ FAX: ( ) Mobile: (3ao)lot-977 i
Mailing Address: City: State: Zip:
p.a• ( )D Y. Vt-S° _ IA029LAI4 0 uJAr 6i6359
Site Address: City: State: Zip:
tSl 12o4b%1 45. COD. 14o&ot oi9 _ WA- 983re
DEMOLITION CONTRACTOR [Check if same as property owner information
Business Name: Phone: ( ) Email:
FAX: ( )
Onsite Contact: Phone: ( ) Mobile: ( )
FAX ( )
Mailing Address: City: State: Zip:
DEMOLITION INFORMATION
#of Structures being demolished: Start Date: AD Completion Date:
ova, (6 - — °CoinIo� #(3oJoa
Asbestos present Y6:17) Survey attached C 1 N Will all asbestos be removed IV' IN)*
DEMOLITION PROJECT CATEGORY —
'Rv
[].Complete Demolition
[ ] Training Fire—Fire Agency:
[ ] Government Ordered Demolition—Attach copy of Order
[ ] Renovation,Alteration,Remodeling,Maintenance,or other Construction
I have read and will abide by the conditions set forth in this permit and any addendum thereto. I do hereby certify that the
information in this application and supplemental data desc ' ed herein is, to the best of my knowledge, accurate and complete.
1 'Ja
Cokes k(cos) oosNf .615(
Applicant Name Signature Date
Date x- ), ;L., tie
i . i Payment Info. di.Approved Asbestos Per t `'�
P, [ ] Cash _ ] Disapproved Permit#t ASB00 [
4. 1.etieck: # i•`4 Demolition Permit
JUN 05 2008 . [ ] Credit Card Review date:C((/OS/b k Permit# DEMOO
Receive date:/ /. Reviewed by:
AOINAA
Agency Use Only Agency Use� Agency Use Only
02/25/08
l gg,010N ci,e4,., Olympic ion Clean Air Agency
•
�g �'""�.�`�\ 2940-B Limited Lane NW
�•�l I ,� Olympia,WA 98502
( . �! (360) 586-1044 • FAX(360) 491-6308
`� , ' Port Angeles Office (360) 417-1466
of
''. 0 RCA A , `, Raymond Office (3r60) 789-3652
.6'�+%.r r,,. s�°`s/ ww.ORCAA.o rg
Demolitions projects within Clallam, Grays Harbor,Jefferson, Mason, Pacific and Thurston counties
REQUIRE A PERMIT and require that the following conditions be met prior to the demolition.
Olympic Region Clean Air Agency(ORCAA) regulations define a demolition project as the wrecking,
razing, leveling, dismantling, or burning (by a fire department for training purposes)of a structure,
making the structure permanently uninhabitable or unusable.
Renovations include the removing of load bearing structural members, but not to the extent to make the
structure uninhabitable.
The following information is merely a reference guide and not a substitute for agency regulations.
1. The start date must be at least 10 working days from the submission date of the complete application and
payment.
2. A good faith asbestos survey must be conducted by a certified Asbestos Hazardous Emergency Response
Act(AHERA) building inspector. A list of qualified contractors and inspectors may be found in your local
Yellow Pages,through the Washington State Department of Labor and Industries, as well as search
engines on the Internet.
3. A copy of the asbestos survey and Demolition Permit must be kept on site and be available for review by
Agency inspection personnel;
4. Any and all structures on the same parcel of property that are not proposed to be demolished must be
identified as such;
5. It is the responsibility of the building owner and/or demolition contractor to ensure there is no ACM
present in the structure to be demolished;
6. Nuisance laws are applicable to the demolition, including nuisance related to the unreasonable interference
with the enjoyment of life and property and the depositing of particulate matter on other property.
ADDITIONAL REQUIREMENTS:
In addition to Agency requirements, most building departments require a demolition permit(separate from
ORCAA's Demolition Permit).The Washington State Department of Labor&Industry and the local fire marshal
may also require notification for asbestos removal projects.Telephone numbers for these entities are listed in the
Government Listing area of the telephone book
Residential ffatntil buildingoccupied,containing
space for
such
as cand
ppratinoffood and eingthaisowned,used, or inendedor designed to be occupied by one family
as their domicile. This term includes houses, mobile homes,trailers,houseboats,and houses with `mother-in-law
apartment' or`guest room.' This term does not include structures that are demolished or renovated as part of a
commercial or public project.Nor does this term include any mixed-use building, structure,or installation that
contains a residential unit,or any building that is leased or used as a rental.
. i i
• BUILDER STATEMENT •
The signer of th� stem nt does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that
they will as m' g e sponsibility of the General Contractor for the proposed project.
Signatu : _ '�� Date: 6�D,
GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: FAX:
IIik ( ) ( )
MAILING ADDRESS: EMAIL:
CONTRACTOR'S LICENSE WAINS
NUMBER: NUMBER
ARCHITECT/ENGINEER: PHONE ( ) FAX:( )
MAILING ADDRESS: EMAIL
Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal:
0 New V--Wood Existing: I ❑ Sewer
❑ Addition 0 Steel Proposed: D Bank ❑ Community System
❑ Alteration/Remodel ❑ Concrete Total: Height: 'Individual System
❑ Repair ❑ Masonry Alt—
Water SuISEP Permit#
Demolition CI Other: Bedrooms: 'Nt Supply:
Existing: '� Setback:
o ❑ Private well ❑ Two Party
Type of Heat: Proposed: _ ❑ Public
(o�-- Total: 0 Name of System:
If this is a Commercial Project you must answer the following:
Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces:
Number of occupants(includes owners,tenants,employees,etc) Current Proposed
IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No
If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply:
I Underground Tank i Above ground Tank Size of Propane Tank:
I Heat Stove I Cook Stove I Woodstove i Fireplace Insert i Hot Water Tank i Pellet Stove I Other
Is this appliance being installed in a Manufactured/Mobile Home? Yes / No
When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property
lines,tank location and size,distances from the propane tank to all property lines,buildings and septic system components,
including the reserve area.
. i . yea * a7 h.. t §.4
Square Footage Current Proposed ti ® ri gy ) �� " tr, ,� . his o'� .
Main Floor Heated . , EH Bld App Review:
6� D LOI
2ntl Floor Heated A ' r" '7.t Consistency Review:
Other Heated 4-mot Base fee:
k� �Qo
Mezzanine 't Additional Section:
{ ' .'•
Heated Basement u `"T •` Plan Check fee:
Y.' C-f
.fix, .'.. .:—':
Unheated Basement t1,,,,,,,,3,-"ty,,
. State Surcharge fee:
Other Unheated I. 4 Pot Water Review fee:
Garage/Carport " _t SUBTOTAL
Decks ; U� '� � •�i
v 911/Rd Approach fee:
Other t1
�1 1 TOTAL: $5 ,
-
x' : _ . Receipt Number: (CO 521
,,V - Cash/Check Number:
ESTIMATED COST(REQUIRED) Date:
•Fair market value of all labor and materials foundation to finish �n D �j
Initials:
��
G:\PermitCenter\###FORMS###\DRD FORMS\Master Permit Application 5-29-08.doc
k�4,'-' V cOO,� JEFFERSOI JUNTY • ,
ti DEPARTMEN1 ..r COMMUNITY DEVELOPMENT i _.
621 Sheridan Street• Port Townsend • Washington 98368 i
360/379-4450 • 360/379-4451 Fax JUN - 6 LI.i0u
o www.co.jefferson.wa.us/commdevelopment
-1".9.41Nd J 1
Master Permit Application MLA: 0 -a-7`j r
Project Description(include separate sheets as necessary):
e4,i'13 6t1,04-- b\ 6-e— D r- Sw 1-e. ;64, f�ee -jai - ('L' \e J.cy(en )
Tax Parcel Number: g Z( D ' _ OZ 5 Property Size: (, 16 eCur5 .o,.iCi Sq'(acres/square feet)
Site Address and/or Directions to Property:Z S i, (Z.4,n‘01�� 4_ I`t JJ`M 0.) o i w A- 1 e& 8
i
Property Owner(s)of Record: Gk a-r('S K. .ve.L66'40.,,- 4401.AS /a-t - C.-L M',n,,,,_,
Telephone: 16 O - 3SS-S>kSq F cel9) 3C,-30t-q-172- email: c- o(t(pevt.cow.
Mailing Address: -i-D. 117ou 76 , 14,srd&1 L,Ok GiS3-g"8
Applicant/Agent(if different from owner): '1 4-
Telephone: Fax: email:
Mailing Address:
What kind of Permit?(Check each box that applies
❑Building 0 Critical Areas Stewardship Plan
Demolition Permit 0 Variance(Minor, Major or Reasonable Economic Use)
❑Single Family El Garage Attached/Detached 0 Conditional Use[C(a),C(d),or C]**
❑ Manufactured Home 0 Modular 0 Discretionary"D"or Unnamed Use Classification
❑ Commercial* 0 Special Use(Essential Public Facilities)**
❑ Change of Use 0 Boundary Line Adjustment
❑ Address 0 Road Approach 0 Short Plat**
❑ Home Business ❑ Cottage Industry ❑ Binding Site Plan**
❑ Propane El Long Plat**
❑Sign ❑ Planned Rural Residential Development(PRRD)/Amendments**
❑Allowed"Yes"Use Consistency Analysis ❑ Plat Vacation/Alteration**
❑Stormwater Management ❑Shoreline Master Program Exemption/Permit Revisions **
❑Site Plan Approval Advance Determination(SPAAD)* ❑ Shoreline Management Substantial Development**
❑Temporary Use 0 Shoreline Management Variance
❑Wireless Telecommunication* 0 Comprehensive Plan/UDC/Land Use District Map Amendment
❑Forest Practices Act/Release of Six-Year Moratorium 0 Jefferson County Shoreline Master Program Amendment
*May require a Pre-Application Conference 0 Tree Vegetation Request
**Requires a Pre-Application Conference
Please identify any other local, state or federal permits required for this proposal, if known: CVL���
QD55 tom. R,4_34- 4.0 tk lo-d.nr-k- i- t]�G, - -{>0 �, cp - f ,.. .-L. R o -
J DESIGNATION OF AGENT
I hereby designate 11 (A- to act as my agent in matters relating to this application for permit(s).
OWNER SIGNATURE (1 Date:
By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of
his,her or its knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet
may result in this permit being null and void.
I further agree to save, indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and
expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit.
further agree to pr vid access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application
eview and a e ired later inspections. Staffs access and right of entry will be assumed unless the applicant informs the County in writing at the
ime of th appli 'on a he or/' a wants prior notice.
lignatur : ll� Date: 1 4 4(
he action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or
ndangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the
Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this
ermit has been is ed will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your
ton(s)eve f u ar in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual
id non-tr nsfer le e on ility for adhering to and complying with the ESA. The Applicant has read this disc im r and signs and dates it below.
gnature. _ ��" Date: ���D8
'ermitCenter\###FORMS###\DRD FORMS\Master Permit Application 5-29-08.doc
EXISTIN(
SHED
SITE (structure
dimensions) 1" = 200'
W
z
1-4
W
O
CL
S87*38'05"E 10
160.02' OVERALL
M
0 SL 7
10'-0" NO —
BUILD ZONE
O4-LXISTING
i SEPTIC
'TANK
`JVITH
LATERALS
30'
.
: . I
9 CON
-r
DOWNSLOPE
PROTECTION
ZONE
126
ESL 1
10'
E
W C B A�
En
+-•� �� PROP SED
M Z SEW R
/ LINE FUTURE\\
EXISTING HOME SITS
/ SEWER '� \
LINE ^'`�
/ I TO BE L J
IREMOVE z�
/ - Z
PROPSED � EXISTING
SO
SHED TO SEWER REMAIN
LINES 1-4 I
43'-
I I 0 I
EXISTING I EXISTING WELL m
I SHED TO / WELL HOUSE TO
REMAIN 1 i REMAIN
WELL
A --_-
o i SETBACK
WATER l
1 ..S LINE 'l�Q. RADIUS
DA
L - - - - DA
EXISTING HOUSE TO BE
co
I DEMOLISHED NEW
CONSTRUCTION ON SAME
__ SITE-------_
SIDEYARD SETBACK 5' _ H aEXISTING
o z p m / GRAVEL
N
DRIVEWA
} 16y.0?'
S878'11'�E ,�� CURTAIN DRAIN
DAYLIGHT
LEGAL DESCRIPTION
5' SECTION - 8
QUARTER SECTION - SE 4
PL TOWNSHIP - 29N
RANGE - 1E
- EXISTING
CURTAIN
DRAIN in
W ~
Ln
01 �
�
N
z
EXISTING
CURTAIN
DRAIN
PARCEL NUMBER
921-084-028
SIZE
1.160 ACRES
SITE ADDRESS
251 ROBBINS ROAD
NORDLAND, WA
98358
BUILDING Ji
FOOTPRINTS
�jBtajl # BLB
08-0247
NEW RESIDENCE = 623 S.F.
EXISTING WELL HOUSE = 25
EXISTING SHED 1 = 108
EXISTING SHED 2 = 48
LEGEND
SOIL LOG 03133f321
A CLEAN OUT Q310N SV G3AOdddV L
B SEPTIC TANK anim9ns SV U3A02lddV
C FILTER SOCK M31A3N NVId ONIGI
D PUMP TANK GOG A LN1100 NOSUainP
E SPLITrER
EXISTING SEPTIC TANK TO BE
DECOMMISIONED
N
yF'x<il z.E
SITE PLAN s:
5'-0" SIDEYARD SETBACK
PROPERTY LINE
CENTERLINE OF
ROBBINS ROAD
1" = 20.0'
NOTE: LOCATION OF ALL
SEPTIC DESIGN AND
EXISTING STRUCTURES AS
TAKEN FROM SEPTIC
DRAWING BY NATHAN
CLEAVER ON FILE AT THE
JEFFERSON COUNTY
HEALTH DEPARTMENT
N
Q
z
LLI
U7
o�
c+� a
3
(J Z
w
�
_ 3
N
N
`��mHt�p
f U�a'n1
d1
O
H¢ a 2 rn
A
0
m
V)
LL
~'
W 0
V
z W
Lu
W
A-2-
TAMARA HALLIGAN
ARCHITECTS
3 60.3 65.2 628