Loading...
HomeMy WebLinkAboutBLD2008-00259 ! • CERTIFICATE OF OCCUPANCY Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 (800) 831-2678 Al Scalf, Building Official PERMIT #: BLD08-00259 SITE ADDRESS: 43 N ANDREW AVE Issue Date: 07/29/2008 PORT TOWNSEND, 98368 Final Date: 8/16/2010 APPLICANT: STEVE BLACK PHONE: (360) 379-5569 PO BOX 465 PORT TOWNSEND WA 98368-0465 SUBDIVISION: IRONDALE Block: 135 Lot: 14+ PARCEL NUMBER: 962113507 Section: 35 Township: 30 N Range: 01 W PROJECT DESCRIPTION: NEW SFR WITH A/G 100 GAL PROPANE TANK THE PROJECT LISTED ABOVE COMPLIES WITH THE REQUIREMENT OF THE BUILDING CODE 2006 EDITION. OCCUPANCY GROUP: R-3 TYPE OF CONSTRUCTION: 5N SPRINKLER SYSTEM yes no THE PROJECT PASSED ITS FINAL INSPECTION AND RECEIVED FINAL SIGN OFF ON 8/16/201 liI:\F_BLD_Occupancy.rpt 10/29/19 lUILDING PERMIT APPLICAAN MLA08-00287 Review Type: I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD08-00259 Received Date: 6/12/2008 SITE ADDRESS: 43 N ANDREW AVE PORT TOWNSEND, 98368 OWNER: STEVE BLACK PHONE: (360) 379-5569 PO BOX 465 PORT TOWNSEND WA 98368-0465 IRONDALE SUBDIVISION: Block: 135 Lot: 14+ PARCEL NUMBER: 962113507 Section: 35 Township: 30 N Range: 01 W CONTRACTOR: OWNER/BUILDER PHONE: REPRESENTATIVE: PHONE: PROJECT DESCRIPTIOr NEW SFR WITH A/G 100 GAL PROPANE TANK TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 1,192 VALUATION 89,037.00 ADD'L: HEAT TYPE: EEE CODE EDITION: 2006 HEAT BASE: HEAT TYPE: PRO OCCUPANCY: R-3 UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N GARAGE: SHORELINE: CONST TYPE: DECK: 228 SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: CON WATER SYSTEM: PUD BEDROOMS: BATHROOMS: Exist: Exist: Prop: 3 Prop: 2 Total: 3 Total: 2 Routing Date: /3/6��-=- Type Amount Paid Bv: Date: Receipt: Approved/Date Permit $923.75 KAS 06/12/08 100353 APPROVED Plan Check $600.44 KAS 06/12/08 100353 State Building Code $4.50 KAS 06/12/08 100353 JUL Zcl 2008 Potable Water Application $59.00 KAS 06/12/08 100353 Jefferson County Planning Total: $1,587.69 & Building Department Jefferson County Building Dillon Permit Num, BLD08-00259 Applicant: BLACK BUILDING PERMIT INSPECTION APPROVALS applicable Code: 2006 International Building Codes To schedule inspections, call (360)379-4455 no later than 7:00 AM the day of the inspection. Requests received after 7:00 AM will not be scheduled for that day's inspections. ELECTRICAL PERMITS are issued by the Washington State Department of Labor& Industries. The electrical permit must be signed off by the State Inspector prior to the County's Framing Inspection Inspection Item Date Approval Signature Notes Setbacks it-'Zi-ck Erosion Control SEE CONDITION 2 FOR CONSTRUCTION ENTRANCE STABILIZATION. Foundation Footing , _D1C � I N5 i hi.Z- 1.1-o.:,14, �'CE�Ei., Ov 1,i ST�.'lS3S Footing Drains Foundation Stem Wall a _or Under Floor Framing 312 4 1 Straps(hold downs) ,L Ext. Shear Wall Nailing b„-_((...OGj • Rough-in Plumbing Framing OC Blocking Airseal 041 ., Insulation: Walls z--2-a-%1 � Insulation: Floors g'00—I Insulation: Ceiling G� _ to Int. Shear Wall Nailing Li, Wallboard Nailing Z 7 i Gas Line: Interior Gas Line: Exterior Propane Tank Heat/Chimney Clearance -IL 10 9c_ Drywell/Alt Drainage ‘2\\\ 1 SEE CONDITION 1 FOR DRYWELL SPECS. Address Posted FINAL INSPECTION g t _ FINAL INSPECTIO MUST BE APPROVED PRIOR TO BUILDING BEING OCCUPIED THIS PERMIT IS VALID FOR ONE YEAR • I CONDITIONS for Building Permit# :BLD08-00259 1.) DRYWELL BOTTOMS MUST BE A MINIMUM OF 1 FOOT AI3OVE SEASONAL HIGH GROUNDWATER LEVEL OR IMPERMEABLE SOIL LAYERS. EACH DRYWELL MAY SERVE UP TO 1,000 SQUARE FEET OF IMPERVIOUS SURFACE FOR EITHER MEDIUM SANDS OR COARSE SANDS. DRYWELLS ARE 48 INCHES IN DIAMETER (MIIMUM)AND HAVE A DEPTH OF 5 FEET (4 FEET OF GRAVEL AND 1 FOOT OF SUITABLE COVER MATERIAL). FILTER FABRIC (GEOTEXTILE) MUST BE PLACED ON TOP OF THE DRAIN ROCK AND ON TRENCH OR DRYWELL SIDES PRIOR TO BACKFILLING. SPACING BETWEEN DRYWELLS MUST BE A MINIMUM OF 4 FEET. DRYWELLS SHALL BE A MINIMUM OF 10 FEET FROM ANY STRUCTURE OR PROPERTY LINE. INFILTRATION SYSTEMS MUST BE DOWNGRADIENT OF THE DRAINFIELD UNLESS THE SITE TOPOGRAPHY CLEARLY PROHIBITS SUBSURFACE FLOWS FROM INTERSECTING THE DRAINFIELD. 2.) CONSTRUCTION ENTRANCES SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR OTHER PAVED AREAS WITHIN 1,000 FEET OF THE SITE. THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM COMPACTED SUBGRADE. QUARRY SPALLS (OR HOG FUEL) SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS. (BMP C105, 2005 DOE STORMWATER MANUAL). ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED BY SHOVELING OR STREET SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE REMOVED OR STABILIZED ON STIE. ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD, WHICH END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY. UPON PROJECT COMPLETION AND SITE STABILIZATION, ALL CONSTRUCTION ACCESSES INTENDED AS PERMANENT ACCESS FOR MAINTENANCE SHALL BE PERMANENTLY STABILIZED. 3.) PRIOR TO OCCUPANCY & BUILDING FINAL - FINAL APPROVAL OF SEPTIC SEP07-268 IS REQUIRED. MUST MEET ALL CONDITIONS OF SEPTIC PERMIT. 4.) MUST COLLECT AND DIVERT ALL SOURCES OF DRAINAGE AWAY FROM SEPTIC TANK, RESERVE & DRAINFIELD. 5 ) A MINIMUM OF 10' MUST BE MAINTAINED BETWEEN BUILDING FOUNDATION AND EDGE OF DISPOSAL COMPONENT. 6.) A MINIMUM OF 2' MUST BE MAINTAINED BETWEEN DECK FOOTING AND EDGE OF SEPTIC TANK. 7.) Critical Aquifer Recharge Areas require special protection measures to mete water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 8.) A Stormwater Site Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 9.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 10.) Not more than 2 unlicensed vehicles shall be stored on any lot unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Chapter 18.30 JCC. Outdoor storage of 3 or more junk motor vehicles is prohibited except in those districts where specified as an autormobile wrecking yard or junk (or salvage) yard and allowed as a permitted use in Table 3-1 or Chapter 18.18 JCC, and such storage shall meet the requriements of JCC 18.20.100, Automobile wrecking yards and junk (or salvage) yards. In no case, shall any such junk motor vehicles be stored in a critical area. 11.) This parcel is within the Kala Point no shooting area per JCC 8.50. 12.) A minimum of two (2) on-site parking spaces shall be provided for the single family residence. 13.) The road approach permit(RAP07-00196) must be inspected and finaled by the Jefferson County Department of Public Works prior to the final inspection/certificate of occupancy of this residence. Contact Terry Duff, Department of Public Works at 360-385-9159 for the final road approach inspection. 14.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 15.) Minimum setback from North Andrew Avenue right-of-way shall be 20 feet. Minimum side and rear yard setbacks shall be 5 feet. 16.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 17.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 18.) The building height is not to exceed 35 feet. ��,¢,50N cor, JEFFERSO•OUNTY 'RECEIVED , . DEPARTMENT OF COMMUNITY DEVELOPMENT ~' 'N 621 Sheridan Street • Port Townsend • Washington 98368 JUN 1 2 2008 360/379-4450 • 360/379-4451 Fax qs O� www.co.jefferson.wa.us/commdevelopment JEFFERSON CCt CC Master Permit Application MLA: Og-ao Project Description(include separate sheets as necessary): --CM/6 .6, FAN /J.Ir //O uSE. • Tax Parcel Number: &j 2- 1!3— SOT Property Size: /O&J X /,"S (acres/square feet) Site Address and/or Directions to Property: 93 /V f,sJ11R e W ,gv2 Pm" liAteusenofp Property Owner( of Record: STs: V E 8L A C.K.Telephone: 37' ^.0 '"a Fax: email: Mailing Address: P t'' gQ.X `h-S PORT Tonva4 Ai 5 Applicant/Agent(if different from owner): Telephone: Fax: email: Mailing Address: — What kind of Permit?(Check each box that applies ❑Building 0 Critical Areas Stewardship Plan ❑ Demolition Permit 0 Variance(Minor, Major or Reasonable Economic Use) X Single Family 0 Garage Attached/Detached 0 Conditional Use[C(a), C(d),or C]** ❑ Manufactured Home El Modular 0 Discretionary"D"or Unnamed Use Classification ❑ Commercial* 0 Special Use(Essential Public Facilities)** ❑ Change of Use 0 Boundary Line Adjustment ❑ Address 0 Road Approach ❑Short Plat** ❑ Home Business 0 Cottage Industry 0 Binding Site Plan** N Propane ❑ Long Plat** El Sign ❑Planned Rural Residential Development(PRRD)/Amendments** ❑Allowed"Yes"Use Consistency Analysis 0 Plat Vacation/Alteration** it Stormwater Management ❑Shoreline Master Program Exemption/Permit Revisions** l Site Plan Approval Advance Determination (SPAAD)* 0 Shoreline Management Substantial Development** ❑Temporary Use 0 Shoreline Management Variance ❑Wireless Telecommunication* 0 Comprehensive Plan/UDC/Land Use District Map Amendment 0 Forest Practices Act/Release of Six-Year Moratorium ❑Jefferson County Shoreline Master Program Amendment *May require a Pre—Application Conference ❑Tree Vegetation Request **Requires a Pre-Application Conference Please identify any other local, state or federal permits required for this proposal, if known: DESIGNATION OF AGENT I hereby designate to act as my agent in matters relating to this application for permit(s). OWNER SIGNATURE Date: By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of his, her or its knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and its employees, representatives or agents for the sole purpose of application review and any required later inspections. Staffs access and right of entry will be assumed unless the applicant informs the County in writing at the time of the application that he r she wants prig);notice. ^ Signature: i [f.e.-A-'*�, �'�°""" � Date: � [[ 0 r- The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)even if you are in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual and non-transferable res prt ibility for adpering to and complying with the ESA. The Applicant has read this disclaimer and 9Ds and dates it below. Signature: ' � j114 Date: - ," G:\PermitCenter\###FORMS###\DRD FORMS\Master Permit Application 5-29-08.doc • BUILDER STATEMENT • The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that they will be assumingheresponsibility of the Ge eral Contractor for the proposed project. f r Signature: ..1� t,x^-<...: f t._ Date: r ,� , GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: FAX: ( ) ( ) MAILING ADDRESS: EMAIL: CONTRACTOR'S LICENSE WAINS NUMBER: NUMBER ARCHITECT/ENGINEER: PHONE ( ) FAX:( ) MAILING ADDRESS: EMAIL Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal: X New X Wood Existing: 0 Sewer ❑ Addition ❑ Steel Proposed: '. Bank ❑ Community System ❑ Alteration/Remodel ❑ Concrete Total: 2 Height: X Individual Sy�ste,,(i CI 0❑ Repair Masonry SEP Permit# 7-0026B ❑ Demolition ❑ Other: Bedrooms: Water Supply: Existing: Setback: ❑ Private well ❑ Two Party Type of Heat: Proposed: Public ;fj Name of System: I'A I Total: '� If this is a Commercial Project you must answer the following: Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply: 1 Underground Tank,Above ground Tank Size of Propane Tank: %(7 0 Le 1 leat Stove i Cook Stove i Woodstove i Fireplace Insert i Hot Water Tank i Pellet Stove i Other Is this appliance being installed in a Manufactured/Mobile Home? Yes / No When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines,tank location and size, distances from the propane tank'to all property lines,buildings and septic system components, including the reserve area. t r s 5 t; tT14, t �. Square Footage Current ProposedffficeU, _c„nl '� ' rie ^t r. . 'WO e.t�.. : . Main Floor Heated "M ;, 1 EH Bid App Review. 2r4 Floor Heated 7, r.t Consistency Review: Other Heated �) „ , ,,, $ fee: Mezzanine ._ "'. * , . Ad itional Section: Heated Basement II : r Plan Check fee: GPO() 4 Unheated Basement 44%,,,i 441 State Surcharge fee: / kj 1 W Other Unheated JLI IEH 4i ,. J Water Review fee: Garage/Carport Z n rr4 SUBTOTAL Decks I 911/Rd Approach fee: Other `„t, L650 ! i�N TOTAL: $ 3S tr w 'f .,' `4 Receipt Number: I DD3 h , ,tip . '' Cash/Check Number: ESTIMATED COST(REQUIRED) . . Date: •Fair market value of all labor and materials f ndation to finish l albs 721 ®o iU EN o3746 )itials: I ______,- G:\PemutCenter\###FORMS###\DRD FORMS\Master Permit Application 5-29-08.doc - • • (.gsON G,O RECEIVED JEFFERSON COUNTY 4 144,1 DEPARTMENT OF COMMUNITY DEVELOPMENT JUN 1 2 2008 ,A, 621 Sheridan Street • Port Townsend • Washington 98368 4� �O 360/379-4450 . 360/379-4451 Fax (OfEWWON COMP( OCG 7N0 http://www.co.jefferson.wa.us/commdevelopment/ STORMWATER SITE PLAN SUBMITTAL TEMPLATE MLA# V g "2 PROJECT/APPLICANT NAME: c re V E 13 L A C X Please answer all of the following questions to the best of your ability. Where the question calls for depiction on a site map, the applicant may choose to either incorporate the elements into the general plot plan for the Master Land Use Application or to submit a separate stormwater site plan map. Project Overview 1. Describe the proposed developed conditions of the site. Indicate position and relative size of proposed improvements on the site map. SI.JCLi- FA/1L� /i6vj-� 1Z 'Do fr //3 4 _ 1J/t i k Lv�yJ 2a X S'a / 9 Rn v-e. L Existing Conditions Summary 2. Describe the existing topography. Indicate contours on the site map. L€veL TO 7 Fr s'Lore y tD .e.1)-re L 4 L. ra 3 fr PR DP e,x ry G. L&i 1L' . 3. Describe the existing vegetation. Indicate native vegetation areas on the site map. IVON2 4. Describe the existing soils. Indicate soil type on the site map. 5. Describe the existing site hydrology(i.e.,drainage;behavior of water on the site—above, below, and on the ground). Indicate existing stormwater drainage to and from the site on the site map. Depict separate drainage basins on the site map, if applicable,and indicate acreage of a ch. H/6h' Pna A--! I� f/�f/,vb ,4fl€A. NO Fzh. I'rA. _ On /s Mi.n �,T-en /> v t) IlAi- RZt xf L f e1L j 6. Describe any excess levels of noise generated by the proposed use or activity: APPROVED AJcW€ STORMWATER PLAN I• JUI 2 2 2008 Stormvuater : iti ill a Require (1 : , JEFFERS•+ , OU T DEPT.OF CO' in stormwater site an template—rev.10✓12003 ! D•' ' SIGNATUR .. ,•"A • • 7. Describe significant geographic features and critical areas (i.e., environmentally sensitive areas such as wetlands, streams, steep slopes,etc.)on the site. Indicate location on the site map. n/.o.ti•( ro f°UTT r 8. Describe the general vicinity of the site,including adjacent land uses and structures, utilities, roads,and sensitive/critical areas (streams,wetlands,lakes,steep slopes,etc.). MS no A)T4 Ned&h'(DOA 14'aot? AA• fab.Y Lrt,44 tc tuoarltp Permanent Stormwater Control Plan This portion of the Stormwater Site Plan consists of the selection and installation.of the appropriate stormwater control BMPs and facilities to remain in place after construction of the project is completed. "Medium" size projects are required to have the totals calculated of all impervious surfaces, pollution-generating impervious surfaces, and pollution-generating pervious surfaces to verify that the thresholds for treatment facilities and flow control facilities are not exceeded. g. Describe the developed site hydrology, as proposed. Indicate whether stormwater will be fully dispersed(i.e., per BMP T5.30 in the Manual)or, if not,what types of stormwater flow control will be utilized for the site or specific threshold discharge areas within the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. f'ro?",o1 cusr rl k Alf AS /J R t+.-e L c ptd f/? Or 1'0 z4& Wkn�. I r � c 0 10. If the project requires the use of stormwater treatment facilities, describe the types of stormwater treatment facilities proposed for use on the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. [This is normally for large"projects or projects that involve the potential for dispersion of contaminants.] M 4 / ,vg j- TR e.A r Att°A/1 F46/I 1T/1s- 11. Describe the performance goals and standards applicable to the project. f 7 12. Describe the flow control system. RECEIVE. • pxy iv-et 2, JUN122 8 ULJI�N 11°11'1 CD stormwater site plan.template—rev.10/1/2003 6 • • 13. Describe the water quality system. Pony kt,f a Ib D1°tiq sr-e PR/ 14. Describe the conveyance system analysis and design. /JoUN f a vfj fo r/t 't Li„-es O 0 s Le- A 14...e. 1 & — 1 15. Describe the source of fill material,physical characteristics of fill material,and deposition of excess material. Loci L b1>k-T- n ,v-€t.Y! 4tAJ/ 16. Proposed methods of placement and compaction consistent with the applicable standards on Appendix Chapter 33 of the Uniform Building Code. LtiAsy 31�, ) G4A-I p4zr 6, us l kt,'L2' .� is oor 17. Describe the proposed surfacing material. \l v�y¢A artoc,1t R1 11v 13 Buff/ 18. Describe methods for restoration of the site. f 4 19. An Operation and Maintenance Manual is required for each flow control and treatment facility. [This is normally required for "large"projects only and only those for which facilities are required to control flow or treat runoff.] If included,list the Manuals here. ) �'/j`,4 RECEIVE .JUN 12 2O8 20. List here and include any special reports or studies conducted to prepare the Stormwater Site Plan. 414- - JEFFER sNCUflTYDCO 21. List other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals include conditions that affect the drainage plan or contain more restrictive drainage-related requirements,describe those conditions or restrictions here. stonnwater site plan template—rev.10/1/2003 7 • CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (SWPPP) The Construction SWPPP addresses sediment and erosion control during construction. The BMPs indicated by the applicant in the template that follows must be installed on the ground during all construction phases of the project. The proponent is responsible for preventing sediment and erosion impacts to environmentally sensitive areas and off-site areas. Consult the Construction Stormwater Pollution Prevention (SWPP) Best Management Practices (BMPs) Packet for guidance, particularly with rural residential development. SECTION I—CONSTRUCTION SWPPP NARRATIVE 1. Construction Stormwater Pollution Plan Elements. Describe how each of the Construction SWPPP elements has been or will be addressed. Identify the type and location of BMPs used to satisfy the required element. If an element is not applicable to the proposal,justify in writing. Descriptions of the 12 Elements are found at section 2.5.2 of the Manual(beginning on page 2-15). 12 Required Elements—Construction SWPPP 1. Mark Clearing Limits. try G4-64 izcz. 2. Establish Construction Access. • A►6.6e A/.5--rr 3. Control Flow Rates. �j�� o•c� nc4 • GUI,Le xr tidtiZA 4. Install Sediment Controls. Ai? 5. Stabilize Soils. f A /I R�CIftIE EID 6. Protect Slopes. /1/14 JUN 1 2 7GQ8 7. Protect Drain Inlets. " [; r L,J i; Y `KU stormwater site plan template—rev.10/1/2003 8 • • 12 Required Elements—Construction SWPPP(continued) 8. Stabilize Channels and Outlets. 9. Control Pollutants. J1 A Y1 10. Control De-Watering(the act of pumping groundwater or stormwater away from an active construction site). N/A - 11. Maintain Best Management Practices(BMPs). s � - 12. Manage the Project. 2. Adjacent Areas. a. Description of the adjacent areas that may be affected by site disturbance (e.g., streams, lakes, wetlands, residential areas, roads). NA _ b. Description of the downstream drainage path leading from the site to the receiving body of water(minimum distance of 400 yards). St A eov� _ �vo Apizax 17'0G F7- fioki.i.futewin p fiore41/ 3. Environmentally Sensitive Areas. RECEIVED a. Description of environmentally sensitive areas that are on or adjacent to the site. /1//4 JUN 1 2 2008 to 1 ncII stormwater site plan template-rev.10/1/2003 9 i i b. Description of special requirements for working in or near environmentally sensitive areas. /1/4 4. Erosion Problem Areas. Description of potential erosion problems on site in the context of the characteristics of the on-site soils(e.g.,erodibility,settleability,permeability,depth,texture,soil structure). /i' cA' -c- f o -'tom 5. Construction Phasing. a. Construction sequence b. Construction phasing(if proposed) 6. Construction Schedule. Wet season is October 1 through April 30(page 2-21 of the Manual). Provide a proposed construction schedule. rt r4 x 4 Ic Is'c/2- r A/c A 'r 'e ,uit II. Wet Season Construction Activities. a. Proposed wet season construction activities. t 1Sr4 Q i >On b. Proposed wet season construction activities for environmentally sensitive areas. f 1 . 7. Financial/Ownership Responsibilities. a. Identify the property owner responsible for the initiation of bonds and/or other financial securities. b. Describe bonds and/or other evidence of financial/} responsibility for liability associated with erosion and sedimentation impacts. Aar _ 4 f` e , 0A/"./0/Lry rElVED 8. Engineering Calculations. Provide Design Calculations on a separate sheet for the following�t able. a. Sediment Ponds/Traps. b. Diversions. JUN 1 2 20n8 c. Waterways. d. Runoff/Stormwater Detention Calculations trr-n stormwater site plan template—rev.10/1/2003 10 Stormwater Site Plan Changes If the designer wishes to make changes or revisions to the originally approved Stormwater Site Plan, the proposed revisions shall be submitted to DCD prior to construction. The submittal shall include substitute pages that include all proposed changes, revised drawings showing any structural changes,and any other supporting information that explains and supports the reason for the change. Final Corrected Plan Submittal If the project included construction of conveyance systems, treatment facilities,flow control facilities, or structural source control BMPs (not standard on-site stormwater management BMPs), the applicant shall submit a final corrected plan ("as-builts")when the project is completed. These should be engineering drawings (stamped by a licensed civil engineer) that accurately represent the project as constructed. APPLICANT SIGNATURE By signing the Construction SWPPP worksheet, I as the applicant/owner attest that the information provided herein is true and correct to the best of my knowledge. I also certify that this application is being made with the full knowledge and consent of all owners of t affected property. ai 6- `%- OS' (LANDOWNER OR AUTHORIZED REPRESENTATIVE SIGNATURE) (DATE) THIS SPACE MAY BE USED FOR ADDITIONAL NOTES, IF NEEDED: RECEIVED JUN 12 2008 "jr" NCD� ODCD stormwater site plan template—rev.10/1/2003 12 a i., _A E- *CZh o_o a' v,c. a Q. • O r a • ..., a a • �i Ga \ . _ 73 --- A, NI-. �' to Z /4 65 r____ to . , ),,. _.f. ir .4? cz, ,, ! E ..... . ti l' ' ; fr Z. \N - I ,.. , a Li , T / j'.'. 1Z:7 WI 'V". LPIM'..". .)Ft"''''VP- _E „... , C;ag, vh n c \ /Li, ,„,,,,, --1< ', x Z .� Q _ ct V...) O tH i (... -g , '1 .. : C:) _0 0 o r..., T . . . . . , ,.. .„... • v, ..._. , ,, .. .,..„ 4c - ...-„, ,...., H 4.0 , _ _ ,..,..., 3 Q �, W x • ' a LA) __-% 4,04% ty,) 1 ' i fl 1? \...k ...... 'K, } Y 1 n Q A-1 . L.I. 1 -- 7- v 00 • ... .'"...'-. Z . .>i \ D> rt, p as es n T n L., 0 '1 O O d C-PM v t P d 0 ---N <1 •-t% ,_1-- - ( 0'.4 " "T‘ 4140 74 'ft,....< c.......1 t-4 0...- 1------ ........ c, 41= rn cPS, 4C4 • • ditm• • .."‘ C 4,A . rl' cr% m M cklk tr) (t) • ,C. . •C (.4 7) •••• rn .... 0 ...., 0 --T3 IiIIIIIII~IMINISI SI mommummAki pc a• x ..s.:* "c. .... ,.., • 'tr.% (1.4 0.1 (../.) t") -.1) ............. *a. ..•*...a :, 0 •••• 4 '. VS •R ' ....I% ...k.< • Crl -7, ;72% .r."-) rt. -s. 0 1—.........:,..........it....2. , i1/4c,, .. :s' .713 (.- ,..,. , ,,Z) -•'4.1 I ks ...- _., ......., ..... «ii.„. _.... 111 - _ or* mow. ..4 AL no.ovri aw...., ........., mwmf.... Amoetwn ..arallo• ••••-., ..t 3 ‘,0 Dr ----, cb ti,c-' • 4...- _,.. v..., -.... 1 0 1 ."' ••• e 11 S'4 -C —I -1 o(---- 1.-) 't, ..Z._4;:e (tr., --->yr .. J.- , .7.- (•::: -x, , -_-,... -.....„:„. ,.. ,-:, ...Li ..4 Z... ‘..' . - L'I - II C.....4 .... .., ...V. V 0 "-t 5 '' .74:5 "7:1 ...... _Ict) ., < ',,, -15 (71 IT\ f:;:p i 1 '•.,N 0 o- t 8 _ 7 • r "— AI, i/ r-- 7%5 F.)1 ° . --__ -- ...:-,.e.- — 70— —/ ‘I ... _.0 01 cc,<—_--,N, .91 i [ /‹)— — _ r I Ilr• ,.., r--0 f-oe, t%) —IC 0 SI, 2C> m = - 9o4 / c - _ -.I I0 Eli 0 ..Ts - ,... , ••• 1..-s - • "`" # 1:14 was mom. Cr) .1.... 4114:-tw- , ....... q l Z 0 .,- , ...."-A ..., 4# ,..._ ,zr) Cl• /..N ...I E,_ og) - -t < 7J w N 2 a O r N . c g r- r" =,- c• rv-i 33 • ""r11 ni "715 = 11110.03 •Z RI =• CD rrt S.8)- M Z=t5 3 CO c° - Vdir CS. VAL M 1 , co 5 :Xi \ x c . ,-, "AP , ....-4 c ji r'"HitC1 43 ....Z 2 117fil .....c 4:0 CO On - r e=r C