HomeMy WebLinkAboutBLD2008-00337 ILDING PERMIT APPLICAT MLA08-00360
Review Type: I
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD08-00337 Received Date: 7/29/2008
SITE ADDRESS: 24 E MARROWSTONE RD
NORDLAND, 98358
OWNER: ROGER G TRAVIS PHONE: 360-774-1500
SUSAN D TRAVIS
24 E MARROWSTONE RD
NORDLAND WA 983589614
SUBDIVISION: Block: Lot: T 34
PARCEL NUMBER: 921094022 Section: 9 Township: 29 N Range: 01 E
CONTRACTOR: OWNER/BUILDER PHONE:
REPRESENTATIVE: PHONE:
PROJECT DESCRIPTION NEW 64 SF ADDITION AND 96 SF COVERED DECK TO EXISTING SFR
TYPE OF WORK RES SQUARE FOOTAGE:
TYPE OF IMP ADD MAIN: 64
VALUATION 8,249.00 ADD'L: HEAT TYPE: EEE
CODE EDITION: 2006 HEAT BASE: HEAT TYPE:
OCCUPANCY:
OCCUPANCY: UNHEATED: #OF STORIES:
OTHER:
CONST TYPE: GARAGE: SHORELINE:
CONST TYPE: DECK: 96 SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL: CON
WATER SYSTEM: PWELL
BEDROOMS: BATHROOMS:
Exist: 3 Exist: 2
Prop: 0 Prop: 0
Total: 3 Total: 2
Routing Date: _/) 1/i)(0
Type Amount Paid By: Date: Receipt: APPROVED
r
Permit $167.25 AMS 07/29/08 100754 B}�
Plan Check $108.71 AMS 07/29/08 100754 SEP 2008
State Building Code $4.50 AMS 07/29/08 100754
Total: $280.46 Jefferson County Planning
Building Department
Jef:arson County Building Di lion Permit NumU. : BLD08-00337
Applicant: TRAVIS
BUILDING PERMIT INSPECTION APPROVALS \pplicable Code: 2006 International Building Codes
To schedule inspections, call (360)379-4455 no later than 7:00 AM the day of the inspection.
Requests received after 7:00 AM will not be scheduled for that day's inspections.
ELECTRICAL PERMITS are issued by the Washington State Department of Labor& Industries.
The electrical permit must be signed off by the State Inspector prior to the County's Framing Inspection
Inspection Item Date Approval Signature Notes
Setbacks
Erosion Control A SILT FENCE SHALL BE INSTALLED EAST OF THE
P I3 DgaILEAL A V c.T A„R TH�s AORTH
OUND Y
—L O K.' (SEE ATTACHED SITE PLAN).
Ar�H S LED
ANY L
THE MINIMUM HEIGHT OF THE TOP OF SILT FENCE SHALL
BE 2 FEET AND THE MAXIMUM HEIGHT SHALL BE 2 1/2 FEET
ABOVE THE ORIGINAL GROUND SURFACE.
THE SILT FENCE SHALL BE BURIED IN A TRENCH TO A
MINIMUM DEPTH OF 5 INCHES BELOW THE GROUND
SURFACE. THE TRENCH SHALL BE BACKFILLED AND THE
SOIL TAMPED IN PLACE OVER THE BURIED PORTION OF THE
SILT FENCE, SUCH THAT NO FLOW CAN PASS BENEATH THE
FENCE AND SCOURING CAN NOT OCCUR.
ANY DAMAGE TO THE SILT FENCE SHALL BE REPAIRED
IMMEDIATELY.
SEDIMENT DEPOSITS SHALL EITHER BE REMOVED WHEN
THE DEPOSIT REACHES APPROXIMATELY ONE-THIRD THE
HEIGHT OF THE SILT FENCE, OR A SECOND SILT FENCE
SHALL BE INSTALLED.
Foundation Footing el'15/os
Footing Drains fib//IDS
Foundation Stem Wall _q/15�'8111 � Val R
Under Floor Framing R/ ob ØJ
U � �Straps(hold downs)
Ext. Shear Wall Nailing /ebbe
Framing /1/20$
Blocking wit..
Airseal b y,4108
Insulation: Walls /00g 4"/
Insulation: Floors , J q
Insulation:Ceiling /�/��
Int. Shear Wall Nailing • •
Wallboard Nailing l o -os
Heat/Chimney Clearance
Drywell/Alt Drainage �fx'(s 7
Address Posted
EXIST
FINAL INSPECTION /fifrf or naj
FINAL INSPECTION MUST BE APPROVED PRIOR TO BUILDING BEING OCCUPIED
THIS PERMIT IS VALID FOR ONE YEAR
•
CONDITIONS for Building Permit# :BLD08-00337
1.) Setback from E. Marrowston Rd right-of-way is no less than 20 ft., Setback from Disney
Rd right-of-way is no less than 20 ft., other side and rear setbacks are no less than 5 ft.
from parcel boundaries If an environmentally sensitive area (ESA) is present, then the
more restrictive setback shall apply.
2.) To help prevent seawater from intruding landward into underground aquifers, all new
development activity on Marrowstone Island, Indian Island and within 1/4 mile of any
marine shoreline shall be required to infiltrate all stormwater runoff onsite.
3.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIPZ:
Water conservation measures:
1. Roof and other intercepted precipitation shall be routed to on-site detention ponds
and/or other approved means and allowed to be released to the soil slowly.
2. Water collected from Storm water and roof catchments may be used for watering
lawns and gardens. Unless catchment water has been treated to meet drinking water
standards, there shall be no cross connections allowed between the potable supply and
impounded water.
3. Water withdrawn from wells on each property shall not be used for watering of lawns
and/or gardens.
4. Ground water withdrawn from each property shall be restricted to a rate of three (3)
gallons per minute.
5. Installation of water conserving fixtures such as low flow toilets, faucets and shower
restrictors and other water saving plumbing fixtures.
6. Landscaping plan (xeriscaping, native vegetation with minimal amounts of irrigation).
Please NOTE that the above listed measures are not intended to be exhaustive, but rather
is intended to be illustrative of the types of water conservation measures.
Si.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIPZ:
1. Installation of a flow meter.
2. On-going well monitoring for chloride concentration.
3. Submittal of monitoring data to County.
5.) MANDATORY MEASURES FOR COASTAL SIPZ:
1. For proof of potable water on a building permit application, applicant must utilize
DOH-approved public water system if available.
2. If public water is unavailable, a qualifying alternative system may be used as proof of
potable water or an individual well may be used as proof of potable water subject to the
following requirement:
a. Chloride concentration of a laboratory-certified well water sample submitted with
building permit application.
3. If public water is unavailable, a qualifying alternative system may be used as proof of
potable water.
6.) The property owner shall comply with Water Conservation Measures (per list maintained
by the UDC Administrator).
7.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water
quality degradation. The submitted proposal does not require additional aquifer
protection measures. However, during construction the project shall follow the Best
Management Practices (BMPs) and facility design standards as identified and defined in
the Stormwater Management Manual for the Puget Sound Basin.
8.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater,
erosion and sediment during construction. BMPs shall address permanent measures to
stabilize soil exposed during construction, and in the design and operation of stormwater
and drainage control systems.
9.) Outdoor residential storage shall be maintained in an orderly manner and shall create no
fire, safety, health or sanitary hazard.
• •
10.) Not more than 2 unlicensed vehicles shall be stored on any lot unless totally screened
from view of neighboring dwellings and rights-of-way. Such screening shall meet all
applicable performance and development standards specific to the district in which the
storage is kept, and shall be in keeping with the character of the area. Screening shall
meet the requirements of Chapter 18.30 JCC. Outdoor storage of 3 or more junk motor
vehicles is prohibited except in those districts where specified as an automobile wrecking
yard or junk (or salvage) yard and allowed as a permitted use in Table 3-1 or Chapter
18.18 JCC, and such storage shall meet the requirements of JCC 18.20.100, Automobile
wrecking yards and junk (or salvage) yards. In no case, shall any such junk motor
vehicles be stored in a critical area.
11.) Call Jefferson County Permit Center, Development Review Division for inspection of
erosion control measures. (360) 379-4463
12.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of
impervious surface which includes roof tops, driveways, concrete, etc.
13.) Exterior lighting for commercial and industrial uses shall not exceed thirty feet (30') in
height from the finished grade. Exterior lighting for residential uses shall not exceed
twenty feet (20') in height from the finished grade, excepting when such lighting is an
integral part of a building or structure. Ground level lighting is encouraged.
14.) Lighting fixtures shall be designed and hooded to prevent the light source from being
directly visible from outside the boundaries of the property. The intensity or brightness of
all lighting, during construction and after project completion shall not adversely affect the
use of surrounding properties or adjoining rights-of-way.
15.) The building height is not to exceed 35 feet.
16.) A SILT FENCE SHALL BE INSTALLED EAST OF THE PROPOSED DRIVEWAY
STARTING AT THE NORTH BOUNDARY TO SOUTH BOUNDRY AT APPROXIMATELY
THE LOCATION OF STEPIC TANK. (SEE ATTACHED SITE PLAN).
A SILT FENCE SHALL BE INSTALLED AT THE WETLAND BUFFER PRIOR TO ANY
LAND DISTURBING ACTIVITY.
THE MINIMUM HEIGHT OF THE TOP OF SILT FENCE SHALL BE 2 FEET AND THE
MAXIMUM HEIGHT SHALL BE 2 1/2 FEET ABOVE THE ORIGINAL GROUND
SURFACE.
THE SILT FENCE SHALL BE BURIED IN A TRENCH TO A MINIMUM DEPTH OF 5
INCHES BELOW THE GROUND SURFACE. THE TRENCH SHALL BE BACKFILLED
AND THE SOIL TAMPED IN PLACE OVER THE BURIED PORTION OF THE SILT
FENCE, SUCH THAT NO FLOW CAN PASS BENEATH THE FENCE AND SCOURING
CAN NOT OCCUR.
ANY DAMAGE TO THE SILT FENCE SHALL BE REPAIRED IMMEDIATELY.
SEDIMENT DEPOSITS SHALL EITHER BE REMOVED WHEN THE DEPOSIT
REACHES APPROXIMATELY ONE-THIRD THE HEIGHT OF THE SILT FENCE, OR A
L SECOND SILT FENCE SHALL BE INSTALLED.
y
�� �gON C • REc1EJ ? Ir�
O� JEFFERSON MINTY
Wry griA DEPARTMENT OF COMMUNITY DEVELOPMENT
rN 621 Sheridan Street • Port Townsend • Washington 98368 JUL 2 9 2008
360/379-4450 • 360/379-4451 Fax�'�cs0 www.co.jefferson.wa.us/commdevelopment
N JEFFERSON COUNTY DCD
Master Permit Application MLA: — Th(Q 0
Project Description(include separate sheets as necessary):
5FS, 7.\b) \�lo0. $ Ixe., p (titN6 Room 3x12c-o\feied/, f.7e
Tax Parcel Number: ci Z i d1 l 022. Property Size: I-{, (acres/square feet)
Site Address and/or Directions to Property:
a L, E ASS .M.AR0 w S "o!U
Property Owner(s)of Record: Rogcr '-;"c.\J‘S
Telephone: 77 9 I ri bo Fax: email:
Mailing Address: 2_9 E c,r L P«,rIc 1-6s"c-.
Applicant/Agent(if different from owner):
Telephone: Fax: email:
Mailing Address:
What kind of Permit?(Check each box that applies
,Building 0 Critical Areas Stewardship Plan
❑ Demolition Permit ❑Variance(Minor, Major or Reasonable Economic Use)
)Z Single Family 0 Garage Attached/Detached 0 Conditional Use[C(a), C(d),or C]**
0 Manufactured Home 0 Modular 0 Discretionary"D"or Unnamed Use Classification
❑ Commercial* 0 Special Use(Essential Public Facilities)**
❑ Change of Use 0 Boundary Line Adjustment
❑ Address 0 Road Approach 0 Short Plat**
0 Home Business 0 Cottage Industry 0 Binding Site Plan**
0 Propane 0 Long Plat**
0 Sign 0 Planned Rural Residential Development(PRRD)/Amendments**
0 Allowed"Yes"Use Consistency Analysis 0 Plat Vacation/Alteration**
❑Stormwater Management ❑Shoreline Master Program Exemption/Permit Revisions**
0 Site Plan Approval Advance Determination(SPAAD)* 0 Shoreline Management Substantial Development**
D Temporary Use 0 Shoreline Management Variance
O Wireless Telecommunication* 0 Comprehensive Plan/UDC/Land Use District Map Amendment
❑ Forest Practices Act/Release of Six-Year Moratorium 0 Jefferson County Shoreline Master Program Amendment
*May require a Pre—Application Conference 0 Tree Vegetation Request
**Requires a Pre-Application Conference
Please identify any other local, state or federal permits required for this proposal, if known:
DESIGNATION OF AGENT
I hereby designate to act as my agent in matters relating to this application for permit(s).
OWNER SIGNATURE Date:
By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of
his,her or its knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet
may result in this per• .-ing null and void.
I further agree to -.v: ,,emnify and hold harmless Jefferson County against all liaoilities,judgments,court costs, reasonable attorney's fees and
expenses whic . y way accrue against Jefferson County as a result of or in consequence of the granting of this permit.
I further agre: o • .vi.- access and right of entry to Jefferson County and its employees, representatives or agents for the sole purpose of application
review and - y r,,•uir •.later inspections. Staffs access and right of entry will be assumed unless the applicant informs the County in writing at the
time of the pp,ati, i:t he ors - . prior notice.
X Signat - 0 _ Date:
The action or a 'io • •pplicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or
endangered spe :nd Gould lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the
"Endangered S.: ,s Ac 'or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this
permit has be .ued ill not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your
action(s)ev: i ou ar compl..nce with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual
and non-tr. sf- . sibili' for adhering to and complying with the ESA. The Applicant has read this disclaimer and signs and dates it below.
Signature'w
Date:
G:\PermitCenter\•##FORMS###\DRD FORMS\Master Permit Application 5-29-08.doc
• 0
BUILDER STATEMENT
The signer of this st ent es hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that
they will be a in t e r sibility of the General Contractor for the proposed project.
Signature: �..- Date: _
GENE L CONT CTOR OR MANUFACTURED HOME INSTALLER: PHONE: FAX:
( ) ( )
MAILING ADDRESS: EMAIL:
CONTRACTOR'S LICENSE WAINS
NUMBER: NUMBER
ARCHITECT/ENGINEER: PHONE ( ) FAX:( )
MAILING ADDRESS: EMAIL
Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal:
i t New X Wood Existing: Z i i Sewer
X Addition 0 Steel Proposed: 0 Bank I l Community System
❑ Alteration/Remodel ❑ Concrete Total: _ 2 Height: Individual System C/
❑ Repair ❑ Masonry SEP Permit# t"t 4--I C t
❑ Demolition ❑ Other: Bedrooms: Water Supply:
Existing: 3 Setback: ) Private well ❑ Two Party
Type of Heat: Proposed:Total: 3 U Public
1' icx- Wa I( Name of System:
If this is a Commercial Project you must answer the following:
Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces:
Number of occupants (includes owners,tenants,employees,etc) Current Proposed
IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No
If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply:
i Underground Tank i Above ground Tank Size of Propane Tank:
i Heat Stove i Cook Stove i Woodstove i Fireplace Insert I Hot Water Tank i Pellet Stove i Other
Is this appliance being installed in a Manufactured/Mobile Home? Yes / No
When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property
lines, tank location and size,distances from the propane tank to all property lines,buildings and septic system components,
including the reserve area.
Square Footage Current Proposed For Office Use.-Only., . _ Amount Revisiorj, ,ss-
Main Floor Heated EH Bld App Review: �,�
l008 (r� Ltpy`1105 —la
2nd Floor Heated / Consistency Review: ' 6 O0
Other Heated7 Base fee: c-
Mezzanine Additional Section:
Heated Basement Plan Check fee:
Unheated Basement State Surcharge fee: c5 0
Other Unheated Pot Water Review fee:
Garage/Carport il so SUBTOTAL
Decks 911/Rd Approach fee:
Z 8 q � ayaa.b2 e \ S}\r1
2,
Other ' TOTAL: $ SOfl ,—I
\ OS 9 Receipt Number: ��^��j
3 41 Cash/Check Number: -1 0 910
ESTIMATED COST_LREQUIRED) Date: l aCj (006
•Fair-market value of all labor a aterials foundation to finish t
8)2_9 q-� 0 Initials:
$ /\
G:\PermitCenter\###FORMS###\DRD FORMS\Master Permit Application 5-29-08.doc
�I
0
p _�
x x d
2 r-' --—
1 .
_t I
T
I` i)
-(0 L
'\ ___:\
•
m
2-
cIN
r - I \-_- V
' L
L
N
c
G'
G
\-__I-XX'' o
N0 __ ______
v — — — ___
il7 c>
r
o x �2d 7 BXz 1 V
X \\\
(1 S'7D oSh 3/C I1
U
0
2'--
E
k
4_ I7c1 1 . 1 —
! 4.4)K r
y- _ 4+rc
I
1 I ,
4
20 I 4
I ; 4'. /yl�t .
�� 1Fi� �;-co)
1 4181. Oct •
on~ �o�t►
, 0:\ilqu- (
s, t„,,,
, ,-. ,
,,,,
W1 ' '01.00°.'". i
1
iii
.. . :, woe°
P
(L... • 4
-noN
/„.,,,
) ; \it,,, ,,, 1. 1. ........._..."
QUERI fDW / II
,� ik /
•
I I /
_~� / ,
•
/ I %',t�rMNIt ti
.r
-.5. 14,- - 40,,,ism - 4 . rto ' ) /
q 0 K3o / 1J,
iTE
V:Tilt ‘�_.
a :,.., 4,4 .1/ i a LE-ms...r_ fir- ; z, O
0 ir
T 0to, III
c j1O _ Ld
____ zo x3 I (�O
o� NEW PRo Pos eD
� \. , r RDD1� 1 a� - -----
ID a,
Ywe c I a. �\ Stormwater BMP's
Required ( L-�
\NNIP TANK
o \
,p 4 m" 7-iti • ,--0 , i
APPROVED ° II
SITE PLAN
` -s- 2008
JEFFERSON CO I \ _�
DEPT.OFCs I 'r �C
SIGNATURE: W/.�.;i`, ,' MGO
k
.." r.
P -1 i -Aki Is �18� 21 a 7�.
0 1,1 i I'n}'y go 0 t/v\. 4-DI? t M o vt
co
< ,..,..,(- nl'z--- 4 S
--ii-r.-_--. IDLII,\ \
�a O
ii..
. _. ..... )::..
C,
II _ �r w _. N 1�
24 STOP
E ,y0
D WIN
j c k,� NON
U' N "i AV is S1,9 8 6 -2 O oil L ?Jo c Z \oat L 0 22 .
1