Loading...
HomeMy WebLinkAboutBLD2008-00412 •UILDING PERMIT APPLICAMI MLA08-00417 Review Type: I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD08-00412 Received Date: 9/16/2008 SITE ADDRESS: 121 RIDGE DR PORT TOWNSEND, 98368 OWNER: NEIL T LUPKES PHONE: 360-352-5902 NORMA J LUPKES 9028 BOULDER LN SE OLYMPIA WA 985017244 CAPE GEORGE VILLAGE DIV 4 SUBDIVISION: Block: Lot: 4 PARCEL NUMBER: 940800004 Section: 13 Township: 30 N Range: 02 W CONTRACTOR: CHOHRACH CONSTRUCTION PHONE: (360)385-0414 ADAM CHOHRACH 1232 ROSE ST PORT TOWNSEND WA 98368 Contractor's License CHOHRCC998J0 Expires 6/5/2009 REPRESENTATIVE: KEVIN COKER PHONE: 360-385-2739 814 GARFIELD ST PORT TOWNSEND WA 98368 PROJECT DESCRIPTIOI NSFR TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 1,412 VALUATION 150,000.00 ADD'L: HEAT TYPE: EEE CODE EDITION: 2006 HEAT BASE: HEAT TYPE: OCCUPANCY: R-3 UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N GARAGE: SHORELINE: CONST TYPE: DECK: 300 SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: CON WATER SYSTEM: CAPE GEO BEDROOMS: BATHROOMS: Exist: 0 Exist: 0 Prop: 2 Prop: 2 Total: 2 Total: 2 Routing Date: l 1 0 �.. .. Type Amount Paid By: Date: Receipt: Approved/Date Permit $1,273.75 LYK 09/16/08 102756 APPROVED �®`V, Plan Check $827.94 LYK 09/16/08 102756 H P State Building Code $4.50 LYK 09/16/08 102756 NOV 2008 Potable Water Application $59.00 LYK 09/16/08 102756 Total: $2,165.19 Jefferson County Plannint & Building Department 1111 • CONDITIONS for Building Permit# :BLD08-00412 1.) 2005 DOE STORMWATER MANUAL DRYWELL DESIGN CRITERIA ALL INFILTRATION SYSTEMS SHOULD BE AT LEAST 10 FEET FROM ANY STRUCTURE, PROPERTY LINE, OR SENSITIVE AREA. FOR SITE WITH SEPTIC SYSTEMS, INFILTRATION SYSTEMS MUST BE DOWNGRADIENT OF THE DRAINFIELD UNLESS THE SITE TOPOGRAPHY CLEARLY PROHIBITS SUBSURFACE FLOWS FROM INTERSECTING THE DRAINFIELD. DRYWELL BOTTOMS MUST BE A MINIMUM OF 1 FOOT ABOVE SEASONAL HIGH GROUNDWATER LEVEL OR IMPERMEABLE SOIL LAYERS. EACH DRYWELL MAY SERVE UP TO 1000 SQUARE FEET OF IMPERVIOUS SURFACE FOR EITHER MEDIUM SANDS OR COURSE SANDS. TYPICALLY DRYWELLS ARE 48 INCHES IN DIAMETER (MINIMUM) AND HAVE A DEPTH OF 5 FEET (4 FEET OF GRAVEL AND 1 FOOT OF SUITABLE COVER MATERIAL). FILTER FABRIC (GEOTEXTILE) MUST BE PLACED ON TOP OF THE DRAIN ROCK AND ON TRENCH OR DRYWELL SIDES PRIOR TO BACKFILLING. SPACING BETWEEN DRYWELLS MUST BE A MINIMUM CF 4 FEET. 2.) CONSTRUCTION ENTRANCES SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR OTHER PAVED AREAS WITHIN 1,000 FEET OF THE SITE THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM COMPACTED SUBGRADE. QUARRY SPALLS (OR HOG FUEL) SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS. (BMP C105, 2005 DOE STORMWATER MANUAL). ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED BY SHOVELING OR STREET SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE REMOVED OR STABILIZED ON STIE. ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD, WHICH END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY. UPON PROJECT COMPLETION AND SITE STABILIZATION, ALL CONSTRUCTION ACCESSES INTENDED AS PERMANENT ACCESS FOR MAINTENANCE SHALL BE PERMANENTLY STABILIZED. 3.) PRIOR TO OCCUPANCY & BUILDING FINAL - FINAL APPROVAL OF SEPTIC SEP08-212 IS REQUIRED. MUST MEET ALL CONDITIONS OF SEPTIC PERMIT. 4.) A MINIMUM OF 10' MUST BE MAINTAINED BETWEEN UF'SLOPE BUILDING FOUNDATION AND/OR FOOTING OR INTERCEPTOR DRAINS TO THE EDGE OF DRAINFIELD TRENCH LINES. 5.) MUST COLLECT AND DIVERT ALL SOURCES OF DRAINAGE AWAY FROM SEPTIC TANK, RESERVE & DRAINFIELD. MUST COMPLY WITH ALL PERMIT CONDITIONS, STATE AND LOCAL CODE. 6.) 10' SEPARATION REQUIRED BETWEEN A WATER LINE AND ALL PORTIONS OF THE ONSITE SEWAGE SYSTEM; EFFLUENT TRANSPORT LINE, TANKS, TREATMENT AND DISPOSAL COMPONENTS. 7.) A Stormwater Site Plan has be6' .ibmitted and approved by the Department. Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 8.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 9.) Not more than 2 unlicensed vehicles shall be stored on any lot unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Chapter 18.30 JCC. Outdoor storage of 3 or more junk motor vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage) yard and allowed as a permitted use in Table 3-1 or Chapter 18.18 JCC, and such storage shall meet the requirements of JCC 18.20.100, Automobile wrecking yards and junk (or salvage) yards. In no case, shall any such junk motor vehicles be stored in a critical area. 10.) A minimum of two (2) on-site parking spaces shall be provided for the single family residence. 11.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 12.) The building height is not to exceed 35 feet. 13.) Minimum setback from Ridge Drive right-of-way shall be 20 feet. Minimum side yard setbacks shall be 5 feet. Minimum setback from Goss Road right-of-way shall be 5 feet as approved by the Public Works Department on October 22, 2008 and the Administrator on October 29, 2008. 14.) Exterior lighting for residential uses shall not exceed twenty feet (20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 15.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. Jefferson County Building Ssion Permit NuIr: BLD08-00412 Applicant: COKER BUILDING PERMIT INSPECTION APPROVALS \pplicable Code: 2006 International Building Codes To schedule inspections, call (360)379-4455 no later than 7:00 AM the day of the inspection. Requests received after 7:00 AM will not be scheduled for that day's inspections. ELECTRICAL PERMITS are issued by the Washington State Department of Labor& Industries. The electrical permit must be signed off by the State Inspector prior to the County's Framing Inspection Inspection Item Date Approval Signature Notes Setbacks ,•Z_3 ,q- Minimum setback from Ridge Drive right-of-way shall be 20 feet. Minimum side yard setbacks shall be 5 feet. Minimum setback from Goss Road right-of-way shall be 5 feet as approved by the Public Works Department on October 22, 2008 and the Administrator on October 29,2008. Erosion Control SEE CONDITION 2 FOR CONSTRUCTION ENT. STABILIZATION Foundation Footing 17-_3 -p?S Footing Drains Foundation Stem Wall 94 Underground Plumbing Under Floor Framing Straps(hold downs) Ext. Shear Wall Nailing 2I Ilo4 Rough-in Plumbing '�1,-'9,.t c\ /km Framing /112�1pct G!L AO -rtt'sP `;`TO X) Blocking Airseal 3 Insulation:Walls •3^15 Ulf - 2 Insulation: Floors Insulation: Ceiling Int. Shear Wall Nailing c f Wallboard Nailing _ �� Gas Line: Interior Gas Line: Exterior Propane Tank Heat/Chimney Clearance Drywell/Alt Drainage SEE CONDITION 1 FOR DRYWELL SPECS. Address Posted FINAL INSPECTION ,7 FINAL INSPECTION MUST BE APPROVED PRIOR TO BUILDING BEING OCCUPIED THIS PERMIT IS VALID FOR ONE YEAR �riika �gON c � JEFFERSOhUNTY • kr, ," DEPARTMENT OF COMMUNITY DEVELOPMENT ,' o '� 621 Sheridan Street• Port Townsend •Washington 98368 --I 360/379-4450 • 360/379-4451 Fax xys,_ ,,SO www.co.jefferson.wa.us/commdevelopment- ---- -, Master Permit Application SEP 1 6 2008 MLA: 08- ('j Project D scriation (include separate sheets as necessary): P ; 1 Tax Parcel Number: 1`}c3 800 o&4 Property Size: ,?,Z II ?Ov (acres/square feet) Site Address and/or Directions to Property: , c e� (21 W "br• C, 6PA o :� - t� tZ o,1 . r ek 1'1" Property Owner(s)of Record 'J S ft Nis. ` L,p S Telephone: 3(40 3S2 S'"kYL Fax: email: Mailing Address: E ff Applicant/Agent(if different from owner): kevrt • coke.,olo esr w fcseo_Jtrset. _ Telephone: 3$5 W8 Fax: email:c� Mailing Address: f i4 elm-r1 t44 4. ?off I rwro-4-4 What kind of Permit?(Check each box that applies Building ❑ Critical Areas Stewardship Plan Demolition Permit 0 Variance(Minor, Major or Reasonable Economic Use) Single Family ❑ Garage Attached/Detached 0 Conditional Use[C(a),C(d),or C]** /❑ Manufactured Home 0 Modular ❑ Discretionary"D"or Unnamed Use Classification ❑ Commercial* 0 Special Use(Essential Public Facilities)** ❑ Change of Use 0 Boundary Line Adjustment ❑ Address ❑ Road Approach 0 Short.Plat** ❑ Home Business ❑Cottage Industry 0 Binding Site Plan** ❑ Propane ❑ Long Plat** ❑Sign ❑ Planned Rural Residential Development(PRRD)/Amendments** ❑Allowed"Yes"Use Consistency Analysis El Plat Vacation/Alteration** ❑Stormwater Management ❑ Shoreline Master Program Exemption/Permit Revisions** ❑Site Plan Approval Advance Determination(SPAAD)* ❑ Shoreline Management Substantial Development** ❑Temporary Use ❑ Shoreline Management Variance ❑Wireless Telecommunication* ❑ Comprehensive Plan/UDC/Land Use District Map Amendment ❑Forest Practices Act/Release of Six-Year Moratorium 0 Jefferson County Shoreline Master Program Amendment *May require a Pre—Application Conference ❑Tree Vegetation Request *Requires a Pre-Application Conference Please identify any other local, state or federal permits required for this proposal, if known: /' DESIGNATION OF AGENT I hereby designate Vrr1 CEO to act as my agent in matters relating to this application for permit(s). OWNER SIGNATURE f°•* — CG--,i Date: 46, 0e By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of his,her or its knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save, indemnify and hold harmless Jefferson County against all liaoilities,judgments,court costs, reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and its employees, representatives or agents for the sole purpose of application review and any required later inspections. Staffs access and right of entry will be assumed unless the applicant informs the County in writing at the time of the application th t he or she w nt prior no ice. Signature: ..' � � /'( - (sb.-dr Date: The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)even if you are in compliance with the Jefferson County development code The Applicant acknowledges that he,she or it holds individual and non-transferabl esponsibility adhering to and complying with the ESA. The Applicant has read this disclaimer and signs and dates it below. Signature: / q Date: /—l6—di" G:\PermitCenter\###FORMS###\DRD FORMS\Master Permit Application 5-29-08.doc 0 BUILDER STATEMENT ID The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that they will be assuming the responsibility of the General Contractor for the proposed project. Signature: Date: GENERAL CONTRACTOR OR MANUFACTURED OME I STALLER: PHONE: FAX: C I%tiwae4 c — 6-0".. ( ) 301 SA 0 ( ) MAILING ADDRESS: EMAIL: CONTRACTOR'S LICENSE WAINS NUMBER: NUMBER ARCHITECT/ENGINEER: PHONE ( ) FAX:( ) MAILING ADDRESS: T EMAIL Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal: )4 New y Wood Existing: 0 ❑ Sewer ❑ Addition ❑ Steel Proposed: Ti Bank Community System ❑ Alteration/Remodel ❑ Concrete Total: Z Height: Individual System CI Repair ❑ Masonry SEP Permit# ❑ Demolition ❑ Other: Bedrooms: Water Supply: Existing: 0 Setback: 1 I Private well I I Two Party Type of Heat: Proposed: 2 Public Total: '� —t- /7L Namee of System (I. ry 6 If this is a Commercial Project you must answer the following: Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No If this is a Propane Tank and/or Appliance Installation permit, mark all items below that apply: i Underground Tank i Above ground Tank Size of Propane Tank: i Heat Stove i Cook Stove i Woodstove i Fireplace Insert i Hot Water Tank i Pellet Stove i Other Is this appliance being installed in a Manufactured/Mobile Home? Yes / No When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines, tank location and size, distances from the propane tank to all property lines,buildings and septic system components, including the reserve area. , Square Footage Current Proposed For Office Use Only Amount Revision Main Floor Heated /%Z..., (1q!'4�$i, EH BId App Review: go-- 2"d Floor Heated r — / �` Consistency Review: i3-1/ Other Heated Base fee: Mezzanine Additional Section: Heated Basement Plan Check fee: Unheated Basement State Surcharge fee: % 5) Other Unheated Pot Water Review fee: qJ CO Garage/Carport SUBTOTAL a Li ac3.IC? Decks 911/Rd Approach fee: Other . TOTAL: $ a`[ag (Li Receipt Number: 6 ba-j!, 10�228'8� Cash/Check Number: 1202- I_MATED COST(RR `w� Date: / .Fair maM -laborandmaterrats foun tion to finish • obi) `J,•v Initials: • G:\PermitCenter\###FORMS###\DRD FORMS\Master Permit Application 5-29-08.doc • i JEFFERSON COUNTY li4iii DEPARTMENT OF COMMUNITY DEVELOPMENT ' 621 Sheridan Street • Port Townsend • Washington 98368 I rril%Tk&„.4 fi0 360/379-4450 . 360/379-4451 Fax C`` http://www.co.jefferson.wa.us/commdevelopment/ STORMWATER SITE PLAN SUBMITTAL TEMPLATE MLA# Cer41 ii PROJECT/APPLICANT NAME: (/(.7 kft / yettal, c l Please answer all of the following questions to the best of your ability. Where the question calls for depiction on a site map, the applicant may choose to either incorporate the elements into the general plot plan for the Master Land Use Application or to submit a separate stormwater site plan map. Project Overview 1. Describe the proposed developed conditions of the site. Indicate position and relative size of proposed improvements on the site map. / / 7b c 0 4 S7rA d a ti•e1,u re S ► cr /erd`dP ,s e a 7r�r� to 4frt C� i-r �1 4GY� S i f--C• l S 7T �f4� �'..t-d pQ�y,rra j 0 rivv.at.1/rn ✓ tT Existing Conditions Summary 2. Describe thh existi topography./' Indicatep°ntours on the site map.,/, �[ g(t5ki' s;pu 2(' *4f2.r✓77e �e�/ ry e 3. Describe theeistin vegetation. Indicate native vegetation areas on the site map. -)i'S /d..I Sc.7./1G Lye�3 it e / -e 7 .e c .�.� s',�-c 4. Describe the existing Indicate soil type,en the site map. "if-u-Le3 5. Describe the existing site hydrology(i.e., drainage;behavior of water on the site—above, below, and on the ground). Indicate existing stormwater drainage to and from the site on the site map. Depict separate drainage basins on the site map, if applicable,and- 0A-,:i., �nd✓icat��ge of each;,,ez_ ,a��� � �f�� r- _/ • "'" -` �� . -_% tea-... APP '�OVED 6. Describe any excess levels of noise generated by the proposed use or activit}: STORM WATER PLAN ivr�.,„0 hrt 3 c �ww J L.(71 - hokves OCT 1 08 Stormw is JEFF+ • • i C�JU Requir d DEPT.OF ii.III ,,,t . stormwater site plan template-rev.10/1/2003 • 5 • • 7. Describe significant geographic features and critical areas (i.e., environmentally sensitive areas such as wetlands, streams, steep slopes,etc.)on the si e. Indicate location on the site map. n /...,z_irdzielirt.:1,J.:3A dirNAJIA S 40 tp 4� - a R a 4_ tA.o I 1 4v� J S 8. Describe the general vicinity of the site,including adjacent land uses and structures, utilities, roads, and sensitive/critical areas (streams,wetlands,lakes,steep s opes,etc.). scLa 3 1)24q44-3 • LLs 4t. 1-0,0__ m • Permanent Stormwater Control Plan This portion of the Stormwater Site Plan consists of the selection and installation.of the appropriate stormwater control BMPs and facilities to remain in place after construction of the project is completed. "Medium" size projects are required to have the totals calculated of all impervious surfaces, pollution-generating impervious j surfaces, and pollution-generating pervious surfaces to verify that the thresholds for treatment facilities and flow control facilities are not exceeded. g. Describe the developed site hydrology, as proposed. Indicate whether stormwater will be fully dispersed (i.e., per BMP T5.30 in the Manual) or, if not,what types of stormwater flow control will be utilized for the site or specific threshold discharge areas within the site. Locate t se facilities n the site pla and ifferentiate proposed �facilities from existing/f�a ilities. ./Vt. Q1V-e... eV-02....,,..„-- - C < LS Veit:ij riir,,,Q A-0.....s......"L Li till/ 10. If the project requires the use of stormwater treatment facilities, describe the types of stormwater treatment facilities proposed for use on the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. [This is normally for large"pr j cts or projects that in olve the potential for dispersion of contaminants.] J 11. Describe the performance goys and standar applicable o t project. 4‘,.......a,s,T -w..e.. 70 AGE'S \Act/ 05, c 12. Describe the flow ontrol system. 1 ' Isc�J t4 --" ,X)—,4 4r..-". YAM 4e , ---- , c. . , E stormwater site plan template-rev.10/1/2003 — 6 • • 13. Describ the water uality system • 14. Describe the convey nce system analysis and design. r ... 411 C9h.r......0 Q 15. Describe the ource of fill terial,physical characteristics of fill material,and deposition of excess material _' TJ �'.. I 6 16. Proposed methods of placement and compaction consistent with the applicable standards on Appendix Chapter 33 of the Uniform Building Code. , ,—) 17. Describe the proprlsed surfacing mate i I. 18. Describe methods for restoration of the site. , Sa?IC�t / IO-524.-4) SIL1,--Sispj Gi LjS-c.fg— -74-.Le S , 19. An Operation and Maintenance Manual is required for each flow control and treatment facility. [This is normally required for "large"projects only and only those for which facilities are required to control flow or treat runoff.] If included,list the Manuals here. 20. List here andinclude any special reports or studies conducted to prepare the Stormwater Site Plan. 21. List other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals include conditions that affect the drainage plan or contain more restrictive drainage-related requirements,describe those conditions or restrictions here. n ✓' ���,, ,tS c,4 r3 ASK 4C.c.- yr/v sv-0 a.S s n"N"'i stormwater site plan template-rev.10/1/2003 7 • 0 CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN(SWPPP) The Construction SWPPP addresses sediment and erosion control during construction. The BMPs indicated by the applicant in the template that follows must be installed on the ground during all construction phases of the project. The proponent is responsible for preventing sediment and erosion impacts to environmentally sensitive areas and off-site areas. Consult the Construction Stormwater Pollution Prevention (SWPP) Best Management Practices (BMPs) Packet for guidance, particularly with rural residential development. SECTION I-CONSTRUCTION SWPPP NARRATIVE 1. Construction Stormwater Pollution Plan Elements. Describe how each of the Construction SWPPP elements has been or will be addressed. Identify the type and location of BMPs used to satisfy the required element. If an element is not applicable to the proposal,justify in writing. Descriptions of the 12 Elements are found at section 2.5.2 of the Manual(beginning on page 2-15). 12 Required Elements-Construction SWPPP 1. Mark Clearing Limits. 2. Establish Construction Access. � t eXil-c ;; %. i IE 3. Control Flow Rtates(. ;- I � �-� `�� `i`' ELF= 4. Install Sediment Cptrols. / ,� ti•- ••,J ► +Cal a� ...44 1 5. Stabi' e Soils. je 4^re f n % (-4 6. Protect Slopes. ", 0, 441, �s r,�2c f. sue, -� JJ -� ., -J 7. Protrain Inlets. 44- storrnwater site plan template—rev.10/1/2003 8 • 12 Required Elements-Construction SWPPP(continued) 8. Stabilize Channels a d Out is i.“ \l^ 9. Control Pollutants. k, .sfy-ie,...1 I. L — 1--.-c ..--Gr S2c c.----we kae"---on,-4_ 6-1\-•-a:41,.-4, - ' rz, ram— 1 10. Control De-Watering(the ac of pumping groundw r or stormwater away from an active construction site). - - .0 11. Maint in Best Management Practices( Ps). scf-r ev-,,,,,...4,2k (-1 C. ,e- 2/00.4., 6/2/tP • _ ___- '12. Manage the Project. 6-4- Sr i 2. Adjacent Areas. -- a. Description of the adjacent areas that may be affected by site disturbance (e.g., streams, lakes, wetlands, residential areas, roads). b. Description of the downstream drainage path leading from the site to the receiving body of water(minimum distance of 400 yards). �,� � .4 d. s___,,e( 7 „--,--.._...e 0--ye 5' (1.---:) 3. Environmentally Sensitive Areas. a. Description of environmentally sensitive areas that are on or adjacent to the site. ri stormwater site plan template—rev.10/1/2003 9 0 r b. Description of special requirements for working in or near environmentally sensitive areas. N7A 4. Erosion Problem Areas. Description of potential erosion problems on site in the context of the characteristics of the on-site soils(e.g.,erodibility,settleability,permeability,depth,texture,soil structure). 5. Construction Phasing. a. Cons�tion sequence i . '\ -- p, _i __CI.L.. • a I� b. Construction phasing(if prop'bsed) 6. Construction Schedule. Wet season is October 1 through April 30(page 2-21 of the Manual). I. Proffide a proposed construction c dule. II. Wet Season Construction Activities. a. Proposed wet season construction ctiv'ies., c b. Proposed wet season construction activities for environmentally sensitive areas. /V 7. Financial/Ownership Responsibilities. a. Identify the property owner responsible for the initiation of bonds and/or other financial securities. b. Describe bonds and/or other evidence of financial responsibility for liability associated with erosion and sedimentation impacts. 8. Engineering Calculations. Provide Design Calculations on 4tlf ep' rate sheet_for the following,if applicable. / a. Sediment Ponds/Traps. i '` •� ✓ b. Diversions. it t 1 ,...1 .1 16 c. Waterways. i=� "`-f .-,:'�f d. Runoff/Stormwater Detention Calculations r T stormwater site plan template—rev.10/1/2003 10 • Stormwater Site Plan Changes If the designer wishes to make changes or revisions to the originally approved Stormwater Site Plan,the proposed revisions shall be submitted to DCD prior to construction. The submittal shall include substitute pages that include all proposed changes, revised drawings showing any structural changes,and any other supporting information that explains and supports the reason for the change. Final Corrected Plan Submittal If the project included construction of conveyance systems,treatment facilities,flow control facilities,or structural source control BMPs (not standard on-site stormwater management BMPs),the applicant shall submit a final corrected plan ("as-builts")when the project is completed. These should be engineering drawings (stamped by a licensed civil engineer) that accurately represent the project as constructed. APPLICANT SIGNATURE By signing the Construction SWPPP worksheet, I as the applicant/owner attest that the information provided herein is true and correct to the best of my knowledge. I also certify that this application is being made with the full knowledge and consent of all owners of the affected property. (LANDOWNER OR AUTHORIZED REPRESENTATIVE SIGNATURE) (DATE) THIS SPACE MAY BE USED FOR ADDITIONAL NOTES, IF NEEDED: 1 (!' rjv s , SEP 1 6 200 J r .;oUATti UEVEL • stormwater site plan template-rev.10/1/2003 12 ::r \ \ / :, i Z • i i T \ i I O r A D .:. Gn .AIlk• ' .1 ..,: , IT/ -o 0 t O L • \ .. I '. \ . D X ," can • /V 1. D A C7 0 ". 5£V-0" 1b 3,_1: 2,-0,A 4,_9: 3,-0. %,-0.r 2,-6. 6,_3. 2,-0" r 3,-0. b,9,: 5,-0,: 9,�. 3,-0„ 3,�„ I 1'-4" 0 0 in ea ii pi VI el IV 1{}i111101Tirl it!mommomm!!1•iTl iil!l!8ltttrtiti ( 1!iT! i!iSYi}!}1ti1fA!/1115}i}1}l!f}iii!!T! Riiiryl ' ® �= /\ P gs4 00 1= II � ,lI :ab 0 0 4J O ©�ca z U2 , ISIS lj rt71 _ (s_)____,.,. ._(:-C-'').) i -----. 111 G‘ ill ':::::::, W b . r=.1i b h' Ilil�'ll«� m o � b A 0 = AMI i IIII ...... a p x b I 00 • MI 1 i "A' ,, ut - ■ ,1U,f I, 1 11 � ..lit lii •.i 1 ii l i!1��1�}ii4fi�l�i� tgni101 llli i. 4141141$4 l ill I}•.la" 141116 • 14 1 litili.i 1. !1. 1_ '' O - i} n ).-6".2.-6', 4.-2' ,2.-6"� 8.-10„ ,2.-6"� 3,-0" „2'-6", l-6„ A 3.-0" „ 3,-0" , 1'-415„ 3.-0„ , 3.-0" , 3.-6" --�� 1 i,` rV O 13 73 3 +,.• 3 w A ^' O v, O m A A U' —1 El X .� sJz -„ zup -0C' mv r" m e --1 3 m X D` N A m b` - 7) O a -, m 1:-1Z71 -t r w co n m m -I A o 0 13 ® O <-- <- < Cr <r i M^ rnn � oamz .o � � CP TiT rrtm m � 66 z D TIT cozrz00 • Dm �cn �' cn v1 v+ u� to • -0 -• m -+ c r- t7 Z D m -0 --0 3p N N N 0 n - z a (/' i -n 3 0 E U' Z it► - - 3 —� m p m 0 O (P 0 0 0 I-- m 0/ m - n61 � zO xam Z m z Z Z (� (� r D m A z , �'= N m p 0 r 0 _ _ .i A mO 7) -' A " 3 m n cn z 0 - 0 0 -+ 0 0 0 0 < E -1 XI 0 p O z cn = m v' ® 0 D N b b o E m � E • (� � 4NX m - X \ -r 1 en elU' a, cP D E r- a s% 10 x Tit ill0 = u xi m m m 1 r T= DNN � m om —+ .I -1 70 ° O O AE = 4` 0 0 0 0 Z 4. 0 nu' 70r- 00i 3rr- x p p E E m m P1- - 70 O 3 @ e e to 0 Z e 1> N �' to 4' D NX � m N mA A11 rrr m D_ _ �m v' 00 0 0 N 0 O E 1›, rzD O co -< m Z 0 0 -Dpz A E cr,- m0 UI U' G� E - 7m0 ir= -n N -4 n D 0 CI z c 0 0 A0 0 ° m A 0 co 0 m O N 1 70 m rD com0 m D 00 O m RESIDENCE FOR: ,42,O DRAWN er, KC �UFKES DATE: 4S-O8 COKER DESIGNWORKS, LLC. SCALE, I/8".I, MAIN PLAN 814 GARFIELD 121 RIDGE DR PORT TOWNSEND, WA S8368 Qc COKER DEBIGNWORK5,LLC. 2008 PORT TOWNSEND,WA PN (360)385-3818 '_-_— g8368 coksrdeslgrworks•man.com • it ` ) . i 47;4 iii „L, if 5 ov 1 d7« G. WN <,� 0. 1r,..--tam i a ,f L----,,,,100"'''' ' y tip. �,? 52'-0" N T6br E I5O.00 • i 1 4 ri°6': b b T .i<.—__._r ___ — DRIYE i so o" A l,-- I b r E O4O _- _--— f �"ry I� �o<,s f 5 "f f 1 / .. - : I 4 111 I j IIW- 1 ' m I o 0 I z 0 IA 1). 1 I> al arr o d �$ ;7C \ m I 1 / M, ''''.0* „1 I C) \ m mz i, DI Gmm I C1� rn ....1.1U r d I 1 i`� 1mZ , j I I 0 iv op o 11 ,r6. 5 SETBACK p ' N 73'9I'E 1`A.00 1� • O. 31'-4" 6'-9" 38'-1" V 39-0" Ei 11 o m � C7 x 3 �, m" n -a �_ m Z z cn D -n. J 4�rit m p A z m � X n p "�- m. m N �, --F 3 � z moo AmZ 3 cmi m �� A � n `- < O m -' v o m o mzxi 3 a A o �m v n XI A v' m D Z m p A7mj � ~ cn cn p �r-'O m. z 3 m T '� m m Z .Zl W 0� v N G� O N o m n $ m o A A m O Z -U (7 T ry�� m T 3 Z F. u m aw � Q o n -71 Vv OOz -o T z -. w < �° A (� 0 T Z i TT? Q s"o -zi m m TIT m r- A -I GN d ,{� z m D 0 M7--- -+( HP D �tlm � m r 0 < z m-0 O mrm m crAI I i j p QCONv,C = , I I cr.m • mG Os m O YD n m O S Z 70 —O T yv, • z 3 = m m O2M Q N I j I j n n � < n ;Pi " z mG` A w XI cm rT tr. m 3O Ta' CD xi N p � p mm Q s. m r < AiXIm.. 7 j � m O c T DO. T < c;x m J� 90 1. t. 73 CA NW w o�• N Kt T\.. ' T TT `ll '�o N IIE 11W-I1 T - T T T` o .