Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD2008-00451
41113UILDINGReview PERMIT APPLIC•ON 00439 Review Type: I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD08-00451 Received Date: 10/15/2008 SITE ADDRESS: 1281 RHODODENDRON DR QUILCENE, 98376 OWNER: JAMES B OLNEY PHONE: 206-234-5640 LESLIE E TOUSSAINT 130 NW 56TH ST SEATTLE WA 981072023 SUBDIVISION: Block: Lot: PARCEL NUMBER: 701344034 Section: 34 Township: 27 N Range: 01 W CONTRACTOR: OWNER/BUILDER PHONE: REPRESENTATIVE: PHONE: PROJECT DESCRIPTION NEW YURT FOR STORAGE, NO PLMB OR HEAT TYPE OF WORK GAR SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: VALUATION 32,500.00 ADD'L: HEAT TYPE: UH CODE EDITION: 2006 HEAT BASE: HEAT TYPE: OCCUPANCY: UNHEATED: # OF STORIES: OCCUPANCY: CONST TYPE: OTHER: 700 SHORELINE: GARA CONST TYPE: DECKLE 268 SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: CON WATER SYSTEM: OTHER BEDROOMS: BATHROOMS: Exist: 0 Exist: 0 Prop: 0 Prop: 0 Total: 0 Total: 0 Routing Date: CUO I Q(`) Type Amount Paid By: Date: Receipt: Approved/Date Permit $391.25 AMS 10/15/08 102695 APPROVED Plan Check $254.31 AMS 10/15/08 102695 State Building Code $4.50 AMS 10/15/08 102695 APR b 10og Total: $650.06 Jefferson County Planning & Building Department Jefferson-County Building Ision Permit Nu r: BLD08-00451 Applicant: TOUSSAINT BUILDING PERMIT INSPECTION APPROVALS applicable Code: 2006 International Building Codes To schedule inspections, call (360)379-4455 no later than 7:00 AM the day of the inspection. Requests received after 7:00 AM will not be scheduled for that day's inspections. ELECTRICAL PERMITS are issued by the Washington State Department of Labor& Industries. The electrical permit must be signed off by the State Inspector prior to the County's Framing Inspection Inspection Item Date Approval Signature Notes Setbacks •7171 2,-er 5ThitO Minimum setback from Rhododendron Drive right-of-way shall be 20 feet. Minimum setback from from the edge of the steep slope for the yurt and drainfields shall be 25 feet,per geotechnical report. Minimum setback from OWHM as depicted on the approved revised site plan is approximately 580 feet. Minimum rear setbacks as shown on the approved revised site plan is approximately 100 feet. Erosion Control 1/7 0? SEE CONDITIONS 2, 3,4, & 5. Foundation Footing /.11?/nq F1 footirt-ltraiis f!�Y5 - Framing 8-e,E. and_41" Puy Q-rit FINAL INSPECTION 3 S r j Z_ / t FINAL INSPECTION MUST BE APPROVED PRIOR TO BUILDING BEING OCCUPIED THIS PERMIT IS VALID FOR ONE YEAR • • CONDITIONS for Building Permit# :BLD08-00451 1.) PRIOR TO FINAL BUILDING OCCUPANCY, PROPONENT SHALL SUBMIT A WRITTEN LETTER FROM STRATUM GROUP WHO PREPARED THE GEOTECHNICAL REPORT DATED OCTOBER 1, 2007 STATING THAT THE STRUCTURE AND/OR FACILITIES HAVE BEEN CONSTRUCTED IN CONFORMANCE WITH THE REQUIREMENTS OF THE "GEOTECHNICAL REPORT" INCLUDING THE STORMWATER METHOD AND LOCATION. THE LETTER SHALL BE STAMPED BY THE LICENSED GEOLOGIST/ENGINEER. 2.) A SILT FENCE SHALL BE INSTALLED AT THE TOP EDGE OF THE STEEP SLOPE ADJACENT TO THE PROPOSED YURT PRIOR TO ANY LAND DISTURB►NG ACTIVITY. THE MINIMUM HEIGHT OF THE TOP OF SILT FENCE SHALL BE 2 FEET AND THE MAXIMUM HEIGHT SHALL BE 2 1/2 FEET ABOVE THE ORIGINAL GROUND SURFACE. THE SILT FENCE SHALL BE BURIED IN A TRENCH TO A MINIMUM DEPTH OF 5 INCHES BELOW THE GROUND SURFACE. THE TRENCH SHALL BE BACKFILLED AND THE SOIL TAMPED IN PLACE OVER THE BURIED PORTION OF THE SILT FENCE, SUCH THAT NO FLOW CAN PASS BENEATH THE FENCE AND SCOURING CAN NOT OCCUR. ANY DAMAGE TO THE SILT FENCE SHALL BE REPAIRED IMMEDIATELY. SEDIMENT DEPOSITS SHALL EITHER BE REMOVED WHEN THE DEPOSIT REACHES APPROXIMATELY ONE-THIRD THE HEIGHT OF THE SILT FENCE, OR A SECOND SILT FENCE SHALL BE INSTALLED. 3.) DESIGN CRITERIA FOR SPLASH BLOCKS: A VEGETATED FLOWPATH OF AT LEAST 50 FEET SHOULD BE MAINTAINED BETWEEN THE DISCHARGE POINT AND ANY PROPERTY LINE, STRUCTURE, STEEP SLOPE, STREAM, WETLAND, LAKE, OR OTHER IMPERVIOUS SURFACE. SENSITIVE AREA BUFFERS MAY COUNT TOWARD FLOWPATH LENGTHS. A MAXIMUM OF 700 SQUARE FEET OF ROOF AREA MAY DRAIN TO EACH SPLASHBLOCK. A SPLASHBLOCK OR A PAD OF CRUSHED ROCK(2 FEET WIDE BY 3 FEET LONG BY 6 INCHES DEEP) SHOULD BE PLACED AT EACH DOWNSPOUT DISCHARGE POINT. NO EROSION OR FLOODING OF DOWNSTREAM PROPERTIES MAY RESULT. FOR SITES WITH SEPTIC SYSTEMS, THE DISCHARGE POINT MUST BE DOWNSLOPE OF THE PRIMARY AND RESERVE DRAINFILED AREAS. 4.) THE FOLLOWING MINIMUM LIPTHS (LINEAR FEET) PER 1,000 SQUAEpEET OF ROOF AREA BASED ON SOIL YPE MAY BE USED FOR SIZING DOWNS UT INFILTRATION TRENCHES: COARSE SANDS AND COBBLES 20 LF MEDIUM SAND 30 LF FINE SAND, LOAMY SAND 75 LF SANDY LOAM 125 LF LOAM 190 LF MAXIMUM LENGTH OF TRENCH MUST NOT EXCEED 100 FEET FROM THE INLET SUMP. MINIMUM SPACING BETWEEN TRENCH CENTERLINES MUST BE 6 FEET. FILTER FABRIC MUST BE PLACED OVER THE DRAIN ROCK PRIOR TO BACKFILLING. A VEGETATED FLOWPATH OF AT LEAST 25 FEET IN LENGTH MUST BE MAINTAINED BETWEEN THE OUTLET OF THE TRENCH AND ANY PROPERTY LINE, STRUCTURE, STREAM,WETLAND, OR IMPERVIOUS SURFACE. A SETBACK OF AT LEAST 5 FEET SHOULD BE MAINTAINED BETWEEN ANY EDGE OF THE TRENCH AND ANY STRUCTURE OR PROPERTY LINE. NO EROSION OR FLOODING OF DOWNSTREAM PROPERTIES MAY RESULT. 5.) CONSTRUCTION ENTRANCES SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR OTHER PAVED AREAS WITHIN 1,000 FEET OF THE SITE. THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM COMPACTED SUBGRADE. QUARRY SPALLS (OR HOG FUEL) SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS. (BMP C105, 2005 DOE STORMWATER MANUAL). ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED BY SHOVELING OR STREET SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE REMOVED OR STABILIZED ON STIE. ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD, WHICH END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY. UPON PROJECT COMPLETION AND SITE STABILIZATION, ALL CONSTRUCTION ACCESSES INTENDED AS PERMANENT ACCESS FOR MAINTENANCE SHALL BE PERMANENTLY STABILIZED. 6.) NO OCCUPANCY STRUCTURES SHOULD BE BUILT WITHIN 25 FOOT OF THE STEEP SLOPES ON THE NORTH AND WEST SIDES OF THE GENTLE SLOPING RIDGE AROUND THE PERIMETER OF THE UPLAND GRASSY AREA OF THE SUBJECT PROPERTY. THIS DISTANCE WILL PROVIDE ADEQUATE SPACE FOR TWO ADDITIONAL SHALLOW FAILURES (BASED ON THE LARGEST SHALLOW FAILURE) BEFORE THE STRUCTURE WOULD BE COMPROMISED. 7.) THE OCCUPANCY STRUCTURE SHOULD BE LIMITED TO A YURT OR MOBILE HOME WITH INDEPENDENT PILE SUPPORTS. 8.) NATIVE VEGETATION ON THE SLOPE SHOULD BE MAINTAINED. REMOVAL OF POTENTIAL HAZARD TREES OR LIMBING AND TOPPING OF TREES FOR VIEW PURPOSES IS ACCEPTABLE. NOTE: PRIOR TO ANY REMOVAL, TOPPING OR LIMBING OF VEGETATION, APPLICANT SHALL CONTACT THE DEPARTMENT OF COMMUNITY DEVLEOPMENT (360-379-4450) TO DETERMINE IF A PERMIT IS REQUIRED FOR SUCH ACTIVITY. 9.) NO SOIL, DEBRIS, OR LANDSCAPING DEBRIS SHOULD BE PLACED ONIPE SLOPES OR WITHIN THE AREAS OF SHALLOW FAILURES. ADDITIONAL MATERIAL ON OR ALONG THE EDGES OF THE SLOPES CAN CAUSE ADDITIONAL FAILURES. 10.) STORMWATER SHOULD BE DISPERSED AND INFILTRATED INTO THE GROUND AND NOT CONCENTRATED NEAR THE TOP OF THE SLOPE. DISPERSION AND INFILTRATION AREAS SHOULD BE LOCATED TOWARDS THE SOUTH SIDE OF THE RIDGE AREA. DISPERSION/INFILTRATION CAN BE ACCOMPLISHED BY A LEVEL INFILTRATION/DISPERSION TRENCH LOCATED ALONG THE SOUTHERN BOUNDARY OF THE PROPERTY. 11.) MUST COLLECT AND DIVERT ALL SOURCES OF DRAINAGE AWAY FROM SEPTIC TANK, RESERVE & DRAINFIELD. MUST COMPLY WITH ALL PERMIT CONDITIONS, STATE AND LOCAL CODE. 12.) THIS BUILDING APPROVAL BY JEFFERSON COUNTY HEALTH DEPARTMENT IS FOR STORAGE ONLY, THIS STRUCTURE IS NOT FOR RESIDENTIAL USE OR HUMAN OCCUPATION. 13.) To help prevent seawater from intruding landward into underground aquifers, all new development activity on Marrowstone Island, Indian Island and within 1/4 mile of any marine shoreline shall be required to infiltrate all stormwater runoff onsite. 14.) The property owner shall comply with Water Conservation Measures (per list maintained by the UDC Administrator). 15.) A vegetative buffer of 25-feet shall be permanently maintained from the top or edge of the Landslide Hazard Area. All buffers shall be measured perpendicularly from the top of the Landslide Hazard Area. 16.) A Geotechnical Report dated October 1, 2007 prepared by Stratum Group was submitted in conjunction with this application. The report addressed the stability of the geologic hazard area. A setback of 25-feet shall be measured perpendicularly from the top or toe of the geologic hazard to the proposed unheated, unplumbed yurt. (If a more permanent structure is to be placed on the property, an updated geotechnical report and greater setback will be required). 17.) Landslide Hazard Areas and their associated buffers shall remain naturally vegetated. Should buffer disturbance occur during construction, the Unified Development Code (UDC)Administrator shall require replanting with native vegetation. No alterations shall be made to the Landslide Hazard Area or its associated buffer without prior authorization by the UDC Administrator. 18.) Prior to and during approved construction activities, the perimeter of the landslide hazard area buffer shall be marked with a temporary sign. The sign shall be placed in such a manner that it can be directly observed from the construction area. The sign shall contain the following statement: "Landslide Hazard Area and Buffer- Do not Remove or Alter Existing Vegetation." 19.) All construction activities shall not encroach upon the landslide hazard area buffer. This includes the storage or preparation of materials. 20.) The applicant shall permanently separate the boundary of the Landslide Hazard Area Buffer from the remainder of the subject property through installing logs, trees, a hedge row, or any other prominent physical marking approved by the UDC Administrator. 21.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 22.) The applicant shall fully adhere to all conditions and requirements of the eagle habitat management plan signed by WDFW on November 24, 2008. 4110 23.) The project shall comply with Construction Stormwater Pollution Prevention (S PP) Elements#1 through #12 of the Department of Ecology's Stormwater Management Manual for Western Washington to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 24.) A Stowmater Site Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 25.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 26.) Not more than 2 unlicensed vehicles shall be stored on any lot unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Chapter 18.30 JCC. Outdoor storage of 3 or more junk motor vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage) yard and allowed as a permitted use in Table 3-1 or Chapter 18.18 JCC, and such storage shall meet the requirements of JCC 18.20.100, Automobile wrecking yards and junk (or salvage) yards. In no case, shall any such junk motor vehicles be stored in a critical area. 27.) A minimum of two (2) on-site parking spaces shall be provided for the single family residence. 28.) Residential developers and individual builders shall be required to preserve shoreline vegetation and reduce the associated risk of erosion during construction and any future activity which may impact the stability of the shoreline. 29.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 30.) The building height is not to exceed 35 feet. 31.) Exterior lighting for residential uses shall not exceed twenty feet (20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 32.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 33.) Minimum setback from Rhododendron Drive right-of-way shall be 20 feet. Minimum setback from from the edge of the steep slope for the yurt and drainfields shall be 25 feet, per geotechnical report. Minimum setback from OWHM as depicted on the approved revised site plan is approximately 580 feet. Minimum rear setbacks as shown on the approved revised site plan is approximately 100 feet. oN 0 IREccEI K .D �ION., JEFFERSO•OUNTY 4 ` . DEPARTMENT OF COMMUNITY DEVELOPMENT OCT 1 S 2008 621 Sheridan Street • Port Townsend •Washington 98368 360/379-4450 • 360/379-4451 Fax �.gs, (#�p5 www.co.jefferson.wa.us/commdevelopment FCIC. fjO}{ ;� t: Master Permit Application MLA: ( jtf �fGJ :� Project Description(include separate sheets as necessary): Yurt for use as storage and summer rain shelter. Tax Parcel Number: 701344034 Property Size: 4.96/216,578 (acres/square feet) Site Address and/or Directions to Property: 1281 Rhododendron Drive,Quilcene 98376.From PT,south on Hwy 19,south on Center Road,south on Dabob Coyle Road to Dabob Cove and Rhododendron Dr.Gate Code is required,call(206)234-5640. 1'?R 1 is the extreme end ofRhododendronDrive.past and above 1211. Property Owner(s)of Record: Bob and Vivian Zirk,Jim Olney& Leslie Toussaint Telephone: (206)234-5640(Leslie) Fax: email: leslietoussaint@gmail.com Mailing Address: 130 NW 56th Street,Seattle Wa 98107 Applicant/Agent(if different from owner): Telephone: Fax: email: Mailing Address: What kind of Permit?(Check each box that applies Building ❑Critical Areas Stewardship Plan ❑ Demolition Permit C.yyur-i- 0 Variance(Minor,Major or Reasonable Economic Use) ❑Single Family X Garage -Attached/Detached 0 Conditional Use[C(a),C(d),or C]** ❑ Manufactured Home 0 Modular ❑ Discretionary"D"or Unnamed Use Classification ❑ Commercial* 0 Special Use(Essential Public Facilities)** ❑ Change of Use ❑Boundary Line Adjustment ❑ Address 0 Road Approach 0 Short Plat** ❑Home Business ❑Cottage Industry ❑Binding Site Plan** ❑Propane 0 Long Plat'"' ❑Sign 0 Planned Rural Residential Development(PRRD)/Amendments** ❑Allowed"Yes"Use Consistency Analysis 0 Plat Vacation/Alteration** Nj Stormwater Management ❑Shoreline Master Program Exemption/Permit Revisions** ❑Site Plan Approval Advance Determination(SPAAD)* 0 Shoreline Management Substantial Development** ❑Temporary Use 0 Shoreline Management Variance ❑Wireless Telecommunication* 0 Comprehensive Plan/UDC/Land Use District Map Amendment ❑Forest Practices Act/Release of Six-Year Moratorium ❑Jefferson County Shoreline Master Program Amendment *May require a Pre—Application Conference ❑Tree Vegetation Request **Requires a Pre-Application Conference Please identify any other local,state or federal permits required for this proposal, if known: DESIGNATION OF AGENT I hereby designate to act as my agent in matters relating to this application for permit(s). OWNER SIGNATURE Date: By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of his,her or its knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attomey's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application review and any required later inspections. Staffs access and right of entry will be assumed unless the applicant informs the County in writing at the time of the applic?' nth hor sh is prior noltice. / C, Date: '`" /�f 41jifSignature: i The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)even if you are in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual and non-transfera le respon ibility for her ani/�yin th the ESA. The Applicant has read this disclaimer and si and dates it below. Signature: Date: (0z/ . / � G:\PermitCenter\###FORMS###\DRD FORMS\Master Permit Application 5-29-08.doc • el BUILDER STATEMENT The signer of this statement does hereby certify that they ate the Owners of the parcel referenced herein,that they are not licensed contractors and that they will be assuming the r sponsibil' 1 the/ General Contractor or the proposed prof �j _ Signature: J of-��� ' �IJ�""� /t" Date: C kiZ%'/ �6�2 6,3 GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: FAX: ( ) ( ) MAILING ADDRESS: EMAIL: CONTRACTOR'S LICENSE WAINS NUMBER: NUMBER ARCHITECT/ENGINEER: PHONE ( ) FAx:( ) MAILING ADDRESS: EMAIL Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal: AX New DX Wood Existing: 0 ❑ Sewer ❑ Addition i I Steel Proposed: -0 Bank ❑ Community System ❑ Alteration/Remodel Li Concrete Total: 0 Height: Fib Individual System ❑ Repair ❑ Masonry 29� EP Permit# (Al_.314 ❑ Demolition ❑ Other: Bedrooms: Water Supply: Existing: 0 Setback: i i Private well ❑ Two Party Type of Heat: Proposed: 0 Public unheated Total: 0 600' Name of System: Dabob Cove Community If this is a Commercial Project you must answer the following: Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply: 1 Underground Tank F Above ground Tank Size of Propane Tank: i Heat Stove i Cook Stove F Woodstove I Fireplace Insert i Hot Water Tank F Pellet Stove T Other Is this appliance being installed in a Manufactured/Mobile Home? Yes / No When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines,tank location and size,distances from the propane tank to all property lines,buildings and septic system components, including the reserve area. Square Footage Current Proposed F9 ' r ' tnt3► ;, Amount ' w. >x , ; ,s;' 'is Main Floor Heated 1. EH Bid App Review: r 00 2'Floor Heated M Consistency Review: t 5-1OQ I Other Heated Base fee: Mezzanine 0 0 ,. 4re1 ine -Exec) 3C66 Heated Basement Plan Check fee: -5 ; Unheated Basement State Surcharge fee: Li- Unheated rD Pot Water Review fee: �f Oyu"--1; -K'fA ) 700 )`7. , , no p1r111,---) Garage/Carport SUBTOTAL Decks 911/Rd Approach fee: Front&Back 268 3 a''6 e K I J f i t1C Other �y TOTAL: $ 1 a(A c')(' ` . Receipt Number: \� ,tc-j . Cash/Check Number: ESTIMATED COST(REQUIRED) 3 .,--,1,r to,z5 .Fair market value of all labor and mated s foundation to finish jl' _` 7 , \011 jInitials: 6L;) G:\PemuK:enter\###FORMS###\DRD FORMS\Master Permit Application 5-29-08.doc er ri „I t t, i✓•f t r(.... J a, .). • Figur Site Location 47°46.996' N, 122°47.27.WGS84 122°49.000' W 122° 0' W 122°47.000' W WGS84 122°46.000' W XJ - • �:i 1 _.1`. < \i,,.��.:gl \ilw.:„.e.k.licli �j Ali \ ;-." . 4t .'''( Y r I 1 • 3. 0 x t •• (r : -, \\\it: ":7!•J:+a�.�=a;,i.43 1f' 1 _oo O . .,.,,. . 'Z1N,, 7Jr; / i \'/r `ref j7i��r�l ►- r',, t;..,. tek•'t k 8y1i'l'iksi1. _1 1. n \ i ,,,',.; 1 rr:;..i:.j.•4.,L....,....„...,--z,,..,-.,...—.....e.....,.,....,,,, ....-.., ; („%.,?? \1 ,:v.,.; .„,,,....„.. .....,:_-. ....-4-.1 ,4.,t V 'f/' i1,0, Iv � S ` fi sH k. ,t/ , - 1. ' ‘ � % b ` ,;s ) /Ai � ' it4" �� fi. I ` 3 !..i.i , ' .:t5"ii:: rk-' 1 M,i Tei: fil . / iii. • p$' i-, pc, 0 z .. :ti tr'�.: r t / /'• 0, .i ,.,)! r; -4107-,.. Fl r1 ' SUBJECT PROPERTY f, Z 1 a' J 4r 44 ' tl? .,:t,t . 4?;:',..!. .. (...:1!!'....._,.........,,,...,...__,,,,4;17 1/7:.:7:_ CASci; , y ,}"c4is j c,--- -,1.... . 1 / ' )(tr?, (' ,.. NS-' .Ay,-.)1( k. kteisliff-A— ........'N,,,II-\''''''''' ''44..'4',.:ip.- {1:-.:. _,,,,. „.....,,,,...,...„,44‘03-1,-.3.) • ,..';, ''''''''. .... r'r' ' / - -,/P.!''''4‘ 4:1S4‘..4(, i. ',...' '',---..„..,..''''''.— 45F"..41 , .:11, K. rl 1/' c:' c _'1.-.:-.. -gN..;74;:.!;'41„,k'S . \ , ::)&"'Pl,!..c'kfor0M., _ 1( 'i iiir ti tl:/ � . Jr 8O /.r/r ' • r' \ ti. % -- a'=.,r Rs ft. / /' �rf I1 r 1 ( I �7p` , 4,—,..,,, , `r ' ' r1/f/r•)r ,�,\111 , . . , f r "�1,' }iq�rtr `: f ,> •� F r $Q 11 '• I 1 Ii�i I 5 11 ! •1/ ` f 0 t\`-, j' ic; r.•.r rn �. 22°49.000' W 122°48.000' W 122°47.000' W WGS84 122°46.000' W 1$° �. TOM EEEI 9l1 _ OJJ METERS Map created with TOFU®©2003 National Geographic(wwwimtionalgeogmaphic.corafopo) • 0 • 41111, Cr) c Nt .. •4** -1--)o 1 . vi u„ ci .(---- ill c.. CU U U tl N -1-> S-• ci s, J i A t "› •\. k ..r. -.I 0 >, c ,./. ... Tu c -- D ti,„1 Tr, < 1-4 Li... .p 0) .._. .6 0... -- 3 :.it i ri . .3 z , 1 — \ . C, ,... i irk C:• a' U , • li .%K i V1 i . - --)......., ...1 1. \ 0 4.)1 OC 75 ' v C./1 1. \ tio .../ • N.) 1 k---'.-- ....I . ........... '< iil C ... -1--v, ••• • L d " . k---"-- 0. I— ... 4- 4.- ...3, ia E''' rii a .47 _irt ...9 ............1110 CIL 4, ••••••••.••••••1 a V. (es Cs. t a 1 - z f-, ,f . '<Si -4 • \•••• ' / • N./ A Cu 1 44 z w co a. oc 4-) W :7C )..... U IA W q) > fI4. M NI- CD Ct. D cut° E 0% [4- 1 „--7-1---- plox _cif:cl>R4-4-1 .....„...-----:•,„..„ , ----.. ... , .., • • , . = I— c:3 Tu" q:, '--,_ •; „ • , u) V) a.. cri co ._ ._ •,„ 0 , , tk- Tiliti. , 0, ,. . ••• is i. 1..... ,, 3.,,, • o. • -tt - )IP C h i%,' I:I. • .-41; - 4,, a) ''N',. ,, • ) a P" - All Pi IZS. , ,,,_ ''',',,, , s•,-/--. 1 + ri7'111 Ili, illeihRer!I!I 7- cl'=.41111+ ''':.,:•t•olililill • < ,oc4, . _ s s \ --- ' T -` ), ' \ ) • i �' .Jt. �� �� , "`� "ter I A v � r I 1 \ r 1 a.. �' :t 1 L • / • Y'� *.•). I7 _ { _ - �, y i j , r ) �// -' i i / . , �� / � __ r l J . v'v w, ,' ) l: ,f Rr i1,- l I `v. -\ v \ v I / t'- / I \ \ I i - xc' .. j 1.•.ii ''\' . • m � STRATUM GROUP lee PO Box 2546, Bellingham, Washington 98227 Phone(360)714-9409 March 27, 2012 Leslie Toussaint 130 NW 56th Street Seattle, Washington 98107 Re: Stormwater Inspection Review Tax Parcel 701344034 1281 Rhododendron Road Toandos Peninsula,Jefferson County, Washington Dear Ms. Toussaint: I visited the property on March 24,2012 for consistency with our recommendations for managing stormwater at the site. The stormwater dispersion/infiltration area is consistent with our recommendations for stormwater management on the site. The stormwater and drainage is routed towards a dispersion areas on the south side of the property such that no stormwater is directed to the steep slope on the north side of the property. Stratum Group appreciates the opportunity to be of service to you. Should you have any questions regarding our reconnaissance please ;c7ontact our office at (360) 714-9409. Sincerely yours, e$ �Yat�j Stratum Group '�ti�Qr''" '•f o `� Dan McShane, L.E.G., M.Sc. ; v> • Licensed Engineering Geologist „�•..,, Daniel McShane • • Elizabeth Elizabeth Toussaint 130 NW 56th Street Seattle,WA 98107 "ROHgWa JUN 1 9 2007 -*'pmfI► _111itVl/L,l► June 17,2007 Mo-Chi Lindblad Jefferson County Department of Community Development 621 Sheridan Street Port Townsend,WA 98368 RE: BLA at 1281 Rhododendron Drive,Quilcene,WA 98376 Case#MLA 06-00642 Dear Mo-Chi, Attached is our geologist's letter report regarding the septic system and landslide risks at 1281 Rhododendron Drive, pursuant to designation of a new reserve area for our existing septic system, required by our proposed boundary lot adjustment. We do intend, at the time of a building permit application, to submit a geologist's report specific to our final building plans. Also as a part of that permit application we expect to have an evaluation of the septic system done, again in terms of our specific use proposal Iz the meantime, %AA= expect this will suffice for establishing the new reserve area for the existing septic system,which was installed and had final approval in 1993. We look forward to completion of our boundary lot adjustment.Thank you for your patience. Sincerely, s (61 74/444-a-kp. Leslie Toussaint Cc Jim Olney Bob and Vivian Zirk Bud Brewer,AMLS Ken Warren, Soils Application, Inc. • Memorandum JUN 1 3 20:7 -1+111til 5�NA of ►Na Date: June 2,2007 Sh�� , To: Leslie Toussaint and Jim Olney �; .?h 130 NW 561 Street /,`1% Seattle,WA 98107 )"/ / _ , From: Geoffrey H. Garrison,PhD,LG �. 6 Washington State Licensed Geologist#2546 - Opinion Letter Regarding Septic System Use �OFFRFY Subject: H. OAR 1281 Rhododendron Drive—Tract 5 Dabob Cove Jefferson County, Washington This memorandum presents my professional opinions regarding the use of an existing sanitary septic system installed within a 4.75 acre parcel at 1281 Rhododendron Drive (Tract 5) on the east shore of Dabob Cove in Jefferson County, Washington (Subject Site). The issue of concern regarding use of the system is the potential to artificially exacerbate the natural susceptibility of the area to landslide events. Jefferson County has reportedly requested that the proposed use of the system be studied with respect to its potential impact on the area. 1.0 REPORT REVIEW The opinions herein are based upon review of several reports provided by the Subject Site owners: Geotechnical Slope Evaluation, Beach Drive-Dabob Cove Properly Access Road, Jefferson County, Washington.Prepared by Myers Biodynamics,Inc. March 1, 1999. Geotechnical Report for 372 Beach Drive, Parcel#701344031, Located in Section 34, Township 27 North, Range I West, W.M., Jefferson County, Washington. Prepared by Northwestern Territories,Inc.,July 12, 2001. Geotechnical Report, Shoreline Bluff, Kennard Lot 2, Tax Parcel 70134049, Township 27N, Range 1W, Section 34, Jefferson County, Washington. Prepared by Stratum Group,August 20, 2001. Geotechnical Report, Shoreline Bluff, Parcel 8, Dabob Cove, Section 34, Jefferson County, Washington. Prepared by Stratum Group, August 20,2001. Subsurface Exploration and Geotechnical Engineering Report, Weaver Property, Tract 7, Dabob Cove 751 Beach Drive, Jefferson County, Washington. Prepared by Aspect Consulting,LLC,May 12, 2003. Geotechnical Report, Kennard Lot 2, Tax Parcel 701334049, Township 27N, Range 1W, Section 34, Township 27N, Range 1W, Jefferson County, Washington. Prepared by Stratum Group,April 28, 2004. 1110 Dr.Geoffrey Garrison,PhD,L �° Page 3 of 3 Opinion Letter 1281 Rhododendron Drive rt Jefferson County, Washington ' `ii.; ,: • 5.0 REASONABLE WORST CASE SCENARIO A reasonable worst case scenario would consider the septic system operating at maximum capacity of 240 gpd,which is a conservative scenario because this rate is designed for a 2-bedroom house. Over an area of acre, 240 gpd is equivalent to 0.04 inches of rain, or approximately 10% of the average rain that falls on the area during the wettest part of the year, when landslide risks are greatest. In fact, the water infiltration rate from the septic system is less natural variability in rainfall for the area. That is, operating the septic system at maximum capacity during the wettest part of the year should not add a statistically significant amount of water to the subsurface as compared to the water it currently receives from rainfall. Furthermore, historic landslide events have occurred in the area of the Subject Site during major decadal-scale rainfall events such as the rains of January/February 1999. In these events, landslides were triggered by inches of rain falling per day for multiple days. The volume of water capable of being infiltrated by the Subject Site's septic system is less than two orders of magnitude (e.g., 100x) smaller than the rainfall in those events and thus not capable of creating a comparable impact,that is,a landslide. 6.0 CONCLUSIONS AND RECOMMENDATIONS If used as intended, the septic system located at the Subject Site should not significantly increase the natural risk of landslide occurrence for either the Subject Site or the surrounding area. Even under a reasonable worst case scenario, the rate of water infiltration allowed by the system design is not significant when compared to naturally occurring infiltration. Furthermore,the reasonable worst case scenario is conservative in that the system is not intended to be used during the wet season. The dwelling is only intended to be used between April and October,months when rainfall is approximately 10%to 50%as great as the wettest months on the year(December-February). Landslide events occur in the area of the Subject Site due to significant decadal-scale regional rainfall events such as occurred in January and February of 1999.The size of the septic system at the Subject Site does not appear to approach the scale of such events and is thus not considered any greater a landslide risk than the natural environment. r N C Z rn rn rn rnrnz,Irnp O rnmr A pU • z �; _ O� 0 _n n H/-V - 2 m _ �. rn ...., ,... v, Ti' A, '9y . 4;44 ALA,Cir.'-1 / �`` �'111• +� !, _ C��.=fir.\p'®1 • -1_ lilt,%•,. ""4.i4liri*:' I y *r 300 .4 At m, I "if( - VW 1 N ( , ,41,1, :,01411:1';.410'-litilifiiimi,... 1„1, .. .,0:Ifitill;);;Illmin\\ ., ,,,,,-,.- ,.--t -\ ,„ , acniv,- ir........." ,50,...>_-__ '\i\\., N. . I - ..,* .,. o a ittiti OM toa-... ` 40 i \ \ 1 cd .- . ''- b°7" 11 "'\'' \61 8 1 ...- -1-'9 4 in.; toll rig; 1 NM,, ' lrili) 2 1 r.) . - oq \s\-\74 z-, Loa-g"MIL.w.'410111niln , • ,! it,t1 1 - -_. z4 z ...I_RowaiogiMill; 8 - ,: : VA-,‘. ' --VA Illaarlitillale**44 -:. t,,t 4';"•\,, . / (a" w -ignilialrrPFSW t \i(IP E j \ • try Nr�e.wjriu/�p� ., 1��1��1�� - _-� I \ t \\1 gyp °x' � .1''` - ;JJ� ��, �`'„' ..'..'llar.mi, -, ),,.,,A4t\VA 11 ( ---`)ra. \ N ,t,,li►' 11 ( .� Vakril , \N' ,,i,A, s',,,...,,,at ?L., „ \ o i1 � , �ar I I =a. 350- \4'& P - ^ -�',I \ .., ,o,, it,.Fi g 1:4 c \ill 1.C4 r g . 2 , rarimV„i I i I (9- I r`.)11 It% ° K Co s_ 0 , i AND4110, - i -I °4 tr g q 1) littit: fair----- 1111 iv l' jik ',`\\Ntai _7.1* *14111 1,1 k/I 1 i Cie AO\, 7 rn lattil ‘ - )1 - g c:11, /I, . i‘ I iii4t _l_._:- .- - . ./. /ny ) ei) 7 . .,/ , i .. ....:, . -- ,..,401, a cii. i coz Itz , g. ii 0 iiv ,, ,,,,, ,...-...,..NI„ /.,A, ;0. . / . i,,„ , / / kl:Nir : , .• 1r . Av.rn 350- l IT d f , Ps 23'-6" A I r I / L � %�i f� D \ � v g A .o \ : ,.. : ,II (i ifV;4, r4'3:.; '. ;fritieY 4 rn '1 4 i Aff-i! zit 944 (.( a. rn 0-4° I) . ' II.i i I 71 V ) , --.0 r> iy. i . 4 -.hi/7 Illiiidi/1/if ri,t 1 figi , , 0 )11(11/ ty 4 g/ 5,G \\, ) i 73 Co ,- :Nit_ ,r 17 I 1 - Z4)4. r , rn CD D 4a I ' \ I � I ' * ` II ' ���DDD00° \, \‘\ I I n q \ \ \ I \ (A \ N\ )44 rn o° f\ Or7)':--- (11 ' 4 O N �` \ \ Z I O I \ i DUrl1NC� i rn z D 1` I �/' i ) \ \ m KO5i�, o ui `o rn ^J rn I I , I OOzAzO 8 N �71 OG}4l0 O /n\\\\\\ I / 1 G i N rn ± g fr 81 O rn rn Cg rn tI / D \ 1 1 /i �7�0-OC np' rn rnTr ,I I I 00 O CD I 1 \ i000 !!$ • rn-,C rn0 O rn0Z�rnrn 0rn O O O �°A --1 rn.Z°z 70 70 rn O N_,D nro o �i D==`$ 6o m 7a zo °Zn�rn K rnCC71 tzzAZ O N r ` z Z� 70 I A., w rnr-°N 1 �{ dam... @ rnrnCD °O Co rn1IIii • L. ND D ° rtV g i N � O D R N R i CO a Ng272 r, Il+ rnz $Nmv O C ¢C n cC 7 IA z. m ° -- O � m n -II -ii m K U j CI —K.A, na crl ...,04 .1' z),.. 73 _ \ diggialW ril C (=> X ---i P c . 'UMW diki ________. o ... ik o �s D y , ii 4 4‘,,,444, kis. _ e p zOP 3 rn0 4atimi: ' \7�' �_ � D w10 ,. ,ter 1. N1,,, �- G1• 11.1. Off"+- O 111%1 CO c9 i . ,• II: // Z s:IKr .: 11110 „ Nr1rn �1X a rnON7o A ZZw m 2 Rw R � �_0Zrn 7,.t: n i -_- - IIIII)III!1 _ \ ilit1.4 . .t#tt' ,-� � 110 N Z Oe I -0 0 0 c a< ' r IOW r ti z 7, (loom 7 iiI 0 Vet C^9 %IrkhH w Ir rn s- ily I `. • 1 01W 0 nj 1 `V \ >o OBENDR9N-DR 4\ ��I ` ` t!aQ•► C) ;2 8 i I • ' ------. r-l-vew* i p• vs ‘ ‘ vv9 i 44tAat rs,, 4.--. It.-erpi wv z_ ..„._______T,____ .* _ itilik n K :ti 7 It t ,,�\!�\VN orbOI" .�� lm k \ -n" 1- , �� �.. le ee,,,liv IIIT M a. r2 Ake I‘ '.;41,,js. /- aitiv v if. ig 0.1.„,t.....„, ,,,,,,,,,,,,,,, __..... ,_, ,..,;;,,. 1i, __ t de oil 1. m '•-.144.11,41i, „4„4„4" ....,—, ....w.tlpoimmo.aaimaiaa=____ 000t\, ----\\4.i ilL 4 111.„.2 ot ffivit-e-iv \,w,l, " ;j, .er, 70_.,,,____ vs A _,,,, MIN t54 ` ----4-__-MINIMUM '' (0 ...,q 1 ` \Ns's \ \ .till/ ., . o'\41; Zklitis., k),,(„ d ros \ s\s, -s, • OS )k '"Iit, %,,N $17„ \ ' rn'2 lig \ • sv isle..:iii.ti.:7146‘:..,4:0, Ismils . . fl �1 D w w w w w co co w W w 4.:(:N: WII' ♦ _-- �� \ :::, ......imiligN.:.::::::...:;:z..1.1 co N V (T A W —. � Yc \ N' j;. O I.W CO N 40 A KJ ,O N-. N 1 O ‘`� from_ �` ,,,, -,, C 1LL m r Z �1 It O• aZ m of V. o •' ,rn U,V O�W C//" - coW N O A T�. 11 a t N 4:,ii t.._N j TiN -,mii it,* Atl,(1 --- ---- . k i - I r. - - , k It \ .7., 70 .. rn N0-17o rn1 i diO g CCU D D D F. 70 H = pN NN- ntN-0 z ) ?°4 Cr.N -,11 II 4 44 m Z= a C V O 2i co R�nw� =�c O IIli-'^ 70 3�o N� 1 �+ rap0k R3 r- v o 7T m � 2�� u ro m 'rNiz, 0 N23. �- Z n o " � * • ► zNrn [Ti�iIN Z j ^IZ Zr� rn m OD" Q Rn�(aIT R�A t's� ac QD D 1m 9 - 9 " i • ..., -rn 70 'icy CP . 11, �ii ` 0 rn 0 HO `. II X O r , D z o i e 7,10 I 1014 0 0 o a C 01 n 7-- 1 Q % oa ft a • r CA-a C D co o r- 0 p N rt VA 7 N0 W F Nrn Aco =i (5) CO ,3 p 0 K � coo 0 q CD. 0 O C T 1 5 2E08 m --I K- D ° < n °cri_ _IZ -� z � N f =_ � N _� o fl s rn s 7 JEFFERSON COUNTY DSO D= -� D co m S� 2 • • ON 9 c°� JEFFERSON COUNTY 1al ,-) kiiiA DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street • Port Townsend • Washington 98368 �qS �0 360/379-4450 . 360/379-4451 Fax �tINO http://www.co.jefferson.wa.us/commdevelopment/ STORMWATER SITE PLAN SUBMITTAL TEMPLATE MLA# 0 4 3 f PROJECT/APPLICANT NAME Leslie Toussaint Please answer all of the following questions to the best of your ability. Where the question calls for depiction on a site map, the applicant may choose to either incorporate the elements into the general plot plan for the Master Land Use Application or to submit a separate stormwater site plan map. Project Overview 1. Describe the proposed developed conditions of the site. Indicate position and relative size of proposed improvements on the site map. 120 SF shed with minimal plumbing and 700 SF unheated yurt for recreational storage.Level pads for new structures will be created within existing cleared areas. Site is 4.9G acres and approx 230' X 1087'.Existing clearing is approx .40 acres. Structures will be-580'from ordinary high water mark. Parking/driveway area will be gravel,approx 1000 SF. Site will have gravel footpaths and timber step areas of approx 820 SF. Bluff edges will have extensive native planting buffers. Existing Conditions Summary 2. Describe the existing topography. Indicate contours on the site map. Existing cleared area, in the south central portion of the parcel,slopes about G degrees NNW and is truncated by a steep bluff to bay. Bluff height is-295'. North of the cleared area is an approx 40 degree slope down to Beach Drive. Parcel to Southwest is a valley which slopes to bay at about 25 degrees.. Southeast is ridge above cleared area. Access is via Rhododendron Drive which terminates at southern property line,at existing cleared area. 3. Describe the existing vegetation. Indicate native vegetation areas on the site map. Cleared area is covered with grasses that presumably took over after septic system was installed in 1993. Except for this area the parcel is completely forested. Trees include maple,alder,fir.cedar and madrone.Shrubs are evergreen huckleberry,holly, oregon grape,ocean spray,salal, ferns and rhododendrons. Some small slopes and bluff edges have been recently planted with native shrubs. 4. Describe the existing soils. Indicate soil type on the site map. Soils include gravel.sand.silt and clay.Grey clay with minnr pebbles blanket the upper pnrtians._underlain by a thickhrown stratified sand unit.A pre-Fraser Glacial drift with an unsorted mix of clay,sand and gravel are beneath the sand unit.The lower slopes along the shoreline are underlain by a mix of soils from the slopes above. In the existing lower cleared area,septic system test pits indicate very fine sandy loam. 5. Describe the existing site hydrology (i.e., drainage; behavior of water on the site—above, below, and on the ground). Indicate existing stormwater drainage to and from the site on the site map. Depict separate drainage basins on the site map, if applicable, and indicate acreage of each. The site slopes to the north,south and east down to the water. Most stormwater runs on undisturbed forested flowpaths to the bay. One of the upper level areas drains down an existing ditch on the east side of Rhododendron Drive. - Generally the site is dry and well drained.During periods of heavy or persistent rainfall,for example the winter^fr._.��?��R there is comp minim^I ct^nding ^tP on the more level areas of clay.Those areas drain and become dry in several days at most. APPROVED 6. Describe any excess levels of noise generated by the proposed use or activity: STO-RMWATER PLAN The work proposed ' . ir, ittle hea' equipment;noise generated will be normal or below normal I;vels. S air 1 f ip I ,' EC EVE D F E B 1 9 2009 Reg C CT 2CCR JEFDEPT.OF CFER NI Y DU E OPMEN stormwater site plan template doc—rev.10/12/2003 SIGNATIJ R . JEFFERSON CQONIY OCO • • 7. Describe significant geographic features and critical areas (i.e., environmentally sensitive areas such as wetlands, streams, steep slopes, etc.)on the site. Indicate location on the site map. The western property line is on Dabob Bay,The land slopes steeply up from the beach to a bluff approximately 300'above the water. There is a relatively level area of about.40 acres,which was cleared many years ago.The property is basically the southern edge of an ancient landslide scarp. Except for the clearing and some extremely steep scarp faces,the entire 4.96 acre parcel is forested. 8. Describe the general vicinity of the site, including adjacent land uses and structures, utilities, roads, and sensitive/critical areas (streams,wetlands, lakes, steep slopes, etc.). The site is located in Dabob Cove,a development of rural residential properties with single family homes and cabins.There are no structures on the parcels immediately north and south of this one. Most of the development is mapped as having steep slopes and landslide risk. Dabob Cove is serviced with underground electricity,a community well/water system and gravel roads.Rhododendron Drive is a gravel access road that begins at Coyle Road and terminates at the southern property line of this parcel. Permanent Stormwater Control Plan This portion of the Stormwater Site Plan consists of the selection and installation of the appropriate stormwater control BMPs and facilities to remain in place after construction of the project is completed. "Medium" size projects are required to have the totals calculated of all impervious surfaces, pollution-generating impervious surfaces, and pollution-generating pervious surfaces to verify that the thresholds for treatment facilities and flow control facilities are not exceeded. g. Describe the developed site hydrology, as proposed. Indicate whether stormwater will be fully dispersed (i.e., per BMP T5.30 in the Manual) or, if not, what types of stormwater flow control will be utilized for the site or specific threshold discharge areas within the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. Stormwater will be fully dispersed per BMP T5.30.Cleared and/or developed areas are 17500 SF,or 8%of entire site.92%of site is maintained in native and forested condition. Proposal is for less than!ODD sf of impervious surfaces,or less than.5%(one-half percent)of the site. Roof runoff will be handled with dispersion trenches. 10. If the project requires the use of stormwater treatment facilities, describe the types of stormwater treatment facilities proposed for use on the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. [This is normally for"large" projects or projects that involve the potential for dispersion of contaminants.] Our proposal does not include stormwater treatment facilities, 11. Describe the performance goals and standards applicable to the project. Our entire design approach has been to impact this sensitive site in as positive a way as possible.Our construction is lightweight with a minimal footprint. Our intention is to maintain as natural a runoff pattern as practical,while diverting stormwater away from steep bluffs. Steep bluffs will be further protected by native planting buffers near the edges. 12. Describe the flow control system. Stormwater will be fully dispersed on the site. 17- 'C 1177 ) a, stormwater site plan template.doc—rev.10/12/2003 6 • • 13. Describe the water quality system. Dispersion trenches will be gravel filled,wrapped in filter fabric and top protected with fill and/or larger rock.Native plantings on all slopes will provide erosion control. 14. Describe the conveyance system analysis and design. Design is simply collection trenches at the yurt drip line,and at shed roof downspots,running via drainage trenches to dispersion trenches and/or to forested flowpaths. 15. Describe the source of fill material, physical characteristics of fill material, and deposition of excess material. No fill will be required.Any excess material to be removed via truck by dirtwork contractor,most probably to his other dirtwork projects within this development. 16. Proposed methods of placement and compaction consistent with the applicable standards on Appendix Chapter 33 of the Uniform Building Code. Foundation piers will be placed on undisturbed earth,with adjacent fill to be placed and compacted by hand,in small lifts. Driveway and parking area gravels will be placed by truck and hand roller compacted. 17. Describe the proposed surfacing material. 3/4"basalt rock from Shine Pit. 18. Describe methods for restoration of the site. Primarily,construction is being kept to minimum,using very light construction.we do not anticipate any restoration will be required.No roads or driveways are proposed,due to the steepness of most of the property.The existing road ends at the gravel parking area. Foundation will be concrete piers,excavated and placed by hand. Trenches for utilites and drainage will be done by the smallest excavator possible. All disturbed ares will be replanted with native plants, covered with mulch tor erosion control,or planted with clover. 19. An Operation and Maintenance Manual is required for each flow control and treatment facility. [This is normally required for "large" projects only and only those for which facilities are required to control flow or treat runoff.] If included, list the Manuals here. N/A 20. List here and include any special reports or studies conducted to prepare the Stormwater Site Plan. Geotechnical Report from Stratum Group,October I,2007 21. List other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals include conditions that affect the drainage plan or contain more restrictive drainage-related requirements, describe those conditions or restrictions here. Septic permit#SEP-91-00374 installed and finalled in 1993. RECEIV] J O C T 1 5 2008 stormwater site plan template doc-rev.10/12/2003 )) ccnn rr !!�� r 7 • • CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (SWPPP) The Construction SWPPP addresses sediment and erosion control during construction. The BMPs indicated by the applicant in the template that follows must be installed on the ground during all construction phases of the project. The proponent is responsible for preventing sediment and erosion impacts to environmentally sensitive areas and off-site areas. Consult the Construction Stormwater Pollution Prevention (SWPP) Best Management Practices (BMPs) Packet for guidance, particularly with rural residential development. SECTION I—CONSTRUCTION SWPPP NARRATIVE 1. Construction Stormwater Pollution Plan Elements. Describe how each of the Construction SWPPP elements has been or will be addressed. Identify the type and location of BMPs used to satisfy the required element. If an element is not applicable to the proposal,justify in writing. Descriptions of the 12 Elements are found at section 2.5.2 of the Manual (beginning on page 2-15). 12 Required Elements—Construction SWPPP 1. Mark Clearing Limits. We do not anticipate clearing beyond the existing old clearing,which is defined by the edges of the forest. There will be limits marked for the landslide hazard buffers. 2. Establish Construction Access. Construction access is via existing Rhododendron Drive,which ends at the south boundary of this parcel.Our parking area at the end of the road will be graveled as one of the first construction actviities. 3. Control Flow Rates. Dispersion trenches located and sized to accomodate flow,per BMP 5.30 4. Install Sediment Controls. Groundcovers,mulch,and native plantings on slopes.Dispersion trenches to be lined with filtration fabrics. 5. Stabilize Soils. Native plantings and roughening on slopes,clover plantings at level areas,gravelled and mulched footpaths,gravel installed on parking area.. 6. Protect Slopes. Steep bluff slopes and existing shallow failure areas to be protected by native plant buffers. Stormwater to be directed away from steep slopes.New slopes at building pads to be protected by roughening,native plantings and bark mulch groundcover. 7. Protect Drain Inlets. N/A;there are no drain inlets 1 ,.r1 y stormwater site plan template doc-rev.10/12/2003 8 if-f t r ; 1'`t^ • 12 Required Elements—Construction SWPPP(continued) 8. Stabilize Channels and Outlets. Dispersion trenches will be lined with filter fabric,and filled with clean washed sewer rock. 9. Control Pollutants. Portable toilet will be installed and remain in service throughout construction.Bark mulch will be on site for erosion control,and can be collected, removed and replaced if required. 10. Control De-Watering (the act of pumping groundwater or stormwater away from an active construction site). Any stormwater requiring pumping will be allowed to filter down through the forested floor via native flowpaths. 11. Maintain Best Management Practices (BMPs). All owners and workers will recieve instructions on site management.Owners will be on-site at all times during construction. 12. Manage the Project. Owners are constructing this project largely with their own labor and will be present at all times during construction. 2. Adjacent Areas. a. Description of the adjacent areas that may be affected by site disturbance (e.g., streams, lakes, wetlands, residential areas, roads). Both adjacent parcels are approximately the same acreage as this one(5 acres)and undeveloped. b. Description of the downstream drainage path leading from the site to the receiving body of water(minimum distance of 400 yards). This site and both adjacent parcels drain into Dabob Bay via native forested flowpaths. Water drains to the south via a valley to the Bay.The shoreline is approximately BOO feet(200 yds)from the building site. 3. Environmentally Sensitive Areas. a. Description of environmentally sensitive areas that are on or adjacent to the site. This parcel is a mapped landslide area and the west boundary is the shoreline of Dabob Bay. stormwater site plan template doc—rev,10/12/2003 9 i b. Description of special requirements for working in or near environmentally sensitive areas. All work to be contained within prescribed setbacks for landslide hazard. 4. Erosion Problem Areas. Description of potential erosion problems on site in the context of the characteristics of the on-site soils(e.g., erodibility, settleability, permeability, depth,texture, soil structure). Steep slopes at shoreline bluffs,as addressed in attached Geotechnical Report from Stratum Inc. 5. Construction Phasing. a. Construction sequence Buffer Planting,Grading, Slope planting,Parkins gravel installation,Utility trenching,Site drainage trenching, Yurt foundation,Shed foundation,Shed framing, Roofing,Yurt install,Rough plumbing,Rough electrical,Exterior finish,Landscaping,Finish electrical,Finish plumbing,Interior finish. b. Construction phasing (if proposed) Buffer plantings will be done at least one growing season before any other work is undertaken. 6. Construction Schedule. Wet season is October 1 through April 30(page 2-21 of the Manual). Provide a proposed construction schedule. North buffer plantings 2008,West buffer planting early Spring 2009,Grading/Site prep B trenching late Spring 2009,foundations,framing and yurt install Summer 2009,Landscaping Fall 2009. II. Wet Season Construction Activities. a. Proposed wet season construction activities. None b. Proposed wet season construction activities for environmentally sensitive areas. Hand planting of buffer area in early Spring(February-March) 7. Financial/Ownership Responsibilities. a. Identify the property owner responsible for the initiation of bonds and/or other financial securities. Jim Olney B Leslie Toussaint,Bob and Vivian Zirk b. Describe bonds and/or other evidence of financial responsibility for liability associated with erosion and sedimentation impacts. Personal responsibilty of owners listed above. 8. Engineering Calculations. Provide Design Calculations on a separate sheet for the following, if applicable. a. Sediment Ponds/Traps. N/A b. Diversions. N/A c. Waterways. N/A d. Runoff/Stormwater Detention Calculations N/A IR la,; it� I,TE D O C T 1 5 2003 stormwater site plan template.doc—rev.10/12/2003 10 tfir1 • Stormwater Site Plan Changes If the designer wishes to make changes or revisions to the originally approved Stormwater Site Plan, the proposed revisions shall be submitted to DCD prior to construction. The submittal shall include substitute pages that include all proposed changes, revised drawings showing any structural changes, and any other supporting information that explains and supports the reason for the change. Final Corrected Plan Submittal If the project included construction of conveyance systems, treatment facilities, flow control facilities, or structural source control BMPs (not standard on-site stormwater management BMPs), the applicant shall submit a final corrected plan ("as-builts") when the project is completed. These should be engineering drawings (stamped by a licensed civil engineer) that accurately represent the project as constructed. APPLICANT SIGNATURE By signing the Construction SWPPP worksheet, I as the applicant/owner attest that the information provided herein is true and correct to the best of my knowledge. I also certify that this application is being made with the full knowledge and consent of all owners of the affected property. (? ),=1 a(41 ld)1/fr' /C L NDOWNER OR AUT RIZED REPRESENTATIVE SIGNATURE) (DATE) THIS SPACE MAY BE USED FOR ADDITIONAL NOTES, IF NEEDED: stormwater site plan template don-rev.10/12/2003 I 12 / l / •110Ui, u� 111'111� ti