HomeMy WebLinkAboutBLD2008-00460 • S
CERTIFICATE OF OCCUPANCY
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
(360)379-4450 FAX (360)379-4451 (800) 831-2678
PERMIT #: BLD08-00460
SITE ADDRESS: 92 BAYCLIFF DR Issue Date: 02/19/2009
Final Date: 1/13/2010
APPLICANT: SHARON M CARTER PHONE: 360-308-9485
PO BOX 3615
SILVERDALE WA 98383-3615
SUBDIVISION: KALA POINT#3 Block: Lot: 234
PARCEL NUMBER: 965000036 Section: 27 Township: 30 N Range: 01 W
PROJECT DESCRIPTION: NSFR W/ATT GARAGE & A/G 250 GAL PROP TANK
THE PROJECT LISTED ABOVE COMPLIES WITH THE REQUIREMENT OF THE BUILDING
CODE 2006 EDITION.
OCCUPANCY GROUP: R-3
TYPE OF CONSTRUCTION: 5N
SPRINKLER SYSTEM yes o
THE PROJECT PASSED ITS FINAL INSPECTION AND RECEIVED FINAL SIGN OFF ON 1/13/2010
I:\F_BLD_Occupancy.rpt 10/29/19
Jefferson County Building Asion Permit Null: BLD08-00460
Applicant: CARTER
BUILDING PERMIT INSPECTION APPROVALS applicable Code: 2006 International Building Codes
To schedule inspections, call (360)379-4455 no later than 7:00 AM the day of the inspection.
Requests received after 7:00 AM will not be scheduled for that day's inspections.
ELECTRICAL PERMITS are issued by the Washington State Department of Labor& Industries.
The electrical permit must be signed off by the State Inspector prior to the County's Framing Inspection
Inspection Item Date Approval Signature Notes
Setbacks 3''20
/0
9 Oi Minimum setback from Baycliff Drive and Brookhaven Place
✓JC• rights of ways shall be 20 feet. Minimum north and east yard setbacks
shall be 5 feet.
Erosion Control SEE CONDITION 2 FOR STABILIZATION OF CONSTRUCTION
ENTRANCE.
Foundation Footing
3b0/107 "t‘ 1-0/61/C
Footing Drains d H'
Foundation Stem Wall 3/3%/0? !—
Underground Plumbing
Under Floor Framing
Straps(hold downs)
Ext. Shear Wall Nailing _277_0 4 I,,
Rough-in Plumbing
Framing
Airseal
f�-24—01
Insulation: Walls
Insulation: Floors
Insulation: Ceiling
Int. Shear Wall Nailing
Wallboard Nailing r
.7/tQq '
Gas Line: Interior (27/Ocr
Gas Line: Exterior
Propane Tank
Heat/Chimney Clearance
Drywell/Alt Drainage SEE CONDITION 3 FOR STORM WATER CERTIFICATION
REQUIREMENT BY ARCI IITECT.
Address Posted
FINAL INSPECTION 10\`D M se-6 -fr) r SQf*ic
FINAL INSPECTION MUST BE APPROVED PRIOR TO BUILDING BEING OCCUPIED
THIS PERMIT IS VALID FOR ONE YEAR
tUILDING PERMIT APPLICID Review N ML Ty 446
Type: I
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT#: BLD08-00460 Received Date: 10/22/2008
SITE ADDRESS: BAYCLIFF DR
OWNER: SHARON M CARTER PHONE: 360-308-9485
PO BOX 3615
SILVERDALE WA 983833615
KALA POINT#3
SUBDIVISION: Block: Lot: 234
PARCEL NUMBER: 965000036 Section: 27 Township: 30 N Range: 01 W
CONTRACTOR: PHONE
PHONE:
REPRESENTATIVE: PHONE:
PROJECT DESCRIPTIOP NSFR W/ATT GARAGE & A/G 250 GAL PROP TANK
TYPE OF WORK RES SQUARE FOOTAGE:
TYPE OF IMP NEW MAIN: 1,893
VALUATION 280,000.00 ADD'L: HEAT TYPE: PRO
CODE EDITION: 2006 HEAT BASE: HEAT TYPE:
OCCUPANCY: R-3 UNHEATED: 195 #OF STORIES:
OCCUPANCY:
CONST TYPE: 5N OTHER: SHORELINE:
CONST TYPE: GARAGE: 567 SETBACK:
DECK: 465 BANK HEIGHT:
SEWAGE DISPOSAL: CON
WATER SYSTEM: KALA PT
BEDROOMS: BATHROOMS:
Exist: 0 Exist: 0
Prop: 2 Prop: 2
Total: 2 Total: 2
Routing Date:
1
Type Amount Paid By: Date: Receipt: Approved/Date
Permit $2,001.75 LYK 10/22/08 102858
Plan Check $1,301.14 LYK 10/22/08 102858 AJDpRcJVE[)State Building Code $4.50 LYK 10/22/08 102858
Potable Water Application $59.00 LYK 10/22/08 102858 FEB iq 2009
Total: $3,366.39
Jefferson County Planninf
& Building Department
• •
CONDITIONS for Building Permit# :BLD08-00460
1.) THE FOLLOWING MINIMUM LENGTHS (LINEAR FEET) PER 1,000 SQUARE FEET OF
ROOF AREA BASED ON SOIL TYPE MAY BE USED FOR SIZING DOWNSPOUT
INFILTRATION TRENCHES:
COARSE SANDS AND COBBLES 20 LF
MEDIUM SAND 30 LF
FINE SAND, LOAMY SAND 75 LF
SANDY LOAM 125 LF
LOAM 190 LF
MAXIMUM LENGTH OF TRENCH MUST NOT EXCEED 100 FEET FROM THE INLET
SUMP.
MINIMUM SPACING BETWEEN TRENCH CENTERLINES MUST BE 6 FEET.
FILTER FABRIC MUST BE PLACED OVER THE DRAIN RC)CK PRIOR TO
BACKFILLING.
A VEGETATED FLOWPATH OF AT LEAST 25 FEET IN LENGTH MUST BE
MAINTAINED BETWEEN THE OUTLET OF THE TRENCH AND ANY PROPERTY LINE,
STRUCTURE, STREAM,WETLAND, OR IMPERVIOUS SURFACE.
A SETBACK OF AT LEAST 5 FEET SHOULD BE MAINTAINED BETWEEN ANY EDGE
OF THE TRENCH AND ANY STRUCTURE OR PROPERTY LINE.
NO EROSION OR FLOODING OF DOWNSTREAM PROPERTIES MAY RESULT.
2.) CONSTRUCTION ENTRANCES SHALL BE STABILIZED WHEREVER TRAFFIC WILL
BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR
OTHER PAVED AREAS WITHIN 1,000 FEET OF THE SITE.
THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM COMPACTED SUBGRADE.
QUARRY SPALLS (OR HOG FUEL) SHALL BE ADDED IF THE PAD IS NO LONGER IN
ACCORDANCE WITH THE SPECIFICATIONS. (BMP C105, 2005 DOE STORMWATER
MANUAL).
ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED BY
SHOVELING OR STREET SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING
SHALL BE REMOVED OR STABILIZED ON STIE.
ANY QUARRY SPALLS THAT ARE LOOSENED FROM THEE PAD, WHICH END UP ON
THE ROADWAY SHALL BE REMOVED IMMEDIATELY.
UPON PROJECT COMPLETION AND SITE STABILIZATION, ALL CONSTRUCTION
ACCESSES INTENDED AS PERMANENT ACCESS FOR MAINTENANCE SHALL BE
PERMANENTLY STABILIZED.
3.) PRIOR TO FINAL BUILDING OCCUPANCY, PROPONENT SHALL SUBMIT A WRITTEN
LETTER FROM JOHN CURTIS WOLFE (REGISTERED ARCHITECT) STATING THAT
THE STORMWATER FACILITY HAS BEEN CONSTRUCTED IN ACCORDANCE WITH
THE REQUIREMENTS OF THE "STORMWATER TRENCHES"AND "TEMPORARY
EROSION CONTROL" HAS BEEN INSTALLED IN ACCORDANCE WITH THE PLAN AS
SIGNED BY JOHN CURTIS WOLFE AND APPROVED BY THE COUNTY ON
OCTOBER 29, 2008.
4.) PRIOR TO OCCUPANCY & BUILDING FINAL - FINAL APPROVAL OF SEPTIC
SEP07-00354 IS REQUIRED. MUST MEET ALL CONDITIONS OF SEPTIC PERMIT.
5.) A MINIMUM OF 10' MUST BE TAINED BETWEEN BUILDING FOUND/ N OR
FOOTING DRAIN TO THE EDG OF DRAINFIELD/DISPOSAL COMPONENT.
6.) 10' SEPARATION REQUIRED BETWEEN A WATER LINE AND ALL PORTIONS OF
THE ONSITE SEWAGE SYSTEM; EFFLUENT TRANSPORT LINE, TANKS,
TREATMENT AND DISPOSAL COMPONENTS.
7.) To help prevent seawater from intruding landward into underground aquifers, all new
development activity on Marrowstone Island, Indian Island and within 1/4 mile of any
marine shoreline shall be required to infiltrate all stormwater runoff onsite.
8.) The property owner shall comply with Water Conservation Measures (per list maintained
by the UDC Administrator).
9.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water
quality degradation. The submitted proposal does not require additional aquifer
protection measures. However, during construction the project shall follow the Best
Management Practices (BMPs) and facility design standards as identified and defined in
the Stormwater Management Manual for the Puget Sound Basin.
10.) A Stormwater Site Plan has been submitted and approved by the Department of
Community Development. Once the subject permit has been issued the applicant shall
fully implement the provisions of the submitted plan and contact the Jefferson County
Department of Community Development to arrange a schedule to inspect the property for
plan compliance. A Certificate of Occupancy will not be issued until the Department
verifies plan compliance. No clearing for roadways or utilities shall occur on the project
site until clearing necessary for the installation of temporary sedimentation and erosion
control measures have been completed.
11.) Outdoor residential storage shall be maintained in an orderly manner and shall create no
fire, safety, health or sanitary hazard.
12.) Not more than 2 unlicensed vehicles shall be stored on any lot unless totally screened
from view of neighboring dwellings and rights-of-way. Such screening shall meet all
applicable performance and development standards specific to the district in which the
storage is kept, and shall be in keeping with the character of the area. Screening shall
meet the requirements of Chapter 18.30 JCC. Outdoor storage of 3 or more junk motor
vehicles is prohibited except in those districts where specified as an automobile wrecking
yard or junk (or salvage) yard and allowed as a permitted use in Table 3-1 or Chapter
18.18 JCC, and such storage shall meet the requirements of JCC 18.20.100, Automobile
wrecking yards and junk (or salvage) yards. In no case, shall any such junk motor
vehicles be stored in a critical area.
13.) This parcel is within the Kala Point no shooting area per JCC 8.50.
14.) A minimum of two (2) on-site parking spaces shall be provided for the single family
residence.
15.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of
impervious surface which includes roof tops, driveways, concrete, etc.
16.) The building height is not to exceed 35 feet.
17.) Minimum setback from Baycliff Drive and Brookhaven Place rights-of-ways shall be 20
feet. Minimum north and east yard setbacks shall be 5 feet.
18.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the
finished grade, excepting when such lighting is an integral part of a building or structure.
Ground level lighting is encouraged.
19.) Lighting fixtures shall be designed and hooded to prevent the light source from being
directly visible from outside the boundaries of the property. The intensity or brightness of
all lighting, during construction and after project completion shall not adversely affect the
use of surrounding properties or adioininq rights-of-way.
.. JEFFERSON COUNTY
f, ' t DEPARTMENT OF COMMUNITY DEVELOPMENT
` 1 621 She 'ndan Street• Port Townsend •Washington 98368
360/379-4450 • 360/379-4451 Fax
www.co.jefferson.wa.us/commdevelopment
Master Permit Application MLA: LiO
. -IL(
Project Description(include se sheets as necessary): •
Tax Parcel Number. 1 JO '( f)t Property Size:'X'l'7 9l p (acres/square feet)
Site Address and/or Directions to Property: AtreCttD4S di
theld
130-7cc i F ,Die_ (vim for—z' 70t.),tisr.-Af.
Property Owners)of Record: A4ife)(f) (, • pj_
Telephone: Fax email: SY\c go,1 cct s t-e A-- cc, r`CI(r'
Mailing Address: 34, 4 j J ()J �(1 q 0.
Applicant/Agent(if different from owner): ' ' /y
Telephone: Fax: email:
Mailing Address: .
What kind of Permit?(Check each box that applies
461Building 0 Critical Areas Stewardship Plan
❑ Demolition Permit 0 Variance(Minor,Major or Reasonable Economic Use)
%Single Family ISI Garage Attached/Detached 0 Conditional Use[C(a),C(d),or C]*"
❑ Manufactured Home 0 Modular 0 Discretionary"D"or Unnamed Use Classification
❑ Commercial* 0 Special Use(Essential Public Facilities)**
❑ Change of Use 0 Boundary Line Adjustment 2 - ZOn]
❑ Address 0 Road Approach 0 Short Plat** •
❑Home Business 0 Cottage Industry 0 Binding Site Plan'"
2'Propane 0 Long Flat**
❑Sign 0 Planned Rural Residential Development(PRRD)/Amendments'"
❑Allowed"Yes"Use Consistency Analysis ❑Plat Vacation/Alteration**
❑Storrnwater Management 0 Shoreline Master Program Exemption/Permit Revisions**
❑Site Plan Approval Advance Determination(SPAAD)* 0 Shoreline Management Substantial Development**
❑Temporary Use 0 Shoreline Management Variance
❑Wireless Telecommunication* 0 Comprehensive Plan/UDC/Land Use District Map Amendment
❑Forest Practices Act/Release of Six-Year Moratorium 0 Jefferson County Shoreline Master Program Amendment
*May require a Pre Application Conference 0 Tree Vegetation Request
**Requires a Pre-Application Conference
Please identify any other local,state or federal permits required for this proposal,if known:
DESIGNATION OF AGENT
I hereby designate to act as my agent in matters relating to this application for permit(s).
OWNER SIGNATURE Date:
By signing this application form,the owner/agent attests that the information provided herein,and In any attachments,Is true and correct to the best of
his,her or is knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet
may result in this permit being null and void.
I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,Judgments,court costs,reasonable attomey's fees and
expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit.
I further agree to provide access and right of entry to Jeffe • • my and its employees,representatives or agents for the sole purpose of application
review and any requi ter inspections. Staffs a... . and ght of entry will be assumed unless the applicant informs the County i�writing at the
time of the applicati the or she warrior notice M}
Signature: ,r,vtJ
•
Date: (I d- - we
The action or actions Applicant will undertake as a result of the issuan f this permit may negatively impact upon one or more threatened or
endangered species and could lead to a potential"take'of an ends red species as those terms are defined in the federal law known as the
'Endangered Species Act'or"ESA."Jefferson County makes na4ssurances to the applicant that the actions that will be undertaken because this
permit has been issued will not violate the ESA Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your
action(s)even If you are in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual
and non-transferable responsibility for adhering to complying with the ESA. The Applicant has read this disclaimer and signs and dates it below.
Signature: � (✓""
\ .— Date: O�¢ � ,'^) CJ 2/
G:\PegnitCmta\###FORMS###\DRD FORMS\MuterPemrit ' 5-229-08.doc ( ,
• • p
BUILDER STATEMENT V�J ..�
The sign
er of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that
they will be assuming the responsibility of the General Contractor for the proposed pnject.
Signature: Date:
GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: Fax:
( ) ( )
MAILING ADDRESS: EMAIL:
CONTRACTORS LICENSE WAINS
NUMBER
N + PHONE (` —Z.c. ZZFAx:(1:C(p)5,4 ,634.70 •,
410 /ENGINEER: ti�J'
•!LING ADDRESS: 1,,d 6? ) Z.: etu Q. N i A) ` � r wI et I,-)
. `i.
Project Type: Frame Type: Bathrooms: Shoreline: Type off Sewage Disposal:
li, New N. Wood Existing: { 0 Sewer ��
❑ Addition 0 Steel Proposed: Z..... Bank" ❑ Community System _ —
D Alteration/Remodel 0 Concrete Total: - . Height: Individual System
O .Repair ❑ Masonry SEP Permit# :,
❑ Demoliition 0 Other. Bedrooms: Water Supply:
Existing: Setback: ❑ Private well 0 Two Party
Proposed: 7.r ❑ Public )
Type of Heat: Total: Z, — Name of System: j
If this I ommercial Protect you must answer the following: or
Numbe arks : Current _- Proposed: Number of ADA Parking Spaces:T_
Number of occup dude tenants,employees,etc) Current Proposed T
IBC Occupancy. T o ns don: Will you have Food Service? Yes / No T.
If this is a Propane Tank and/or App -Instal`on mark all items below that apply: `S
I Underground Tank Bove ground Tank Size o Tank: -I- <a'--
I Heat Stove I Cook Stove I Woodstove firepiace lnse ' of Water T Ilet Stove i Other y l
Is this appliance being installed in a Manufactured I Mobile Home? No'
When applying for a permit to install a propane tank you must also submit a howing all of ings,all property
lines,tank location and size,distances from the propane tank to all property lines,bui dings and septic system ents,
including the reserve area. , , ,�,w , `}
r^ ^i, q ra. 4` ,] h F cep �x T ~r' L,7 "1,
Square Footage Current Proposed � or C'Tx "Y- �t yt ,PJ 4,101. E i '' "• ),"
Main Floor Heated 1�( }( EH Bld App Review: 1- -�
ea Floor Heated
` ` r:, Consistency Review: c_ ;
7 c
Other Heated • Base fee:• �-;' i
Mezzanine ;4 Additional Section:
f; ,
r ` tf4e� Plan Check fee: .
osl
Heated Basement 7` I\Zt, I 1 rl
Grt ...z 1
Unheated Basement is q ;- . State Surcharge fee:
c. 1
Other Unheated " Pot Water Review fee: ( 1 -
Garage/Carport .,kit.lLi1 • SUBTOTAL `- ,.1
9. Approach fee: r,-it
Decks ` �iQ `r�GQ> J � r/ f.i.-tr.,
Other pr� �t2 C 1t'ZW �c,%Z TOTAL: $' (lf�-=
T'� Receipt Number. '62 c;,r'(�)'
1 lx
Cash/Check Number: 1 1/4T x ESTIMATED COST(REQUIRED) jt ; pate: 7
.Fair market value of all labor and maleiials foundation to,hash
-, . r Initials: �
`` _ i
G:\PermitCcnter\###FORMS###\DRD FORMS\Muter Permit Application 5-29-08.doc John Curtis Wolfe 9 *`C4'Z..9j-'71:--r
20207 23rd Ave NW T, , s‘,y r
�'1/GII�'I..� �, . Shoreline, WA 9817P `
t
r .
IP
Lot 4-, frictim . 17/v .
.asQ cc§, JEFFERSON COUNTY
4 . „ikir A s d.aa
DEPARTMENT OF COMMUNITY DEVELOPMENT:—°:; `i_-
621 Sheridan Street• Port Townsend •Washington 98368""b
Z 360/379-4450.360/379-4451 Fax
http://www.co.jefferson.wa.us/commdevelopment/ - :_;T 2
STORMWATER SITE PLAN SUBMITTAL TEMPLATE
(
MLA# L S I.1 PROJECT/APPLICANT NAME: L/f�,V�Q/� '
-
Please answer all of the following questions to the best of your ability. Where the question calls for depiction on a site map, the
applicant may choose to either incorporate the elements into the general plot plan for the Master Land Use Application or to submit a
separate stormwater site plan map.
Project Overview
1. Describe the proposed developed conditions of the site. Indicate position and relative size of proposed improvements on the
site map.
�t- *t " Lt4 :13(5' reel 41)c,..9 -6,5tiek t un(nO-S
�a.2.1. A 'ZI ,/`114v
Existing Conditions Summary
2. Describe the existing topogrraap�hy. Indicate contours on the site map.t
_I-ViitC31/(44 t
r) LUt74 ,
3. Describe the existing vegetation. Indicate native vegetation areas on ttbe site map.
leM tq t om_ ', -, oto��l�o5t, s„ Il"''k i1,t .vim
C�
4. Describe the existing soils. Indicate soil type on the site map.
k5)(ee".4 644A 'IA OttlieV1 PIP t --' 1
5. Describe the existing site hydrology(I.e.,drainage;behavior of water on the site—above,below, and on the ground). Indicate
existing stormwater drainage to and from the site on the site map. Depict separate drainage basins on the site map, if
applicable,and a reage of each.
APPROVED '
6. Describe any excess levels of noise enerated by the proposed use or actvity: STORMWATER PLAN
t4ee�l 7IfLAI , -0 (
OCT 2 9 2008
Requir d
JEF NT
DEPT.OF TY DE EL P E
stormwater site plan template—rev.t at/2003 SIGN ATI 5
1
1
III 11111
7. Describe significant geographic features and critical areas (i.e., environmentally sensitive areas such as wetlands, streams,
steep slopes,etc.)on the site. Indicate location on the site map. ) �}
h4 . O pan 1 �� _ (-011 w lti 4l t -.04,J-
8. Describe the general vicinity of the site,including adjacent land uses and structures, utilities,roads,and sensitive/critical areas
(streams,wetlands lakes steep slopes,etc.).
1/Ir-i :; - ) i 1 (aIAlir , 'le--Is totln pi g, d 1.
t tAitve vc)(314 rb 1 tqes
Permanent Stormwater Control Plan
This portion of the Stormwater Site Plan consists of the selection and installation of the appropriate stormwater control BMPs
and facilities to remain in place after construction of the project is completed.
'Medium' size projects are required to have the totals calculated of all impervious surfaces, pollution-generating impervious
surfaces, and pollution-generating pervious surfaces to verify that the thresholds for treatment facilities and.flow control
facilities are not exceeded.
g. Describe the developed site hydrology,as proposed. Indicate whether stormwater will be fully dispersed (i.e., per BMP T5.30
in the Manual)or, if not,what types of stormwater flow control will be utilized for the site or specific threshold discharge areas
within the site. Locate these facilities on t e site Ian and differe iate•)roposed facilities from xisting facilities.a
frill, c tP[ 1 i° :l 'j' . ,t ct s L.A3111
riV,tc ' t c ra,4e - =5 I Oil" '<, US) 9
10. If the project requires the use of stormwater treatment facilities,describe the types of stormwater treatment facilities proposed
for use on the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. [This is
normally for'large'projects or projects that involve the potential for dispersion of contaminants.]
INIA.,
11. " 1 Describe
be the performance goals an standards applicableto the pro ect.
i s t ° (1-2'a �1� e- /limo-I-. v (t �f : ( Baal
-tv Ilte-' ' t pttqlovvairy RAA4 re.- C,VAie Iv i-(- eturaz..
12. i Des be the.flow co trol syst m. .4
F littlidtMATints . IA I ) 41 Z. Z,c A ' etivl loe - - 1)?Nii\
. , .L , . _ . r..sti":vel ric-V,( etta 4foluki .- /4(..A.A
3 1
t 1
f i
R
j
i a. y
atamwateralte plan tamplate.doc-II 10/12/2093 ;i 6
r
0 •
13. Describe the water uality system.
zrit. �L9Ir4 e � �� <4,/i l 014441.5a1
14. Describe the conveyance system analy is and design. } ,
1 A jrL( -14�,q�4 _ 131iil-�
4" iiivrilt1 ,4;191.01r vil 'etilet rVe--niciliiiri2 * C--aWtt'7 .0447-- -14 tki-5 4-"4,15. Describe the source of fill material,ph sical ch racteristics ofiittmaterlal,and deposition of xcess material.
___C. 1�L � t,� U 1a1 s AA (MA �� -2014 -
16. Proposed methods of placement and compaction consistent with the applicable standards on Appendix Chapter 33 of the
Uniform Building Code.
61di-g Advt) etiAA6Cer H. ( 457 ti4v- Itzke cak,ci 606.4 . pire_1-.25--01fe
cictv
s� J2 _
17. Descri e-prroposed surfacing material. &
v 18. Describe methods for restoratio of the site.
� Wit° k9; Jiro6_ , tkt Y / iL L? 6tA ' ,tom/
.it f5i4jItit-''
19. An Operation and Maintenance Manual is required for each flow control and treatment facility. [This is normally required for
"large"projects only and only those for which facilities are required to control flow or treat runoff.] If included,list the Manuals
here. 1\142c
20. List here and include any special reeorts r studies conducted to prepare the Stormwater Site Plan.
AID_ �s [ram )I`r4
21. List other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals include
conditions that affect the drainage plan or contain more restrictive drainage-related requirements,describe those conditions or
restrictions here.
6f` 1 je
<4r&i4A1 prihml 44 Irr.--ierVQ., _),r'4fil/)49 ,_›
stormwater site plan template—rev.10/12003 .
7
r ,
•
12 Required Elements—Construction SWPPP(continued)
8. Stabilize Channels and Outlets. ,
�ZI►ft (Vie 'jl ,vcov4 dAz4o, d emajpit 6944
9. Contr I Pollutants.
•
10. Control D Watering(the act of pumping groundwater or stormwater way from an active construction site
IAA . fs 1idel -P.1( �c�► �l�( ��
11. Maintain Best Management Practices(BMPs). •
1-
919
12. Manage the Project.
2. Adjacent Areas.
a. Description of the adjacent areas that may be affected by site disturbance (e.g., streams, lakes, wetlands, residential
areas,roads). ,
ovoliz4
b. Description of the downstream drainage path leading from the site to the receiving body of water(minimum distance of 400
yards). ,
C't zev:DI t Cu/A (Y12.-
3. Environmentally Sensitive Areas.
a. Description of environmentally sensitive areas that are on or adjacent to the site.
stormwater site plan template—rev.10/1/2003 9
• .
•
b. Description of special requirements for working in or near environmentally sensitive areas.
'RA
4. Erosion Problem Areas. Description of potential erosion problems on site in the context of the characteristics of the on-site
soils(e.g.,erodibility,settleability,permeability,depth,texture,soil structure).
•
'.10 y -6 (,tom 1-0;4 . 01 .2UtA ). (,) // ido tJ ! 1�`
'.�. �� t. c �, ... 1 I i Ma '1 -u e' 1. .
5. Construction Phasing.
a. Constriction sequence `
ag-c4,1/14.1, .mac it/,biA , t-3Uc ter/ , be/M(`+f/, f
b. Construction phasing(if proposed)
6. Construction Schedule. Wet season is October 1 through April 30(page 2-21 of the Manual).
1. Provide a proposed constructs n chedule.
664.w,ww?MLF A 3 7-
II. Wet Season Construction Activities.
a. Proposed wet season.construction activities.
b. Proposed wet season construction activities for environmentally sensitive areas.
7. FinanclallOwnershiP Responsibilities.
a. Identify the property over responsible for the initiation of bonds and/or other financial securities.
trr7(A Kett/!
b. Describe bonds and/or other evidence of financial responsibility for liability associated with erosion and sedimentation
impacts. /
crov
8. Engineering Calculations. Provide Design Calculations on a separate sheet for the following,if applicable.
a. Sediment Ponds/Traps.
b. Diversions.
c. Waterways.
d. Runoff/Stormwater Detention Calculations
10
stonnwater site plan template.doc-rev.10/12/2003
0
SECTION II—EROSION AND SEDIMENT CONTROL PLAN
Sediment and erosion control measures may be depicted on the master land use application plot plan,a stormwater site plan,and/or a
separate Construction SWPPP.site plan. This is a checklist to ensure that the following are depicted on a site plan:
1. General.
'r a. Vicinity Map ,
b. Jefferson County Approval Block S C.e 441462
\,c. Erosion and Sediment Control Notes
2. Site Plan.
a. Legal description of subject property.
' b. North arrow.
c. Indicate boundaries of existing vegetation(e.g.,tree lines,pasture areas,etc.).
— d. Identify and label areas of potential erosion problems.
Pek e. Identify FEMA base flood boundaries and Shoreline Management boundaries(if applicable).
f. Show existiiiy and proposed contours.
g. Indicate drainage basins and direction of flow for individual drainage areas. /lam,
h. Label final grade contours and identify developed condition drainage basins.
'N:i. Delineate areas that are to be cleared and graded.
N j. Show all cut and fill slopes indicating top and bottom of slope catch lines.
3. Conveyance Systems.
N, a Designate locations for swales,interceptor trenches,or ditches. —
1
IstA b. Show all temporary and permanent drainage pipes,ditches,or cut-off trenches required for erosion&sediment control.
• tsiok c. Provide minimum slope and cover for all temporary pipes or call out pipe irtt rts. ,
i
1. d. Shows grades,dimensions,and direction of flow in all ditches,swales,culverts and pipes.
e. Provide details for bypassing off-site runoff around disturbed areas a (;{, / - j...,,,i
M4 f. Indicate locations and outlets of any dewatering systems. i
1
-- 4. Location of Detention Best Management Practices(BMPs). Identify location of detention BMPs. '' ` ,_,,i
5. Erosion and Sediment Control Facilities. . " "
a. Show the locations of sediment trap(s),pond(s),pipes and structures. Atre,v ( 4 ,Kr �
r
b. Dimension pond berm widths and inside and outside pond slopes. �► ' r '
c. Indicate the trap/pond storage required and the depth,length,and width dimensions.(`A
d. Provide typical section views through pond and outlet structure.
e. Provide typical'details of gravel cone and standpipe,and/or other filtering devices.
f. Detail stabilization techniques for outlet/inlet.
g. Detail controVrestrictor device location and details. NA
h. Specify mulch and/or recommended cover of berms and slopes. m�k� saw/�/„M�
i. Provide rock specifications and detail for rock check dam(s),if applicable. ` ""C'
�/j. Specify spacing for rock check dams as required. 2 /
k. Provide front and side sections of typical rock check dams. /
I. Indicate the locations and provide details and specifications for silt fabric. �-
.-
\/m. Locate the construction entrance and provide a detail.
6. Detailed Drawings. Any structural pragtices used that are not referenced in the Ecology Manual should be explained and
illustrated with detailed drawings.
\ 7. Other Pollutant BMPs. Indicate on the site plan the locations o1'BMPs t be used for the control of pollutants other than
��/ sediment(e.g.,concrete wash water). fk(1-P-rE2 (.a. 0
8. Monitoring Locations. Indicate on the site plan the water quality sampling locations to be used for monitoring water quality on
the construction site. Sampling stations should be located upstream and downstream of the project site. Nit
stormwater site plan template—rev.10/12003 «
• •
Stormwater Site Plan Changes
If the designer wishes to make changes or revisions to the originally approved Stormwater Site Plan, the proposed revisions shall be
submitted to DCD prior to construction. The submittal shall include substitute pages that include all proposed changes, revised
drawings showing any structural changes,and any other supporting information that explains and supports the reason for the change.
Final Corrected Plan Submittal
If the project included construction of conveyance systems,treatment facilities, flow control facilities,or structural source control BMPs
(not standard on-site stormwater management BMPs),the applicant shall submit a final corrected plan(`as-builts')when the project is
completed. These should be engineering drawings (stamped by a licensed civil engineer) that accurately represent the project as
constructed.
APPLICANT SIGNATURE
By signing the Construction SWPPP worksheet, I as the applicant/owner attest that the information provided herein is true and
correct to the best of my knowledge. I also certify that this application is being de with t full kn dge nd consent of all
owners of the affected property.
( • �s rNER OR AUTHORIZED ESE TIVE SIGNATURE) (DATE)
THIS SPACE MAY BE USED FOR ADDITIONAL NOTES,IF NEEDED:
stormwater site plan template.doc—rev.10/12/2003 12
r
eLl." ----811446*441A1-6-1.44.4—v -l'L,,--7-7--
..._________________\iii)k.......________________________
tr . .
0 0 Yam.
•
•
���`T' �.G�1 +
• ny•••••• (10 e
• /.d o1 l •
. •
• ..
,...,,t
...... ‘. ..
.. .
,,,, , ,,
..,
.11-.-t,‘,. . . . .
. ,. ...„x„,,... •.,
so--7
.....,_______„ ,, __ 7•_.\ _ _ '‘..1 .9..c::, „„_..0t!f....kry,A,1*,. 4-,...-_, ,.
1 IN•N ,. \Iv \\ il \ : '
1-.\.
i zu111":- . -\ ' \...1-6--'•'
1 0 --',
J .o .
iI
•
' � .0 lj .., -'
- \ Q � Q ' ` Q
f/ * ���''
‘...a.• \11 . CP •lirP -i.l' ' •
. • . .. . •
GI
_ E
:_._ . ,,, ,
, il(
( Lk., • .A \ ,
kg- , ..M. '..,,4' -. , e '4,' ii. '' .:' : ,•s' :i
i 0 Mil: ''.___...----;" " • 11101,141i .;, --dik ,r‘
. -.. 1 /.45-- - II %
- • �'-
•
K... • ..... . 0i4 �• 0 . ... .
C.. __---- • --tr' st " ..
SN
\ 1
c \
. 4. c,v .,, . 1 1\ 1 •,../',. P..T. ..kl 0
Lg W •X"ti \ f
4
c-- _.._ dAp-ori-
!.,.. ,. .,
4.4 ...* .• -e . . e'
. ' 4.- if • ... ki\"b• ' •
• ....:.... i it. ,4,1,1\ t -- ' ..)k .
J VI4ip'v .. �.
ii.
r ,,•' /'•• ./Jr.., 01, 1 1*.I.I /7. .. �/
t
( • u 4.........
„„av,r, . .
fru-
. c---- ..
. •
. 1 . ,1•
.4_,‘
ov .40 4t.. a4A!
C /-----
.. ,, % (00,0„.. ,
.. „, .
. .
n.
r .0 .40
P ZmXm � p - ° a
' c ______---\ • P, -\---- - ., 1 .
� 7
• ,r ° 330 mm ,. o
. O .
� � � oZ .10
rnram " N � V� �
, : b O2 U� Zo o
r o cno m GI 73 co
r, liPi, 8 co r � mmo N cm -1ZO XI
c , lkik -yr;
oo
,r �► ,, ? ° to
Ti � ce _ , - n
`•+ 0 .)O Z Z
w I
61 - e u S 0cz — • M r? 5 1). g p (efl ia .0 w p K w
0 _..
. 0 g a =
t� I ice. -1 c m = k
�- - \ . . can
_
,1
•
t. (o'o" I z'.o" lik��'v' 1111
t •
1 C.) zbxe=.
N '
V-414 ..K1/4 .'
VT N
,, N V` r
11 z¢:o• k 16:z` ' 4-:b" ` I'I s,tp 't - •
N.
Q 1!4 ` V,1p .. N. I3.e." ‘ 4:Iv" ‘
a
f ,..k,„ "--
CI
: 4_, -14- 1- i; 4.-,
• 1 -4 #4- -•:-,4,_.. r k',)" - 1 1 1...- -., - - k-, - ---L--0-;•--,_, ,, ---\ 1,' * 1 4-• oi
4 .._
%,k-'A- •-• -N 1 .13. 'i 16 I ---T:-. ' - ;it: , -I,
‘).4.4. . -\ $: ! / 4 ,, \v. .' ! , v.1 / 1 , .1,,_.
,t , vl
-.\ tk 1 • i DTT-7
-. . - 1 - IL
irc----- 0a
_q. 4 * W. �C\ �1¢, •`+za *: ram,* -13 ` : .I
z.
%, . i,..- Tr 4.-_____,... A LjL i ________1:: .
R
..,1, __\ , .
,, i'i-*-\\I 4 t
1# - _,,, .1).
—
'f'ca�Nz sf':ro" 11 -'2'•`bio01 Imo'` •• 1 N _ It
4 '.4-"
-tt 2,, A 0
\-- II F2 ..r. -
" -3% !-.-r.) k 4". IT Xi - 14 ler.. .7i'A A i —
IrTh
,� . -cam= L _ ` 1 P I I` ; 4
m 2 W o s- : Q Z. — BSI- 7 4b.;.—._ P. c
T 1 . �- off, 1 1 OA. '' •
�css s
N o x�NE ON 0 D
0"�93 `'�NSpm �w-, t� D (� (� - _�
�A;z ohm e r J �1 V V ,n` +'
Npp0 (®c�ZOO� ZT� 0 Y. � ' ��I 1 u I I .. 1 ��— ` '... _.... .._............._._ _-_
E-92 pPc.•T9J i. T 8•!e �Ci•n J ci•ly f¢' ;�i \1i( ` /�1•�..
IVA I,nzi g-COTEO NA n \ _- IIO:bn I - 1P' l+!ieri" \ 1'��b4 Zi'r
AAOz y o00 0,= D O
y m . of r 4;. - f
A m m m'v r'III
A Gti.-rtz. (P)Clf (& —— F IIII.@�(a•` ►J
E z SNam m d T
�lr (n V
mo p N oO . ; I .
x Z rC)m ..]At
N �I _I 1
T
Z •
ri
111
...._. . ......• •
•
1
\._`../ /1) L„Y .4,"--), (.>"' ,/"..\) C:., ' .1_ (,.,.V..,/ ,e'41C-I''' g--;)a-, ,
, .
1
„,--.
. I
r . .
/11.-
-...
... .
L.,, /
tl
,..
. . .
.„.
i
,,,, •
„„-
ly
.. -....
(,.1_, . , _
4../.
dr 1,.. ,
• it.* eto et-E610(4-
1t
fettrio{%. ig-
44 -, ...
me./...4.A.f4..t.. ..
'...
giC;(441 .- -.... .......
.../
. i r —.
\)'' \am..i. oste. ukfeitz- /
1 /. ii ) 4 --rc4L4L'f.'6k
zt ,,v›. ...-
441t-t-44, ---• ..ik 'ir 1
I .
,
.....S
.,....',
i .
z.J.,..i :-_- ,„) .....--. 1,-);• ,-. - //I
11.
'
'1.A
i-
1 _ ,• '4'
1
i
11*
r ,
...:
. .
--,'; I
i
. 1±1.. ..,. \....
! •
i I
.„.. .. .
' I
t L,
L.....,• / ., , ....._ , . , ,,$)./.\.) .,
de
1 till:.
, • ! ,v,,
, • i
,-- '. '
_I!.-4 I ! •:
••
I 1
+._____4-,..1:,____4,..,
i .I '
.,.
_ 1
;•_z c , 1
I :1 L----
_..
r
. -
. .
. 7::' 1 3 F: irifil Ni T
r43 r in,A r, 7
CO' TRUCTION STORM WATER POL' 'TION PREVENTION
The object of this narrative is to provide a comprehensive overview of the
storm water pollution impacts of the Carter Residence to be built on lot 234, Kala
Point Division 3, Jefferson County Washington.
The lot is predominately wooded with a forest carpet of salal bushes. It
slopes down fairly evenly from west to east at 15%.
The drive, home, primary septic system, storm water infiltration trenches
and associated grading will have an extent of clearing covering approximately
14,200 SF or 49.3% of the lot.
The lot will be accessed from Baycliff Drive approximately 125' downhill
from the monument marking its intersection with Brookhaven Place. The
construction/ driveway entrance will have a 20' length of 12" diameter CMP set in
a 12" deep bed of 7/8" crushed rock and be topped with 12" minimum of 4%6"
quarry spalls. The CMP minimum outfall is on an 18" deep bed of 4"-6" quarry
spalls T wide and 6' long. A temporary sedimentation trap of herringboned straw
bales will be set 5' downstream from that.
The construction entrance will be a 15' wide by 50' long area of 4"- 8"
quarry spalls 12" deep on a layer of geo-fabric able to withstand concrete truck
loads of 400 psi minimum. The construction entrance will be cut with a minimum
2% grade side to side and storm water will be controlled by filter fabric fence at
the extent of clearing.
BEST MANAGEMENT PRACTICES
ALL PROJECT MINIMUM REQUIREMENTS
Before construction the extent of clearing or ground disturbance will be
clearly marked on site by either plastic flagging or filter fabric fencing per plan.
Flow rates of storm water will be controlled by filter fabric fences downhill
of the driveway, foundation excavation and stockpiled back fill material.
The foundation excavation will be day lighted at the northeast corner and
storm water flow from the hole will be monitored such that flows do not
overwhelm the filter fence. Straw bales will be kept on site in dry condition to
impede heavy flow from the hole by dramatic rainfall.
Stockpiles of backfill material will be protected by weighted plastic tarps.
Storm water on exposed soils within the disturbance area incidental to the
building pad will flow into filter fabric fences protecting the primary and reserve
septic fields.
Exposed soils incidental to excavation and grading will be protected by a
combination of mulching and seeding. Chipped site vegetation a minimum of 2"
deep, straw bales spread at a rate of 3 bales per 1,000 SF and native grass
seeds will be used.
Storm water flow in the existing roadway ditch will have a rock check dam
downstream of the new construction entrance/ driveway.
Filter fabric fences protecting undisturbed slopes downhill from the extent
of ground disturbance will be maintained during construction.
No pollutants other than soil sedimentation are expected. Control of
sedimentation will be accomplished by filter fabric fencing plus straw bales if
needed in dramatic rain events.
Concrete truck wash will be limited to an area east and adjacent the drive.
Filter fabric fencing will protect the roadside ditch.
An emergency supply of filter fabric fencing and stakes, straw bales, 6 mil
plastic sheeting, petroleum spill detergent and absorbent will be kept on site.
No de -watering components are necessary. Although the total disturbance
area is large, the separation of the drive, building pad, terrace grading, septic
and storm water infiltration components plus their successive execution over
time protect neighboring properties from unnatural hydrological changes with the
simple preventive measures described.
PERMANENT STORM WATER RETENTION/ INFILTRATION PLAN
The following permanent storm water management plan is described
uphill to downhill, west to east.
Terraces uphill of the garage will be graded back toward their respective
3' landscape block retaining walls at a minimum of 2%. The curving base of the
retaining walls will slope downhill at a minimum of 2% providing at least 100' of
vegetated Swale before exiting onto adjoining property.
The concrete drive and walkway will be graded at 2% minimum side to
side. The 17'of concrete drive between the paved street and property line will
drain east into the existing ditch. A steel grated trench drain in the driveway at
the property line will intercept 800 SF of driveway drainage which will then flow
into a plastic yard drain. 4"0 PVC tight line pipe will convey that water another
plastic yard drain and into 24' (see figure 3.2) of gravel filled infiltration trench.
The western terrace immediately adjacent the rear of the garage and
western side of the residence will be graded 2% minimum to the north such that
flows from dramatic rainfall will travel away from the structure.
Footing drains are 4" O perforated PVC set in 1-1/2" washed gravel with
filter fabric protection. Footing drains connect with downspout drains downhill of
the crawlspace.
All downspouts are 3"x2" metal draining into 4"0 PVC tight line with clean
outs.
Footing and downspout drains ultimately enter infiltration trenches via 18"
square plastic yard drain catch basin sumps with solid lids (see figure 3.2)
designed to accommodate 1,000 SF of impervious surface within a 30' long
trench in native soil measuring 2' wide filled with 18" of washed 1-1/2" to 1-3/4"
washed gravel covered with filter fabric material and at least 6" of compacted
soil. A succession of trenches connected with 4" O PVC tight line can be located
not less than 6' apart. All trenches shall be a minimum of 15' from the homes
crawlspace and septic system and 5' from any property line.
Northern garage and northwestern house downspouts carry storm water
from 1,356 SF of roof to (see figure 3.2) 42' of infiltration trench.
Northeastern downspouts carry storm water from 553 SF of roof to 18' of
infiltration trench.
Eastern porch and all southern downspouts carry storm water from 1,405
SF of roof to 42' of infiltration trench. This system includes 24' of trench required
by the drive for a total of 66' of infiltration trench.
All infiltration trenches drain clear of the primary and reserve septic fields.
CONSTRUCTION ACCESS
NO /
/
"<=25' MIN.
4"-8" QUARRY SPALLS �
GEO-TEXTILE FA-- )
BRIC
12" MIN. THICKNESS
LENGTH PER THE OPO SITE
DEVELOPMENT INSPECTOR
PROVIDE FULL MOTH
INGRESS/EGRESS AREA
PLASTIC COVERING STOCKPILES
ANCHOR WEIGHTS WTH STAKES
STRAW WATTLE
10' MAX. SOIL BERM
\ \ STRAW BALES
CONVEY RUNOFF TO APPROVED LOCATION.
CUT SLOPES
BURY SHEETING IN 4 IN. X 6 IN. TRENCH A ANCHOR WEIGHTS WITH STAKES
MINIMUM OF 8 FT. SETBACK FROM TOP OF 10' MAX.
SLOPE. BACKFILL WITH WASHED ROCK. CONVEY RUNOFF TO
APPROVED LOCATION.
PROVIDE ENERGY DISSIPATION AT TOE WHEN NEEDED. \
�\v � 10' MAX.
TOE IN SHEETING IN 4 IN. X 6 IN. TRENCH A 5 \ 3' MIN.
MINIMUM OF 3 FT. SETBACK FROM BOTTOM L ,I
OF SLOPE. BACKFILL WITH WASHED ROCK. /t _ _
CONVEY RUNOFF TO APPROVED LOCATION. n
SECTION C.2 FLOW CONTROL BMPs
ROCK CHECI
VIEW LOOKING UPS]
SECTION A -A
L = THE DISTANCE SUCH THAT POINTS A & B
ARE OF EQUAL ELEVATION
L
-,POINT A I 'POINT B
SPACING BETWEEN CHECK DAMS
FILTER FENCE _ MEAL FENCE POSTS
FIGURE C.2.2.A TYPICAL TRENCH INFILTRATION SYSTEM
PLAN VIEW
...........NTS........... .........
infiltration trench
4" rigid or 6" flexible
perforated pipe
FILTER FABRIC MATERIAL 60" WIDE
BOLLS. USE STAPLES OR WIRE RINGS TO
ATTACH FABRIC TO WIRE MIRAFI 70OX OR
PRE -APPROVED EQUAL
of I I 2" X 2" X 14gc PARE FABRIC OR EQUIV.
o (OPTIONAL -PER SITE CONDITION)
BURY BOTTOM OF FILTER MATERIAL IN 8"
X 12' TRENCH
I I 6'-0`
U MAXIMUM LI
ro
FILTER FABRIC MATERIAL-
z
NOTE: ANGLE SILT FENCE BACK UP THE
SLOPE AT THE END OF RUN.
0
BACKFILL WITH NATIVE SOIL MATERIAA N
OR GRAVEL BACKFILL IN TRENCH AND
ON BOTH SIDES OF FENCE
FABRIC ON THE SURFACE
roof
drain
w/solid lid
PLAN VIEW g roof drain
NTS �I III
overflow
4" rigid or 6" flexible splash block
perforated pipe
ou... -------•- .
b� 0 washed rock
12" y �' 1 1/2"-3/4"
�1' ,min
fine mesh CB sump w/solid lid
cnraon
varies
A
filter fabric-1
1/24/2005
4PI
iM►t I.
L`,, 11
m([4 .
compacted backfill
4" rigid or 6" flexible
perforated pipe
washed rock
1 1i
MM/2 -' t 5
SECTION A
NTS
14
2005 Surface Water Design Manual - Appendix C
C-42
roof
X drain
PLAN VIEW
NTS 4" rigid or 6" flexible
perforated pipe
Irrriltration trench sump w/solid lid
4° rigid or 6" flexible.
perforated pipe
Jr
ot
Infiltration trench
4" rigid or W flexible
perforated pipe
—-•--•---•--- - ----------- -�
................. nfiltrationtrench
40 J 1
M
Av
�4A ®'
0
\v 1`
Zt��Llt�b M
ps
0
TEMPORARY
EROSION CONTROL
SCALE 1 "=20.0'
777
_A
v
\ y
\
PERMANENT STORM
WATER MANAGEMENT
SCALE 1 "=20.0'
DIEn.
w
\
CPa 00D lz4ft1
FDA!EW
tile
1q4-
1
q WN9END
BAY
R� ftON�Z
�'
\;�/
I
.vd6
a
�r
I r WQ;➢iN.AN_ �p�Y ¢•1ql
I mAAfEfPq ti�eGr�\ii dye\��,
.
p
U.N➢Ox
Wp09
>2'
S3 , � 94 "a ,1� 'J'Y```�1 6ArLYLLW➢R
a
+
$Q53,V`RY'�J G '
I,"Woscr.
_
U bi
80�DW �X
41--+
gVIL[AGLdY
V!
RY. SPPrd--
�i
BOAR➢W1EK
MWRLf50NAI xxe Gp x L.
PL ="ry
\\It-
PROSPE
LA LSI
..SaOAgE PL. II D.
�t3` \• 01 'a E. casra➢t)I�
�N1 �REF'F' \ \ I
1
•ORMWATER PLA
FOCT 2 9 2008
Architect
2020723rd Ave NW
Shoreline, WA 98177
206-542-5727--AI