HomeMy WebLinkAboutBLD2008-00504 •
• BUILDING PERMIT •
Jefferson County Department of Community Development
621 Sheridan Street, Port Townsend, WA 98368
(360)379-4450 FAX (360)379-4451
PERMIT #: BLD08-00504 Received Date: 12/10/2008
SITE ADDRESS: 5413 SR 20 Issue Date 1/21/2009
PORT TOWNSEND, 98368 Expiration Date 1/21/2010
OWNER: MICHAEL J FELBER PHONE: 360-385-0202
KAREN L HACKENBERG
670 ADELMA BEACH RD
PORT TOWNSEND WA 98368-9281
SUBDIVISION: Block: Lot: T 38+
PARCEL NUMBER: 901051018 Section: 5 Township: 29 N Range: 01 W
CONTRACTOR: TOLLEFSON BUILDERS INC PHONE: (360) 732-4080
TODD HULBERT
PO BOX
C UM WA 98325
Contractor's License TOLLEBI977N9 Expires 3/15/2009
PROJECT DESCRIPTION: NEW DETACHED GARAGE - UNHTD, NO PLMB
TYPE OF WORK GAR SQUARE FOOTAGE:
TYPE OF IMP NEW MAIN:
VALUATION 15,390.00 ADD'L: HEAT TYPE: UH
CODE EDITION: 2006 HEAT BASE: HEAT TYPE:
OCCUPANCY: UNHEATED: #OF STORIES:
OCCUPANCY: OTHER:
CONST TYPE: GARAGE: 604 SHORELINE:
CONST TYPE: SETBACK: 161
DECK: BANK HEIGHT:
SEWAGE DISPOSAL: ALT
WATER SYSTEM: Type Amount Paid By: Date: Receipt:
BEDROOMS: BATHROOMS: Permit $265.25 LYK 12/10/08 105130
Exist: 0 Exist: 0 Plan Check $172.41 LYK 12/10/08 105130
Prop: 0 Prop: 0 State Building Code $4.50 LYK 12/10/08 105130
Total: 0 Total: 0 Total: $442.16
Directions to Site:
SEE DIRECTIONS & MAP IN FILE
HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
Office Hours 9:00 a.m. -4:30 p.m.
HOT LINE AVAILABLE 24 HOURS A DAY
SPECIAL CONDITIONS APPLY - SEE ATTATCHED
11, 0
Michael Felber • 670 Adelma Beach Rd. • Port Townsend, WA 98368
January 11,2012
Jefferson County Dept. of Community Development
621 Sheridan St.
Port Townsend,WA 98368
Dear Community Development People,
This letter is a written request for you to cancel our permit# BLDO8-00504. The
site address is 5413 SR 20, Port Townsend,WA 98368. This permit was for a
detached garage. We have not started any construction or excavation for this
garage.
Sincerely,
Michael F ber Karen Hac en-berg
r
' J A N 1 2 2012
! JEFFERSON COUNTY
Fr-pi-OF CnRq„^t I NITY DEVELOPMENT
Jefferson County Building •sion Permit Nurr: BLD08-00504
Applicant: FELBER
BUILDING PERMIT INSPECTION APPROVALS applicable Code: 2006 International Building Codes
To schedule inspections, call (360)379-4455 no later than 7:00 AM the day of the inspection.
Requests received after 7:00 AM will not be scheduled for that day's inspections.
ELECTRICAL PERMITS are issued by the Washington State Department of Labor& Industries.
The electrical permit must be signed off by the State Inspector prior to the County's Framing Inspection
Inspection Item Date Approval Signature Notes
Setbacks Minimum setback from SR 20 right-of-way shall be 50 feet. Minimum
setback from north and south property lines shall be 5 feet. Minimum
setback from shoreline top of bank as depicted on the submitted site
plan shall be 161 feet. Minimum setback from Commercial Forest
lands shall be 250 feet. If an ESA is present,then the more stricter
setback(s)shall apply.
Erosion Control Need to provide this Department with a wet-stamped letter that certifies
the temporary erosion control methods have been installed correctly.
Foundation Footing
Footing Drains
Foundation Stem Wall
Straps(hold downs)
Ext. Shear Wall Nailing
Framing
Blocking
Airseal
Insulation: Walls
Insulation: Floors
Insulation: Ceiling
Int. Shear Wall Nailing
Wallboard Nailing (t /
=k.t t t)1Yr I L
Drywell/Alt Drainage ENGINEERED STORM WATER PLAN BY MACLEARNSBERRY.
NEED LETTER PRIOR TO FINAL BLDG SIGN OFF.
Address Posted
FINAL INSPECTION
FINAL INSPECTION MUST BE APPROVED PRIOR TO BUILDING BEING OCCUPIED
THIS PERMIT IS VALID FOR ONE YEAR
• •
CONDITIONS for Building Permit# :BLD08-00504 •
1.) Once the Temporary Erosion Control measures has been installed, you will need to have
MacLearnsberry Engineering do a site visit and verify that they have been installed in
accordance with the plan. Once verified and approved, you will need to provide this
Department with a wet-stamped letter that certifies the temporary erosion control methods
have been installed correctly.
2.) PRIOR TO FINAL BUILDING OCCUPANCY, PROPONENT SHALL SUBMIT A WRITTEN
LETTER FROM MACLEARNSBERRY ENGINEERING STATING THAT THE
STORMWATER FACILITY HAS BEEN CONSTRUCTED IN ACCORDANCE WITH THE
REQUIREMENTS OF THE "DRAINAGE REPORT" DATED SEPTEMBER 15, 2008 AS
SIGNED BY MATTEW C. MACLEARNSBERRY OF MACLEARNSBERRY
ENGINEERING.
3.) To help prevent seawater from intruding landward into underground aquifers, all new
development activity on Marrowstone Island, Indian Island and within 1/4 mile of any
marine shoreline shall be required to infiltrate all stormwater runoff onsite.
4.) The property owner shall comply with Water Conservation Measures (per list maintained
by the UDC Administrator).
5.) A vegetative buffer of 30-feet shall be permanently maintained from the top or edge of the
Landslide Hazard Area for those portions located outside the 200 foot shoreline
jurisdiction. All buffers shall be measured perpendicularly from the top of the Landslide
Hazard Area.
6.) Landslide Hazard Areas and their associated buffers shall remain naturally vegetated.
Should buffer disturbance occur during construction, the Unified Development Code
(UDC) Administrator shall require replanting with native vegetation. No alterations shall be
made to the Landslide Hazard Area or its associated buffer without prior authorization by
the UDC Administrator.
7.) Prior to and during approved construction activities, the perimeter of the landslide hazard
area buffer shall be marked with a temporary sign. The sign shall be placed in such a
manner that it can be directly observed from the construction area. The sign shall contain
the following statement: "Landslide Hazard Area and Buffer- Do not Remove or Alter
Existing Vegetation."
8.) All construction activities shall not encroach upon the landslide hazard area buffer. This
includes the storage or preparation of materials.
9.) The applicant shall permanently separate the boundary of the Landslide Hazard Area
Buffer from the remainder of the subject property through installing logs, trees, a hedge
row, or any other prominent physical marking approved by the UDC Administrator.
10.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water
quality degradation. The submitted proposal does not require additional aquifer
protection measures. However, during construction the project shall follow the Best
Management Practices (BMPs) and facility design standards as identified and defined in
the Stormwater Management Manual for the Puget Sound Basin.
11.) The identified Fish and Wildlife Habitat Area (Type Ns Stream), shall maintain a
vegetative buffer setback of 50 feet for that portion of the stream located outside the 200
foot shoreline jurisdiction and is less than 20% grade. If the portion of the stream located
outside the 200 foot shoreline jurisdiction is greater than 20%, the the buffer shall be 75
feet. The setback shall be measured horizontally from the Ordinary High Water Mark
(OHWM) to the proposed development.
12.) An additional setback of five (5) feet is required from the edge of the stream buffer area to
the proposed development.
•
13.) A permanent physical separation along the boundary of the stream buffer area shall be
installed and permanently maintained. Such separation can include installing logs, trees,
a hedgerow, or any other prominent physical marking approved by the UDC Administrator.
14.) Stream buffer perimeters shall be marked with temporary signs at an interval of one per
parcel or every one hundred (100) feet, whichever is less. Signs shall be in place prior to
and during construction activities. The signs shall contain the following statement: "Buffer
- Do Not Remove or Alter Existing Vegetation."
15.) The applicant shall fully adhere to all conditions and requirements of the full eagle habitat
management plan as signed by WDFW on October 16, 2008 and the applicants on
October 17, 2008.
16.) An Engineered Stormwater Plan has been submitted and approved by the Department of
Community Development. Once the subject permit has been issued the applicant shall
fully implement the provisions of the submitted plan and contact the Jefferson County
Department of Community Development to arrange a schedule to inspect the property for
plan compliance. A Certificate of Occupancy will not be issued until the Department
verifies plan compliance. No clearing for roadways or utilities shall occur on the project
site until clearing necessary for the installation of temporary sedimentation and erosion
control measures have been completed.
17.) Outdoor residential storage shall be maintained in an orderly manner and shall create no
fire, safety, health or sanitary hazard.
18.) Not more than 2 unlicensed vehicles shall be stored on any lot unless totally screened
from view of neighboring dwellings and rights-of-way. Such screening shall meet all
applicable performance and development standards specific to the district in which the
storage is kept, and shall be in keeping with the character of the area. Screening shall
meet the requirements of Chapter 18.30 JCC. Outdoor storage of 3 or more junk motor
vehicles is prohibited except in those districts where specified as an automobile wrecking
yard or junk (or salvage) yard and allowed as a permitted use in Table 3-1 or Chapter
18.18 JCC, and such storage shall meet the requirements of JCC 18.20.100, Automobile
wrecking yards and junk (or salvage) yards. In no case, shall any such junk motor
vehicles be stored in a critical area.
19.) A minimum of two (2) on-site parking spaces shall be provided for the single family
residence.
20.) Proponent shall submit an original written confirmation letter from DOT stating that the
approach has been installed based on the conditions of the Access Connection Permit
Number 46908.
21.) Residential developers and individual builders shall be required to preserve shoreline
vegetation and reduce the associated risk of erosion during construction and any future
activity which may impact the stability of the shoreline.
22.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of
impervious surface which includes roof tops, driveways, concrete, etc.
23.) The building height is not to exceed 35 feet.
24.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the
finished grade, excepting when such lighting is an integral part of a building or structure.
Ground level lighting is encouraged.
25.) Lighting fixtures shall be designed and hooded to prevent the light source from being
directly visible from outside the boundaries of the property. The intensity or brightness of
all lighting, during construction and after project completion shall not adversely affect the
use of surrounding properties or adjoining rights-of-way.
26.) Minimum setback from SR 20 ri f-way shall be 50 feet. Minimum setback north
and south property lines shall be feet. Minimum setback from shoreline top o ank as
depicted on the submitted site plan shall be 161 feet. Minimum setback from Commercial
Forest lands shall be 250 feet. If an ESA is present, then the more stricter setback(s)
shall apply.
(-4i,,, ON cow JEFFERSONOOUNTY •
>a DEPARTMENT OF COMMUNITY DEVELOPMENT
`-) `�' 621 Sheridan Street • Port Townsend • Washington 98368
360/379-4450 • 360/379-4451 Fax
p www.co.jefferson.wa.us/commdevelopment
�` ING'5
Master Permit Application MLA: O"S - 4
Project Descripti n(include separate sheets as necessary):
N,Q+acn - LYn h4 ei nC) Pirl a_w J An LL .
Tax Parcel Number: C10/o 57o tC( Property Size: 31 •`-/S (acres/square feet)
Site Address and/or Directions to Property:
S."--41l3 s( Z0 Pori T'Gwt�Serj K1 Sf 4_i
Property Owner(s)of Record: MV((C��LZ_ f �/�- /(AP v /! , ffelcr6— ' 6-
Telephone:..3ar-,3r9 `-0 )L Fax: ,5,MI/4 -- email: kE%7Y'l �'�C4& '
Mailing Address: 670 A 7-jt'IL1 .(4-1 / ., pe,,e i 7i4 Jt > i/4 7 8
Applicant/Agent(if different from owner): Tectc( No tben i
Telephone: 732 c!c>Ssc-) Fax: 7 32 'ju t email:
Mailing Address: Pd 6.1c too ctllwnoc�►•. 4,.'A- e-is.c .s 'Tocfc.fea Titt 0.,b„,'( teits,c...,.
What kind of Permit?(Check each box that applies
❑Building 0 Critical Areas Stewardship Plan
C] Demolition Permit ❑Variance(Minor, Major or Reasonable Economic Use)
❑ Single Family 0 Garage Attached/Detached 0 Conditional Use[C(a), C(d),or C]**
❑ Manufactured Home ❑ Modular ❑ Discretionary"D"or Unnamed Use Classification
❑ Commercial* ❑Special Use(Essential Public Facilities)**
❑ Change of Use ❑Boundary Line Adjustment a EC 1 0 0O8
❑ Address ❑ Road Approach ❑Short Plat
❑ Home Business ❑ Cottage Industry ❑ Binding Site Plan**
❑ Propane ❑ Long Plat**
❑ Sign ❑ Planned Rural Residential Development(PRRD)/Amendments**
❑Allowed"Yes"Use Consistency Analysis 0 Plat Vacation/Alteration**
❑ Stormwater Management ❑Shoreline Master Program Exemption/Permit Revisions**
❑ Site Plan Approval Advance Determination(SPAAD)* ❑Shoreline Management Substantial Development**
❑Temporary Use ❑Shoreline Management Variance
❑Wireless Telecommunication* ❑ Comprehensive Plan/UDC/Land Use District Map Amendment
❑ Forest Practices Act/Release of Six-Year Moratorium 0 Jefferson County Shoreline Master Program Amendment
*May require a Pre—Application Conference ❑Tree Vegetation Request
**Requires a Pre-Application Conference
Please identify any other local, state or federal permits required for this proposal, if known:
DESIGNATION OF AGENT
I hereby designate TCA?s j-tG-13G- 7` t ay agent in matters relating to this application for permit(s).
OWNER SIGNATURE��
( "e�`�Y/( /"../7k.,zw,___ Date: i 7By signing this application form,th owner/agent attests that the information provided �Ul. y ��
rein,and in any attachments,is true and correct to the best of
his, her or its knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet
may result in this permit being null and void.
I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and
expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit.
I further agree to provide access and right of entry to Jefferson County and its employees, representatives or agents for the sole purpose of application
review and any required later inspections. Staffs access and right of e ry �III,be assumed unless the applicantca infornis the County in
writing at the
time of the appr tine t t'hee r hew 24: ce. F� C/C/ 2��'�JSignature: '�/// �%," - 1 Date:
The action or actions Applica will undertake as a result of the issuance of this permit may gatively impact upon one or more threatened or
endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the
"Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this
permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your
action(s)even if you are in compliance with the Jefferson ounty development code.The Applicant acknowledges that he,she or it holds individual
and non-transf bletres onsj if foya her' to and I ing w th SA. 2. A licant has read this diisryclaci er and signs and dates it below.
Signature ^' Date: G G1, , l 1 7
G:\PemutCenter\###FORMS###\DRD FORMS\Master Permit Application 5-29-08.doc
1111
BUILDER STATEMENT •
The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that
they will be assuming the responsibility of the General Contractor for the proposed project.
Signature: Date:
GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: FAX:
"To t ref Scan_4..,i(dtrs. .iv►c. (3,Gei 732_ L10Sso (%40)732 '-/oSst
MAILING ADDRESS: ?o !cox too Gam:,,,,.. ,,,,,% two,- QEMAIL. . c(c./fp Tr,MtF-sc)N bu.1cl4- :s .-OGW•
CONTRACTOR'S LICENSE WAINS
NUMBER: `I'J//egZ 7 77 Ail
NUMBER
ARCHITECT/ENGINEER: mi 1(u !I,v 1( PHONE (&O(o) 42.-G137 FAX:( ) kOZ. -i4`72
MAILING ADDRESS: EMAIL -
Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal:
,C<New Wood Existing: o ❑ Sewer
❑ Addition ❑ Steel Proposed: o Bank 0 Community System
❑ Alteration/Remodel ❑ Concrete Total: o Height:, .e'lndividual System
G Is
O Repair 0 Masonry SEP Permit#
❑ Demolition 0 Other: Bedrooms: Water Supply:
Existing: v Setback: ❑ Private well ❑ Two Party
Type of Heat: Proposed: ' g Public
en -r1 Total: c>
`7 t Name of System:
If this is a Commercial Project you must answer the following:
Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces:
Number of occupants(includes owners,tenants,employees,etc) Current Proposed
IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No
If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply:
1 Underground Tank 1 Above ground Tank Size of Propane Tank:
1 Heat Stove 1 Cook Stove i Woodstove i Fireplace Insert 1 Hot Water Tank 1 Pellet Stove 1 Other
Is this appliance being installed in a Manufactured/Mobile Home? Yes / No
When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property
lines, tank location and size,distances from the propane tank to all property lines,buildings and septic system components,
including the reserve area.
Square Footage Current Proposed .or.Office Use Only tip_ "Amount Revision
Main Floor Heated r ' , - EH Bid App Review:
I fir_ I.'
2na Floor Heated Consistency Review:
Other Heated . :.t Base fee: ,h -,._.
Mezzanine Additional Section: _
t
Heated Basement Plan Check fee: .) /I
Unheated Basement ° . State Surcharge fee: ' 1 raj
Other Unheated Pot Water Review fee: ,
(� i. I I f. ti 1�)
Garage/Carport 1:6� ,��`t� s .� SUBTOTAL
Decks ; 911/Rd Approach fee: _"_____
Other ;' TOTAL: $ /K )6
r Receipt Number: I 1)5(3-0
``Y Cash/Check Number:
11C)
ESTIMATED COST(REQUIRED) Date:
.Fair market value of all labor and materials foundation to finish _ t�
Initials:
/6 Zr'c.)
G:\PermitCenter\###FORMS###\DRD FORMS\Master Permit Application 5-29-08.doc
M 0 0 ^
i'LN
O
O
�Fa
CDI:IIII �
ci
s °O
mi �I
9<D"
H
--• _ l
O 5N
II
m T n 0 •
•
__ -�_ •
o1 -1 ,-1- •
: - ' -I
-
-
- O
I f N
n
D I
m
• •
Z •
€
•
z� .
�
m
w
SIRzmOm
R r •
x mm
N
0.'"'"---------- o
•
il
0
r<oT
o xi
N�No O �i2m
-4 MM< OOmZ vi Zmgm0zEA c'gQmOZ mm mm �Q•E� O
m Z
.-
0
•
vOO m O-
mciCO�T co
m
; .,y F.
X 8y� 0mw c= -mC75
O SO
.- OSO
'o Z
01 OZ
C....) / / w
/
I ... / "
0Z - j ` _ _ . .. .._
to D i . ^
CD r
C m e
CD -0
> 4 �V i \,
iv eh ^1 3� O
co
OSYZ Z8
Z m _ _
n o _ -
$m
fill
I '
m3� 3i Co
.
1A TN ,00zzm
UZ
OY r, O m ' R m \o -• mmn
T0') I m w
R �Am
me NpmOOo
• � y ..wN
0 Z-. fr C
0f /// 9r. ! o
�CSI a o
,GP m
p ���C, p / l 1 1 Q�o, • a, O �p
z
Mint
I �m z>
• / O= -� O Z A m
Po aARN000R wl�ni S Q p
/ FOR OVERLAP c 2 I
x E= C.1).,_ m
xo o 73 GI
gm
aF OD O
.1Qq�
c atn9s
iUi
71
0
O TI •
■
C
Q
1
cp
s 1
c
a o D. m = 00 73
I m v� O
N N' 0,Q d N _ D
C $D(ss 22 II m cfl z
.."'CD T
C. �� N C.J T
cn @,p10 T a 7 p �!/^� /`
C N J 0,2 3 -o O w
om mCn SS2 g c090S e = o
m oM c 9 _ _ � � .
cn —I cn 0
III
t Z �_ cn cn_m1 DO C� Z_< 1- D0 � 00 '- -0m� m mx f I
` IolcO Z ZOrz Dm DNmm � ZZ m 2 '0 Z 77 m . 0 u) --t 0 m - N G7 I
m � � .�� -� mlo GO m � ['
,I:
N'sl -iii°111"r
, , .... * x 2
h z m
04404 ram., i
,W1 illifter goki
oo
386'- 11" x t- - �
iik1V. 206'-9" i„0
' m O — --- P
,2, 737JD0, 73 � m -
-I 0 —� -II O I � Z
(nm Qs, ) mN � mm � � < T
UT _ 13
Qp _ �_
CO omo c O—I0 - c c.r o mm �N o n �-
70
DPI-
i ,Q �" m g "' ZCZ � . � ZCm Z O
2.
m co ci nOk
m
o � W <3 2 ,,� y <i M� om `' m Ai 5 o„z mn1 ti ♦ ,,lJ
CO
CO
CD
0 _
c, m '� %�'� � r`4,► \ ' ' =" SST Dc D
r-
V0
m I wn',i► ` �,�zD �.(n
m 6) cn ' , r Aovi) \ '�?y st\ 2 i� I z
......,
.: , „,
Z C mJO 0 Os �tj��, �"
N �• c� r m -< 7� /� �� 2Q D
oco 0 0 (n 7 o '� SETBACK LINE
tl:► '
m - -,� —
_ a. ,� _ � 836.8
cn O �, zS0 021 „W -- - _ _
NI m m ° N 1 .> >. 4 "------- —p
N c�"z 0
O o W Z PROPERTY LINE
0o D ��< co Z CsJ
Cn V7 C (2 W N r' 100
xi
.+ m--' m DO cmp omp pm Xl
_� ;L7 C/� um z xl o x 7, x xi �■■'
MI M
r� C —I u m '
m. 9 v SZ• ,Q. D Z500 NI -- m F
D �� "I m � zo mn OC 13
.0 �'' T? m � c) z zm O
c �,
0 `�. "'= zw umi � Sao mN O
m �` S zK 23 � Z r Cr) CD
C
dtk N 171
m i t O ,"/�_ De -- o Z -I D Z Z
cn O
C 3 't A ,,,0 • * co Z z 0 m m D
D w (P 426. 0� —Di m c� m
N rn 7J N (n El D O m M
� m � Z
m5. � torirl " ' 0z0 n � �po —im CO
a) •
Z7 0 D U,
rn II IN
it. m• D D m CL
N ...� m z z co
meolla r'a p� 1/1 z - m m m
• A j`'' o 0 U' —I
(� ' o o _ o 0
o
o � o
o
!II1d
9_3_me g-- . 0 Z �{�dW�31d M 140114 � z 0
N O m N y d . o C7
N
m coW 41 lJJ
N N S C -
70
r rn@�T4a ' r 'm D C p
n°� X2 cnv COZ n
CA m c
m73
-D e �o �
z j1.
)> z13
0 5 m
n -I X D
C O p HCn D � ,oCn z rr ZZ H
m
R.
m 0 cmi� 0 °
m
73
COO CnppT co -0 C77Cnpa'. 2 -0 ci
ov m � � m � � � z � c) � O � 13 rnDO O0 � m
- r O O = C O � � lo 00 0 oA
(� � (� O TT? CD
p mm cam
0
p to n
p _
_, ... ,
m
CcalD.' X
Cn Ocn x r
76'• o
p
173L./-.
cn /T � O Zo 4 dY9ft Z p rTi,� Cn Cn
m
'
m
,H —I
C7 1'' � O N 1010cn
p 77 77 :7 � n = 0 -1yrpm �m my oO PDO / m Who Z No1 ' 0 0 1 � � ,IZ Nm
m -' r-< O m , I
_ 7C = -loch
II /4- -) -.'4N
Ts o r
PC 0 p Z xi O
z m m 0
CO0ci C 0ci p m c9 O � -ri
C9 -7 > 0 � =DCo Cn 0 00 � � � _ �
m m r = D -t O O p =
> E r � 0 Z v -A � O �
Z m m 0 � z m m c co = CO 0 7 0 -o coco -n z �
o !v _+ C� WDm -i � -1 0 ocDO -o 0 CZOQ Om ' m
rn �' D � -Ici OD z c cpp � "D p D � � � p � m
cn n Z mcn 0 m � p � 0 � D 0 m Om rm 73 pp
.-. z ci m o -nD � m CO 0 p � p -mo om
m m 0 Cn p , 0 m -1
-1 J o c nl Pi O D Z m \ C„ n
p cn r m Cn
(11 3 < Z
cr m Cn cn c_ � Cn C 1" - Cn D m �.
N1 COj ') -7 777 n m n � mr Z :\ /
CD m D O c 0 p 0 O
CD CO pm z70 073 73 � `'•�
-mi m
C p < rn
- Cn -o
zco imml
oo = � m -o c m : 0
C -0 Fri
D n z Z m pit 0 0 O N
m 0
. <
m g Zco Cm 7303 � cCr� O 0 no
cc � �
= D � 73 D 0 -i � z �� � � pcnOcn
ci " 0 mCn Z ! p p T °° � 0
z � O
� D CZ -Ic m -� m � � Cn E„
0z o -4 rC CO ow_
? O CAD Cl) p a�
i,
Z D -G m O
chi D G) m �..I Z n z)•
2.)
ni33 mCn -AD D -n al OZ - - olt
CD •
00
N zZ oo 3> E `� m . . Zp iW Kew �,
1.1
Q- Om w � z = p •� ' 0
-n�-. Z - rm m 0 . �? 18
1 0- ,rt T 0 0 m -I0 •' '�� b
— o CO o •
■ - - CAD
0