HomeMy WebLinkAboutBLD2009-00013 MLA09-00012
UILDING PERMIT APPLICN Review Type: I
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD09-00013 Received Date: 1/22/2009
SITE ADDRESS: 73 PETERSON RD
PORT TOWNSEND, 98368
OWNER: COLLEEN A SMITH PHONE: (360) 732-4241
ARCHIE J SMITH
73 PETERSON RD
PORT TOWNSEND WA 98368-8723
SUBDIVISION: Block: Lot: GL 1+
PARCEL NUMBER: 801061001 Section: 6 Township: 28 N Range: 01 W
CONTRACTOR: J A G CONSTRUCTION PHONE: 360-452-9892
PO BOX 1665
PORT ANGELES WA 98362
Contractor's License JGCONGC930NZ Expires 8/9/2009
REPRESENTATIVE: PHONE:
PROJECT DESCRIPTIOP ADD CONCRETE DECKS AND 48" RAMP TO NEW MFH
TYPE OF WORK NON SQUARE FOOTAGE:
TYPE OF IMP NEW MAIN:
VALUATION 4,077.00 ADD'L: HEAT TYPE:
CODE EDITION: 2006 HEAT BASE: HEAT TYPE:
OCCUPANCY: UNHEATED: #OF STORIES:
OCCUPANCY:
CONST TYPE: OTHER: SHORELINE:
GARA
CONST TYPE: DECKLE 160 SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL: ALT
WATER SYSTEM: PWELL
BEDROOMS: BATHROOMS:
Exist: Exist:
Prop: Prop:
Total: Total:
Routing Date:
Type Amount Paid By: Date: Receipt: Approved/Date
Permit $111.25 KAS 01/22/09 105276 APPROVED
Plan Check $72.31 KAS 01/22/09 105276
State Building Code $4.50 KAS 01/22/09 105276 MAR 2009
Total: $188.06 Jefferson County Planning
& Building Department
• BUILDING PERMIT •
Jefferson County Department of Community Development
621 Sheridan Street, Port Townsend, WA 98368
(360)379-4450 FAX (360)379-4451
PERMIT #: BLD09-0001 3 Received Date: 1/22/2009
SITE ADDRESS: 73 PETERSON RD Issue Date 3/2/2009
PORT TOWNSEND, 98368 Expiration Date 3/2/2010
OWNER: COLLEEN A SMITH PHONE: (360) 732-4241
ARCHIE J SMITH
73 PETERSON RD
PORT TOWNSEND WA 98368-8723
SUBDIVISION: Block: Lot: GL 1+
PARCEL NUMBER: 801061001 Section: 6 Township: 28 N Range: 01 W
CONTRACTOR: J A G CONSTRUCTION PHONE: 360-452-9892
PO BOX 1665
PORT ANGELES WA 98362
Contractor's License JGCONGC930NZ Expires 8/9/2009
PROJECT DESCRIPTION: ADD CONCRETE DECKS AND 48" RAMP TO NEW MFH
TYPE OF WORK NON SQUARE FOOTAGE:
TYPE OF IMP NEW
VALUATION 4,077.00 MAIN:
CODE EDITION: 2006 ADD'L: HEAT TYPE:
OCCUPANCY: HEAT BASE: HEAT TYPE:
OCCUPANCY: UNHEATED: # OF STORIES:
CONST TYPE: OTHER: SHORELINE:
GARA
CONST TYPE: DECKLE 160 SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL: ALT
WATER SYSTEM: PWELL Type Amount Paid By: Date: Receipt:
BEDROOMS: BATHROOMS: Permit $111.25 KAS 01/22/09 105276
Exist: Exist: Plan Check $72.31 KAS 01/22/09 105276
Prop: Prop: State Building Code $4.50 KAS 01/22/09 105276
Total. Total: Total: $188.06
Directions to Site:
SEE MAP QUEST DIRECTIONS AND MAP IN FILE
HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR PTO FINAL INSPECTION
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
Office Hours 9:00 a.m. -4:30 p.m.
HOT LINE AVAILABLE 24 HOURS A DAY
SPECIAL CONDITIONS APPLY - SEE ATTATCHED
Jefferson County Building vision Permit Neer: BLDI9-00013
Applicant: SMITH
BUILDING PERMIT INSPECTION APPROVALS Npplicable Code: 2000 International Building Codes
To schedule inspections, call (360)379-4455 no later than 7:00 AM the day of the inspection.
Requests received after 7:00 AM will not be scheduled for that day's inspections.
ELECTRICAL PERMITS are issued by the Washington State Department of Labor& Industries.
The electrical permit must be signed off by the State Inspector prior to the County's Framing Inspection
Inspection Item Date Approval Signature Notes
Setbacks Minimum setback from Peterson Road& Old Eaglemount Road
rights of ways shall be 20 feet. Minimum setback from the east
property shall be 100 feet. Minimum setback from the south property
line shall be 5 feet.
Foundation Footing deck slabs
Framing
1
/-11
FINAL INSPECTION t-j= ijog '
FINAL INSPECTION MUST BE APPROVED PRIOR TO BUILDING BEING OCCUPIED
THIS PERMIT IS VALID FOR ONE YEAR
• •
CONDITIONS for Building Permit# :BLD09-00013
1.) DESIGN CRITERIA FOR SPLASHBLOCKS:
A VEGETATED FLOWPATH OF AT LEAST 50 FEET SHOULD BE MAINTAINED
BETWEEN THE DISCHARGE POINT AND ANY PROPERTY LINE, STRUCTURE,
STEEP SLOPE, STREAM, WETLAND, LAKE, OR OTHER IMPERVIOUS SURFACE.
SENSITIVE AREA BUFFERS MAY COUNT TOWARD FLOWPATH LENGTHS.
A MAXIMUM OF 700 SQUARE FEET OF ROOF AREA MAY DRAIN TO EACH
SPLASHBLOCK.
A SPLASHBLOCK OR A PAD OF CRUSHED ROCK(2 FEET WIDE BY 3 FEET LONG
BY 6 INCHES DEEP) SHOULD BE PLACED AT EACH DOWNSPOUT DISCHARGE
POINT.
NO EROSION OR FLOODING OF DOWNSTREAM PROPERTIES MAY RESULT.
FOR SITES WITH SEPTIC SYSTEMS, THE DISCHARGE POINT MUST BE
DOWNSLOPE OF THE PRIMARY AND RESERVE DRAINFILED AREAS.
2.) CONSTRUCTION ENTRANCES SHALL BE STABILIZED WHEREVER TRAFFIC WILL
BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR
OTHER PAVED AREAS WITHIN 1,000 FEET OF THE SITE.
THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM COMPACTED SUBGRADE.
QUARRY SPALLS (OR HOG FUEL) SHALL BE ADDED IF THE PAD IS NO LONGER IN
ACCORDANCE WITH THE SPECIFICATIONS. (BMP C105, 2005 DOE STORMWATER
MANUAL).
ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED BY
SHOVELING OR STREET SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING
SHALL BE REMOVED OR STABILIZED ON STIE.
ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD, WHICH END UP ON
THE ROADWAY SHALL BE REMOVED IMMEDIATELY.
UPON PROJECT COMPLETION AND SITE STABILIZATION, ALL CONSTRUCTION
ACCESSES INTENDED AS PERMANENT ACCESS FOR MAINTENANCE SHALL BE
PERMANENTLY STABILIZED.
3.) All construction activities shall not encroach upon the stream and/or wetland buffer. This
includes the storage or preparation of materials.
4.) A setback of 75-feet, measured perpendicularly from the wetland edge, shall be
permanently maintained as a buffer. No filling, grading, clearing, or other alteration of the
wetland or its buffer is allowed.
This is consistent with JCC Section 18.22.070(6) in that the manufactured home is
replacing an existing manufactured home and is an additional 168 square feet larger than
the previous home but will maintain the same required setbacks as stated in the 2004
manufactured home permit (BLD04-0592).
5.) Buffer perimeters shall be marked with temporary signs at an interval of one per parcel or
every one hundred (100) feet, whichever is less. Signs shall contain the following
statement: "Wetland & Buffer- Do Not Remove or Alter Existing Vegetation."
6.) A permanent physical separation along the upland boundary of the wetland buffer area
shall be installed and permanently maintained. Such separation can include installing
logs, trees, a hedgerow, or any other prominent physical marking approved by the UDC
Administrator.
•
7.) Critical Aquifer Recharge Areas may require special protection measures to mifigate water
quality degradation. The submitted proposal does not require additional aquifer
protection measures. However, during construction the project shall follow the Best
Management Practices (BMPs) and facility design standards as identified and defined in
the Stormwater Management Manual for the Puget Sound Basin.
8.) The identified Fish and Wildlife Habitat Area (Type 3 Stream), shall maintain a vegetative
buffer setback of 100 feet. The setback shall be measured horizontally from the Ordinary
High Water Mark (OHWM) to the new replacement manufactured home.
This is consistent with JCC Section 18.22.070(6) in that the manufactured home is
replacing an existing manufactured home and is an additional 168 square feet larger than
the previous home but will maintain the same required setbacks as stated in the 2004
manufactured home permit (BLD04-0592).
9.) An additional setback of five (5) feet is required from the edge of the stream buffer area to
the proposed manufactured home.
10.) A permanent physical separation along the boundary of the buffer area shall be installed
and permanently maintained. Such separation can include installing logs, trees, a
hedgerow, or any other prominent physical marking approved by the UDC Administrator.
11.) Buffer perimeters shall be marked with temporary signs at an interval of one per parcel or
every one hundred (100) feet, whichever is less. Signs shall be in place prior to and
during construction activities. The signs shall contain the following statement: "Buffer- Do
Not Remove or Alter Existing Vegetation."
12.) The project shall comply with Construction Stormwater Pollution Prevention (SWPP)
Elements#1 through#12 of the Department of Ecology's Stormwater Management
Manual for Western Washington to control stormwater, erosion and sediment during
construction. BMPs shall address permanent measures to stabilize soil exposed during
construction, and in the design and operation of stormwater and drainage control systems.
13.) A Stormwater Site Plan has been submitted and approved by the Department of
Community Development. Once the subject permit has been issued the applicant shall
fully implement the provisions of the submitted plan and contact the Jefferson County
Department of Community Development to arrange a schedule to inspect the property for
plan compliance. A Certificate of Occupancy will not be issued until the Department
verifies plan compliance. No clearing for roadways or utilities shall occur on the project
site until clearing necessary for the installation of temporary sedimentation and erosion
control measures have been completed.
14.) Outdoor residential storage shall be maintained in an orderly manner and shall create no
fire, safety, health or sanitary hazard.
15.) Not more than 2 unlicensed vehicles shall be stored on any lot unless totally screened
from view of neighboring dwellings and rights-of-way. Such screening shall meet all
applicable performance and development standards specific to the district in which the
storage is kept, and shall be in keeping with the character of the area. Screening shall
meet the requirements of Chapter 18.30 JCC. Outdoor storage of 3 or more junk motor
vehicles is prohibited except in those districts where specified as an automobile wrecking
yard or junk (or salvage) yard and allowed as a permitted use in Table 3-1 or Chapter
18.18 JCC, and such storage shall meet the requirements of JCC 18.20.100, Automobile
wrecking yards and junk (or salvage) yards. In no case, shall any such junk motor
vehicles be stored in a critical area.
16.) A minimum of two (2) on-site parking spaces shall be provided for the single family
residence.
17.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of
impervious surface which includes roof tops, driveways, concrete, etc.
18.) The building height is not to exceed 35 feet.
19.) Exterior lighting for residential uses shall not exceed twenty feet (20') in heightTrom the
finished grade, excepting when such lighting is an integral part of a building or structure.
Ground level lighting is encouraged.
20.) Lighting fixtures shall be designed and hooded to prevent the light source from being
directly visible from outside the boundaries of the property. The intensity or brightness of
all lighting, during construction and after project completion shall not adversely affect the
use of surrounding properties or adjoining rights-of-way.
21.) Minimum setback from Peterson Road right-of-way shall be 20 feet. Minimum setback
from Old Eaglemount Road right-of-way shall be 20 feet. The setback from the property
line adjoining the parcel zoned Rural Forest 1:40 to the west shall be no less than 100
feet. The setback from the south property line shall be no less than 5 feet. If an
environmentally sensitive area (ESA) is present, then the more restrictive setback shall
apply.
, o D. 0 Iii -..,..\
t-,
. co
(.0 /1\
0 ,„.., ..._:._
.. z c.. c (-t
07 m
........
(t$ rn X) 73 0 M
C) 0 0 23 •00 %:::. -E:
0 10 rn ft • --t- CA
.....
-
i aa.
% 0 • k c ÷
m
o _, -4 • 73 Z
M . .......
... =0 Gri 4 El, a z 0 ca
-.• 0 0 _, ,_,. C) 7's
' 0...c
il . ** CO')
Iv
G**"
0 0 .0 .1 7,-,•
ta egp 0 13 k5' •IN. 5.
.........
4.48 r) 5. o 0 0.".TJ CU
a ra• 5 9, 5_ C.) 115
. 5 : z-,- 0 01 0 CD .
at E. 0) E, .
? e)
,....,....:
P 0 0 0 13 -0 CO
r r
,..) +145 P (0 • 11 -o 3 0
_ ,..,....
t ide.,a'S i•fs I Amp • -, - < :7-0 r.:": C-. .
"1.6 4:, ; 3 7;4 al 5 2) ........, .-..•
3
„...... 3--: pi, ,,, ...2ri!i' ::-„, g % • -0 g 3 - ...
9 ,4 cow , , .
- END
5. 1 Tr 4) m .....
0 . tS * .k ., 41 9 :I :-• (11,
• ,.: •i" (i)
C.4 .....--
44.41.ft GO 17 ' ' 2
.10,1Mor 40 '—'---;
. .
Li) 1
----„,,_
. ..., , --•
Q - #
— 1\
. ..4..,-D-
I"N &I\ el
! N\E"'
--t-- i-- .
• , , gi 1(80 , h
.Z
a if
LI ... ,--,....._ (i L% evi5+il ol 1 A4,"
t: I, 1--------______.
. C> 1 fel:, Cr 01,Ni
4.4- *its , ...,‘.. ..,
It f ...D ,....4.. Ci)n
4-1 PA e z.,..4. /.. ,..... 1 fel 4-b li 0- s _
EN
—E*4 tz) =., b- ..•._ 4, aelt- "ti 1,1 -4-,
izg.1 ....... --A:-7-
L-4.-,.,..g
No __\... ....,
,14...,,,; EFFEBSliti COUNTY DCD
""ie:,. :- ' .. •,
,; ...;
FILE Gui-dy
, , _
� JEFFERSOAUNTY ,
j DEPARTMENT OF COMMUNITY DEVELOPMENT
11494M°1\T
` ' 621 Sheridan Street • Port Townsend •Washington 98368 JAN 2 2 2 tt
360/379-4450 • 360/379-4451 Fax '
kq www.co.jefferson.wa.us/commdevelopment
SNOti� l CPS tl nl tr
JEFFE;i: q oIi ��
Master Permit Application MLA: (� - i
Project Description(include separate sheets as necessa ): /I
Tax Parcel Number: Q I 2& I eDp f Property Size: 7, , '5 4, (acres/square feet)
Site Address and/or Dir ctions to Property: f• �_
73 r e c Ir -'o-�-c va_ I d r- -f 1 Oboftsf,.1-,
Property Owner(s)of Record: "T rills r r, `c
� I(r a{J to e v. S vvk
Telephone: ' Fax: email:
Mailing Address: s. gD,p1-e.r'1.5„›.z:, ,•'
Applicant/Agent(if different from owner):
Telephone: Fax: email:
Mailing Address:
WhaY,kind of Permit?(Check each box that applies
uilding 0 Critical Areas Stewardship Plan
O Demolition Permit ❑Variance(Minor, Major or Reasonable Economic Use)
❑Single Family 0 Garage Attached/Detached 0 Conditional Use[C(a),C(d),or CI**
❑ Manufactured Home 0 Modular ❑ Discretionary"D"or Unnamed Use Classification
❑ Commercial* 0 Special Use(Essential Public Facilities)**
❑ Change of Use ❑ Boundary Line Adjustment
❑ Address ❑ Road Approach 0 Short Plat**
❑ Home Business 0 Cottage Industry 0 Binding Site Plan**
❑ Propane ❑ Long Plat**
❑ Sign • 0 Planned Rural Residential Development(PRRD)/Amendments**
❑Allowed"Yes"Use Consistency Analysis 0 Plat Vacation/Alteration**
0 Stormwater Management ❑Shoreline Master Program Exemption/Permit Revisions**
0 Site Plan Approval Advance Determination(SPAAD)* 0 Shoreline Management Substantial Development**
❑Temporary Use 0 Shoreline Management Variance
❑Wireless Telecommunication* 0 Comprehensive Plan/UDC/Land Use District Map Amendment
❑ Forest Practices Act/Release of Six-Year Moratorium 0 Jefferson County Shoreline Master Program Amendment
*May require a Pre-Application Conference 0 Tree Vegetation Request
**Requires a Pre-Application Conference
Please identify any other local, state or federal permits required for this proposal, if known:
DESIGNATION OF AGENT
I hereby designate to act as my agent in matters relating to this application for permit(s).
OWNER SIGNATURE Date:
By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of
his,her or its knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet
may result in this permit being null and void.
I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and
expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit.
I further agree to provide access and right of entry to Jefferson County and its employees, representatives or agents for the sole purpose of application
review and any required later inspections. Staffs access and rig of entry will be assumed unless the applicant informs the County in writing at the
time of the application tha or she wants prior notice. �� /
Signature: - - --'-- Date: „ate 2 J`
The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or
endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the
"Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this
permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your
action(s)even if you are in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual
and non-transferable res onsibility for adhering to anfl complying with the ESA. The Applicant has read this disclaim r and signs and dates it below.
Signature: d- N.._..... 3,,1 r4. Date: :2Z-/el
G:\PernutCenter\###FORMS###\DRD FORMS\Master Permit Application 5-29-08.doc
• BUILDER STATEMENT •
The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that
they will be assuming the responsibility of the General Contractor for the proposed project.
Signature: Date:
GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE:/ E �1 FAX:
/ �' 4 L._P 1 , (�[0 :off `�J�'14� --, 1 ( )
MAILING/ DDR SS: EMAIL:
CONTRACTOR'S LICENSE ^ 0 h 6- a 93 1,1 A)Z W INS
NUMBER
�/„�INUMBER
ARCHITECT/ENGINEER: PHONE ( ) FAX:( )
MAILING ADDRESS: EMAIL
Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal:
Ipew LI Wood Existing: LI Sewer
❑ Addition Ll Steel Proposed: Bank ❑ Community System
❑ Alteration/Remodel Pi/Concrete Total: Height: ❑ Individual System
❑ Repair ❑ Masonry SEP Permit#
❑ Demolition ❑ Other: Bedrooms: Water Supply:
Existing: Setback: ❑ Private well ❑ Two Party
Type of Heat: Proposed: ❑ Public
Total: Name of System:
If this is a Commercial Proiectyou must answer the following:
Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces:
Number of occupants(includes owners,tenants,employees,etc) Current Proposed
IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No
If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply:
i Underground Tank i Above ground Tank Size of Propane Tank:
i Heat Stove i Cook Stove 1 Woodstove i Fireplace Insert 1 Hot Water Tank i Pellet Stove 1 Other
Is this appliance being installed in a Manufactured/Mobile Home? Yes / No
When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property
lines, tank location and size,distances from the propane tank to all property lines,buildings and septic system components,
including the reserve area.
Square Footage _Current Proposed For Office Use Only Amount Revision
Main Floor Heated EH Bld App Review:
2°Floor Heated Consistency Review:
. i:-
-
Other Heated Base fee: I f I • a5
Mezzanine Additional Section:
_ 2 . ;r:..
Heated Basement Plan Check fee: ^ / 1
1 •,' -1 Y State Surcharge fee: o`
Unheated Basement r , ,
'Tr- I „iji11I- : 4 .5o •
Other Unheated Pot Water Review fee:
Garage/Carport SUBTOTAL l�S Mn�
Decksaei, / n O„i p^ 11/Rd Approach fee: l—_
("ICJ e4;V., itiltt#1:
Other _ TOTAL: $ 1 S%• O ,
Receipt Number: 105 no
Cash/Check Number: CI 4
^�
ESTIMATED COST(REQUIRED) Date: cf �7
•Fair market value of all labor and materials foundation to finish t a31oq
/ c0 0 Initials:
E
v • —
G:\PermitCenter\###FORMS###\DRD FORMS\Master Permit Application 5-29-08.doc
O ' V} (0 ...0g
0 t � 73 cn yd
•Z--, fl "iii.
i At
► f V -
,f
C3 �' 0 .
® `
,`sue � {.._.... .....
b •
o
r— ,
— .
,, .
.t
-...) :+:- ,
1. i
....7,.....,. ....,
ca
' 1 1 , " g
fik' \ 0
HaAO
N
4,�,,
r
3
! ' i
Az) i ,i. 0
, A., , .1
a
4 1
,
1 J
4
5 -
ro
UN.)
ms ,.-
' Z11 Zi
g.)-c , atill,-4N- ItN t- ...s?i, I , .... ' . /fit
1355.
CUI qb, off.
t yi A W - s
tix
/ ,.::,--,-,-ikt ,..,-,..--.-.,, ., 1).<7;4-‘ fv:`.,..':!, (.' It-. /
•
lb
1a U izi
;
rn . _
1 .
tfk.
8 t I III 1 A )Y
RV v
...._ ,, . ... ' ; ' ej4 1J,' C , ik% 4/ Agr:;› 4; t_477 '
— --
ate+ '... s . .. , _
<iiiliob..."
do •
1
73
e
m ' �.
_ T
lb
�n � ..
it zn ,
m i..__ x
•
zj
T
nR.7
END ril
me Celt
tfj
Cr li••••••
•••ti 1
: