Loading...
HomeMy WebLinkAboutWORKSHOP re Auditor's Office Annex relocation1 JEFFERSON COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST TO: Board of Commissioners FROM: Josh D. Peters, County Administrator Shawn Frederick, Central Services Director DATE: March 16, 2026 RE: WORKSHOP re: Space Planning Options for Relocating Auditor’s Annex Staff upon Termination of the Port of PT Lease STATEMENT OF ISSUE: As part of the 2026 budget process in late 2025, the Board directed staff to terminate the Port of Port Townsend Lease (Auditor’s Annex) to reduce ongoing costs to the General Fund. The target date given to Central Services staff was May 31, 2026. The Port lease terminates in September 2026, though the County has provided notice to the Port for early termination (end of May 2026). Definitive direction is required now to be able to vacate the Auditor’s Annex on Port property this year or to extend the Port lease. ANALYSIS: To accomplish vacating the Port property by May 31, 2026, space planning and relocating staff have been necessary. Based on discussions with internal stakeholders, Central Services developed information on five scenarios. The Board was introduced to these scenarios and other factors shared by potentially affected electeds and staff on March 9. Each option was listed with current location, proposed location, office type, timeline for completion, and cost estimates. On March 11, the Auditor’s Office has proposed a space scenario (attached) to accommodate Auditor’s staff within the Courthouse. At this juncture, the two most viable options are the following: 1. Accept the March 11 Auditor space scenario. Direct Central Services to pursue implementation, which includes commitment to appropriation of funds. The most likely timeline for implementation implies County withdrawal of early lease termination with the Port. The Auditor’s Annex on Port property would be vacated on or before the least termination date in September 2026. Appropriations would include lease and utility payments for the Auditor’s Annex at the Port through the lease period. 2. Extend the Port lease for the Auditor’s Annex, including a six-month early termination provision. Continue space planning for the Courthouse and Courthouse Annex (i.e., the building in back). Incorporate decision points and projected expenses into the 2027 budget process. FISCAL IMPACT: The fiscal impact will be dependent on which option is selected. 2 RECOMMENDATION: Review scenarios and determine which option best aligns with the county’s Strategic Plan. REVIEWED BY: _______________________________ _______________ Josh D. Peters, County Administrator Date 3/12/2026 Jefferson County Court House First Floor Plan 149 P�7:3 134 48'-4 I/Z" V-7" 40'-7 1/4" 4m -0 1)4� .41 I'll FA. _71T 1_�g '41 1/4' 134A 10'. i�y 7' 173A. W-0 f4 N X� V 7 - r 17113 131 131A142 142A 152A 18' I\Y k 133A EK I GOB ',4, 9'-Jbj- I- 153AI 1 151 153 172A ❑ Assessor r... ....... 4. 9.29" Is 141 14] I -A F1 "'Vault Elevator 'r=— — F 130- 14QA I 50AOA) Auditor 170A 101C F] J �? Entrance-, Corridor 170 3 T7 OB �2 110— 4 IT-10' 20A K.A' 41, 110A V-' 18 yig. 261-10" S2 \ I10 t 1 176A 7, Break Room Treasurer 176 .3— I LOB] A 174A 7 175A nt 121A 113A A 03A Entrance z Vault k EE r aj I It .. .. ... 91 1-17 01A 1-174 J 122A 111A 641 20. 19'-61/4 15 123A 112A 14 21[ E111 ......... ......... ------- 0 123 V-6 - I L--Ij 4 4 AutocadDrawing; January 9, 2002 Scale In Feet Revision Date By Revision Date By 11 Revision Date BY August 5, 2002 pp 0 1 3 5 10 is 0, Z 7rV I