HomeMy WebLinkAboutBLD2009-00222 ! •
CERTIFICATE OF OCCUPANCY
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
(360)379-4450 FAX (360)3794451 (800) 831-2678
Al Scalf, Building Official
PERMIT #: BLD09-00222
SITE ADDRESS: 743 BYWATER WAY Issue Date: 10/13/2009
PORT LUDLOW, 98365 Final Date: 3/29/2011
APPLICANT: WHITNEY E MEISSNER PHONE: 360-437-0198
ANTHONY J MEISSNER
743 BYWATER WAY
PORT LUDLOW WA 98365-9238
SUBDIVISION: WHITE ROCK COVE TRACTS DIV II Block: Lot: 4
PARCEL NUMBER: 821265016 Section: 26 Township: 28 N Range: 01 E
PROJECT DESCRIPTION: ADDITION & REMODEL TO EXISTING SFR & RE-LOCATE A/G 120 GAL
PROP TANK
THE PROJECT LISTED ABOVE COMPLIES WITH THE REQUIREMENT OF THE BUILDING
CODE 2006 EDITION.
OCCUPANCY GROUP: R-3
TYPE OF CONSTRUCTION: 5N
SPRINKLER SYSTEM yes no
THE PROJECT PASSED ITS FINAL INSPECTION AND RECEIVED FINAL SIGN OFF ON 3/29/2011
I:\F_BLD_Occupancy.rpt 10/29/19
1UILDING PERMIT APPLICI N MRAOw0023a
Ype: I
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD09-00222 Received Date: 7/14/2009
SITE ADDRESS: 743 BYWATER WAY
PORT LUDLOW, 98365
OWNER: WHITNEY E MEISSNER PHONE: 360-437-0198
ANTHONY J MEISSNER
743 BYWATER WAY
PORT LUDLOW WA 98365-9238 WHITE ROCK COVE TRACTS DIV II
SUBDIVISION: Block: Lot: 4
PARCEL NUMBER: 821265016 Section: 26 Township: 28 N Range: 01 E
CONTRACTOR: TOLLEFSON BUILDERS INC PHONE: (360) 732-4080
TODD HULBERT
PO BOX 100
CHIMACUM WA 98325
Contractor's License TOLLEBI977N9 Expires 3/16/2011
REPRESENTATIVE: PHONE:
PROJECT DESCRIPTIOP ADDITION & REMODEL TO EXISTING SFR & RE-LOCATE A/G 120
GAL PROP TANK
TYPE OF WORK RES SQUARE FOOTAGE:
TYPE OF IMP ADD MAIN: 1,000
VALUATION 102,663.00 ADD'L: HEAT TYPE: EEE
CODE EDITION: 2006 HEAT BASE: HEAT TYPE:
OCCUPANCY: R-3 UNHEATED: # OF STORIES:
OCCUPANCY: OTHER:
CONST TYPE: 5N GARAGE: SHORELINE:
CONST TYPE: DECK: SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL: CON
WATER SYSTEM:
BEDROOMS: BATHROOMS:
Exist: 2 Exist: 2
Prop: 2 Prop: 1
Total: 4 Tonal: 3
Routing Date:-1— 4-061
-�
Type Amount Paid By: Date: Receipt: Approved/Date
Permit $1,010.55 LYK 07/14/09 108803 APPROVED
Plan Check $656.86 LYK 07/14/09 108803
State Building Code $4.50 LYK 07/14/09 108803 OCT 13 2009
Total: $1,671.91 Jefferson County Planning
&Building Department
Jefferson County Building "Lion Permit NAIL: BLD09-00222
Applicant: MEISSNER
BUILDING PERMIT INSPECTION APPROVALS \pplicable Code: 2006 International Building Codes
To schedule inspections, call (360)379-4455
ELECTRICAL PERMITS are issued by the Washington State Department of Labor& Industries.
The electrical permit must be signed off by the State Inspector prior to the County's Framing Inspection
Inspection Item Date Approval Signature Notes
Setbacks b ' -OCl ‘14,NOcjiekit Minimum setback from Bywater Way right-of-way shall be 20 feet.
Minimum side and rear yard setbacks shall be 5 feet.
Erosion Control SEE CONDITION 1
Foundation Footing -- .0c1evAkic- -c l gtiw` o C--(,, 3
Footing Drains a,d ` •
_Zti.�D ( i_ J ,�� t I I
t JIJ�
Foundation Stem Wall �Z��`ti �,
��� �Jr
.Uadergrd Plumbing
Under Floor Framing `,I_ _64
Straps(hold downs) C " T
Ext. Shear Wall Nailing1
Rough-in Plumbing
� [b ( ls�
Framing _6d
Blocking i
Airseal U !�
Insulation:Walls
Insulation: Floors _1—).- 0 \i (�.,
Insulation: Ceiling �ll VV
Int. Shear Wall Nailing `J
Wallboard Nailing I 2 A
tb
Gas Line: Interior
Gas Line: Exterior ppj VIA)61 �� �� I e < Z (6 `f 6
Propane Tank
Heat/Chimney Clearance
Drywell/Alt Drainage Existing
Address Posted
FINAL INSPECTION 2 _ `l /a7
FINAL INSPECTION MUST BE APPROVED PRIOR TO BUILDING BEING OCCUPIED
THIS PERMIT IS VALID FOR ONE YEAR
• •
CONDITIONS for Building Permit# :BLD09-00222
1.) EXPANSION OF THE SEPTIC SYSTEM IS REQUIRED. THE SYSTEM ISSUED UNDER
SEP09-97 MUST BE FINALED PRIOR TO FINAL APPROVAL OF THIS PERMIT.
2.) CONSTRUCTION ENTRANCES SHALL BE STABILIZED WHEREVER TRAFFIC WILL
BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR
OTHER PAVED AREAS WITHIN 1,000 FEET OF THE SITE.
THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM COMPACTED SUBGRADE.
QUARRY SPALLS (OR HOG FUEL) SHALL BE ADDED IF THE PAD IS NO LONGER IN
ACCORDANCE WITH THE SPECIFICATIONS. (BMP C105, 2005 DOE STORMWATER
MANUAL).
ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED BY
SHOVELING OR STREET SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING
SHALL BE REMOVED OR STABILIZED ON STIE.
ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD, WHICH END UP ON
THE ROADWAY SHALL BE REMOVED IMMEDIATELY.
UPON PROJECT COMPLETION AND SITE STABILIZATION, ALL CONSTRUCTION
ACCESSES INTENDED AS PERMANENT ACCESS FOR MAINTENANCE SHALL BE
PERMANENTLY STABILIZED.
3.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water
quality degradation. The submitted proposal does not require additional aquifer
protection measures. However, during construction the project shall follow the Best
Management Practices (BMPs) and facility design standards as identified and defined in
the Stormwater Management Manual for the Puget Sound Basin.
4.) The project shall comply with Construction Stormwater Pollution Prevention (SWPP)
Elements#1 through #12 of the Department of Ecology's Stormwater Management
Manual for Western Washington to control stormwater, erosion and sediment during
construction. BMPs shall address permanent measures to stabilize soil exposed during
construction, and in the design and operation of stormwater and drainage control systems.
5.) A Stormwater Site Plan has been submitted and approved by the Department of
Community Development. Once the subject permit has been issued the applicant shall
fully implement the provisions of the submitted plan and contact the Jefferson County
Department of Community Development to arrange a schedule to inspect the property for
plan compliance. A Certificate of Occupancy will not be issued until the Department
verifies plan compliance. No clearing for roadways or utilities shall occur on the project
site until clearing necessary for the installation of temporary sedimentation and erosion
control measures have been completed.
6.) Outdoor residential storage shall be maintained in an orderly manner and shall create no
fire, safety, health or sanitary hazard.
7.) Not more than 2 unlicensed vehicles shall be stored on any lot unless totally screened
from view of neighboring dwellings and rights-of-way. Such screening shall meet all
applicable performance and development standards specific to the district in which the
storage is kept, and shall be in keeping with the character of the area. Screening shall
meet the requirements of Chapter 18.30 JCC. Outdoor storage of 3 or more junk motor
vehicles is prohibited except in those districts where specified as an automobile wrecking
yard or junk (or salvage) yard and allowed as a permitted use in Table 3-1 or Chapter
18.18 JCC, and such storage shall meet the requirements of JCC 18.20.100, Automobile
wrecking yards and junk (or salvage) yards. In no case, shall any such junk motor
vehicles be stored in a critical area.
8.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of
impervious surface which includes roof tops, driveways, concrete, etc.
9.) The building height is not to exce35 feet. •
10.) Minimum setback from Bywater Way right-of-way shall be 20 feet. Minimum side and rear
yard setbacks shall be 5 feet.
11.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the
finished grade, excepting when such lighting is an integral part of a building or structure.
Ground level lighting is encouraged.
12.) Lighting fixtures shall be designed and hooded to prevent the light source from being
directly visible from outside the boundaries of the property. The intensity or brightness of
all lighting, during construction and after project completion shall not adversely affect the
use of surrounding properties or adjoining rights-of-way.
• •
•
DUI 'colonnSUO) NOl9NI1-163111'1____ ___''N.1.g111 L1311g(IIA9 CM-
_
ono!d 3�N3ois3�1 a3Hssiaw - RR i s(9 It 4 el
'LIP!NOLLIOW 0360dO21d b g z • 3
11
01
iq
r ill
I .!•
_,....„.. ..,\10....-..1 ,,, .,, , og
......, ...,, ....... ...,t, .....
.....x•..„„ f .... . .0_.. ,
..
\Z"'. .....
i
1' €. .;V 1 : :, 77
e E •µ n! 3 i
. i
n/ ^
Iw'I
1.
.0 1 1 1 s
�.K 1 f .�''' i t.F f
au aauar 1 7 11
, i k. ,
® -�,
JO o
X li 31
'• 11 V
na - 47,1101(--
_ 1
70
ZSL 1
Y
PI 1 ?i Fr g�
g
,. g
£3� r
a ri g
�; I. a° ,..f
11
o ill
r t iif A
Fu .,. LL 8
sE a z
• •
Ir�� N e06, JEFFERSON COUNTY
` DEPARTMENT OF IF** COMMUNITY DEVELOPMENT
621 Sheridan Street• Port Townsend •Washington 98368
$ -ty 360/379-4450 • 360/379-4451 Fax
{4�INc� www.co.jefferson.wa.us/commdevelopment J U L 1 4 2009
Master Permit Application MLA: C 1--'a'3L
Project�scriLptio�nn(inc�udrate sheets as t _
Ari L t sk, I hod�( O tr l S I SF' ¶ �.-Lor 4�r,t-
Tax Parcel Number: C} ti / ti io J u/(v P
foperty Size: "Z,562 'square feet)
Site Address and/or Directions to Property:
714 3 b'Yvt l>CI-7L - (1)14 V Al T/2T L UbLOU,J
Property Owner(s)of Record: ,U t1 LU#)TX) ' / /SSALT612 -7
Telephone: L{37_ /` }' Fax email: (�l�a tUA 01 1 ricle,r1Q-t
Mailing Address: 743 SYKA EIL tellY ,J L-U&Ot ), evil- 93k6---
Applicant/Agent(If different from owner):
Telephone: Fax: email:
Mailing Address:
What kind of Permit?(Check each box that applies
Muilding ❑Critical Areas Stewardship Plan
❑ Demolition Permit ❑Variance(Minor,Major or Reasonable Economic Use)
,fir Single Family ❑Garage Attached/Detached ❑Conditional Use[C(a),C(d),or C]**
❑ Manufactured Home 0 Modular 0 Discretionary"D"or Unnamed Use Classification
❑ Commercial* 0 Special Use(Essential Public Facilities)**
❑ Change of Use ❑Boundary Line Adjustment
❑ Address El Road Approach ❑Short Plat**
❑Home Business ❑Cottage Industry ❑Binding Site Plan*"
❑Propane 0 Long Plat**
❑Sign ❑Planned Rural Residential Development(PRRDyAmendments**
❑Allowed"Yes"Use Consistency Analysis ❑Plat'Vacation/Alteration**
❑Stormwater Management ❑Shoreline Master Program Exemption/Pemiit Revisions**
❑Site Plan Approval Advance Determination(SPAAD)* ❑Shoreline Management Substantial Development--
❑Temporary Use 0 Shoreline Management Variance
❑Wireless Telecommunication* ❑Comprehensive Plan/UDC/Land Use District Map Amendment
❑Forest Practices Act/Release of Six-Year Moratorium ❑Jefferson County Shoreline Master Program Amendment
*May require a Pre-Application Conference ❑Tree Vegetation Request
"*Requires a Pre-Application Conference
Please identify any other local,state or federal permits required for this proposal,if known:
DESIGNATION OF AGENT
I hereby designate to act as my agent in matters relating to this application for permit(s).
OWNER SIGNATURE Date:
By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of
his,her or its knowledge, material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet
may result in this permit being null and void.
I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and
expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit.
I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application
review and any uired later inspections. Staffs access and right of entry will be assumed unless the applicant informs the County in writing at the
time of the ap ' ti that he r is prior notice.
Signature: Yr 4-----..._. Date: (__ _ C
The action or actions Applica t will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or
endangered species and could lead to a potential`take"of an endangered species as those terms are defined in the federal law known as the
"Endangered Species Act or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this
permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your
action(s)even if you are in compliance with the Jefferson Countydevelopment code.TheApplicant acknowledges
and non-trans )p responsi 'ity for dheri to and complying p odds l that he,she s It and dates it belol
n9 plying with the ESA. The Applicant has read this disclaimer and sins below.
signature: 6( (I (A — Date: 2,. ..,; > &
G:\PermitCenter\###FORMS###\DRD FORMS\Master Pemrit Applianion 5-29-08.doc
• •
BUILDER STATEMENT
The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that
they will be assuming the responsibility of the General Contractor for the proposed project.
Signature: Date:
GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: RH9NE:1 4 2009 FAX:
7eK / (. �.c�) 7 3z—qc, e) (344i-73 1- y�7 6f I
MAILING ADDRESS: Pt.13 � '1 C h i kckt 1-1-Pt;0)/4 c2 .'��S_EMAIL: "6;41 l=r-e ile f y /1 0 L L i Ice f.J.c C,/'vi
CONTRACTOR'S LICENSE WAINS
NUMBER: Tou J 13 L 7 7 7 A/9 NUMBER
ARCHITECT/ENGINEER: PHONE ( ) FAX:( ) 1
MAILING ADDRESS: EMAIL
Project Type: ' Frame Type: Bathrooms: Z Shoreline: Type of Sewage Disposal:
Li New )St Wood Existing: ❑ Sewer
X Addition I 1 Steel Proposed: / Bank 0 Community System
[1 Alteration/Remodel LI Concrete Total: — Height: k Individual System
[I Repair ❑ Masonry SEP Permit#
[7 Demolition 0 Other: Bedrooms: Water Supply:
Existing: ..' Setback: ❑ Private well ❑ Two Party
Type of Heat: Proposed: ,l- ,K Public
e(.C<r?I C_ Total: if- Name of System:
If this is a Commercial Project you must answer the following:
Number of Parking Spaces: Current Proposed: Number of ADA Parking Spaces:
Number of occupants(includes owners,tenants,employees,etc) Current Proposed
IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No
If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply:
1 Underground Tank 1 Above ground Tank Size of Propane Tank:
I Heat Stove I Cook Stove 1 Woodstove I Fireplace Insert 1 Hot Water Tank I Pellet Stove I Other
Is this appliance being installed in a Manufactured/Mobile Home? Yes / No
When applying fora permit to install a propane tank you must also submit a site plan showing all of the buildings,all property
lines, tank location and size,distances from the propane tank to all property lines,buildings and septic system components,
including the reserve area.
7
Z a t Fes;s r sue; :;:',, ` i��1 -?I ..:Y k
Square Footage Current Proposed r: 'v t 4i t •�, f� ...."f � .:} .. t i• it ` . '!:n ! .: r
Main Floor Heated 4 , I : rH Bld App Review: r7
—61 2 Floor Heated :'.':14' r W Consistency Review:
Other Heated ' . .- Base fee: 01
0 3-
Mezzanine 1 iil'` w ' Additional Section:
..1.-_) ,--,;',f ems*' r--
M
Heated Basement n ti Plan Check fee: /
Unheated Basement 'a.,,,, €sett-r• State Surcharge fee:
Other Unheated 'INtAi , ;_ Pot Water Review fee:
Garage/Carporl SUBTOTAL ,l
t nFs' `°
Decks oil
1 4-, 911/Rd Approach fee:
vv„...,-,...-,,,..., EXI 51-14_
��
Other 'E „+`_ TOTAL $IQ ls� I
'
Receipt Number: I OST,I)3
w Cash/Check Number: 51
ESTIMATED COST(REQUIRED) Date: I r�
.Fair market value of all labor and
ttmaterials foundation to finish ( l r(J-I
•1 (_I(,J�',c -�:_f Initials: •
G:\PermitCcnter\###FORMS###\DRD FORMS\Master Permit Application 5-29-08.doc
• •
10#5-°11
°te> JEFFERSON COUNTY
,F` kiii, ,.d DEPARTMENT OF COMMUNITY DEVELOPMENT
J U L 1 4 2009 _ ,
4. , , 621 Sheridan Street • Port Townsend • Washington'98368
•qs �O
360/379-4450 • 360/379-4451 Fax
87NG http://www.co.jefferson.wa.us/commdevelopment/
STORMWATER SITE PLAN SUBMITTAL TEMPLATE
MLA# oft - a 54 PROJECT/APPLICANT NAME: Am1"l_k),u% / /I/l&iS,AJ
Please answer all of the following questions to the best of your ability. Where the question calls for depiction on a site map, the
applicant may choose to either incorporate the elements into the general plot plan for the Master Land Use Application or to submit a
separate stormwater site plan map.
Project Overview
1. Describe the proposed developed conditions of the site. Indicate position and relative size of proposed improvements on the
site map.
/4i.D 1,002 sc F'r -ro .x is y-i/ti- I-brit&- 'kJ -2 ,S fh2c S/ , . AJo
4DbL m AJ,4 _. i?2r4p a& lr• y tAJo , tot i46CO 'Gfc D
Existing Conditions Summary
2. Describe the existing topography. Indicate contours on the site map.
•7/1 .3t.1/LP/rt?6 S t-7-5- is 1 V C-L_/ E/ CK.VA-gl) 'St_.OP: bel4c.v .4Gv i,' ; As
r--buss AS /4 /C -b Okr /rE A44P.
3. Describe the existing vegetation. Indicate native vegetation areas on the site map.
5 x t3ei,e y auskfc5 r).v.StoPE > f 5D ' rieavi /4-00-4C, --77c65
(42,a6 Fi/c) ox- SOLI✓/4 EA-S ' 5/o6 Or/401,. 6 -
4. Describe the existing soils. Indicate soil type on the site map.
Log N{y34/VD/sAiliDy Lo4it, --v AitjprT JC'2-/ 'iv (S&r ,iL Lo6 A-iir-4c--4- --)- liu.1
Sr-P;1C F.(t6)
5. Describe the existing site hydrology(i.e., drainage; behavior of water on the site—above, below, and on the ground). Indicate
existing stormwater drainage to and from the site on the site map. Depict separate drainage basins on the site map, if
applicable, and indicate acreage of each.
rxaGL4F,fr DP..A-itu. { A1,041 I d,t4 Suizi2m)b, SiT-e f z itiiv _l-oPE
No DRAIA» 61 L 1AJ7o CXerZ PiL9/2
APPROVED
6. Describe any excess levels of noise generated by the proposed use or activity STORMW A , .
SEC--Lu,i)-..J(e1 k6A r 4)0/z/y74 -- Ain 5k- D Lc211;11 Co / ' .1 III
Regt* JEEP RSO
DEP7:OF C'O •UN
;4:
A�1.. I v jiltFv.N
stormwater site plan template-rev.10/21/2008
•
7. Describe significant geographic features and critical areas (i.e., environmentally sensitive areas such as wetlands, streams,
steep slopes,etc.)on the site. Indicate location on the site map.
i 6 U.SE l S Dit) 1 1 LL- G.6--)UTL S LdPE f}-kJi \/ E/2 /fit G40,t46.
/tfo U1E7L JUhS Or STK�- MS
8. Describe the general vicinity of the site, including adjacent land uses and structures, utilities, roads,and sensitive/critical areas
(streams,wetlands, lakes,�ste.e slopes,etc.).
73(ACK 7VPPE CAb /4s S HO&,u vIL/ .5 t�AP ( 5 tJ 10A-V&)
IJ`rOODFD 1_6 l S 80TH s iDE,S of PfZOPEP.-ry /-1.UD G7Kr&v'
3o-troA4 of P>2cPEQrygoii2PO//J&7
Pi412fiD tse Rgy koi4 D.
Permanent Stormwater Control Plan
This portion of the Stormwater Site Plan consists of the selection and installation of the appropriate stormwater control BMPs'.
and facilities to remain in place after construction of the project is completed.
"Medium" size projects are required to have the totals calculated of all impervious surfaces, pollution-generating impervious
surfaces, and pollution-generating pervious surfaces to verify that the thresholds for treatment facilities and flow control
facilities are not exceeded.
g. Describe the developed site hydrology, as proposed. Indicate whether stormwater will be fully dispersed (i.e., per BMP T5.30
in the Manual) or, if not, what types of stormwater flow control will be utilized for the site or specific threshold discharge areas
within the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities.
55-01t1n lvl4TER,.. 65 cz DisPISEL>. ,Q) ?/ I-J/ 4 I,S S ut'5 144 U� & J
10. If the project requires the use of stormwater treatment facilities, describe the types of stormwater treatment facilities proposed
for use on the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. [This is
normally for"large"projects or projects that involve the potential for dispersion of contaminants.]
!* 1 L-rr/ t(1)1 i z3 /1SF1L a v RI/l--y
11. Describe the performance goals and standards applicable to the project.
��,�JiLt iStoiy C�� _P iACT —
12. .D.escrabe the flow control'system.
10g" itior airy--x9j? 1r, Ficer rz_ofris
1 ' V
t
stormytter$iteFllan`tempIate iv.10/21/20Q8, i
•
13. Describe the water quality system.
Ala
J U L 1 4 2009
14. Describe the conveyance system analysis and design.
%v/A __.�
15. Describe the source of fill material,physical characteristics of fill material, and deposition of excess material.
t5 S MR7E-1 j AL_ cola ,3 L/SE L To PILL bit} I-OGU S Po75
CA) P/1 E-e7\. Jc F'1 LC-- GUC(C_ R&Q u t 12�
16. Proposed methods of placement and compaction consistent with the applicable standards on Appendix Chapter 33 of the
Uniform Building Code.
A O D t r-tDi�-L- &11V1°)4CTTO
17. Describe the proposed surfacing material.
D211161014 A-L2. b / Q,u S t ry
18. Describe methods for restoration of the site.
�d ts-O/-i4TlOAJ W 1 c L- SE /VEcr s����/. �X/ST/AJcn Dk L l//t 4'(
19. An Operation and Maintenance Manual is required for each flow control and treatment facility. [This is normally required for
"large"projects only and only those for which facilities are required to control flow or treat runoff.] If included, list the Manuals
here.
MIA
20. List here and include any special reports or studies conducted to prepare the Stormwater Site Plan.
AjO i Pc(?r5
21. List other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals include
conditions that affect the drainage plan or contain more restrictive drainage-related requirements, describe those conditions or
restrictions here.
Si✓Pi K Sys-re-AA
stormwater site plan template—rev.10/21/2008
• •
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (SWPPP)
The Construction SWPPP addresses sediment and erosion control during construction. The BMPs indicated by the applicant in the
template that follows must be installed on the ground during all construction phases of the project. The proponent is responsible for
preventing sediment and erosion impacts to environmentally sensitive areas and off-site areas. Consult the Construction Stormwater
Pollution Prevention (SWPP) Best Management Practices (BMPs) Packet for guidance, particularly with rural residential
development.
SECTION I—CONSTRUCTION SWPPP NARRATIVE
1. Construction Stormwater Pollution Plan Elements. Describe how each of the Construction SWPPP elements has been or
will be addressed. Identify the type and location of BMPs used to satisfy the required element. If an element is not applicable
to the proposal,justify in writing. Descriptions of the 12 Elements are found at Volume II Section 3.2.3 of the Manual (beginning
on page 3-7).
12 Required Elements—Construction SWPPP
1. Mark Clearing Limits.
SOU t�L SM P-u-. 7 S WILL- 13E FEI L :b, STu/v4OS 12 L,v1CV&.
-7-,ere.s b sT-1114Ps 7Z' ,a DtsPoSEb of O.V n-- •
2. Establish Construction Access.
FYI 5TI-(1L Th I 10-11-V
3. Control Flow Rates.
D>24IAJ' Sat /-1 MsT - 7420u6 4 -rREEs s Stuoru1 S1.oPe
A7a4s S 1 Ai 1R t_i4C � Q L c Q�L�v L - wLtil� iPc 1T/ u
()F l� 1A) FiEL- (.i26-s c It1 t Li— 5 f 4 l a
4. Install Sediment Controls.
40_5 s l Bu,S li.r oXl s-77,06
5. Stabilize Soils.
(12A6Sr 3usl-/rs 7n S 15xl5i (J
6. Protect Slopes.
&L)Pe Wbf f T[L (b1 4/ s ,9701) rX(s 7 7A}c
•
7. Protect Drain Inlets.
•
stomwater site plan template—rev.10/21/2008 8
• •
12 Required Elements-Construction SWPPP(continued) '
8. Stabilize Channels and Outlets.
/JO> OetTET4 al.!- 1 4 LUGS
9. Control Pollutants.
Thhir PC u._t c.T7Ovu , - crele_ tutu_ USE SPILL 1 t-7l
r
10. Control De-Watering(the act of pumping groundwater or stormwater away from an active construction site).
AllyT A-PPLICABLE
11. Maintain Best Management Practices(BMPs).
-5u13 CD 1CP)12-S GviLL t3 PPOFE S1&/UIL 1 T' Y 11-LL.
Lo't , (,s /2lC/AJ(77 RRLigT/O_ I Lp s W r 71-J /`5Par/9-131 G t t
Zem)72 is 7a/2.__
12. Manage the Pro ject.
� VI'S iT 5 t L, '/L y f,-S eufL, s
2. Adjacent Areas.
a. Description of the adjacent areas that may be affected by site disturbance (e.g., streams, lakes, wetlands, residential
areas, roads).
4J) /11)J) 4 ZEi(1 Lt)I LL. , P/S 1IT1 &b
b. Description of the downstream drainage path leading from the site to the receiving body of water(minimum distance of 400
yards).
f�T 1 4;ST- 700 I 7U Dg_c_P J C N 6EsiL rR- 14 b/s6 /'4 VRD ,q,
.13a 7r' q ry,c' SC DPE, do PtFS of cUlt7n2 lot-r-0x 1 41C0
3. Environmentally Sensitive Areas.
a. Description of environmentally sensitive areas that are on or adjacent to the site.
stormwater site plan template—rev.10/21/2008
9
•
• •
b. Description of special requirements for working in or near environmentally sensitive areas.
/t_M JOE
4. Erosion Problem Areas. Description of potential erosion problems on site in the context of the characteristics of the on-site
soils(e.g.,erodibility, settleability, permeability,depth,texture, soil structure).
(JJ&LL, 65- 8LIS t-�D 0 tTte D2p-/.t,l ft� we 1_ 8e /14 ,e iF/eb, 1 tJ iJE
6ie& P
s L Ji L R L/ !D��g A-Fr / zooe_t_ is ecm,,ot E-77- • sLOPe /5
Gib / it,J0 tJLz Gu4z
5. Construction Phasing.
a. Construction sequence
FoGA-AJtir4Ti OK)1 DiQ /'v PicPos&b A-DD/T/&c.3,
772 7ug.&/ raCi/ ! ,41-PD
b. Construction phasing(if proposed)
6. Construction Schedule. Wet season is October 1 through April 30(page 2-21 of the Manual).
Provide a proposed construction schedule.
DR}/ /A) A-DDrrlon.J wcat,b/A 7 Ito Ram &y IFC61/v/u14)67 of
II. Wet Season Construction Activities.
a. Proposed wet sewn construction activities.
/�t s loR Ayo2 K ( PLamBixibi rAt 1 DkylviekttL/ �� •
b. Proposed wet season construction activities for environmentally sensitive areas.
AhwE-
7. Financial/Ownership Responsibilities.
a. Identify the property owner responsible for the initiation of bonds and/or other financial securities.
_ ILC/ /L ) tvN/7 U / iW�scu i-
b. Describe bonds and/or other evidence of financial responsibility for liability associated with erosion and sedimentation
im acts.
-- 1 30tiU/1-L /tP0tv5/ 3/L 1 T 1�/
8. Engineering Calculations. Provide Design Calculations on a separate sheet for the following, if applicable.
a. Sediment Ponds/Traps. i1.
b. Diversions.
c Waterways. — —_----___--�-
u. Runoff/Stormwater Detention Calculation
stormwater site plan template—rev.10/21/2006 10
# •
Stormwater Site Plan Changes
If the designer wishes to make changes or revisions to the originally approved Stormwater Site Plan, the proposed revisions shall be
submitted to DCD prior to construction. The submittal shall indude substitute pages that include all proposed changes, revised
drawings showing any structural changes,and any other supporting information that explains and supports the reason for the change.
Final Corrected Plan Submittal
If the project included construction of conveyance systems,treatment facilities,flow control facilities, or structural source control BMPs
(not standard on-site stormwater management BMPs), the applicant shall submit a final corrected plan ("as-builts")when the project is
completed. These should be engineering drawings (stamped by a licensed civil engineer) that accurately represent the project as
constructed.
APPLICANT SIGNATURE
By signing the Construction SWPPP worksheet, I as the applicant/owner attest that the information provided herein is true and
correct to the best of my knowledge. I also certify that this application is being made with the full knowledge and consent of all
ow rs of the affected property.
-1f04/o9
(LANDOWNER 0 ZED REPRESENTATIVE SIGNATURE) (DATE)
THIS SPACE MAY BE USED FOR ADDITIONAL NOTES, IF NEEDED:
stormwater site plan template—rev.10/21/2008 12
A
a
t
� C� rno �1" ?/_Y 'M
)y5 S " '--)-- -- ) , ''v (A4M °&,,c. ,
(i �1 ' w o G �� rn � r d •
b - c�, i 7Ki -,/ -, , • -
1
N Iq I
- , ,q,k.7`ei'6-- -76-476 7P
ii •
• c/) 1 Z'1 1 4.. i
ri [� 10'D" .e,, _a
a
o _) t
I
C \ - % 1 Crl
�,.Z ! CAI
-� v G` o
1
q
_II
Cl 1 n i
11
1 II
1
m tN s I;
'� rn a
z. 1 kj
w I ,,�
rn yZ n'\ -1 cn
-i 1
. C-31 ,__:H-4 4 //,/ , .
-., --- R -,v --n --I ,,e I ,
'c
Imo ° o , aC �- * 1 _
�` ,� 1.
c E
v
Wt. ,QQ"QL l
IC