Loading...
HomeMy WebLinkAboutBLD2009-00346 BUILDING PERMIT APPLICA•N MRLA09-00p342 e: I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD09-00346 Received Date: 10/12/2009 SITE ADDRESS: 311 MATS VIEW RD PORT LUDLOW, 98365 OWNER: ANDREW P LAYTON PHONE: (206) 842-3728 ELIZABETH A LAYTON 14127 FARMVIEW LN NE BAINBRIDGE ISLAND WA 981101192 SUBDIVISION: Block: Lot: T 38+ PARCEL NUMBER: 821042005 Section: 4 Township: 28 N Range: 01 E CONTRACTOR: MARINE FLOATS PHONE: (253) 383-2740 1208 EAST D STREET TACOMA WA 98401 Contractor's License MARINF*085QP Expires 3/11/2011 REPRESENTATIVE: MARINE FLOATS PHONE: (253) 383-2740 1208 EAST D STREET (253) 383-1102 TACOMA WA 98421 PROJECT DESCRIPTION NEW DOCK TYPE OF WORK NON SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: VALUATION 102,000.00 ADD'L: HEAT TYPE: CODE EDITION: 2006 HEAT BASE: HEAT TYPE: OCCUPANCY: UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: GARAGE: SHORELINE: CONST TYPE: DECK: SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: WATER SYSTEM: BEDROOMS: BATHROOMS: Exist: 0 Exist: 0 Prop: 0 Prop: 0 Total: 0 Total: 0 Routing Date: -0q Type Amount Paid By: Date: Receipt: Approved/Date Permit $1,004.95 LYK 10/12/09 111079 ���� Plan Check $653.22 LYK 10/12/09 111079 O V E 1 State Building Code $4.50 LYK 10/12/09 111079 1 Total: $1,662.67 JAN if t' ;1 Jefferson County Planning & (siding.Department Jefferson County Building itsion Permit Nuer: BLD09-00346 Applicant: LAYTON BUILDING PERMIT INSPECTION APPROVALS applicable Code: 2006 International Building Codes To schedule inspections, call (360)379-4455 ELECTRICAL PERMITS are issued by the Washington State Department of Labor& Industries. The electrical permit must be signed off by the State Inspector prior to the County's Framing Inspection Inspection Item Date Approval Signature Notes Miscellaneous FINAL INSPECTION 5- 0 (1) PC FINAL INSPECTION MUST BE APPROVED PRIOR TO BUILDING BEING OCCUPIED THIS PERMIT IS VALID FOR ONE YEAR 1.) 1. Prior to receiving project final, project proponent shall submit a letter fr•he project engineer stating that the project was constructed per the approved plan sheets. 2. Removal of trees and shrubs from the shoreline are not authorized under this permit. 3. The proposed pier, ramp, and float shall not be used for residential purpose. 4. Boats that are occupied shall not be moored at private piers, ramps, and floats for longer than three days unless pump-out facilities are available in the immediate vicinity. 5. Docks, piers, and floats shall be marked as necessary to avoid hazardous conditions for water surface users, as specified by the U.S. Coast Guard. 6. The structure shall comply with U.S. Coast Guard requirements for safety and navigation. 7. A bulkhead shall not be allowed in the future to protect the pier, ramp, and float structure, which is a non-essential, non-appurtenant structure. 8. Any damage to the proposed structure shall be repaired or removed as soon as practicable. At the end of the useful life of the structure, or if unused for one year or more, the pier, ramp, and float will be removed as soon as practicable. 9. Flood hazard reduction measures are to be used as required by the Jefferson County Flood Damage Prevention Ordinance 07-0515-06 (Chapter 15.15 Jefferson County Code). 10. Construction Materials and Methods of Construction to Reduce Flood Hazard (i) All new construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage. (ii) All new construction and substantial improvements shall be constructed using methods and practices that minimize flood damage. 11. All new construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage. 12. All new construction and substantial improvements shall be constructed using methods and practices that minimize flood damage. 13. The project shall adhere to the Best Management Practices (BMPs)to control strormwater, erosion, and sedimentation during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 14. Prior to commencing development activity, proponent is responsible for informing the Washington Department of Fish and Wildlife (WDFW) in order for WDFW to determine whether this action is subject to the Washington State Hydraulic Code (Chapter 220-10 WAC). Hydraulic Project Approval (HPA) is required for all hydraulic projects, which are defined as construction or performance of other work that will use, divert, obstruct, or change the natural flow or bed of any of the salt or fresh waters of the state. 15. In addition to Jefferson County permit conditions, the project proponent shall comply with all conditions set forth by the Washington Department of Fish and Wildlife through HPA. 16. Prior to commencing development activity, the proponent is responsible for informing the US Army Corps of Engineers (COE) in order for COE to determine whether a Department of the Army permit or review is required. Generally, review is required for construction and dredging in or around navigable waters of the US and for work or fill in hydrologically connected wetlands. Contact the US Army Corps of Engineers, Seattle District Regulatory Branch, PO Box 3755, Seattle WA 98124, (206) 764-3495, for more information. 17. Work within the jurisdiction of the Shoreline Master Program other than as described above shall receive separate review from this Department. 18. Construction shall be in su tial compliance with the site plan approv December 30, 2009 as it exists n or is hereafter amended by Jefferson Cou ( and/or the Washington Department of Ecology. 19. No fill or other material may be placed in waters or intertidal areas of Jefferson County. 20. All lumber and other materials treated with preservatives shall be sufficiently cured to minimize leaching into the water or shore bed, in accordance with the BMPs approved by the Washington Department of Fish and Wildlife. 21. The design, location, and construction of docks, piers, and floats, as well as their subsequent use, shall avoid adverse effects on fish, shellfish, wildlife, marine vegetation, water quality, and geohydraulic processes. Construction methods shall minimize the use of materials hazardous to the environment. 22. Dock, piers, floats and boat houses shall be designed and constructed to minimize hazards to users and to be capable of withstanding the historic extremes of wind, wave, and tides at their location. 23. In areas of seasonal exposure to high wind and waves, docks and moored vessels shall be moved to a protected location during that time of year when high wind and waves are anticipated. 24. Dock and piers shall be set back a minimum of 10 feet from property lines except for joint use docks and piers, which may be located adjacent to or upon a property line when mutually agreed to by contact or covenant with the owners of the adjoining property, a copy of which shall be filed with the County Auditor and submitted with the building application. 25. Docks and floats shall not extend more than three feet in height above the water nor exceed eight feet in width. Piers shall be constructed to the minimum height necessary above historic extreme high tide and shall not exceed eight feet in width. 26. If provided, railings shall be of clear or open framework design and conform to the Uniform Building Code where required. 27. Construction of the pilings shall include stops, and the stops shall be designed to prevent the float from grounding during low tides. 28. The Agreement Regarding Joint-Use Overwater Structure submitted as part of shoreline permitting, which was received by Jefferson County on December 29, 2008, must be recorded with the Assessor's Office prior to submitting for a building application. Any changes in the recorded document(from that received by Jefferson County on December 29, 2008) require review and approval from Department of Community Development. • III (4-cv-- oN off, JEFFERSON COUNTY A DEPARTMENT OF COMMUNITY DEVELOPMENT `` ti `4 621 Sheridan Street • Port Townsend •Washington 98368 360/379-4450 • 360/379-4451 Fax �q".. O� www.co.jefferson.wa.us/commdevelopment .,. SrS Master Permit Application MLA: 09 -34 Project Description(include separate sheets as necessary): To construct a 152'-6"long dock. Tax Parcel 821042005 and 821042007 Property Number: Size: •64 acres (acres/square feet) Site Address and/or Directions to Property: 31 1 Mats View Road, Port Ludlow Property Owner(s)of Record: Andrew and Elizabeth Layton Telephone:206-242-2711 Fax: email: Mailing Address: 14127 Famview Lane,Bainbridge Island,WA 98110 Applicant/Agent(if different from owner): Marine Floats Corporation Telephone: 253-383-2740 Fax: 253-383-1102 email: angela@marinefloats.com an marinefloats.com Mailing Address: 1208 East D Street,Tacoma,WA 98421 What kind of Permit?(Check each box that applies OBuilding 0 Variance(Minor, Major or Reasonable Economic Use) ❑ Demolition Permit 0 Conditional Use[C(a),C(d),or C]** ❑Single Family 0 Garage Attached/Detached D Discretionary"D"or Unnamed Use Classification ❑ Manufactured Home 0 Modular 0 Special Use(Essential Public Facilities)*" 0 Commercial* 0 Boundary Line Adjustment ❑ Change of Use 0 Short Plat** ❑ Address El Road Approach 0 Binding Site Plan** 0 Home Business 0 Cottagelndustry 0 Long Plat** ❑ Propane 0 Planned Rural Residential Development(PRRD)/Amendments** ❑Sign OCT 1 2 ^'`,i,❑Plat Vacation/Alteration** n 0 Allowed"Yes"Use Consistency Analysis I 0 Shoreline Master Program Exemption/Permit Revisions** ❑Stormwater Management ❑Shoreline Management Substantial Development** ❑Site Plan Approval Advance Determination(SPAAD)* 0 Shoreline Management Variance ❑Temporary Use 0 Comprehensive Plan/UDC/Land Use District Map Amendment ❑Wireless Telecommunication* 0 Jefferson County Shoreline Master Program Amendment ❑ Forest Practices Act/Release of Six-Year Moratorium 0 Tree Vegetaion Request *May require a Pre—Application Conference **Requires a Pre-Application Conference Please identify any other local, state or federal permits required for this proposal, if known: DESIGNATION OF AGENT I hereby designate Marine Floats Corporation to act as my agent in matters relating to this application for permit(s). OWNER SIGNATURE Date: 9/25/09 By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of his,her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application review and any required later inspections. Staffs access and right of entry will be assumed unless the applicant informs the County in writing at the time of the app icat'on that he wa pri tice. Signature: , ) Date: 9/25/09 The actidn or ctions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or endangered species and could lead to a potential lake"of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)even if you are in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual and non-transfe ble resp nsibititpfor adhe_r_ing to and complying with the ESA. The Applicant has read this disclaimer and signs and dates it below. Signature: '� l t — Date: 9/25/09 C:\Documents and Settings\caral\Local Settings\Temporary Internet Files\OLK86\Master Permit Application 12-19-2006.doc • • BUILDER STATEMENT The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that they will be ass /ing the responsibility pf,f,theneral Contractor for the proposed project. Signature: ' ALL L~e g Date: 9/25/09 GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: FAX: . Marine Floats Corporation ( 253)383-2740 ( 2534)383-1102 MAILING ADDRESS: angela@marinefloats.com EMAIL: angela@marinefloats.com CONTRACTOR'S LICENSE WAINS NUMBER: MARINEF#085QP NUMBER , ARCHITECT/ENGINEER: Sitts and Hill Engineers PHONE (253 ) 474-9449 FAX:( ) MAILING ADDRESS: 4815 Center Street,Tacoma,WA 98409 EMAIL Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal: ❑ New ❑ Wood Existing: ❑ Sewer ❑ Addition ❑ Steel Proposed: Bank ' f.1 Community System ❑ Alteration/Remodel ❑ Concrete Total: Height: ❑ Individual System m Repair ?j 91 A a 11'L1 I ❑1t Masonry SEP Permit# ❑ Demolition ❑ Other: Bedrooms: Water Supply: Existing: Setback: ❑ Private well ❑ Two Party Type of Heat: Proposed: ❑ Public Total: Name of System: If this is a Commercial Project you must answer the followinq: Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply: ❑Underground Tank 11Above ground Tank Size of Propane Tank: ❑Heat Stove 0 Cook Stove 0 Woodstove ❑ Fireplace Insert ❑Hot Water Tank ❑Pellet Stove ❑Other Is this appliance being installed in a Manufactured/Mobile Home? Yes / No When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines, tank location and size,distances from the propane tank to all property lines, buildings and septic system components, including the reserve area. Square Footage Current Proposed For Office Use Only Amount Revision Main Floor Heated EH Bid App Review: 2nd Floor Heated Consistency Review: Other Heated Base fee: j cog q5 Mezzanine Additional Section: Heated Basement Plan Check fee: (53 Unheated Basement State Surcharge fee: , `C� 1 ' Other Unheated Pot Water Review fee: Garage/Carport SUBTOTAL Decks 911/Rd Approach fee: Other (� t j C ti\ 1294 TOTAL: $ I315_ (p' J I/ Receipt Number: ` I )C`1 Cash/Check Number: I U—I 3 kl ESTIMATED COST(REQUIRED) Date: O 1 Z .Fair market value o�aJl abor and materials foundation to finish U V1/ o�v1 Initials: c_ � "' lJl C:\Documents and Settings\caral\Local Settings\Temporary Internet Files\OLK86\Master Permit Application 12-19-2006.doc - / 1 — 1 • -- 1 I I / - 1 1 .- ---------1 I / I I I I I I I I I I I I I X I I I 7:1I I I g I I I I • I I I I ' i$ 1 I r mm gg2 I R i o 1 � g H I IPC cP > cc C C N- To 2e ,0>D0 n D VIX co O I ��pp LJ f�l I N I I ISM LA430'x O 7$• rts I �t�o:,��, I ..•x 1 I I 1 1...-------- 1\i I � I I Z - P y — I I I I g -I I - - � �� P m I VI u I120'x I q 94'x u • app 1! l. X u ' N 112 09 .A LA) \ O 0 01 1-, N O co N CT7 --I0 m -0 I C7 cn aD D75n d. z0 0DZ -< D -11 git-o� "Ft C, CA 4 ......, n 0 ao m ~ �'d m 4 pa n' o c o C�7 �j ?� N H '1 cn �o N o o W U N v C7 1::: n W 11,?P,.. ..0 '�`Z � c Co �' ` rn NJ w n S .iN v o co m .I-6O