Loading...
HomeMy WebLinkAboutCONSENT Change Order No. 7 Membrane Bioreactor Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Josh Peters, County Administrator From: Eric Kuzma, Public Works Director Agenda Date: April 6, 2026 Subject: Change Order No. 7, Ovivo USA, LLC Port Hadlock Wastewater Project Statement of Issue: Execution of Change Order No. 7 to the contract with Ovivo USA, LLC for supply of the Membrane Bioreactor (MBR) wastewater treatment plant equipment for Port Hadlock. Analysis/Strategic Goals/Pro's & Con's: Change Order No. 7 is a $12,694.00 (plus 9.2% WSST) increase to the Ovivo contract. The proposed change to the contract is an additional site visit for Ovivo's intergrator during the performance testing of the Port Hadlock UGA Water Reclamation Facility. The week long site visit occurred between October 13 - 16, 2025. Fiscal Impact/Cost Benefit Analysis: Change Order No. 7 adds $12,694.00 (plus 9.2% WSST) to the total contract price. The contract increases from $1,815,335.35 (plus WSST) to $1,828,029.35 (plus WSST). The project is funded at 100% by the Department of Commerce through the American Rescue Plan Act, State and Local Fiscal Recovery Funds. Recommendation: Public Works recommends that the Board sign Change Order No. 7 where indicated and return signed change order to Public Works. Department Contact: Samantha Harper, P.E., (360) 385-9175. Reviewed By: 9ai D. t 4/1/26 Josh Peters, County Administrator Date CHANGE ORDER NO.:7 Owner: Jefferson County Owner's Project No.: 405-21140 Engineer: Tetra Tech Engineer's Project No.: N/A Contractor: Ovivo USA, LLC Contractor's Project No.: Project: Port Hadlock Wastewater Contract Name: Port Hadlock Wastewater Effective Date of Change Order: Upon Execution Date Issued: 03/23/2026 by all parties The Contract is modified as follows upon execution of this Change Order: Description: This change order number 7 is for the cost of an added site visit for Ovivo's Integrator during the MBR start-up. The date range for this site visit was October 13—16, 2025. Attachments: ECN 15 for Additional Site Visit by Integrator to Port Hadlock Change in Contract Price Change in Contract Times Original Contract Price: Original Contract Times(for capital project): Substantial Completion: Per Article 2.02(Original Contract) $ 1,395,158.00(plus WSST) Ready for final payment: Per Article 2.02(Original Contract) Increase from previously approved Change Orders Nos. From previously approved Change Orders No.1 to No. 1-6: 6and8: Substantial Completion: N/A $ 420,177.35(plus WSST) Ready for final payment: Payment for CO 7 once CO 7 executed Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial Completion: N/A $ 1,815,335.35(plus WSST) Ready for final payment: N/A Increase this Change Order: [Increase][Decrease]this Change Order: Substantial Completion: N/A $ $12,694.00(plus WSST) Ready for final payment: Contract Price incorporating this Change Order: Contract Times: $1,828,029.35(plus WSST) N/A $ Ready for final payment: N/A EJCDC•C-941,Change Order EJCDC•C-941,Change Order,Rev.1. Copyright°2018 National Society of Professional Engineers,American Council of Engineering Companies and American Society of Civil Engineers.All rights reserved. Page 1 of 2 Reconi(end d by Engineer(if required) Accepted by Contractor a w. ( C- �� 3/30/26 U `1 f�a�/Z�2�:. Date Eric Schaefer Date County Engineer or Public Works Director Ovivo Project Manager Authorized by Greg Brotherton Date Chair,Jefferson County Board of Commissioners EJCDC•C-941,Change Order EICDC'C-941,Change Order,Rev.1. Copyright°2018 National Society of Professional Engineers,American Council of Engineering Companies and American Society of Civil Engineers.All rights reserved. Page 2 of 2 Ovivo SiC Systems OVIVO 03 2300 Greenhill Dr.#100 (/j t/� Round Rock,TX 78664 Worldwide Experts in Water Treatment 0 O ECN 15 for Additional Site Visit by Integrator Port Hadlock Loom Date Prepared By Services Performed For: L.- ? 1 ,,'1t, O,, , Port Hadlock RtiuriJ r2:uc. I Lam 0 ) ihis F- teini �h,Ing h.t; , ,; - ii ri,,,.,]nr trr tri , , Port Hadlock ��iiC*/�'/ ,3rirl UvivP( ‘lr rir{)• r tn:tt,VJr March 17t1,2Q26. C i_r-I, i: °,I.hir( lr)r1,0 irrrrt -Ind cc 01 C11-1,l rl'( Jr t 1,,o,v, .,n H.• 13 i , .,nr! r, rn;Rlc 1 ndit thcri'r,i A.ir L-r ni nr,r ;i r.v;-, !,.ii, �'' hive th,• m. i i i , , i,..,1 c u r.V,rt 1,1 'II, ".< ,ii �i .my )..ti r`r , { i}'-i' l-r..ri .3n , th t," r 1, tt i, _- Ct-,:' . �'7 , of till; Ci..N. ,f !', :•ft CO i O Proposal Overview ;' ' . .4-� •. ` -, Iry _ t _ __ __ -r- " r.. Project Change Notice(ECN 15)for Port Hadlock 1 Ovivo Scope of Supply Out of Scope Items • • Supporting Documentation • Purchase Price Item Description Sell Price(US Dollars) 1 Additional Site Integration Trip $12,694.00 Payment Schedule ,, -T • a-- n .S_ r* , .f.. k._ • ♦.,. t ter. w Project Change Notice(ECN 15)for Port Hadlock 2 Pricing and Commercial Terms Warranty General Notes Proprietary and Confidential Information IL • . ' I CO; L.,.',01t,i7 • e, turd part,<2, or usc (:T iNforn.,;:kpi pifro OV Ovivo ,riy clotrinem,fl to ino Or • Any sper al oros partRula; to this design ann intorinJ`Joyl poinc(1 a rt-so t Of Jf d,)(tirnont siobi cunlident11 ,3-1c she I he toe property of Ovivo niJ sitU rot b iicorporod wholf, ti part in other projec.t, tpirnt obtair,written pe-rn soon 11Qm Ovivo r rio so, t - . • , • I 4 . • -.0%4" • . - • *- t lib. • _ - - .."1"11111./Pik. -V-"" 17 I g _ • • 4....116A0 L4r"Plit - Project Change Notice(ECN 15)for Port Hadlock 3 4. . Approval and Acceptance ,r- °roer tc) fTh-)V2 r::.r1.,.,ii Y/10-11111,CrI3r1i7:1 I 10 thP Ov•VO Pr-ol,:i r f',,li.lcr Lino"? 1Lcept,2, 11..!",,3 revNi PO,: 34-e-e-Y6),\C-trwthi Peft-Ha4414aek Ovivo Project Manager • . Sdia461424- , 1"3()-20-2-i-/- 3/17/2026 : ... 1 N , • . los, ...1 4. -.. .: .", 2";'). . "-- . 460'' ''4D.;:,'• ,. 1, I ... - a% r•••.:•• ...11,.... , p le,.., - . - - 4,.. --aci, •. ---- —.i.--•::- •r --,-N.,,,r_. •*-- _ ,, , -...344 :-._..:1.-L--;---.---..•.3 - - _— _••••'-'17- r ._•..•..•,,,,.......i...., ni iii.i....... ---"ig".41 1Mlb. :--- - _ Au. "---c-lir-. :f:::: I _ i . . ' ' _-.---i-'. ----"•ft.,„,„... . ' ----#.---_- ---7,-___,-_; - , ----,,:- '''''' ... - __..,..: - " .7;15• .... 1 g . • . ... .. a % ...4,30.3mor•••••A.40..,,,,,r._... ---. , '..t... ...• Project Change Notice(ECN 15)for Port Hadlock 4 OVIVO Worldwide Experts 01 Water Treatment 2025 FIELD SERVICE RATE SHEET Effective January 1st,2025 and valid until December 31st,2025 Ovivo SiCBLOX Technical Services group is our field-based team for your water treatment system needs. We work directly with clients to commission,optimize,support,and enhance the operation of your treatment facility. Standard Rate Overtime Rate Labor Classification Mon-Fri Evenings,anytime over Bhrs/day and holidays In-House Programming Support $160/hr $240/hr Technical Services $180/hr $270/hr Engineer/Project Manager $190/hr $285/hr Onsite Controls/Instrumentation $200/hr $300/hr Travel Time (To and from site) As per above rates NOTES • Minimum charge for a service call is 4 hrs • Overtime is defined as any hours over 8 hrs per day • Pates apply from the time the employee departs the shop/office until return (includes time required to obtain materials and equipment) • All rates in USD • Rates do not include tax. Charge Rate Ground Travel $0.60/mile Per Diem (if meals are not provided) $100/day Travel and Living (hotel,car rental) Cost + 20% Rental Equipment Cost+ 20% 3rd Party Contractors Cost+ 20% Consumables Cost + 20% To contact SiCBLOX Technical Services Email: sicbloxservice@ovivowater.com Telephone: (512) 652-5848 Hours of Operations: 8:00am-5:00pm (Monday- Friday, CST)