Loading...
HomeMy WebLinkAboutBLD2010-00177 MLA10-0005� •UILDING PERMIT APPLICON Review Type: I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD10-00177 Received Date: 5/26/2010 SITE ADDRESS: 250 JANSEN RD NORDLAND, 98358 OWNER: CHRISTIAAN P MEYER TRSTEE PHONE: 602-920-9375 STEPHENIE M MEYER TRSTEE 32531 N SCOTTSDALE#105 SCOTTSDALE AZ 852661519 OLSON & HAMBLETON'S SUBDIVISION: Block: Lot: 3 PARCEL NUMBER: 977700090 Section: 4 Township: 29 N Range: 01 E CONTRACTOR: TOLLEFSON BUILDERS INC PHONE: (360) 732-4080 TODD HULBERT PO BOX 100 CHIMACUM WA 98325 Contractor's License TOLLEBI977N9 Expires 3/16/2011 REPRESENTATIVE: TOLLEFSON BUILDERS INC PHONE: (360) 732-4080 TODD HULBERT PO BOX 100 PROJECT DESCRIPTIOI' STAIRS TO THE BEACH TYPE OF WORK NON SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: VALUATION 50,000.00 ADD'L: HEAT TYPE: CODE EDITION: 2006 HEAT BASE: HEAT TYPE: OCCUPANCY: OCCUPANCY: UNHEATED: #OF STORIES: CONST TYPE: OTHER: SHORELINE: CONST TYPE: GARAGE: SETBACK: DECK: BANK HEIGHT: SEWAGE DISPOSAL: WATER SYSTEM: BEDROOMS: BATHROOMS: Exist: Exist: Prop: Prop: Total: Total: Routing Date: _.. ....�_._.�_ 7 IC Type Amount Paid By: Date: Receipt: Approved/Date Permit $643.75 LYK 05/26/10 117762 APPROVED Plan Check $418.44 LYK 05/26/10 117762 State Building Code $4.50 LYK 05/26/10 117762 JUL f 2010 Total: $1,066.69 Jefferson County Planning & Building Department Jefferson County Building •sion Permit Nu•r: BLD10-00177 Applicant: MEYER TRSTEE BUILDING PERMIT INSPECTION APPROVALS \pplicable Code: 2006 International Building Codes To schedule inspections, call (360)379-4455 no later than 7:00 AM the day of the inspection. Requests received after 7:00 AM will not be scheduled for that day's inspections. ELECTRICAL PERMITS are issued by the Washington State Department of Labor& Industries. The electrical permit must be signed off by the State Inspector prior to the County's Framing Inspection Inspection Item Date Approval Signature Notes Setbacks Foundation Footing -�)t Framing FINAL INSPECTION FINAL INSPECTION MUST BE APPROVED PRIOR TO BUILDING BEING OCCUPIED THIS PERMIT IS VALID FOR ONE YEAR • • CONDITIONS for Building Permit# :BLD10-00177 1.) To help prevent seawater from intruding landward into underground aquifers, all new development activity on Marrowstone Island, Indian Island and within 1/4 mile of any marine shoreline shall be required to infiltrate all stormwater runoff onsite. 2.) The property owner shall comply with Water Conservation Measures (per list maintained by the UDC Administrator). 3.) A Geotechnical Report dated February 4, 2010 prepared by Zenovic &Associates was submitted in conjunction with this application. The report addressed the stability of the geologic hazard area concluding the proposed steel stairs are appropriate for this site as long as construction techniques are used that will prevent damage to the bank and minimize impacts to marine environment. 4.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 5.) Prior to commencing development activity, proponent is responsible for informing the Washington Department of Fish and Wildlife (WDFW) in order for WDFW to determine whether this action is subject to the Washington State Hydraulic Code (Chapter 220-10 WAC). Hydraulic Project Approval (HPA) is required for all hydraulic projects, which are defined as construction or performance of other work that will use, divert, obstruct, or change the natural flow or bed of any of the salt or fresh waters of the state. 6.) In addition to Jefferson County permit conditions, the project proponent shall comply with all conditions set forth by the Washington Department of Fish and Wildlife through Hydraulic Project Approval. 7.) Prior to commencing development activity, the proponent is responsible for informing the US Army Corps of Engineers (COE) in order for COE to determine whether a Department of the Army permit or review is required. Generally, review is required for construction and dredging in or around navigable waters of the US and for work or fill in hydrologically connected wetlands. Contact the US Army Corps of Engineers, Seattle District Regulatory Branch, PO Box 3755, Seattle WA 98124, (206) 764-3495, for more information. 8.) Any damage to the proposed structure shall be repaired or removed as soon as practicable. At the end of the useful life of the structure, the stairs will be removed as soon as practicable. 9.) Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent stormwater runoff from carrying soil and other pollutants into surface water or storm drains that lead to waters of the state. Sand, silt, clay particles, and soil will damage aquatic habitat and are considered to be pollutants. 10.) Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48 RCW, Water Pollution Control, and WAC 173-201A, Water Quality Standards for Surface Waters of the State of Washington, and is subject to enforcement action. 11.) During construction, all releases of oils, hydraulic fluids, fuels, other petroleum products, paints, solvents, and other deleterious materials must be contained and removed in a manner that will prevent their discharge to waters and soils of the state. The cleanup of spills should take precedence over all other work on the site. 12.) Proper disposal of construction debris must be on land in such a manner that debris cannot enter Admiralty Inlet or cause water quality degradation of state waters. • 13.) Prior to constructing the structure, the applicant shall obtain a building permit from Jefferson County Department of Community Development. Stamped and signed engineered drawings shall be included in the building application submittal. 14.) The proponent shall notify the Jefferson County Department of Community Development at (360) 379-4450 forty-eight (48) hours prior to commencing construction in order to allow monitoring and ensure compliance with permit conditions. 15.) Substantial progress towards completion of the project shall be performed within two years of the issuance of the permit. 16.) Prior to commencing development activity, proponent is responsible for informing the Washington Department of Fish and Wildlife (WDFW) in order for WDFW to determine whether this action is subject to the Washington State Hydraulic Code (Chapter 220-10 WAC). Hydraulic Project Approval (HPA) is required for all hydraulic projects, which are defined as construction or performance of other work that will use, divert, obstruct, or change the natural flow or bed of any of the salt or fresh waters of the state. 17.) In addition to Jefferson County permit conditions, the project proponent shall comply with all conditions set forth by the Washington Department of Fish and Wildlife through Hydraulic Project Approval. 18.) Prior to commencing development activity, the proponent is responsible for informing the U.S. Army Corps of Engineers (COE) in order for COE to determine whether a Department of the Army permit or review is required. Generally, review is required for construction and dredging in or around navigable waters of the U.S. and for work or fill in hydrologically connected wetlands. Contact the US Army Corps of Engineers, Seattle District Regulatory Branch, PO Box 3755, Seattle WA 98124, (206) 764-3495, for more information. 19.) Work within the jurisdiction of the Shoreline Master Program other than as described above shall receive separate review from this Department. 20.) Construction shall be in substantial compliance with the site plan submitted on February 17, 2010 as it exists now or is hereafter amended by Jefferson County and/or the Washington Department of Ecology. 21.) The design, location, and construction of the stairs, as well as their subsequent use, shall avoid adverse effects on fish, shellfish, wildlife, marine vegetation, water quality, and geohydraulic processes. Construction methods shall minimize the use of materials hazardous to the environment. All lumber and other materials treated with preservative shall be sufficiently cured to minimize leaching into the water or shore bed, in accordance with the Best Management Practices approved by the Washington Department of Fish and Wildlife. 22.) No fill or other material may be placed in the waters or intertidal areas of Jefferson County. 23.) A bulkhead shall not be allowed in the future to protect the stairs, which is a non-essential, non-appurtenant structure. 24.) All applicable U.S. Coast Guard navigational safety requirements shall be followed. 25.) Any damage to the proposed structure shall be repaired or removed as soon as practicable. At the end of the useful life of the structure or if the stairs are not used for one year, the stairs will be removed as soon as practicable. 26.) The project shall adhere to the Best Management practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 27.) Shrubs and tree limbs may be prod to construct the stairs, but tree removallOot allowed under this shoreline permit. /SJNC /;�' ff. JEFFERSON COUNTY /k•ert DEPARTMENT OF COMMUNITY DEVELOPMENT r•=7 •. ti '-4 621 Sheridan Street • Port Townsend •Washington 98368 360/379-4450 • 360/379-4451 Fax 1,s5 y www.co.jefferson.wa.us/commdevelopment ---9' Master Permit Application MLA: _/( -1S. Project Description(include separate sheets as necessary): y -----Y--In c-ss S-}-a.✓w^.,i Z.-- Vl/1...� !B��,d C�/ , c irk i Tax Parcel Number: 1-1-1- 'MO - O/Q Property Size: 5-.2S Ate+/_ (acres/square feet) Site Address and/or Directions to Property: Z ".SavLSetA 2o4 A,, tslo•-ck I K..i4 Property Owner(s)of Record: ' PC--(3,5 -T'-u s-f Telephone: Fax: email: Mailing Address: _NA JS 21 ii:5, 3ZS2.1 A. Ss a"1 ,:aktt4 Iris` Sr .� ct,lt tA4. 8�(aL Applicant/Agent(if different from owner): To t'\-r•�cv. ibu�ldcvs CT,octci 1b.�.4-) Telephone: 3bo --1_32- Lotto Fax: atop-'l3 Z- A a% email: e4t1-eFsw. '6.,,% J .c u►r Mailing Address: ?•O• E o•p 1C101 C L.tww.c...›,nn I LA)A /832-5" What kind of Permit?(Check each box that applies ❑Lot or Road Segregation ❑Building ❑Critical Areas Stewardship Plan ❑ Demolition Permit 0 Variance(Minor, Major or Reasonable Economic Use) ❑Single Family III Garage Attached/Detached ❑Conditional Use[C(a),C(d),or CI** D Manufactured Home -❑ Modular • - 0 Discretionary"D"or Unnamed Use Classification ❑ Commercial* 0 Special Use(Essential Public Facilities)** O Change of Use ❑Boundary Line Adjustment ❑ Address 0 Road Approach D Short Plat** r r 1 , Lj O ❑ Home Business 0 Cottage Industry 0 Binding Site Plan** k HI 6 Li, ❑ Propane 0 Long Plat** ❑Sign -. 0 Planned Rural Residential Development(PRRD)/Amendments** ' 0 Allowed"Yes"Use Consistency Analysis ❑Plat Vacation/Alteration** ❑ Stormwater Management 0§horeline Master Program Exemption/Permit Revisions** ❑Site Plan Approval Advance Determination(SPAAD)* Shoreline Management id'+ti'+^'( ❑Temporary Use 0 Shoreline Management Variance St. ❑Wireless Telecommunication* ❑Comprehensive Plan/UDC/Land Use District Map Amendment ❑ Forest Practices Act/Release of Six-Year Moratorium ❑Jefferson County Shoreline Master Program Amendment *May require a Pre—Application Conference 0 Tree Vegetation Request **Requires a Pre-Application Conference Please identify any other local,state or federal permits required for this proposal, if known: DESIGNATION OF AGENT I hereby designate To t1•AA . tio.lelt,is/Todd, Botha fifo act as my agent in matters relating to this application for pemmit(s). • OWNER SIGNATURE Date: By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of his,her or its knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application review and any required later inspections. Staffs access and right of entry will be assumed unless the applicant informs the County in writing at the time of the applisat -he�rlL fie wants prior notice. ' /1/ Date: 2 — ( ? ^ (Signature: c.) The action or actions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or endangered species and could lead to a potential'take"of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)even if you are in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual and non-transferable responsibility for adhering to and complying with the ESA. The Applicant has read this disclaimer and signs and dates it below. Signature: Date: • • BUILDER STATEMENT j The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that they will be assuming the responsibility of the General Contractor for the proposed project. Signature: Date: GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: FAX: • .-Tv(1�4-- 1C`• (--( s ; C_ (3 )-7 3:)._ 1/o(6-U ( ) MAILING ADDRESS: EMAIL: CONTRACTOR'S LICENSE WAINS NUMBER: NUMBER ARCHITECT/ENGINEER: PHONE ( ) FAX:( ) MAILING ADDRESS: EMAIL Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal: i 1 New ❑ Wood Existing: ❑ Sewer O Addition 0 Steel Proposed: Bank ❑ Community System ❑ Alteration/Remodel 0 Concrete Total: _ Height: 0 Individual System O Repair 0 Masonry SEP Permit# Water Supply: O Demolition 0 Other: Bedrooms: pp Y: Existing: Setback: 0 Private well 0 Two Party Type of Heat: Proposed: ❑ Public Total: - Name of System: • If this is a Commercial Project you must answer the following: Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No • If this is a Propane Tank and/or Appliance Installation_permit,mark all items below that apply: 1 Underground Tank i Above ground Tank Size of Propane Tank: i Heat Stove i Cook Stove 1 Woodstove Fireplace Insert i Hot Water Tank 1 Pellet Stove i Other Is this appliance being installed in a Manufactured/Mobile Home? Yes / No When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines,tank location and size,distances from the propane tank to all property lines,buildings and septic system components, including the reserve area. • S•uare Footage Current Proposed For Office U 4 Amount Revision Main Floor Heated EH Bld App Review: 22 Floor Heated Consistency Review: Other Heated Base fee: + , 3 7 Mezzanine Additional Section: Heated Basement Plan Check fee: Li 1 , G Unheated Basement State Surcharge fee: 1 7 t1 5 r� Other Unheated Pot Water Review fee: V Garage/Carport SUBTOTAL Decks 911/Rd Approach fee: Other TOTAL $ � 6 9 — Receipt Number: Cash/Check Number: (2:1i2 ESTIMATED (REQUIRED) Date: F � •Fair marks slue of all labor and materials founds on to finish )(W , e) Initials: G:\PermitCenter \DRD FORMS\Current DRD Forms\Master Permit Application 5-29-08.doc U U i� GENERAL NOTES 1. Engineering Design loads: Roof live load: 25 psf (snow) Wind loading based on:100 mph/Exposure "D" Seismic Zone: D per I.B.C. 2. Construction shall conform to these plans and all applicable codes and local ordinances including the 2006 Edition of the International Building Code. SOIL NOTES 1. Foundation design is based on: soil bearing capacity of 1500 psf with increases per I.B.C. Table 1804.2. 2. All footings except where noted otherwise on plans shall be set at least 12" into undisturbed earth or certified compacted fill. 3. Any unusual soil conditions such as organic soils, clay pockets or uncertified fills shall be brought to the attention of the engineer prior to construction. CONCRETE NOTES 1. Concrete sholl be a commercially available transit —mix properly proportioned and delivered to the site in ready —mix trucks. Aggregate size shall be a maximum of 1)Iz" in foundations and �4" at all other locations. Slump should not exceed 4". Curing compound shall be sprayed on all exposed surfaces immediately after final trowelling. 2. All cement shall conform to the ASTM Standard C-150. All aggregate shall conform to ASTM Standard C-33. All reinforcing bars shall conform to ASTM Standard A-615 as follows: #3—#5 Bars and WWM—Grade 40 #6 Bars and larger —Grade 60 All rebor to be welded shall be ASTM A706 steel. Preheat all bars #7 and larger per AWS D14-92. Preheat not required for bar sizes #6 and smaller. 3. Concrete shall have a minimum 28—day compressive strength of 3000 psi and shall not contain less than 5—)12 sacks of cement per cubic yard. Concrete shall also be air entrained. Total air content (percent by volume) shall not be less than 5% or more than 77 4. Splices in continuous reinforcement shall lap as noted on the plans as follows: Grade 40 reinforcing bars: Minimum of 32 bar diameters Grade 60 reinforcing bars: Minimum of 48 bar diameters 5. Unless shown otherwise, the minimum concrete cover for reinforcing shall be 3" when placed directly against earth and 2" for all other locations unless specified on the plans. POST INSTALLED ANCHOR NOTES: 1. Adhesive Anchors: Anchoring adhesive shall be a two —component high solids, epoxy —based system supplied in manufacturers standard cartridge and dispensed through static —mixing nozzle supplied by the manufacturer. The adhesive anchor shall have been tested and qualified for performance in cracked and uncracked concrete per [CC —ES AC308. Adhesive shall be SET—XP Epoxy —Tie adhesive from Simpson Strong —Tie, or approved equal. Install per manufacture's recommendations. SPECIAL INSPECTION REQUIRED 2. Mechanical Anchors: Expansion: Wedge anchors shall be an imperial —sized steel threaded stud with an integral cone expander and a three —segmented expansion clip. The stud shall be manufactured from carbon steel and the expansion clip shall have two undercutting embossments per segment and be manufactured from 316 stainless steel. The anchor shall have been tested and qualified for performance in cracked concrete per ACI 355.2 and ICC—ES AC193. Anchors shall be Strong —Bolt wedge anchors from Simpson Strong —Tie. Install per manufacture's recommendations. Screw: Anchor shall have 360' contact with the base material and shall not require oversized holes for installation. Fasteners shall be manufactured from carbon steel, and are heat treated. Anchors shall be zinc plated in accordance with ASTM B633 or mechanically galvanized in accordance with ASTM B695. The anchor shall hove been tested and qualified for performance in cracked concrete per ACI 355.2 and ICC—ES AC193. Anchors are not to be reused after initial installation. Screw anchors shall be Titen HD anchors from Simpson Strong —Tie. Install per manufacturer's recommendations. GENERAL NOTES FOR STEEL CONNECTIONS SHALL APPLY TO ALL STEEL CONNECTIONS UNLESS NOTED OTHERWISE. ALL WORK SHALL BE IN ACCORDANCE WITH THE AISC SPECIFICATION. SHOP DRAWINGS SHALL BE SUBMITTED AND REVIEWED BY THE ARCHITECT/ENGINEER BEFORE COMMENCING FABRICATION. ALL STEEL ANCHORS AND TIES AND OTHER MEMBERS EMBEDDED IN CONCRETE AND MASONRY SHALL BE LEFT UNPAINTED. DIMENSIONAL TOLERANCE FOR BUILT—UP MEMBERS SHALL BE PER AWS D1.1. STRUCTURAL STEEL ALL STEEL SHALL CONFORM TO THE FOLLOWING: W—SHAPES L—SHAPES — ANGLES C—SHAPES — CHANNELS HSS — SQUARE OR RECTANGULAR STRUCTURAL STEEL PIPE Fy=35KS1 STEEL PLATES AND BARS MATERIAL CALLED OUT ON PLANS AS (A36) ANCHOR BOLTS/RODS COMMON BOLTS ALL OTHER STEEL UNLESS NOTED OTHERWISE STRUCTURAL STEEL WELDING STAIRWAY ASTM A992, Fy=50KSI ASTM A36, Fy=36KS1 ASTM A36, Fy=36KS1 ASTM A500 GRADE B, Fy=46KS1 ASTM A53, TYPE E OR S GRADE B, ASTM A36, Fy=36KS1 ASTM A36, Fy=36KS1 ASTM F1554 GRADE 36, Fy=36KS1 ASTM A307 ASTM A36, Fy=36 KSI STRUCTURAL STEEL SHOP DRAWINGS SHALL SHOW ALL WELDING WITH AWS A2.4 SYMBOLS. ALL WELDING SHALL BE DONE BY AWS/WABO (WASHINGTON ASSOCIATION OF BUILDING OFFICIALS) CERTIFIED WELDERS AND IN ACCORDANCE WITH AWS D1.1. WELDS SHOWN ON DRAWINGS ARE THE MINIMUM SIZES. INCREASE WELD SIZE TO AWS MINIMUM SIZES, BASED ON PLATE THICKNESS. THE MINIMUM WELD SIZE SHALL BE A". FIELD WELDING SYMBOLS HAVE NOT NECESSARILY BEEN INDICATED ON THE DRAWINGS. WHERE SHOWN, PROPER FIELD WELDING PER AWS D1.1 SHALL BE USED. WHERE NO FIELD WELDING SYMBOLS ARE SHOWN, IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE THE USE OF SHOP AND FIELD WELDS. ALL PARTIAL PENETRATION GROOVE WELD SIZES SHOWN ON THE DRAWINGS THROAT THICKNESS. ALL WELDS SHALL BE MADE USING LOW HYDROGEN ELECTRODES WITH MINIMUM TENSILE STRENGTH PER AWS D1.1 (MINIMUM 70 KSI). LOW HYDROGEN SHAW ELECTRODES SHALL BE USED WITHIN 4 HOURS OF OPENING THEIR HERMETICALLY SEALED CONTAINERS, OR SHALL BE REDRIED NO MORE THAN ONE AT A TIME, AND ELECTRODES THAT HAVE BEEN WET SHALL NOT BE USED. ALL WELDING SHALL BE PERFORMED IN STRICT ADHERENCE TO A WRITTEN WELDING PROCEDURE SPECIFICATION (WPS) PER AWS D1.1. ALL WELDING PARAMETERS SHALL BE WITHIN THE ELECTRODE MANUFACTURER'S RECOMMENDATIONS. WELDING PROCEDURES SHALL BE SUBMITTED TO THE OWNER'S TESTING AGENCY FOR REVIEW BEFORE STARTING FABRICATION OR ERECTION. COPIES OF THE WPS SHALL BE ON SITE AND AVAILABLE TO ALL WELDERS AND THE SPECIAL INSPECTOR. ALL COMPLETE —PENETRATION WELDS SHALL BE ULTRASONICALLY TESTED UPON COMPLETION OF THE CONNECTION, EXCEPT PLATE UNLESS LESS THAN OR EQUAL TO J" THICK SHALL BE MAGNETIC PARTICLE TESTED. REDUCTION IN TESTING MAY BE MADE IN ACCORDANCE WITH THE BUILDING CODE WITH APPROVAL OF THE ENGINEER. ALL STRUCTURAL STEEL MEMBERS AND FASTENERS SHALL BE HOT —DIPPED GALVANIZED OR PAINTED TO MINIMIZE CORROSION. JEFFERSON COUNTY DCD BUILDING PLAN REVIEW AS SUBMITTED APPROVED AS NOTED Date - ( -10 Reviewer NOTICE: Plans are approved excepting any errors or omissions. All work must pass inspection in conformance with all applicable codes and regulations. Contact the Building Department at 379-4450 prior to making changes or revisions to the approved plans 1Xz"x 1Xz" HSS POST (TYP.) 1X"O STEEL PIPE HANDRAIL (TYP.) -'4"xlY2" HSS MID RAILS (TYP.) EXISTING BEDROCK STAIRWAY RIGHt SIDE ELEVATION Scale: 1/2" = 1' APPROVED SITE PLAN - 77- ELEVATION = 974.50 APPROX. LINE OF EXISTING GRADE ELEVATION = 949.00 NEW CONCRETE LANDING, SEE DETAIL B/S3 ELEVATION = 944.50t EXISTING CONC. PEDESTAL W I- O Z `af af Q (n Z O V) > w w F- � o F CNO� � M O w W� 2;�0DO U W O p N InJ O M Ld `t O cOZvo Z w Q v N W I-- Z J X � O O M Mo_aw w �- 06 o U Fw- _ Q Of a_ � C) � wQZ I� 0 3 z W o g w CS o -- C!� � U yZj H �7 �-1 z V N a L.I co } ¢ 3 � � J � m O N z C)^ Zi U _ jmgU Li Z w F U SCALE: % 2 DATE: June 24, 10 FILE: 09187 S JOB N0: 09187 NEN M. �eN OF WASy��c Q� CO "a �p� ? 3594 O /STERF } /ONAL EN y SHEET S OF