HomeMy WebLinkAboutBLD2010-00277 •BUILDING PERMIT APPLIC•ON MLA10-0 Review Type:pe: I
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD10-00277 Received Date: 8/2/2010
SITE ADDRESS: THORNDYKE RD
OWNER: DANIEL A IVERSON TRUSTEE PHONE:
JEAN E IVERSON TRUSTEE
144 RAINBOW DR#4460
LIVINGSTON TX 77399-1044 TRAILS END HOMESITES
SUBDIVISION: Block: 3 Lot 21
PARCEL NUMBER: 950100320 Section: 16 Township: 27 N Range: 01 E
CONTRACTOR: SOUTH SHORE CONSTRUCTION PHONE: (360) 275-0818
230 E HILLSIDE DR
BELFAIR WA 98528
Contractor's License SOUTHSC016NL Expires 3/13/2012
REPRESENTATIVE: PHONE:
PROJECT DESCRIPTION NEW GARAGE ATTACHED TO M/H
TYPE OF WORK GAR SQUARE FOOTAGE:
TYPE OF IMP NEW MAIN:
VALUATION 23,000.00 ADD'L: HEAT TYPE: UH
CODE EDITION: 2009 HEAT BASE: HEAT TYPE:
OCCUPANCY: UNHEATED: # OF STORIES:
OCCUPANCY: OTHER:
CONST TYPE: GARAGE: 576 SHORELINE:
CONST TYPE: DECK: SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL: CON
WATER SYSTEM:
BEDROOMS: BATHROOMS:
Exist: 0 Exist:
Prop: 0 rop: 0
Total: 0 Total: 0
Routing Date:
Ili -2:10
Type Amount Paid By: Date: Receipt: Approved/Date
Permit $363.25 LYK 08/02/10 119865 APPROVED
Plan Check $236.11 LYK 08/02/10 119865
State Building Code $4.50 LYK 08/02/10 119865 20
10
Total: $603.86 NOV
Jefferson County Planning
Building Department
Jefferson County Building 13.sion Permit Nu, : BLD10-00277
Applicant: IVERSON TRUSTEE
BUILDING PERMIT INSPECTION APPROVALS applicable Code: 2009 International Building Codes
To schedule inspections, call (360)379-4455 no later than 7:00 AM the day of the inspection.
Requests received after 7:00 AM will not be scheduled for that day's inspections.
ELECTRICAL PERMITS are issued by the Washington State Department of Labor& Industries.
The electrical permit must be signed off by the State Inspector prior to the County's Framing Inspection
Inspection Item Date Approval Signature Notes
Setbacks . Minimum setback from Thorndyke Road right-of-way shall be 20 feet.
Minimum north and south property line setbacks shall be 5 feet.
Minimum setback from top of landslide hazard area bank shall be 20
feet.
Erosion Control SEE CONDITION 3
Post Holes
Foundation Footing 11. _ ,6 -
r
Footing Drains
Foundation Stem Wall L2-i*'16 \ Yl
Underground Plumbing
Straps(hold downs)
Ext. Shear Wall Nailing
Rough-in Plumbing
Framing t`24 J(( 'W J
Blocking
Wallboard Nailing
Drywell/Alt Drainage SEE CONDITION 1 &2-SWT&GEOTECH CERTIFICATION
PRIOR TO FINAL
Address Posted
So (owl' I.+ FAN -JD hip
FINAL INSPECTION /2[/1" 11
FINAL INSPECTION M S BE APPROVED PRIOR TO BUILDING BEING OCCUPIED
THIS PERMIT IS VALID FOR ONE YEAR
• •
CONDITIONS for Building Permit# :BLD10-00277
1.) PRIOR TO FINAL BUILDING OCCUPANCY, PROPONENT SHALL SUBMIT AN
ORIGINAL WRITTEN WET-STAMPED LETTER FROM ENVIROTECH ENGINEERING
STATING THAT THE STORMWATER FACILITY HAS BEEN CONSTRUCTED IN
ACCORDANCE WITH THE REQUIREMENTS OF THE "DRAINAGE FACILITY" LETTER
DATED oCTOBER 20, 1010 AS SIGNED BY MICHAEL STRATON, P.E. OF
ENVIROTECH ENGINEERING.
2.) PRIOR TO FINAL BUILDING OCCUPANCY, PROPONENT SHALL SUBMIT AN
ORIGINAL WRITTEN LETTER FROM ENVIROTECH ENGINEERING WHO PREPARED
THE GEOTECHNICAL REPORT DATED JULY 21, 2010 STATING THAT THE
STRUCTURE AND/OR FACILITIES HAVE BEEN CONSTRUCTED IN CONFORMANCE
WITH THE REQUIREMENTS OF THE "GEOTECHNICAL REPORT." THE LETTER
SHALL BE WET-STAMPED BY THE LICENSED GEOLOGIST/ENGINEER.
3.) CONSTRUCTION ENTRANCES SHALL BE STABILIZED WHEREVER TRAFFIC WILL
BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR
OTHER PAVED AREAS WITHIN 1,000 FEET OF THE SITE.
THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM COMPACTED SUBGRADE.
QUARRY SPALLS (OR HOG FUEL) SHALL BE ADDED IF THE PAD IS NO LONGER IN
ACCORDANCE WITH THE SPECIFICATIONS. (BMP C105, 2005 DOE STORMWATER
MANUAL).
ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED BY
SHOVELING OR STREET SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING
SHALL BE REMOVED OR STABILIZED ON STIE.
ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD, WHICH END UP ON
THE ROADWAY SHALL BE REMOVED IMMEDIATELY.
UPON PROJECT COMPLETION AND SITE STABILIZATION. ALL CONSTRUCTION
ACCESSES INTENDED AS PERMANENT ACCESS FOR MAINTENANCE SHALL BE
PERMANENTLY STABILIZED.
4.) Water line must maintain 10' min. setback from any portion of the septic system.
5.) To help prevent seawater from intruding landward into underground aquifers, all new
development activity on Marrowstone Island, Indian Island and within 1/4 mile of any
marine shoreline shall be required to infiltrate all stormwater runoff onsite.
6.) The property owner shall comply with Water Conservation Measures (per list maintained
by the UDC Administrator).
7.) A vegetative buffer of 20-feet shall be permanently maintained from the top or edge of the
Landslide Hazard Area. All buffers shall be measured perpendicularly from the top of the
Landslide Hazard Area.
8.) A Geotechnical Report dated July 21, 2010 prepared by Envirotech Engineering was
submitted in conjunction with this application. The report addressed the stability of the
geologic hazard area. A setback of 20-feet shall be measured perpendicularly from the
top or toe of the geologic hazard to the proposed development.
9.) Landslide Hazard Areas and their associated buffers shall remain naturally vegetated.
Should buffer disturbance occur during construction, the Unified Development Code
(UDC) Administrator shall require replanting with native vegetation. No alterations shall be
made to the Landslide Hazard Area or its associated buffer without prior authorization by
the UDC Administrator.
10.) Prior to and during approved coniktion activities, the perimeter of the landsiazard
area buffer shall be marked with a temporary sign. The sign shall be placed in such a
manner that it can be directly observed from the construction area. The sign shall contain
the following statement: "Landslide Hazard Area and Buffer- Do not Remove or Alter
Existing Vegetation."
11.) All construction activities shall not encroach upon the landslide hazard area buffer. This
includes the storage or preparation of materials.
12.) The applicant shall permanently separate the boundary of the Landslide Hazard Area
Buffer from the remainder of the subject property through installing logs, trees, a hedge
row, or any other prominent physical marking approved by the UDC Administrator.
13.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water
quality degradation. The submitted proposal does not require additional aquifer
protection measures. However, during construction the project shall follow the Best
Management Practices (BMPs) and facility design standards as identified and defined in
the Stormwater Management Manual for the Puget Sound Basin.
14.) A Stormwater Site Plan has been submitted and approved by the Department of
Community Development. Once the subject permit has been issued the applicant shall
fully implement the provisions of the submitted plan and contact the Jefferson County
Department of Community Development to arrange a schedule to inspect the property for
plan compliance. A Certificate of Occupancy will not be issued until the Department
verifies plan compliance. No clearing for roadways or utilities shall occur on the project
site until clearing necessary for the installation of temporary sedimentation and erosion
control measures have been completed.
15.) Outdoor residential storage shall be maintained in an orderly manner and shall create no
fire, safety, health or sanitary hazard.
16.) Not more than 2 unlicensed vehicles shall be stored on any lot unless totally screened
from view of neighboring dwellings and rights-of-way. Such screening shall meet all
applicable performance and development standards specific to the district in which the
storage is kept, and shall be in keeping with the character of the area. Screening shall
meet the requirements of Chapter 18.30 JCC. Outdoor storage of 3 or more junk motor
vehicles is prohibited except in those districts where specified as an automobile wrecking
yard or junk (or salvage) yard and allowed as a permitted use in Table 3-1 or Chapter
18.18 JCC, and such storage shall meet the requirements of JCC 18.20.100, Automobile
wrecking yards and junk (or salvage) yards. In no case, shall any such junk motor
vehicles be stored in a critical area.
17.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of
impervious surface which includes roof tops, driveways, concrete, etc. Pre-existing legal
lots of record less than one acre in size in rural residential districts are subject to the
stormwater requirements in Chapter 18.30 JCC and must meet the "Area of Impervious
Surface Coverage"to the maximum extent practicable as determined by the administrator.
Lot coverage is defined as amount of impervious surface, which includes rooftops,
driveways, concrete, etc.
18.) The building height is not to exceed 35 feet.
19.) Minimum setback from Thorndyke Road right-of-way shall be 20 feet. Minimum north and
south property line setbacks shall be 5 feet. Minimum setback from top of landslide
hazard area bank shall be 20 feet.
20.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the
finished grade, excepting when such lighting is an integral part of a building or structure.
Ground level lighting is encouraged.
21.) Lighting fixtures shall be designed and hooded to prevent the light source from being
directly visible from outside the boundaries of the property. The intensity or brightness of
all lighting, during construction and after project completion shall not adversely affect the
use of surrounding properties or adjoining rights-of-way.
•
&vt,v'voted/ Ewg ,eertik
9
Geotecrvaocii ° EfA.vt,rowvvtewt0 ° °t2.oadwau
January 10, 2011
South Shore Construction
230 E.Hillside Drive
Belfair,Washington 98528
RE: Foundation Assessment for Daniel and Jean Iverson Structure Located along Thomdyke Road,
Parcel 950-100-320/950-100-321,Port Ludlow,Washington
Dear Mr. Moore,
Envirotech Engineering (Envirotech) has completed this foundation assessment letter for a residential
structure located on the referenced property. Envirotech completed one site visit after pin piles were
installed, reinforcement steel assembled, and concrete in place. Information pertaining to the project was
provided by Rich Moore of South Shore Construction.
The pin piles were not required for structural bearing, but were utilized as slope stability mitigation. The
pin piles are 2-inch diameter, schedule 40 steel pipe. Each pin pile was driven per the recommendations
provided by Envirotech in a geotechnical report dated July 21, 2010.
Per the information provided by the contractor, and site observations by Envirotech, the pin piles are
suitable for this project and intended application. As previously mentioned,pin piles are only required for
slope failure mitigation. If slope failure occurs, long-term integrity of the pin piles may be compromised,
and the site must be re-evaluated for further mitigation by a professional engineer.
Envirotech appreciates the opportunity to be of assistance on this project. Please contact Michael Staten at
360-275-9374 if you have any questions or require additional information.
Sincerely,
Envirotech Engineering
bg , CLYpE Sr
�G4 Gov wnsy��c Y�`t2
i `
7 Ail ifipl14
,) w�
CISTE043045 a RE C 1� �
O F �4
S�pNAL„AG`�
Michael Staten, P.E.
JAN 18 .2011 .
Project Director
JEFFERSON CUUND,
PO gox_984
-geLfair, washi,vt.atow 98528
off: 36O-2755-9374
CeLL: 360-689-6045
Fax: 360-275`47 8.9
evt.vLrotech@aeotechwicaLCw facow,
• III r► -?9
EVLvirotech &ydswueert,o,e
6,eotechv Ic.cL ° Evuvl,rovUMevttaL °Dr01,1442ee ° R.oadwaT
October 20, 2010
UC South Shore Construction
Daniel and Jean Iverson
1545 Thomdyke Road
Port Ludlow,Washington 98365 (
Reference: Small Parcel Stormwater Management Plan for the Property Located on Thomdyke Road \
Parcel 950-100-320 and 950-100-321, Port Ludlow,Washington
Dear Mr. and Mrs. Iverson,
Envirotech Engineering has previously completed a geotechnical report, and the enclosed small parcel
stormwater management plan for the referenced property.
The drainage design was based on the 2005 Department of Ecology Stormwater Manual for downspout
infiltration systems. Based on the proposed 2,256 sf of roof area, 135 sf of available infiltration area, and
on-site fine and medium sands, drain rock depth should be at least 3 feet in depth. This conclusion was
interpolated from a standard trench width of 2 feet,and a trench length between 30 If(medium sands)and
75 If(fine sands)for every 1000 sf of roof area.
Per the geotechnical report, downspout runoff should not be located within 30 feet of the critical slope.
Although an overflow system at the roof downspout may be located on the west side of the residence,
overflow is not permitted on the east side of the structure. Therefore, it is recommended to utilize an
overflow pipe at the infiltration pit.
We conclude that the drainage design is acceptable with relation to the geotechnical report, prepared by
Envirotech Engineering on July 21, 2010.
Envirotech appreciates the opportunity to be of assistance on this project. We anticipate that this small
parcel stormwater management plan meets your expectations. Please contact Michael Staten at 360-275-
9374 if you have any questions or require additional information.
Sincerely,
Envirotech Engineering
CLYDE
07 ov WA Sy!ST-9,i,
.rj
r /O/20//O
�9x, RF�S R�° ``w APPROVED
ASS/ONAL ps
STORM WATER PLAN
Michael Staten, P.E.
Project Director
NOV — 3 2010
74 NE Hurd Road
Fel.-fa.r, wa.chCvuc tovn.98528
JEFFERS OU of: 300-2775-9374
DEPT.OF CO , ITY DE E. EN Cell: 300-08 6045
SIGNATU' .. /1i,\..40, a' Fax: 300-275-4789
di • evt.vLroteck@eieotechvu,caLLvLfo.coon.
• •
OVERFLOW PIPE AT
INFILTRATION AREA
PREFERRED OVER
DOWNSPOUT OVERFLOW
HOUS\�
/—ROOF DRAIN
r I ERFLOW SOLID
LID GROUND
SPLASH BLOCK SURFACE
BACKFILL 4' DIA. MIN
PERFORATED PVC
PIPE
2% MIN ENCOMPASS ,= _
2i MIN DRAINROCK WITH .x t 6, MIN
FILTER FABRIC +w`Y
4' DIA MI -Wr Y -�
SOLID PVC FINE MESH
SCREEN 4' DIA. MIN, . . . ...
CATCH BASIN SOLID PVC 3/4' - 1 1/2' � �, �Y••
SUMP WASHED DRAIN + .+ Y+ "+ ��
ROCK ........•...
3' MIN
'Artiratirip AWAY
15 FT ION � �, -, 25'
�Y:
i�*?9 ntrl�i
ROOF DRAINAGE DETAILS _
N.T.S. INFILTRATION
SURFACE AREA
TO BE 135 SF
Voti CLYOe
NOTES. `�►� �F AS Ix
1.1. INFILTRATION AREA TO BE LOCATED ON THE SOUTHWEST CORNER OF -\7PROPERTY, AS SHOWN ON THE SITE PLAN. rt
40
401
2. DRAINAGE SYSTEM FOR ROOF RUNOFF SHALL BE INSPECTED BY HOME .-t
OWNER BI-ANNUALLY, AND MAINTAINED AS NECESSARY.
Oa /A9
•
IFS�0NAE GiST C,V.
APPROVED
STORM WATER PLAN
PROJECT/ OWNER/ LOCATION.
SMALL PARCEL STEJRMWATER
NOV - 3 2010 MANAGEMENT PLAN
IVERSON
THORNDYKE ROAD
PARCEL 950-100-320 I. 950-100-321
JEFFERS OU PORT LUDLOW, WASHINGTON
DEPT.OF ITY DF :LO MENT ENGINEER.
ENVIROTECH ENGINEERING
SIGNATURE: 74 NE HURD ROAD
BELFAIR, WASHINGTON 98528
360-275-9374
DRAINAGE DETAILS
•
;Cr
N ►
4040 3068
♦
a)
w 0
c
L c co
a
ov x
3
cD o N
0
0
COr
0)
••
E
(0
IL
x
N
w
0
co'
a
A
= r (0 \/
O x J
o ' Z II
o a Q
CL
Z w
J
0>x;' 2
• •
BMP C105: Stabilized Construction Entrance
Purpose Construction entrances are stabilized to reduce the amount of sediment
transported onto paved roads by vehicles or equipment by constructing a
stabilized pad of quarry spalls at entrances to construction sites.
Conditions of Use Construction entrances shall be stabilized wherever traffic will be leaving
a construction site and traveling on paved roads or other paved areas
within 1,000 feet of the site.
On large commercial,highway,and road projects,the designer should
include enough extra materials in the contract to allow for additional
stabilized entrances not shown in the initial Construction SWPPP. It is
difficult to determine exactly where access to these projects will take
place; additional materials will enable the contractor to install them where
needed.
Design and • See Figure 4.2 for details.Note:the 100'minimum length of the
Installation entrance shall be reduced to the maximum practicable size when the
Specifications size or configuration of the site does not allow the full leng
th(100').
• A separation geotextile shall be placed under the spalls to prevent
fine sediment from pumping up into the rock pad. The geotextile
shall meet the following standards:
Grab Tensile Strength (ASTM D4751) 200 psi min.
Grab Tensile Elongation(ASTM D4632) 30%max.
Mullen Burst Strength (ASTM D3786-80a) 400 psi min.
AOS (ASTM D4751) 20-45(U.S. standard sieve size)
• Consider early installation of the first lift of asphalt in areas that will
paved;this can be used as a stabilized entrance. Also consider the
installation of excess concrete as a stabilized entrance. During large
concrete pours, excess concrete is often available for this purpose.
• Hog fuel (wood-based mulch)may be substituted for or combined with
quarry spalls in areas that will not be used for permanent roads. Hog
fuel is generally less effective at stabilizing construction entrances and
should be used only at sites where the amount of traffic is very limited.
Hog fuel is not recommended for entrance stabilization in urban areas.
The effectiveness of hog fuel is highly variable and it generally
requires more maintenance than quarry spalls. The inspector may at
any time require the use of quarry spalls if the hog fuel is not
preventing sediment from being tracked onto pavement or if the hog
fuel is being carried onto pavement. Hog fuel is prohibited in
permanent roadbeds because organics in the subgrade soils cause
degradation of the subgrade support over time.
• Fencing(see BMPs C103 and C104)shall be installed as necessary to
restrict traffic to the construction entrance.
4-8 Volume II— Construction Stormwater Pollution Prevention
February 2005
•
• Whenever possible,the entrance shall be constructed on a firm,
compacted subgrade. This can substantially increase the effectiveness
of the pad and reduce the need for maintenance.
Maintenance • Quarry spalls(or hog fuel)shall be added if the pad is no longer in
Standards accordance with the specifications.
• lithe entrance is not preventing sediment from being tracked onto
pavement,then alternative measures to keep the streets free of
sediment shall be used. This may include street sweeping, an increase
in the dimensions of the entrance,or the installation of a wheel wash.
• Any sediment that is tracked onto pavement shall be removed by
shoveling or street sweeping. The sediment collected by sweeping
shall be removed or stabilized on site. The pavement shall not be
cleaned by washing down the street,except when sweeping is
ineffective and there is a threat to public safety. If it is necessary to
wash the streets,the construction of a small sump shall be considered.
The sediment would then be washed into the sump where it can be
controlled.
• Any quarry spalls that are loosened from the pad,which end up on the
roadway shall be removed immediately.
• If vehicles are entering or exiting the site at points other than the
construction entrance(s),fencing(see BMPs C103 and C104)shall be
installed to control traffic.
• Upon project completion and site stabilization, all construction
accesses intended as permanent access for maintenance shall be
permanently stabilized.
Driveway steal meet the
requirements of the
Pe gyp agency
It Is recommended that
the entrance be
crowned so that nrwn
voreco
drains off the pod
`t,
Instal driveway culvert �
If there Is a roadside • 1-'••'•
ditch present •'•p:i:,
4'-8'Way spells
GeomxOle CC.‘
�
t r mN,tttcloress_�• �S ��
Provide lull width of
krpress/egress area
Figure 4.2—Stabilized Construction Entrance
February 2005 Volume ll-Construction Stormwater Pollution Prevention 4-9
III I
oN o }{}aGht?d GQYGIO�e
�4� ° JEFFERSON COUNTY `J
4 / DEPARTMENT OP COMMUNITY DEVELOPMENT
f40621 Sheridan Street• Port Townsend •Washington 98368
360/379-4450 • 360/379-4451 Fax
$�S,�NO,sO$ www.co.jefferson.wa.us/commdevelopment
Master Permit Application MLA: ( 0 -aCV
Project Descri tion(include separate sheets @s necessary):
gulidiril a-{+a.chec qa,u-a 1, - o 'H
Tax Parcel Number:`,50/D 0 32 0/ w1�O/OD 3 2 I ProperlySize: (acres/square feet)
Site Address and/or Directions to Property:
TAM VIC kw ROAc1) - A-Lucl low, W A ci$34?
Property Owner(s)of Record: --Oa-VIi -1 3 -cir\ :veers or
Telephone: O S'O '-�-2-/3 Fax:
3� email: 'f
Mailing Address: 272o E - H i I(S;(762- TA-- ) 1-C"a;r t, P. `Rcg5 2%
Applicant/Agent(if different from owner): S°u1{i Shore, (arts-i'yI{c.i V I I V'G.
Telephone:3(00 - 509- /342_ Fax: 3(00-2-75-(0256 email: --
Mailing Address: 23 D j✓H i/($1 c) 13e I-Fn,i t w A 01 8 5`1.%
What kind of Permit?(Check each box that applies
uilding Critical Areas Stewardship Plan
]�B El Demolition Permit ❑Variance(Minor,Major or Reasonable Economic Use)
❑Single Family ,Garage 4 . -:j Detached 0 Conditional Use[C(a),C(d),or C]**
❑ Manufactured Home El Modular 0 Discretionary"D"or Unnamed Use Classification
❑ Commercial* ❑Special Use(Essential Public Facilities)**
❑ Change of Use ❑Boundary Line Adjustment
❑ Address 0 Road Approach ❑Short Plat**
❑Home Business 0 Cottage Industry ❑Binding Site Plan** AUG - 2
❑Propane 0 Long Plat**
❑Sign ❑Planned Rural Residential Development(PRRD)/Amendments**
❑Allowed"Yes'Use Consistency Analysis ❑Plat Vacation/Alteration**
❑Stormwater Management El Shoreline Master Program Exemption/Permit Revisions**
❑Site Plan Approval Advance Determination(SPAAD)* 0 Shoreline Management Substantial Development*"`
❑Temporary Use 0 Shoreline Management Variance
❑Wireless Telecommunication* 0 Comprehensive Plan/UDC/Land Use District Map Amendment
❑Forest Practices Act/Release of Six-Year Moratorium 0 Jefferson County Shoreline Master Program Amendment
*May require a Pre—Application Conference ❑Tree Vegetation Request
**Requires a Pre-Application Conference
Please identify any other local,state or federal permits required for this proposal,if known:
Ara DESIGNATION OF AGENT
I hereby designate b t .:%(Q,, h f
11/
� ��WU-��11/ hG to ct as my agent in matters relating to this application for permit(s).
OWNER SIGNATURE Date: O 7-2- oG—IV
By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of
his,her or its knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet
may result in this permit being null and void.
I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attomey's fees and
expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit.
I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application
review and any required later inspections. Staffs access and right of entry will be assumed unless the applicant informs the County in writing at the
time of the application that he or she wants prior otice. ''ll•
Signature: 'IAA (2 mQ� (&d\ SS C)?Date: � O� /v
ter.
The action .r. tions Applicant will undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or
endangered •-cies and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the
"Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this
permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your
action(s)even if you are in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual
and non-transferable responsibility for adhering to and complying with the ESA. The Applicant has read this disclaim and s ns and dates it below.
signature: �Yo p. i o
����'� J SS C." Date: r/ l
G:\PemtitCenter\###WORMS###\DRD FORMS\Master Permit Application 5-29-08.doc
• •
BUILDER STATEMENT
The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that
they will be assuming the responsibility of the General Contractor for the proposed project.
Signature: Date:
GENERAL CONTRACTOR OR MANUFACTURED HOME INSTALLER: PHONE: FAX:
SDI' SYkOVe CO Y hUC\Cn , InC. (3140) STA-1342 (itco) 275.4021.0
MAILING ADDRESS: 230 E. '-'inside "(Wive_ EMAIL: ---
CONTRACTOR'S LICENSE `� i r/\f IN_ q$5 25K, WAINS
NUMBER: SOUT14SC0 Ijo NIL NUMBER . _
ARCHITECT/ENGINEER: PHONE ( ) FAX:( )
MAILING ADDRESS: ' EMAIL
Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal:
New X Wood Existing: 6 1) L I Sewer
❑ Addition f] Steel Proposed: Bank ❑ Community System
❑ Alteration/Remodel Ll Concrete Total: Height: ❑ Individual System
❑ Repair ❑ Masonry SEP Permit#
❑ Demolition ❑ Other: Bedrooms: Water Supply:
Existing: Setback: ] Private well ❑ Two Party
Type of Heat: Proposed: ❑ Public
MN►� 4 I Total: Name of System:
If this is a Commercial Project you must answer the following:
Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces:
Number of occupants(includes owners,tenants,employees,etc) Current Proposed
IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No
If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply:
1 Underground Tank 1 Above ground Tank Size of Propane Tank:
1 Heat Stove 1 Cook Stove I Woodstove 1 Fireplace Insert 1 Hot Water Tank 1 Pellet Stove 1 Other
Is this appliance being installed in a Manufactured/Mobile Home? Yes / No
When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property
lines,tank location and size,distances from the propane tank to all property lines,buildings and septic system components,
including the reserve area.
Square Footage Current Proposed Forlffic0 Use%Only ;s ,,,., , Amount Revision ;- t 4-
Main Floor Heated r r = EH Bld App Review:
Iiie u f1 -
27 Floor Heated • '� ` Consistency Review:
Af.
Other Heated , Base fee: Cs ,P5
Mezzanine -w Additional Section: _`_ ,,,]; - _.
Heated Basement Plan Check fee: ) _• I I
Unheated Basement State Surcharge fee: ,.L 50
Other Unheated Pot Water Review fee: 1 �6 PL 1P
I`J
Garage/Carport SUBTOTAL
Decks M 111911/Rd Approach fee:
ft J p/�
. .: TOTAL: $ (0ya-
Other 81O
f Receipt Number: 1 19 Ws'
CashlCheck Number: 82,
3
ESTIMATED COST UIRED) Date: C —�G�
.Fair market value I l rend materials foundat:o finish --H�
irl Z000 Initials: l
r
G:\PcrmitCcnter\###FORMS###\DRD FORMS\Master Permit Application 5-29-08.doc
N.
O oo y ;. m
Z \ 1
CS' (o -ilk
W m ° w `�° c �. o
mil �d�. Iy� • CD �' Ca -o -• a)i - r Z
c� �y�0 C'�, • N 0 o co n o 0
mil °r. ��� '�1 O O ,°, ,- " rn w
'1� fD a
4Q del
cs
w't Ikti, i.,..11 i .
mIP
c
x
Nr w
b N 5 c) o
N
( CD
NQ D NO 0 Z c ,- a°CA
0 CD CD n'
x - q n o: <
- - - -----i Thorndyke Road - - - -
---� --� maria,a r —Ditch----.
,OgAill.1.1.1111.11.1, 09 H2O Main •
10' Setback to H2O Main A M °00 N M „00,00°0 N
t o w IMF
CD 0
�.���, v
���r n ^ -0o o O
— cD o o , 0
1 CD
CL CD
(' �''; G�, ���� ����,�,����0 No Build �,, r- ,
r
4
m villiviimiwt. .
I ..4.40. . -- —...P.Ahh,A
(11 ‘ 1\. V...
co �OI8A Ov -1 of W *4'
o
z 1 0zl,5' No Build (See Attached Waiver)
o co
O — p N O d
cwn O 00I I N O
00 co o "' v I w v o `�°
D x
m ry r D m I °° a 2 m
�' ° ° coo 0 o m o
x N N O - 0 N _- t ► _. W
--7c2c:x
cr
r 4 „
-
n I o
'11\
CD
O O -a rV co
I N N
cn
to
O cD CD G) N ..
CO a) q O I °•
I O N
co
co
o
a
S 0°57'00" W co
$ 0°57'00" W o N
60' co
0 60, 0
n
x-
-a
-.._
cD
-
cnco
H_ _ o
rO N co
n
(D
N
O
3 D
m x.r K 0 .a
c(i' O 5' C
m
co m
0 0 o r }-,i 0 Z ry CD
-I (,' D nO x v) -co o ���
m G) * D -1 O' Z O 'a m * C1�•
Z Z _1 O O o7 0' a) !• C�
<co co 5 2
-< Z A p oIII
70 j Z r w co cn a
a D N ° co N O O n s2° -ma•y•...4 di . '
cD L_ -7 O . M ✓� Z H pa
n D c co O ` w < 7 D'
� L O N Z R. 0 (D OD 10 .
u' rn n O^vCD jco •
m i E
�tr1
73CD MNADNwO om A - :: in, �v ' .- C. ~
m z sr,r`f4 It.. M° Q T p . �_ "
2N Lo oo _ h F gT_�T R ■! �O r , x ° N Zo F„, N or •o d e c
cn
cnO , < U y C nO ' S <J r T��` fO r NO
zc O � \ " a5f�1° JJ \< vy -
N w O m C0 VVV�o - 'IJ � v0_ D77 Q, ,
v o 7J a4Q
".:‘.61
0 CN
am
-<