Loading...
HomeMy WebLinkAboutScan of newspaper ad 050626~,,;;vy y,ve,, ~••al vrre DUdrO :ommissioners of Jefferson ate of Washington, will sled bids no later than ~ June S, 2026 at the ,e County Commissioners, level of the Jefferson urthouse, 1820 Jefferson Box 1220, Port Townsend, ,, 98368, for construction , Northwest School of ~oatbuildlng (NWSWB) ~arlne On-Site Grinder 1llation for Port Hadlock ty Project No. 4052128- ,ids will be opened and ly shortly after the bid 'in the Jefferson County ers Chambers, basement the Jefferson County interested persons can id opening. scription: This contract · the installation of on- pumps for the Northwest 'ooden Boatbuilding and school buildings, which •s seven (7) cabins and and Star Marine. The eludes the connection to low pressure sewer (LPS) ystem; the installation )PE ~PS collection pipe, ,E low pressure "side , grinder pump tanks, ,ps and control panels; Ion to existinq building ,purtenances; the startup ,ft-he grinder pumps; the of the existing septic ; clearing and grubbing; nt of hot mix asphalt concrete sidewalks; and all in accordance with I Contract Plans, these •isions, and the Standard ·'s Estimate for this work JS WSST. ents: Bids must be accordance with the ,ecifications in the bid All bid documents bid forms, plans, addenda, and plan are available on the ,ange of Washington ww.bxwa.com. Click ects", "Public Works," ounty Public Works" ~Ing," and "Project Bid s must "Register as a ,ceive automatic e-mail future addenda and to :he. "Bidders List.'' Call , 258-1303 if you need ite Walkthrough: all attend a mandatory ,lkthrough. The pre-bid ,t the Northwest School rtbuildinq located at 42 :reet, Port Hadlock, WA ,!lowing dates/times: Board of County Commissioners on the selection and funding of open space projects utilizing the Conservation Futures Fund. The Board of County Commissioners seeks representation on the committee from each commissioner district and a broad spectrum of interests. There are currently two vacancies on the committee: One for a citizen to represent an "Open Interest," and one to represent commissioner District 2. The committee meets approximately 6 times per year, with the majority of activities occurring in March and April. Interested individuals should send a letter or email to the Natural Resources Program Coordinator, 615 Sheridan St., Port Townsend, WA 98368 (email: tpokorny@co.jefferson.wa.us) to arrive no later than Wednesday, May 13, 2026 to request an application. These are non-paid positions. For more information, contact program coordinator Tami Pokorny, Jefferson County Environmental Public Health at Ph: (360) 379-4498 or email tpokorny@co.jefferson.wa.us or visit https://www.co.jefferson.wa.us/560/ Conservation-Futures-Program. PTL.: April 29, May 6, 2026 Legal No.215439 NOTICE OF PUBLIC HEARING Additional Budget Appropriation 2026; Various County Departments; Hearing scheduled for Monday, May 11, 2026 at 10:30 a.m. in the Commissioners Chambers (HYBRID) NOTICEISHEREBYGIVENthata public hearing is scheduled by the Jefferson County Board of Commissioners for MONDAY, May 11. 2026 at 10:30 a.m. in the Commissioners' Chambers, County Courthouse, 1820 Jefferson Street, Port Townsend, WA 98368 (HYBRID). Notice of said hearing is to be published in the official newspaper of Jefferson County. Various County Departments have requested increases to their 2026 budget. Per RCW 36.40.140 the BOCC must hold a public hearing regarding the proposed budget changes. This agenda item is to approve the public notice only; the individual changes will be reviewed at the public hearing. The information is available for viewing on the County website by visiting: www.co.jefferson.wa.us and follow this pathway - Services - Laserfiche Web Portal (username and password is: public) - Board of Commissioners - BOCC Agenda Packets - 2026 Weekly Agenda Items - 05 May 2026 - 051126 - HEARING re ·••¥•• - ·······"· ..... , ..,, .......... MRC project, and committing time to education and outreach events throughout the year. For more information or to express interest in submitting an application, please email jeff.co.mrc@gmail.com, or visit https://www.jeffersonmrc.org/ about-us/, Application deadline is May 20, 2026. Thank you for your interest in helping guide marine conservation efforts in Jefferson County! PTL.: May 6, 2026 Legal No.215618 03A Notices Olympic Area Agency on Aging (O3A) Council of Governments (COG) meets May 7, 2026, via Zoom/Conference call at 10:00 a.m. Agenda includes review and approval ofrevised Advisory Council bylaws. O3A posts scheduled COG and volunteer Advisory Council meeting agendas and information online in the events calendar at www.03A.org/Events. See this calendar for current meeting info or call 1-866- 720-4863. It is O3A policy that public meetings are accessible to people with disabilities. If you need assistance to participate in a meeting due to a disability as defined under the Americans with Disabilities Act or Washington Law Against Discrimination, please call Ingrid Henden for ADA coordination at above number or by email: lngrid.henden@dshs.wa.gov to request an accommodation at least 48 hours prior to the scheduled meeting .. PTL.: May 6, 2026 Legal No.215565 State Notices STATE OF WASHINGTON WASHINGTON STATE PARKS AND RECREATION COMMISSION ADVERTISEMENT FOR BID specmcations are available through Builders Exchange Washington, Inc. at http://www. bxwa.com. Posted Projects"; "Public Works", "Washington State Parks and Recreation. Bidders have the option to access Bid Documents, including Specifications and Drawings, at www.parks. wa.gov/contracts by clicking on the Construction Projects link for reference purposes. However, the official channel for bid notifications and addenda is the State Parks Public Opportunities-MRSC Rosters Bonfire Portal, and bidders should rely on it for the most up-to-date information. PLANS MAY ALSO BE VIEWED THROUGH: Associated Builders And Contractors, Spokane WA; Tri City Construction Council, Kennewick WA; Daily' Journal of Commerce, Seattle WA; Weekly Construction Reporter, Bellingham WA; Daily Journal Of Commerce Plan Center, Portland OR; Lower Columbia Contractor Plan Center, Longview WA; Abadan Spokane Plan Center, Spokane WA; ARC Document Solutions, Seattle, WA; Associated General Contractors, Boise, ID; Dodge Construction, Bedford, MA; Hermiston Plan Center, Hermiston, OR; Contractor Plan Center, Clackamas, OR; Wenatchee Plan Center, Wenatchee, WA; Spokane Regional Plan Center, Spokane, WA; Associated General Contractors, Spokane, WA; Walla Walla Valley Plan Center, Walla Wall, WA; Yakima Plan Center, Yakima, WA. TECHNICAL QUESTIONS regarding this project shall be directed to: Dan Budsberg, Project Representative at telephone: (360) 725-9758, email: dan.budsberg@parks. wa.gov or Fayruj Ahmed at telephone: (360) 725-9760, email: fayruj.ahmed@parks. wa.gov, 11834 Tilley Rd, Olympia, WA 98504-2650. BID RESULTS will be published on the State Parks Public Opportunities-MRSC Rosters Bonfire Portal https:// m rscroste rs. bonfire hub, com/portal following the bid deadline and in the Construction Projects section at www.parks. wa.gov/contracts after the bid submittal. This practice ensures that those involved and interested can readily view bid outcomes, enhancing Ut- WASHINGTON IN AND FOR THE COUNTY OF JEFFERSON KALA POINT VILLAGE ASSOCIATION, Plaintiff V, SARAH BELL and JOHN/JANE DOE BELL, and their marital community et al., Defendants NO. 25-2-00218-16 SUMMONS BY PUBLICATION (60 DAYS) The State of Washington, To: THE UNKNOWN HEIRS, DEVISEES AND ASSIGNEES OF JULIE BELL, deceased; and ALL OTHER PERSONS OR PARTIES UNKNOWN CLAIMING ANY RIGHT, TITLE, ESTATE, LIEN, OR INTEREST IN THE REAL ESTATE DESCRIBED IN THE COMPLAINT HEREIN, Defendants. You are hereby summoned to appear within sixty days after the date of the first publication of this summons, to wit, within sixty days after the 15th day of April, 2026, and defend the above entitled action in the above entitled court,and answer the complaint of the plaintiff and serve a copy of your answer upon the undersigned attorney for plaintiff at his (or their) office below stated; and in case of your failure so to do, judgment will be rendered against you according to the demand of the complaint, which has been filed with the clerk of said court. The object of this action being to collect unpaid assessments and foreclose a lien for the same, This concerns collection of a debt. Any information obtained or provided will be used for that purpose. The attorney is acting as a debt collector. Signed: Pody & McDonald, PLLC Dean H. Pody, WSBA #27585 Patrick M. McDonald, WSBA #3661S Asha A. Abdulle, WSBA #61101 Joseph A. White, WSBA #63425 1000 Second Avenue, Suite 1605 Seattle, WA 98104-1094 Published: The PT Leader April 15,22,29, May 6,13, 2026 Legal No.215408 Wednesday, May 6, 2026 • B 13 re h e n siv e P la n 2 PT M C - Stre e ts & R O W 13 PTMC - Utilities & water 7 PTMC - Zoning 8 PTMC - Land Division 9 PTMC - Environmental 0 PTMC - Procedures of Port Townsend ~e~ing D>esign Standards ,g Details The open r public hearing will be a meeting offering both a al location and a virtual 1. How to participate: :tend in person: The 1g will be held in Council iers on the second floor Hall at 540 Water Street, iwnsend, WA. ticipate Virtually: 1d in person or virtually nputer or tablet at https:// JS/j/94575085860 ,e only (muted - listen- ode) United States: Local - 1(253)215-8782 access I457S085860# you are experiencing :al difficulties, please ,t all methods listed before reporting any to: alerksupport@ t.us terested parties may iate in the Hearing rovide oral or written my. For your ience, the Hearing er's Rules of Procedure e found on the City's under "Hearing er" at https://cityofpt. , n n ing-com mun ity- pment/pa ge/hea ring- er ting Written Comments: v will also accept written nts until such time that rllc hearing is adjourned. send written comments i. staff contact and :e the file number. ntact: iarriman, EMPA, AICP ning Manager, Email: rn@cityofpt.us I Phone: 9-4423 PTL.: May 6, 2026 Legal No.215608 unty Notices CALL FOR BIDS 4 - Northwest School of 1 Boatbulldlng (NWSWB) r Marine On-Site Grinder lnst<tllatlo for the Port May 20, 2026 at 9:30am or May 20, 2026 at 1 :30pm Contractors will be required to attend one of the two pre-bid site walkthroughs. Bid Bond: Each bid shall be accompanied by a surety bond, postal money order, cashier's check or certified check payable to the Treasurer of Jefferson County in the sum of five (5%) percent of the bid amount, to be forfeited to Jefferson County by the successful bidder if he/ she fails to enter into a contract and file an acceptable surety bond in the amount of 100% of the contract price within ten (10) days of the award. The Board of County Commissioners reserves the right to reject any and all bids, and to accept the bid deemed most advantageous to Jefferson County, and to waive all informalities in the bidding. Equal Opportunity: The Jefferson County Public Works in accordance with Title VI of the Civil Rights Act of 1964 (78 Stat. 252.42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Funding: This project is funded through the U.S. Environmental Protection Agency FY 2022 and FY2023 Community Grant Number 02197501. All work performed on this project will be subject to state prevailing wage rates. Jefferson County is an Equal Opportunity and Affirmative· Action Employer. Contractors are encouraged to commit to local hires for this project. Small, Minority- and Women-Owned firms are encouraged to submit bids. The Successful bidder will be required to conform to the wage requirements prescribed by the federal Davis-Bacon and Relate Acts which requires that all laborers and mechanics employed by contractors and subcontractors performing on contracts funded in whole or in part by SRF appropriations in excess of $2000 pay their laborers and mechanics not less than the prevailing wage rates and fringe benefits, and determined by the Secretary of Labor, for corresponding classes of laborers and mechanics employed on similar projects in the area. PTL.: May 6,13, 2026 Legal No.21S576 ~ PublicH~ JEFFERSON COUNTY CONSERVATION FUTURES FUND PROGRAM Citizen Oversight Committee Addi Budget Appropriations You are welcome to participate in this hearing. You will need to join the meeting by 10:30 a.m. using the following methods: VIRTUALLY: Via the following Zoom, link: https:// zoom.us/j/93777841705, PHONE: Dial 1-253-215-8782 and enter access code: 937-7784- 1705# and press •g to "raise your hand" to be called upon. Access for the hearing impaired can be accommodated using Washington Relay Service at 1-800-833-6384, or IN- PERSON at 1820 Jefferson Street, Port Townsend, WA 98368 (Commissioners Chambers) In addition, written testimony is also invited beginning on April 27, 2026 and ending on May 11, 26 at the end of the Public Hearing, unless extended by the Board of County Gommissioners. Written public testimony may be submitted by Email to: jeffbocc@ co,jefferson.wa.us You may view testimony received by visiting: www. co.jefferson.wa.us and following this pathway - Services - Laserfiche Web Portal (username and password is: public) - Board of . Commissioners - BOCC Agenda Packets - 2026 Weekly Agenda Items - 05 May 20:26 - 051126 - HEARING re Addi Budget Appropriations You can also Mall your testimony to: Jefferson County Commissioners' Office; P.O. Box 1220, Port Townsend, WA 98368. Written testimony must be received by the Board of County Commissioners by the end of the hearing testimony period. Signed this 27th day of April, 2026 JEFFERSON COUNTY BOARD OF COMMISSIONERS Greg Brotherton, Chair PTL.: April 29, May 6, 2026 Legal No.215544 The Jefferson County Marine Resources Committee has an upcoming vacancy for 2 committee member positions (District 2, District 2 Alt). The MRC is focused on protecting and restoring the marine and estuarine environment withln Jefferson County. If you have a background in marine science, or are involved in areas related to ports, marinas, commercial fishing, or shoreline development and/or planning, and are keen to take an active role in: • Learning about marine conservation Participating in science-based research and educational outreach Contributing recommendations to policy Please consider joining our Committee! Members are appointed to a four-year term (2026-2030), and commit to: Sealed bids will be received for the following project: PROJECT NUMBER: SW-C1831 PROJECT TITLE: Anderson Lake State Park - New Day Use Facilities and Trail Development PROJECT DESCRIPTION: This project includes paving the park's main road, paving the trail and construction of boardwalk along a section of trail, removal of the existing vault restrooms PROJECT LOCATION: Anderson Lake State Park is located at 1061 Anderson Lake Road, Chimacum, WA 98325 (Jefferson County). It's on the Quimper Peninsula about 7-8 miles south of Port Townsend, Washington. and construction of two new CXT's. ESTIMATED BID RANGE: $707,185.80- $864,338.20 PROJECT REPRESENTATIVE: Dan Budsberg PROCUREMENT COORDINATOR: Jason Bologna PREBID WALKTHROUGH: 10:30 AM on Thursday, May 07, 2026. Meet Anderson Lake Parking Area. · SUBMITTAL DUE DATE/TIME: 1:00 PM on Thursday, May 21, 2026 ELECTRONIC BIDDING: Bidders are required to register as vendors on the MRSC Bonfire Procurement Portal https:// m rscrosters.bonfi reh u b.com to be eligible to submit bids. All bid submissions must be completed electronically through the State Parks Public Opportunities section of the portal. · Bidders must use the official Bid Proposal Form, provided as part of the electronic bid documents, ensuring that all required fields are properly filled out and submitted before the deadline. (See Bonfire support details further down.) PLANS. SPECIFICATIONS. ADDENDA. AND PLAN HOLDERS LIST: Contractors can access plans and specifications through the State Parks Public Opportunities-MRS( Bonfire Procurement Portal at https:// m rscrosters.bonfireh u b.com/ portal. Important: Bidders are encouraged to "Register as a Prime/GC Interest" on the project details page of the MRSC Rosters Bonfire Procurement Portal to be placed on the Bidders List. This service is free for Prime Bidders, transparency and efficieru the bidding process. THE STATE OF WASHING PREVAILING WAGE RATES applicable for this public w project. Bidders are respon to verify and use the r recent prevailing wage r, The "Effective Date" for project is the bid submittal' and date above. BIDDER RESPONSIBI will be evaluated for project. In determining bk responsibility, the Agency : consider an overall accoun of the criteria set fortH Division 00 - Suppieme Responsibility Criteria. Ph direct questions regarc this subject to the Pro Representative. MANDATORY 15% APPRENi LABOR HOURS of the total la hours are not a requirerr of this construction contr Voluntary workforce diver goals for this appren participation are identified the Instructions to Bidd Bidders may contact Department of Labor Industries, Apprentices Section, to obtain informat on available apprentices programs. SUBCONTRACTOR LISTIN Per RCW 39.30.060, when bid proposal combined "' any alternates totals one mill dollars or more, the Bid, must list the Subcontract they intend to use for structi steel, rebar installation, heati ventilation, and air conditioni (HVAC), plumbing, and electri work on the Subcontrac Utilization List form for t project. ACCESS EQUITY: The success Bidder is required to compk their vendor registration Access Equity, a secure B2GN< online vendor manageme system. Prime Contractt already registered with B2GNc for any public entity must enst their information is up to da The system can be access, either directly at https://omwt diversitycompliance.com/ via the Office of Minority aI Women's Business Enterpris (OMWBE) website at https omwbe.wa.gov/. PTL.: April 29, May 6, 20 Legal No.2155