HomeMy WebLinkAboutEx 13 SEPA DNS, SEPA Memo, Env. Checklist4�SON �0 JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT
w 621 Sheridan Street I Port Townsend, WA 98368 LOG ITEM
360-379-4454 1 email: gbaIlard@co.jefferson.wa.us
tr I N awww.co.jefferson.wa.us/260/CommunityDevelopment page Of
s'�
Final SEPA Determination on Non -Significance (DNS)
for Zoning Conditional Use Permit (ZON2025-00011)
for the construction of a 150 foot high monopole for Wireless Communication Facilities (WCF)
Land Use Permit Case #: ZON2025-00001 is a Type III Zoning Conditional Use Permit for a 150 foot high
monopole for wireless communication facilities (WCF). This proposal requires a public hearing with a
decision by the Jefferson County Hearing Examiner per JCC 18.42.080(3) Table 13-1. A copy of the
application and all the reports are available on Jefferson County's Customer Self -Service Portal (see
below).
Location: The 6.12 acre parcel is zoned Rural Residential 1 dwelling per 5 acres (RR1:5), and is
located north of Swansonville Road and Fleet Drive, and west of Jefferson Avenue in the Port
Ludlow Area. The parcel is in Section: 8, Township: 28N, Range: 1 E, W.M. (APN 821081015).
PUBLIC HEARING AND WHERE TO VIEW DOCUMENTS: The all -virtual public hearing before the
Jefferson County Hearing Examiner is scheduled for 10:00 a.m. on Tuesday June 16, 2026.
To join the meeting:
Zoom link: https://us06web.zoom.us/*/82678751298
Phone: (253) 215-8782, Webinar ID: 826 7875 1298 ,*9 to raise your hand, *6 to unmute
To view the case file, including application and staff report, and other hearing materials: go to
www.co.iefferson.wa.us — Services — Laserfiche Web portal (username/password: public) — Board of
Commissioners — Boards & Committees — Hearing Examiner — 2026 — Horizon 150 foot monopole
or by visiting Jefferson County's Customer Self -Service Portal:
https://selfservice-op.oeffcowa.us/energov prod/selfservice#/home and entering Case number:
ZON2025-00011.
Description of Proposal: Horizon Tower in conjunction with Verizon Wireless is proposing a new
WCF. The proposal is to construct a new 150' monopole tower with attached antennas within a
50'x50' fenced area along with ground mounted equipment and generator. The tower will improve
coverage and network reliability in rural Jefferson County. Horizon Tower has obtained an
agreement with the property owner that will allow for construction and maintenance of this facility,
necessary utility connections, and provisions for access to the site.
Reports Submitted: The applicant has submitted documentation in their application regarding their
Radio Frequency propagation maps and how co -locating the proposed antennas is not feasible on
existing towers within their desired service area. They also provided a photo simulations of the view
of the proposed monopole from key viewing area. A copy of all the studies and reports are available
at the DCD Office or on the DCD customer self-service portal.
Permits required: The implementation of this proposal would require building and address permit from
Jefferson County DCD. The lease of the 50 by 50 foot area for the proposed WCF facility is exempt from the
land division requirement per RCW 58.17.040(8). This proposal would also require approval from Federal
Communication Commission (FCC) and clearance from the Federal Aviation Administration (FAA).
SEPA Threshold Determination: Jefferson County Department of Community Development (DCD) is
the lead agency for this proposal and issued a preliminary threshold determination of a
Determination of Non -Significance (DNS) on November 5, 2025 per WAC 197-11-355. The comment
period ended on November 19, 2025. DCD received comments from agencies and the public
regarding this proposal.
The SEPA record included DCD SEPA Memo dated May 12, 2026, application, the design of this
proposal, the studies/reports submitted, comments from agencies and the public, and the existing
Jefferson County development regulations. DCD has determined that this proposal will not result in
probable significant adverse impacts to the environment. Based on the above, DCD has issued a
final threshold determination of a DNS on May 13, 2026. There is no additional SEPA comment for
this proposal.
Issuance Date: /13
Signature: All
Greg Ballard, PA Responsible Official
Appeals: The SEPA appeal must be submitted in writing to DCD Planning within 14 days of final threshold
determination with the applicable appeal fee, in conformance with JCC 18.40.330 and 18.40.810.
Appeals of environmental determinations under SEPA, shall be consolidated with any open record hearing on the
project permit for consideration by the Jefferson County Hearing Examiner.
MEMORANDUM
Jefferson County Department of Community Development
DATE: May 12, 2026
TO: Interested Parties
FROM: Jefferson County DCD
RE: Environmental Review regarding a SEPA threshold determination for the
construction of a 150 foot high monopole for wireless communication
facilities and appurtenances
CASE NUMBER: ZON2025-00011
LANDOWNER: Norman Moran
41 Fleet Drive
Port Ludlow, WA 98365
AGENT: Bill North
The North Group, Inc.
117 Town & Country Dr, Ste A
Danville, CA 94526
LOCATION: The 6.12 acre parcel is zoned Rural Residential 1 dwelling per 5 acres
(RR1:5), and is located north of Swansonville Road and Fleet Drive, and
west of Jefferson Avenue in the Port Ludlow Area. The parcel is located
in Section: 8, Township: 28N, Range: 1 E, W.M. (Assessor parcel number
821081015).
PROPOSAL: Horizon Tower in conjunction with Verizon Wireless is proposing a new Wireless
Communication Facility (WCF). This proposal is referred by the applicant as the Mats Mats Bay
site. The proposal is to construct a new 150' monopole tower with attached antennas within a
50'x50' fenced area along with ground mounted equipment and generator. The tower will
improve coverage and network reliability in rural Jefferson County. Horizon Tower has obtained
an agreement with the property owner that will allow for construction and maintenance of this
facility, necessary utility connections, and provisions for access to the site. In addition to
Verizon's antennas at the top of the monopole, the proposal could co -locate three other wireless
communication antennas on the monopole.
This project requires a TYPE III Zoning Conditional Use Permit (ZON2025-00011), with a notice
of application and public hearing and an open record public hearing before the Jefferson County
Hearing Examiner (H.E.) per JCC 18.42.080(3) Table 13-1. The H.E will issue a decision based
on the information in the record.
An all -virtual public hearing before the Jefferson County Hearing Examiner is scheduled for
10:00 a.m. on Tuesday June 16, 2026. The DCD staff report and exhibits will be available by
June 2, 2026 on the Jefferson County Customer Service Portal under ZON2025-00011
To join the meeting: Zoom link: https:Hus06web.zoom.us/j/82678751298
Phone: (253) 215-8782, Webinar ID: 826 7875 1298 ,*9 to raise your hand, *6 to unmute
A. ENVIRONMENTAL RECORD and EXHIBITS
The environmental review consisted of analysis based on the following documents included in
the environmental record.
131. Application date July 31, 2025
B2. JCC 18.42 Criteria dated July 30, 2025
B3. SEPA Checklist dated July 29, 2025
B4. Site Plans, Elevations, and Photo Simulations dated May 22, 2025
B5. Mats Mats Radio Frequency (RF) Documentation received July 31, 2025
B6. Priority Habitat Species Map dated July 29, 2025
B7. RF Design Analysis showing existing Cell sites and existing & proposed coverage
received July 31, 2025
B8. Agent's response to comments received from public dated 4/17/26
B9. Alternate Site Analysis received April 17, 2026
C1. Notice of Application sent November 5, 2025
C2. DCD received approximately 145 comments from 73 individuals as of May 12, 2026
The information above along with additional information when it becomes available can be
viewed at Jefferson County's Customer Self -Service Portal:
https:Hselfservice-op.oeffcowa.us/energov prod/selfservice#/home and entering Case number:
ZON2025-00011.
This information may also be available at the DCD located at 621 Sheridan Street, Port
Townsend, WA 98368 during office hours.
B. STAFF AMENDMENTS TO THE ENVIRONMENTAL CHECKLIST
The following sections correspond with related categories of the environmental checklist
submitted for the proposal, and clarify, amend, or add to that document.
CHECKLIST ITEMS
EARTH
The proposed site is predominantly flat with a knoll located in the northern section of the
parcel where the cell tower would be located. The proposal would be located within a 50
by 50 foot compound area. From the knoll there is minimal slope to the north, there is a
7.5% slope to the western property line (PL), a 10% slope to the eastern PL, and a 4%
slope to the southern property line. The site contains trees and native shrubs. The
compound areas would be served by a 30 foot wide access and utility easement.
Grading and clearing would be anticipated with a 12 foot wide by approximately 400 long
gravel road from the southern edge of the parcel to the proposed compound area. This
proposal should not entail the importing or exporting of significant quantities of cut or fill
material.
SEPA Memo
Horizon 150 foot high Monopole
ZON2025-00001
Page 2
2. AIR
The checklist adequately addresses the issues of this section.
3. WATER
Surface Water: There are no streams or wetlands on this 6.12 acre parcel or within 200
feet of the boundary of this proposal.
Ground Water: This is an unmanned site so no water or sewage disposal is proposed.
Water Runoff: The retention of native vegetation around the compound areas should
assist in fully dispersing stormwater from the site. The proposal will entail approximately
12 by 400 sq foot access road would entail 4,800 sq ft of impervious surface. The 50 by
50 foot compound area would equate to 2,500 sq ft of impervious surface. This would
equate to 7,300 sq ft of impervious surface. All stormwater for non-residential projects is
reviewed by the Jefferson County Public Works Department. The engineered
stormwater plan would be required to meet the Washington State Department of
Ecology's 2024 Stormwater Management Manual of Western Washington.
4. PLANTS
Except for the gravel for the access and compound area, this proposal would retain most
of the native trees and shrubs for screening of the proposal. The retention of existing
trees and vegetation meet the landscaping requirements per Section 18.30.130 JCC. If
the vegetation removed the applicant would be required to submit a landscaping plan to
meet the landscaping requirements.
5. ANIMALS
The checklist adequately addresses the issues of this section.
6. ENERGY AND NATURAL RESOURCES
The checklist adequately addresses the issues of this section. Electricity will be
provided by the Jefferson County PUD. The site would also have telephone cable install
within the 30 foot wide access and utility easement.
7. ENVIRONMENTAL HEALTH
The Federal Communication Commission (FCC) has jurisdiction over the maximum
permissible exposure for the general public per the Federal Telecommunication Act of
1996.
This is addressed in the purpose of the Jefferson County Personal Wireless Service
Facilities found in Chapter 18.42 JCC. This is addressed in the Land Use Section
below.
8. LAND AND SHORELINE USE
Comprehensive Plan: The application addressed compliance with the Jefferson County
Comprehensive Plan in stating that the proposal will expanding essential public facilities
and service by improving rural telecommunication. In addition, this would protect public
safety infrastructure without degrading the rural character.
SEPA Memo
Horizon 150 foot high Monopole
ZON2025-00001
Page 3
Zoning: With the exception of the area to the south located in the Port Ludlow Master
Planned resort zone MPR-SF-4, the site and surrounding areas are zoned Rural
Residential 1 dwelling per 5 acres (RR1:5). This proposal requires a TYPE III Zoning
Conditional Use Permit with a hearing before the Jefferson County Hearing Examiner
per Table 13-1 of Section 18.42.080(3) JCC.
Zoning CUP Criteria Section 18.40.530 JCC. This proposal is required to meet all of the
Zoning CUP criteria in addition to the other Unified Development Code Requirements.
This includes the Development Code Standards found in Section 18.30 JCC, which
address stormwater, lighting. parking, landscaping, etc. This proposal is also required to
meet the Personal Wireless Service Facilities requirements found in Chapter 18.42 JCC.
These are the most applicable standards for the review of the construction of this 150
foot high monopole for wireless communication facilities.
Chapter 18.42 JCC - Personal Wireless Service Facilities:
Section 18.42.010 JCC - Purpose, policy, goals, and interpretation.
(1) Purpose. This chapter is designed to provide opportunities for the community to be
served by personal wireless service facilities, consistent with the rights of personal
wireless service providers as set forth in the Federal Telecommunications Act of 1996
(Pub. L. No. 104-104, 110 State 56, 31-136, codified at 47 U.S.C. 332(c)), hereinafter
referred to as "the Telecommunications Act" or "the Act," while at the same time
providing for an orderly development of the county and protecting the health, safety, and
general welfare of the county's residents and property owners. This chapter is also
intended to comply with Section 6409 of the Middle Class Tax Relief and Job Creation
Act of 2012 (H.R. 3630, P.L. 112-96), hereinafter referred to as "Section 6409," as
implemented by 47 CFR 1.40001, as it exists now or may be amended in the future.
(2) Intent and Interpretation. These standards are designed to comply with the Act. The
provisions of this chapter shall not be interpreted to prohibit, or to have the effect of
prohibiting, telecommunications or personal wireless services, television broadcast
signals, multichannel multi -point distribution services or direct broadcast satellite
services, or to unreasonably discriminate among providers of functionally equivalent
services.
The property is not within the jurisdiction of the Shoreline Master Program.
The review of this proposal through the Zoning CUP (ZON 2025-00011) will ensure that
all of the requirements of the Jefferson County Code are met.
9. HOUSING
The checklist is adequate.
10. AESTHETICS
This proposal is not in a key viewing area as addressed in Section 18.42.090(2)(a). The
applicant has provided photo simulations with the site plan submitted that show the view
of the proposed tower from key viewing areas. The design of this proposal locating the
monopole on a knoll within the interior of this 6.12 acres parcel and the retention of trees
and shrubs outside of the 50 by 50 foot compound area.
SEPA Memo
Horizon 150 foot high Monopole
ZON2025-00001
Page 4
11. LIGHT AND GLARE
The only light proposed is a motion activated shielded security light at the entrance of
the compound. The proposal is not proposing lighting on the tower.
12. RECREATION
This proposal would provide 100 spaces for people to rent for the placement of their own
RV and park models. RV's and park models are intended for recreation use. The
checklist description is adequate.
13. HISTORICAL AND CULTURAL PRESERVATION
This proposal will ensure that historic and cultural resources are protected as part of the
federal permitting requirement for the FCC permit. The checklist description is
adequate.
14. TRANSPORTATION
The subject property is accessed Fleet Drive, a county road. The landowner home is
located off an easement to Fleet Drive. The agent will be required to demonstrate that
they have legal access the proposal from Fleet Drive. The application indicates that the
unmanned facility would be visited only a couple of times a month.
15. PUBLIC SERVICES
The objective of this proposal is to provide better telecommunications to the area around
the proposal.
16. UTILITIES
The proposal would be served by electric and telephone service in the 30 foot access
and utility easement. The checklist adequately addresses the issues of this section.
CONCLUSIONS AND RECOMMENDATIONS
The SEPA record includes this DCD SEPA Memo dated May 12, 2026, application, the design
of this proposal, the studies/reports submitted, comments from agencies and the public, and the
existing Jefferson County development regulations that are applicable to this proposal. DCD has
determined that this proposal will not result in probable significant adverse impacts to the
environment. Based on the above, DCD will be issuing a final threshold determination of a DNS
on May 13, 2026. There is no additional SEPA comment for this proposal.
The SEPA review addresses impacts to the environment, but the proposal is still required to
meet all of the applicable sections of the Jefferson County Code as outline above in the Land
Use Section of this SEPA Memo. The decision of this proposal will be determined by the
Jefferson County Hearing Examiner based on the information in the record and the open record
public hearing to be held on June 16, 2026.
SEPA Memo
Horizon 150 foot high Monopole
ZON2025-00001
Page 5
SEPA1 Environmental Checklist Exhibit E
Purpose of checklist
Governmental agencies use this checklist to help determine whether the environmental impacts of your
proposal are significant. This information is also helpful to determine if available avoidance, minimization, or
compensatory mitigation measures will address the probable significant impacts or if an environmental impact
statement will be prepared to further analyze the proposal.
Instructions for applicants
This environmental checklist asks you to describe some basic information about your proposal. Please answer
each question accurately and carefully, to the best of your knowledge. You may need to consult with an
agency specialist or private consultant for some questions. You may use "not applicable" or "does not apply"
only when you can explain why it does not apply and not when the answer is unknown. You may also attach
or incorporate by reference additional studies reports. Complete and accurate answers to these questions
often avoid delays with the SEPA process as well as later in the decision -making process.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time
or on different parcels of land. Attach any additional information that will help describe your proposal or its
environmental effects. The agency to which you submit this checklist may ask you to explain your answers or
provide additional information reasonably related to determining if there may be significant adverse impact.
Instructions for lead agencies
Please adjust the format of this template as needed. Additional information may be necessary to evaluate the
existing environment, all interrelated aspects of the proposal and an analysis of adverse impacts. The checklist
is considered the first but not necessarily the only source of information needed to make an adequate
threshold determination. Once a threshold determination is made, the lead agency is responsible for the
completeness and accuracy of the checklist and other supporting documents.
Use of checklist for nonproject proposals
For nonproject proposals (such as ordinances, regulations, plans and programs), complete the applicable parts
of sections A and B, plus the Supplemental Sheet for Nonproject Actions (Part D). Please completely answer all
questions that apply and note that the words "project," "applicant," and "property or site" should be read as
"proposal," "proponent," and "affected geographic area," respectively. The lead agency may exclude (for non -
projects) questions in "Part B: Environmental Elements" that do not contribute meaningfully to the analysis of
the proposal.
https:HecoIogy.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/Checklist-guidance
SEPA Environmental checklist September 2023 Page 1
(WAC 197-11-960)
A.Background
Find help answering background questions'
1. Name of proposed project, if applicable:
Mats Mats Bay
2. Name of applicant:
Horizon Tower / Verizon Wireless
3. Address and phone number of applicant and contact person:
Horizon Tower
117 Town & Country Dr, Ste A
Danville, CA 94526
Contact: Bill North — The North Group, Inc.
425-876-2909
4. Date checklist prepared:
July 29, 2025
5. Agency requesting checklist:
Jefferson County
6. Proposed timing of schedule (including phasing, if applicable):
Construction 2026 / no phasing
7. Do you have any plans for future additions, expansion, or further activity related to or
connected with this proposal? If yes, explain.
No Future activity is included in this proposal or anticipated at this time
8. List any environmental information you know about that has been prepared, or will be
prepared, directly related to this proposal.
Phase 1 report
NEPA
9. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes, explain.
No
10. List any government approvals or permits that will be needed for your proposal, if known.
SEPA Determination
WCF Type III approval
Building Permit
2 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-A-Background
SEPA Environmental checklist September 2023 Page 2
(WAC 197-11-960)
11. Give brief, complete description of your proposal, including the proposed uses and the
size of the project and site. There are several questions later in this checklist that ask you
to describe certain aspects of your proposal. You do not need to repeat those answers on
this page. (Lead agencies may modify this form to include additional specific information
on project description.)
The proposed facility will consist of the construction of a new 150' monopole wireless
telecommunications facility with antennas, radios, cabling, and ground equipment within a
50'x50' fenced lease area. The site will improve Verizon Wireless coverage and capacity in
the Port Ludlow and Swansonville areas and is designed for additional carrier collocation.
12. Location of the proposal. Give sufficient information for a person to understand the
precise location of your proposed project, including a street address, if any, and section,
township, and range, if known. If a proposal would occur over a range of area, provide the
range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and
topographic map, if reasonably available. While you should submit any plans required by
the agency, you are not required to duplicate maps or detailed plans submitted with any
permit applications related to this checklist.
No assigned address — Port Ludlow, WA 98365
Latitude 47.937389° N, Longitude-122.695797` W
Parcel #821081015, Jefferson County
Zoning: RR-5.
B.Environmental Elements
Earth
Find help answering earth questions3
a. General description of the site:
Undeveloped rural parcel with rolling terrain and moderate vegetation.
Circle or highlight one: Flat, rolling, hilly, steep slopes, mountainous, other:
b. What is the steepest slope on the site (approximate percent slope)?
There are no slopes within the immediate area of the proposed site.
c. What general types of soils are found on the site (for example, clay, sand, gravel, peat,
muck)? If you know the classification of agricultural soils, specify them, and note any
agricultural land of long-term commercial significance and whether the proposal
results in removing any of these soils.
Sand and gravel. No agricultural soils of long-term significance.
3 https:Hecology.wa.gov/regulations-permits/sepa/enviroamental-review/sepa-guidance/sepa-checklist-
guidance/sepa-checklist-section-b-environmental-elements/environmental-elements-earth
SEPA Environmental checklist September 2023 Page 3
(WAC 197-11-960)
d. Are there surface indications or history of unstable soils in the immediate vicinity? If
so, describe.
No.
e. Describe the purpose, type, total area, and approximate quantities and total affected
area of any filling, excavation, and grading proposed. Indicate source of fill.
Leveling and gravel placement within a 50'x50' lease area, minimal excavation.
f. Could erosion occur because of clearing, construction, or use? If so, generally describe.
No significant erosion anticipated.
g. About what percent of the site will be covered with impervious surfaces after project
construction (for example, asphalt or buildings)?
Less than 5,000 sq ft of impervious gravel surface.
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any.
Standard BMPs during construction.
Air
Find help answering air questions4
a. What types of emissions to the air would result from the proposal during construction,
operation, and maintenance when the project is completed? If any, generally describe
and give approximate quantities if known.
Temporary construction emissions only; minimal ongoing emissions from maintenance vehicles.
b. Are there any off -site sources of emissions or odor that may affect your proposal? If
so, generally describe.
M
c. Proposed measures to reduce or control emissions or other impacts to air, if any:
Not applicable; emissions minimal.
a https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-Air
SEPA Environmental checklist September 2023 Page 4
(WAC 197-11-960)
3. Water
Find help answering water questions'
a. Surface:
Find help answering surface water questions'
Is there any surface water body on or in the immediate vicinity of the site
(including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If
yes, describe type and provide names. If appropriate, state what stream or river it
flows into.
Mats Mats Bay is nearby but over 200' from site; no direct impact.
2. Will the project require any work over, in, or adjacent to (within 200 feet) the
described waters? If yes, please describe and attach available plans.
No.
3. Estimate the amount of fill and dredge material that would be placed in or
removed from surface water or wetlands and indicate the area of the site that
would be affected. Indicate the source of fill material.
Not applicable.
4. Will the proposal require surface water withdrawals or diversions? Give a general
description, purpose, and approximate quantities if known.
No.
5. Does the proposal lie within a 100-year floodplain? If so, note location on the site
plan.
M
6. Does the proposal involve any discharges of waste materials to surface waters? If
so, describe the type of waste and anticipated volume of discharge.
No.
b. Ground:
Find help answering ground water questions'
1. Will groundwater be withdrawn from a well for drinking water or other purposes?
If so, give a general description of the well, proposed uses and approximate
quantities withdrawn from the well. Will water be discharged to groundwater?
Give a general description, purpose, and approximate quantities if known.
5 https:Hecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-3-Water
s https:Hecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-3-Water/Environmental-
elements-Surface-water
https:Hecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-3-Water/Environmental-
elements-Groundwater
SEPA Environmental checklist September 2023 Page 5
(WAC 197-11-960)
No.
2. Describe waste material that will be discharged into the ground from septic tanks
or other sources, if any (domestic sewage; industrial, containing the following
chemicals...; agricultural; etc.). Describe the general size of the system, the number
of such systems, the number of houses to be served (if applicable), or the number
of animals or humans the system(s) are expected to serve.
None.
c. Water Runoff (including stormwater):
1. Describe the source of runoff (including storm water) and method of collection
and disposal, if any (include quantities, if known). Where will this water flow? Will
this water flow into other waters? If so, describe.
Stormwater will infiltrate on -site.
2. Could waste materials enter ground or surface waters? If so, generally describe.
No.
3. Does the proposal alter or otherwise affect drainage patterns in the vicinity of the
site? If so, describe.
No.
d. Proposed measures to reduce or control surface, ground, and runoff water, and
drainage pattern impacts, if any:
No significant surface or ground water impact anticipated. Consequently, no
reduction measures are required.
4. Plants
Find help answering plants questions
a. Check the types of vegetation found on the site:
® deciduous tree: alder, maple, aspen, other
® evergreen tree: fir, cedar, pine, other
® shrubs
® grass
❑ pasture
❑ crop or grain
❑ orchards, vineyards, or other permanent crops.
❑ wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
❑ water plants: water lily, eelgrass, milfoil, other
❑ other types of vegetation
SEPA Environmental checklist September 2023 Page 6
(WAC 197-11-960)
b. What kind and amount of vegetation will be removed or altered?
Minimal clearing of trees and brush within lease area and access route.
c. List threatened and endangered species known to be on or near the site.
None known.
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance
vegetation on the site, if any.
Existing vegetation around perimeter will remain for screening.
e. List all noxious weeds and invasive species known to be on or near the site.
None observed.
5. Animals
Find help answering; animal questions'
a. List any birds and other animals that have been observed on or near the site or are
known to be on or near the site.
Songbirds, hawks, deer commonly observed in the area.
• Birds: hawk, heron, eagle, songbirds, other:
• Mammals: deer, bear, elk, beaver, other:
• Fish: bass, salmon, trout, herring, shellfish, other:
b. List any threatened and endangered species known to be on or near the site.
Per the Washington Fish and Wildlife Priority Habitats and Species report dated
7/29/2025 no listed species are identified or observed on site.
c. Is the site part of a migration route? If so, explain.
None known — Please see Washington Fish and Wildlife PHS report dated 7/29/2025.
d. Proposed measures to preserve or enhance wildlife, if any.
No measures needed.
e. List any invasive animal species known to be on or near the site.
None known.
8 https:Hecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-5-Animals
SEPA Environmental checklist September 2023 Page 7
(WAC 197-11-960)
6. Energy and natural resources
Find help answering energy and natural resource questions'
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet
the completed project's energy needs? Describe whether it will be used for heating,
manufacturing, etc.
Electricity for telecom equipment.
b. Would your project affect the potential use of solar energy by adjacent properties? If
so, generally describe.
M
c. What kinds of energy conservation features are included in the plans of this proposal?
List other proposed measures to reduce or control energy impacts, if any.
Low -power telecom equipment with efficient components.
7. Environmental health
Health Find help with answerine environmental health auestions10
a. Are there any environmental health hazards, including exposure to toxic chemicals,
risk of fire and explosion, spill, or hazardous waste, that could occur because of this
proposal? If so, describe.
[Me
1. Describe any known or possible contamination at the site from present or past
uses.
There are no known contaminates from past or present use.
2. Describe existing hazardous chemicals/conditions that might affect project
development and design. This includes underground hazardous liquid and gas
transmission pipelines located within the project area and in the vicinity.
There are no known or existing hazardous chemicals or conditions on the property.
3. Describe any toxic or hazardous chemicals that might be stored, used, or produced
during the project's development or construction, or at any time during the
operating life of the project.
Diesel backup generator with contained fuel system.
4. Describe special emergency services that might be required.
None required.
S. Proposed measures to reduce or control environmental health hazards, if any.
9 https:Hecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-6-Energy-natural-resou
10 https:Hecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-7-Environmental-health
SEPA Environmental checklist September 2023 Page 8
(WAC 197-11-960)
All RF emissions meet FCC guidelines.
b. Noise
1. What types of noise exist in the area which may affect your project (for example:
traffic, equipment, operation, other)?
Typical rural background noise.
2. What types and levels of noise would be created by or associated with the project
on a short-term or a long-term basis (for example: traffic, construction, operation,
other)? Indicate what hours noise would come from the site)?
Temporary construction noise; negligible operational noise.
3. Proposed measures to reduce or control noise impacts, if any:
No noise is anticipated therefore, no measures are proposed.
8. Land and shoreline use
Find help answering land and shoreline use questions"
a. What is the current use of the site and adjacent properties? Will the proposal affect
current land uses on nearby or adjacent properties? If so, describe.
Undeveloped; adjacent rural residential.
b. Has the project site been used as working farmlands or working forest lands? If so,
describe. How much agricultural or forest land of long-term commercial significance
will be converted to other uses because of the proposal, if any? If resource lands have
not been designated, how many acres in farmland or forest land tax status will be
converted to nonfarm or nonforest use?
M
1. Will the proposal affect or be affected by surrounding working farm or forest
land normal business operations, such as oversize equipment access, the
application of pesticides, tilling, and harvesting? If so, how?
M
c. Describe any structures on the site.
None.
d. Will any structures be demolished? If so, what?
M
e. What is the current zoning classification of the site?
RR-5.
f. What is the current comprehensive plan designation of the site?
" https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-8-Land-shoreline-use
SEPA Environmental checklist September 2023 Page 9
(WAC 197-11-960)
Rural Residential.
g. If applicable, what is the current shoreline master program designation of the site?
Not applicable.
h. Has any part of the site been classified as a critical area by the city or county? If so,
specify.
M
i. Approximately how many people would reside or work in the completed project?
None.
j. Approximately how many people would the completed project displace?
None.
k. Proposed measures to avoid or reduce displacement impacts, if any.
Not applicable.
I. Proposed measures to ensure the proposal is compatible with existing and projected
land uses and plans, if any.
Facility designed per county code. The project will be located on an undeveloped lot
with existing vegetation around the perimeter utilized as screening.
m. Proposed measures to reduce or control impacts to agricultural and forest lands of
long-term commercial significance, if any:
Not applicable.
9. Housing
Find help answering housing questions12
a. Approximately how many units would be provided, if any? Indicate whether high,
middle, or low-income housing.
None.
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle, or low-income housing.
None.
c. Proposed measures to reduce or control housing impacts, if any:
Not applicable.
12 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guid ance/SE PA - Checklist -Sec tion- 13- Environmental - elements/Environmental- elements- 9- Housing
SEPA Environmental checklist September 2023 Page 10
(WAC 197-11-960)
10. Aesthetics
Find help answering aesthetics questions13
a. What is the tallest height of any proposed structure(s), not including antennas; what is
the principal exterior building material(s) proposed?
150' monopole with non -reflective finish.
b. What views in the immediate vicinity would be altered or obstructed?
Minimal; screened by vegetation. No view alteration or obstruction is anticipated.
Included in the application are photo simulations which provide detail that visual impact
will be negligible.
c. Proposed measures to reduce or control aesthetic impacts, if any:
Painted finish and fenced enclosure with privacy slats. The facility is being placed on a 6
acre undeveloped property with existing vegetation around the facility perimeter
providing screening.
11. Light and glare
Find help answering light and glareguestions14
a. What type of light or glare will the proposal produce? What time of day would it
mainly occur?
None.
b. Could light or glare from the finished project be a safety hazard or interfere with
views?
M
c. What existing off -site sources of light or glare may affect your proposal?
None.
d. Proposed measures to reduce or control light and glare impacts, if any:
Not applicable.
12. Recreation
Find help answering recreation questions
a. What designated and informal recreational opportunities are in the immediate
vicinity?
None on -site; nearby marine and hiking areas.
b. Would the proposed project displace any existing recreational uses? If so, describe.
No.
13 https:Hecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-1 O-Aesthetics
" https:Hecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
gu idance/SEPA- Check list-Section-B-Environmental-elements/Environmental-elements-1 I -Light-glare
SEPA Environmental checklist September 2023 Page 11
(WAC 197-11-960)
c. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any:
Not applicable.
13. Historic and cultural preservation
Find help answering historic and cultural preservation questions"
a. Are there any buildings, structures, or sites, located on or near the site that are over
45 years old listed in or eligible for listing in national, state, or local preservation
registers? If so, specifically describe.
None known.
b. Are there any landmarks, features, or other evidence of Indian or historic use or
occupation? This may include human burials or old cemeteries. Are there any material
evidence, artifacts, or areas of cultural importance on or near the site? Please list any
professional studies conducted at the site to identify such resources.
None known; NEPA review to be completed.
c. Describe the methods used to assess the potential impacts to cultural and historic
resources on or near the project site. Examples include consultation with tribes and
the department of archeology and historic preservation, archaeological surveys,
historic maps, GIS data, etc.
NEPA review and consultation as required.
d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and
disturbance to resources. Please include plans for the above and any permits that may
be required.
There are no anticipated loss, changes to, or disturbance of resources. Therefore, no
measures to avoid are proposed.
14. Transportation
Find help with answering transportation questionS16
a. Identify public streets and highways serving the site or affected geographic area and
describe proposed access to the existing street system. Show on site plans, if any.
Access via Swansonville Road and Fleet Drive.
b. Is the site or affected geographic area currently served by public transit? If so,
generally describe. If not, what is the approximate distance to the nearest transit
stop?
M
15 https:Hecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements- 13-Historic-cultural-p
16 https:Hecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-14-Transportation
SEPA Environmental checklist September 2023 Page 12
(WAC 197-11-960)
c. Will the proposal require any new or improvements to existing roads, streets,
pedestrian, bicycle, or state transportation facilities, not including driveways? If so,
generally describe (indicate whether public or private).
No.
d. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or
air transportation? If so, generally describe.
No.
e. How many vehicular trips per day would be generated by the completed projector
proposal? If known, indicate when peak volumes would occur and what percentage of
the volume would be trucks (such as commercial and nonpassenger vehicles). What
data or transportation models were used to make these estimates?
One to two per month for maintenance.
f. Will the proposal interfere with, affect, or be affected by the movement of agricultural
and forest products on roads or streets in the area? If so, generally describe.
No.
g. Proposed measures to reduce or control transportation impacts, if any:
Not applicable.
15. Public services
Find help answering public service questions!?
a. Would the project result in an increased need for public services (for example: fire
protection, police protection, public transit, health care, schools, other)? If so,
generally describe.
No.
b. Proposed measures to reduce or control direct impacts on public services, if any.
Not applicable.
Find help answering utilitiesguestions18
a. Circle utilities currently available at the site: electricity, natural gas, water, refuse
service, telephone, sanitary sewer, septic system, other:
electricity
b. Describe the utilities that are proposed for the project, the utility providing the
service, and the general construction activities on the site or in the immediate vicinity
which might be needed.
17 https:Hecology.wa.gov/regulations-permits/sepa/environmental-review/sepa-guidance/sepa-checklist-
guidance/sepa-checklist-section-b-environmental-elements/environmental-elements- 15-public-services
18 https:Hecology.wa.gov/regulations-permits/sepa/environmental-review/sepa-guidance/sepa-checklist-
guidance/sepa-checklist-section-b-environmental-elements/environmental-elements- 16-utilities
SEPA Environmental checklist September 2023 Page 13
(WAC 197-11-960)
New electrical service and fiber connection extended to site within utility easement.
C.Signature
Find help about who should sien19
The above answers are true and complete to the best of my knowledge. I understand that the
lead agency is relying on them to make its decision.
3a�j /)0 1 ��
Type name of signee: Bill North
Position and agency/organization: The North Group, Inc.
Date submitted: July 29, 2025
19 https:Hecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-C-Signature
SEPA Environmental checklist September 2023 Page 14
(WAC 197-11-960)