Loading...
HomeMy WebLinkAboutCONSENT Russ Construction Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Josh Peters, County Administrator From: Eric Kuzma, Public Works Director Ct Agenda Date: July 6, 2026 Subject: Phase 4 - NWSWB and Star Marine On-site Grinder Pump Installation for Port Hadlock UGA - Award of Contract Statement of Issue: Award of Construction Contract to Russ Construction, LLC, of Montesano, Washington for their bid amount of $796,634.40, which includes 9.5% Washington State Sates Tax (WSST) for the above referenced project. Analysis/Strategic Goals/Pro's Ft Con's: The Public Works Department has completed checking the bids and has investigated the qualifications of the lowest bidder including Bidder responsibility criteria of RCW 39.04.350(1) and project supplemental criteria in Special Provisions 1-02.14 Disqualification of Bidders. Bid tabulations and Bidder verification documentation is attached. Fiscal Impact/Cost Benefit Analysis: The Bid amount is $796,634.40, which includes 9.5% WSST. This project is funded with Environmental Protection Agency (EPA) FY2022 and FY2023 Community Grant funds. Recommendation: Public Works recommends that the Board authorize the Award of Contract to Russ Construction, LLC, and return signed award document to Public Works. Department Contact: Samantha Harper, P.E., Wastewater Project Manager, Ext. 175 Reviewed By: 6,/3 .q9-4 C41:711P Josh Pters, County Administrator Date AON Department of Public Works 623 Sheridan Street Port Townsend,WA 98368 % Jefferson County, Washington 360-385-9160 DATE: July 7, 2026 TO: Board of County Commissioners FROM: Eric Kuzma, Public Works Director SUBJECT: AWARD OF CONTRACT Phase 4—NWSWB and Star Marine On-site Grinder Pump Installation for Port Hadlock UGA, County Project No.405-2128-0, EPA Grant No.02J97501 In the matter of awarding a construction contract for the above referenced work: • The Call for Bids was issued by the Board of County Commissioners on May 6, 2026. • Due notice of the Call for Bids was given as required by law. • Sealed bids were received and opened in public on June 5, 2026 in the Commissioner's Chambers. • The Public Works Department has completed checking the bids and has investigated the qualifications of the lowest bidder including Bidder responsibility criteria of RCW 39.04.350(1) and project supplemental criteria in Special Provisions 1-02.14 Disqualification of Bidders. • Bid tabs are attached for reference. The Public Works Department recommends that the construction contract be awarded to the lowest responsive and responsible bidder: Russ Construction LLC. of Montesano, Washington for their bid amount of$796,634.40, which includes 9.5% Washington State Sales Tax (WSST) for the Phase 4 — NWSWB and Star Marine On-site Grinder Pump Installation for Port Hadlock UGA, County Project No.405-2128-0, EPA Grant No.02J97501. Approved Greg Brotherton Date Chair, Board of County Commissioners Attached: Bid Tabulations Bid &Contractor Verification Summary BID & CONTRACTOR VERIFICATION SUMMARY Form Version Date: Jefferson County Public Works Project Name County Project No PHASE 4 - Northwest School of Wooden Boatbuilding (NWSWB) and Star Marine On-Site Grinder Pump Installation 405-2128-0 Bid Opening Date: Bid Opening Time: 7/172024 5-Jun-26 2:00pm "' w C "' 0 C iii ::c C) :i: ~ ~ ..J CONTRACTOR "' w C C iii ~ ..J 1- z w "' < 11. ~ 1- w w ::c "' z 0 ;:: s ::, m ~ C iii '!': C w "' w 1- z w "' C iii C w ii: ii1 w > ::c I- < :E "' 0 l- o : 1- z 0 0 ► m C w C) C w ~ z ,, 0 < "' :E ::, C z w C ~ C w z C) iii ..J < "' 0 11. 0 "' Q. o z g ..J : w C w .,_ C w C ::, ..J 0 '!': C z 0 m ..J < "' 0 11. 0 "' 11. -;F. .. ..J < "' 0 11. 0 "' 11. C iii ::c I- i= C w z "' ::, 1-- w "' z 0 ;:: : s 0 w C z 0 iii ::, ..J ..J 0 l/ z 0 z ..J ~ 0 11. 0 "' 11. C iii ::c I- i= C w z "' ::, 1-- w "' "' l- o : 1-- z 0 0 C c ..J : w C w .,_ "' 0 .,_ ,-: "' l'l C w z C) iii z 0 ;:: < 0 ii: ;:: "' w 0 s: s w C) : in 0 0 N ... !:!. 0 co 0 ci .., .; .., il; "' I- "' ::; "' 0 l- o : 1-- z 0 0 m ::, "' ~ 0 0 ;;; :E "' 0 !!:. :E "' 0 .,_ z 0 ;:: ;:'j ::; ;:: ::, "' 0 l- o ~ 1-- z 0 0 m ::, "' w m C '1 0 0 co :E "' 0 !!:. :E "' 0 .,_ w 0 z < :E "' 0 .,_ "' w Q. "' ~ 0 ~ 1-- z 0 0 m ::, "' w m C ~ .. ., .. :: .. C C ~ !!! C .. E ::, u 0 C iii .,_ ~ t: ffi :5 'ii .,_ 'U 0 0 !' w m C ~ 0 0 e 0 w m C .. w "'m ::, s: I- :E ~o "' 'iii w:;; m C Ct'. "' .. 0 !!:: I- > 0 0 : ~ I- 3: z- 0 .g 0 .. ~~ - Q, "'i, Q. .c C w C z w Q. ,,,_ ::, 1:' "' 0 .,_ 0 o e t- C 1/l w ::; m ze ow cm w s: ,, :E 00 w- ::c ~ 0 .. -e !!!. .. :E Q. "'> - 0 .,_ "' : (IS C 3, "'0 0 'O ti] <"" "' Q, I- i, z .c 0 .. 0"' m :E ::, "' "'.,_ "' w m :E ::, z w "' z w 0 ::; "' ~ 0 : 1-- z R w I- i z 0 ;:: : ii:-;. >< ~ w:;; w > "'> Z 0 w"' 0 .. ::; J !'> ·~ ~e I-::, ~ g ~~ z"' 81 w I-- iii m w s: ,jj ..J z 0 C w rf >, ffi ~ > ~ w> "'0 z~ w .. 0 J ::i ·~ ~e I-:, O u :~ ~ ~ 8~ <ii ::, I- ~ "' :E ::, i w "' Q. >, w ~ 0 ~ z ~ ..:- "' ~ ::, "' "' .. '!': J ...J • ..: C: ~ ~ e I-:, "' u ::, " ~~ - Q, "" i, ..J .c "' 1-- z w :E w "' 5 a_ w ... a, C z .!! Q:: ,- E ~~ ;:: 1l ::, .. ~ ·e "' a. w ~ 0 !! ;:: ~ Zz w - "' ... Q. 0 Q. .; < ... ::c "" I- 0 § ::l w..; 0 ~ z .. <.., ::; s: Q. 0 :E "' 0 .,_ 00 ::c C) ::, 0 "' ::c 1- ,, ~ C iii w "' Q. 1::: ~ < C z < :E Example $1,234,567.00 X YES YES YES YES 91-1234567 YES YES YES YES YES YES(1) YES N/A Not a DBE YES Not on list 123456789 123456789 ABCDEF•123yz 1/1/2018 YES Account is current Not on list No records found by SAM 654321-00 N/A Provide date Submitted, YES or of meeting Sent or Not Exempt attended Required 1 Russ Construction $796,634.40 Yes Yes Yes Yes 82-5082812 Yes Yes N/A Yes N/A Yes Yes N/A Not a DBE N/A N/A 604266213 604266213 RUSSCC'812DH 1/30/2027 Yes Account is current Not on list No records found by SAM 2189008 N/A Exempt 5/21/2026 Submitted 2 Strider Construction $859,835.61 Yes Yes Yes Yes 91-1418799 Yes Yes N/A Yes N/A Yes Yes N/A Not a DBE N/A N/A 601100050 601100050 STRIDCC1210Z 6/23/2026 Yes Account is current Not on list No records found by SAM 655099001 N/A Exempt 5/21/2026 Submitted 3 Van Ness Construction $935,071.46 Yes Yes Yes Yes 84-3934275 Yes Yes N/A Yes N/A Yes Yes N/A Not a DBE N/A N/A 604536262 604536262 VANNENC800CD 2/3/2027 Yes Account is current Not on list No records found by SAM N/A Exempt 5/21/2026 s Nordland Construction $1,022,478.15 Yes Yes Yes Yes 41-2182880 Yes Yes N/A Yes N/A Yes Yes N/A Not a DBE N/A N/A 602529765 602529765 NORDLCN953NT 5/28/2027 Yes Account is current Not en list No records found by SAM N/A Exempt 5/21/2026 ENGINEER'S ESTIMATE (with 9.5" sales tax) $876,305.07 B ID T A B U LA T IO N SU M M A R Y PHASE 4 - Northwest School of Wooden Boatbuilding (NWSWB) and Star Marine On-Site Grinder Pump Installation U.S. EPA FY 2022 and FY2023 Community Grant Number 02J9750l Russ Construction PO Strider Construction 4721 •van Ness Construction **Nordland Construction COUNTY PROJECT 405-2128-0 BID OPENING DATE: June 5, 2026 ENGINEER'S ESTIMATE Box 336 Montesano, Northwest Drive Bellingham, WA 131 Hays Street Port 123 Ponderosa Place BID OPENING TIME: 2:00 p.m. WA 98563 98226 Hadlock, WA 98339 Nordland, WA 98358 ITEM QUANTITY UNIT ITEM DESCRIPTION UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. BID BID BID BID BID BID BID BID BID BID 1 1 CALC Minor Chanae and Force Account $ 15,000.00 $ 15,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 2 1 EST As-built Drawines ($5,000 Minimum) $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 3 1 LS Mobilization $ 73,000.00 $ 73,000.00 $ 60,000.00 $ 60,000.00 $ 100,000.00 $ 100,000.00 $ 59,036.00 $ 59,036.00 $ 85,000.00 $ 85,000.00 4 1 LS Project Temporary Traffic Control $ 7,000.00 $ 7,000.00 $ 20,000.00 $ 20,000.00 $ 7,000.00 $ 7,000.00 $ 8,349.00 $ 8,349.00 $ 20,000.00 $ 20,000.00 5 1 LS Clearing and Grubbing $ 10,000.00 $ 10,000.00 $ 35,000.00 $ 35,000.00 $ 5,000.00 $ 5,000.00 $ 5,919.05 $ 5,919.05 $ 15,000.00 $ 15,000.00 6 103 LF Remove Existine Pavement $ 15.20 $ 1,565.60 $ 20.00 $ 2,060.00 $ 7.00 $ 721.00 $ 24.85 $ 2,559.55 $ 25.00 $ 2,575.00 7 25 SF Remove Cement Concrete $ 15.20 $ 380.00 $ 20.00 $ SOD.DO $ 20.00 $ SOD.OD $ 45.89 $ 1,147.25 $ SO.DO $ 1,250.00 8 30 EA Pothole Existing Utilities $ 650.00 $ 19,500.00 $ 250.00 $ 7,500.00 $ 450.00 $ 13,500.00 $ 934.38 $ 28,031.40 $ 750.00 $ 22,500.00 9 150 CY Import Trench Backfill $ 20.00 $ 3,000.00 $ 40.00 $ 6,000.00 $ 60.00 $ 9,000.00 $ 112.24 $ 16,836.00 $ 75.00 $ 11,250.00 10 3 LS Decommission Existing Seotic Svstem $ 3,500.00 $ 10,500.00 $ 2,500.00 $ 7,500.00 $ 5,000.00 $ 15,000.00 $ 5,855.42 $ 17,566.26 $ 3,000.00 $ 9,000.00 Decommission Existing Septic System, NWSWB Upper 11 1 LS Campus $ 15,740.00 $ 15,740.00 $ 2,500.00 $ 2,500.00 $ 19,000.00 $ 19,000.00 $ 13,305.50 $ 13,30S.SO $ 5,000.00 $ 5,000.00 Decommission Existing Septic System, NWSWB 12 1 LS Westrem Building $ 12,320.00 $ 12,320.00 $ 2,500.00 $ 2,500.00 $ 14,000.00 $ 14,000.00 $ 18,446.00 $ 18,446.00 $ 5,000.00 $ 5,000.00 13 1 LS Decommission Existing Seotic Svstem, Aiax Cafe $ 29,200.00 $ 29,200.00 $ 2,500.00 $ 2,500.00 $ 38,000.00 $ 38,000.00 $ 44,516.50 $ 44,516.50 $ 5,000.00 $ 5,000.00 14 152 TON Crushed Surfacing Top Course $ 120.00 $ 18,240.00 $ 70.00 $ 10,640.00 $ 85.00 $ 12,920.00 $ 86.38 $ 13,129.76 $ 125.00 $ 19,000.00 15 42 TON Crushed Surfacing Base Course $ 120.00 $ 5,040.00 $ 70.00 $ 2,940.00 $ 65.00 $ 2,730.00 $ 139.15 $ 5,844.30 $ 125.00 $ 5,250.00 16 30 TON 11/4-inch Crushed Basalt $ 80.00 $ 2,400.00 $ 70.00 $ 2,100.00 $ 75.00 $ 2,250.00 $ 80.12 $ 2,403.60 $ 150.00 $ 4,500.00 17 2 TON Commercial HMA $ 200.00 $ 400.00 $ 1,500.00 $ 3,000.00 $ 1,000.00 $ 2,000.00 $ 2,035.50 $ 4,071.00 $ 2,500.00 $ 5,000.00 18 3 CY Commercial Concrete $ 100.00 $ 300.00 $ 1,200.00 $ 3,600.00 $ 1,000.00 $ 3,000.00 $ 3,331.17 $ 9,993.51 $ 1,000.00 $ 3,000.00 Connection of On-site Grinder Pump System to the 19 13 LF Building Drain $ 2,500.00 $ 32,500.00 $ 1,000.00 $ 13,000.00 $ 470.00 $ 6,110.00 $ 1,030.58 $ 13,397.54 $ 1,500.00 $ 19,500.00 PVC Gravity Sanitary Sewer Lateral Pipe 4 In. Diam. SDR 20 176 LF 35 $ 83.00 $ 14,608.00 $ 40.00 $ 7,040.00 $ 67.00 $ 11,792.00 $ 68.10 $ 11,985.60 $ 70.00 $ 12,320.00 PVC Gravity Sanitary Sewer Lateral Pipe 6 In. Diam. SDR 21 132 LF 35 $ 83.00 $ 10,956.00 $ 45.00 $ 5,940.00 $ 73.00 $ 9,636.00 $ 113.65 $ 15,001.80 $ 100.00 $ 13,200.00 22 198 LF HDPE Low Pressure Sewer 2-inch Diam. DR 11 $ 44.00 $ 8,712.00 $ 25.00 $ 4,950.00 $ 38.00 $ 7,524.00 $ 64.31 $ 12,733.38 $ 75.00 $ 14,850.00 23 35 LF HDPE Low Pressure Sewer 1-1/4-inch Diam. DR 11 $ 41.00 $ 1,435.00 $ 32.00 $ 1,120.00 $ 33.00 $ 1,155.00 $ 83.92 $ 2,937.20 $ 75.00 $ 2,625.00 24 13 EA Sewer Cleanout (Gravity) $ 600.00 $ 7,800.00 $ SOD.OD $ 6,500.00 $ 330.00 $ 4,290.00 $ 491.85 $ 6,394.05 $ 750.00 $ 9,750.00 25 2 EA Collection Vault Cleanout $ 3,300.00 $ 6,600.00 $ 7,500.00 $ 15,000.00 $ 4,870.00 $ 9,740.00 $ 5,662.60 $ 11,325.20 $ 8,500.00 $ 17,000.00 26 7 EA Grinder Pump Valve Vault and Clean out $ 3,300.00 $ 23,100.00 $ 7,500.00 $ 52,500.00 $ 4,500.00 $ 31,500.00 $ 5,253.86 $ 36,777.02 $ 7,500.00 $ 52,500.00 27 3 EA Bend Cleanout $ 3,000.00 $ 9,000.00 $ 7,500.00 $ 22,500.00 $ 5,900.00 $ 17,700.00 $ 9,445.34 $ 28,336.02 $ 8,000.00 $ 24,000.00 28 1 EA End Cleanout $ 3,000.00 $ 3,000.00 $ 5,000.00 $ 5,000.00 $ 3,800.00 $ 3,800.00 $ 7,503.75 $ 7,503.75 $ 7,500.00 $ 7,500.00 29 1 LS Shorine and Extra Excavation (Sewer) $ 20,000.00 $ 20,000.00 $ 5,000.00 $ 5,000.00 $ 4,600.00 $ 4,600.00 $ 9,531.20 $ 9,531.20 $ 5,000.00 $ 5,000.00 30 512 LF HDPE Low Pressure Sewer 3-inch Diam. DR 11 $ 46.00 $ 23,552.00 $ 30.00 $ 15,360.00 $ 45.00 $ 23,040.00 $ 59.23 $ 30,325.76 $ 75.00 $ 38,400.00 Type 2 Grinder Pump, WH472 (Cottages and Westrem 31 3 EA Building) $ 25,000.00 $ 75,000.00 $ 30,000.00 $ 90,000.00 $ 30,000.00 $ 90,000.00 $ 27,029.27 $ 81,087.81 $ 33,500.00 $ 100,500.00 32 1 EA Type 2 Grinder Puma, WH482 (Aiax Cafe) $ 25,000.00 $ 25,000.00 $ 30,000.00 $ 30,000.00 $ 29,000.00 $ 29,000.00 $ 29,085.40 $ 29,085.40 $ 35,000.00 $ 35,000.00 Type 2 Grinder Explosion Proof Pump, WX482 (Star 33 2 EA Marine and Unner Campus Building) $ 42,000.00 $ 84,000.00 $ 38,000.00 $ 76,000.00 $ 39,000.00 $ 78,000.00 $ 37,899.12 $ 75,798.24 $ 45,000.00 $ 90,000.00 Type 4 Grinder Explosion Proof Pump, WX484 34 1 EA Fiberglass (Intermediate PS) $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 55,000.00 $ 55,000.00 $ 60,752.86 $ 60,752.86 $ 60,000.00 $ 60,000.00 35 70 LF Schedule 40 conduit 1-1/4 In. Diam. $ 75.00 $ 5,250.00 $ 17.00 $ 1,190.00 $ 85.00 $ 5,950.00 $ 58.23 $ 4,076.10 $ 75.00 $ 5,250.00 36 280 LF Schedule 80 conduit 1-1/4 In. Diam. $ 75.00 $ 21,000.00 $ 18.00 $ 5,040.00 $ 90.00 $ 25,200.00 $ 23.37 $ 6,543.60 $ 75.00 $ 21,000.00 37 150 LF Schedule 40 conduit 3 In. Diam. $ 120.00 $ 18,000.00 $ 22.00 $ 3,300.00 $ 100.00 $ 15,000.00 $ 38.18 $ 5,727.00 $ 100.00 $ 15,000.00 38 6 EA Grinder Pump Control Panel $ 5,200.00 $ 31,200.00 $ 12,000.00 $ 72,000.00 $ 6,500.00 $ 39,000.00 $ 6,946.49 $ 41,678.94 $ 8,500.00 $ 51,000.00 Grinder Pump Control Panel, Type 4 and Electrical Post 39 1 LS Mount $ 20,000.00 $ 20,000.00 $ 10,000.00 $ 10,000.00 $ 12,500.00 $ 12,500.00 $ 21,699.47 $ 21,699.47 $ 27,500.00 $ 27,500.00 40 5 EA Bollards $ 1,400.00 $ 7,000.00 $ 2,000.00 $ 10,000.00 $ 1,700.00 $ 8,500.00 $ 1,481.20 $ 7,406.00 $ 2,000.00 $ 10,000.00 41 1 EA Gate Valve 3-inch Diam. $ 3,000.00 $ 3,000.00 $ 3,500.00 $ 3,500.00 $ 2,270.00 $ 2,270.00 $ 3,956.00 $ 3,956.00 $ 3,000.00 $ 3,000.00 42 2 EA LPS Connection 3-inch Diam. $ 3,500.00 $ 7,000.00 $ 1,000.00 $ 2,000.00 $ 1,500.00 $ 3,000.00 $ 3,214.25 $ 6,428.50 $ 3,000.00 $ 6,000.00 43 7 EA Service Connection 2-inch Diam. $ 3,500.00 $ 24,500.00 $ 2,500.00 $ 17,500.00 $ 1,750.00 $ 12,250.00 $ 2,845.43 $ 19,918.01 $ 3,000.00 $ 21,000.00 Connection to Existing LPS Collection System 3-inch 44 3 EA Diam. $ 2,700.00 $ 8,100.00 $ 1,000.00 $ 3,000.00 $ 540.00 $ 1,620.00 $ 2,291.57 $ 6,874.71 $ 3,000.00 $ 9,000.00 45 1 LS CSWPPP and TESC Plan $ 1,200.00 $ 1,200.00 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 2,760.00 $ 2,760.00 $ 2,500.00 $ 2,500.00 46 1 LS Ternnorarv Erosion and Sediment Control $ 15,000.00 $ 15,000.00 $ 1,500.00 $ 1,500.00 $ 250.00 $ 250.00 $ 10,281.00 $ 10,281.00 $ 5,000.00 $ 5,000.00 47 550 SY Seeding and Fertilizin• bv Hand $ 10.00 $ 5,500.00 $ 3.00 $ 1,650.00 $ 3.00 $ 1,650.00 $ 4.69 $ 2,579.50 $ 15.00 $ 8,250.00 48 92 SY Bark or Wood Chio Mulch $ 100.00 $ 9,200.00 $ 20.00 $ 1,840.00 $ 20.00 $ 1,840.00 $ 35.56 $ 3,271.52 $ 25.00 $ 2,300.00 49 6 TON Quarry Spalls $ 80.00 $ 480.00 $ 125.00 $ 750.00 $ 450.00 $ 2,700.00 $ 269.78 $ 1,618.68 $ 250.00 $ 1,500.00 Subtotal $800,278.60 $727,520.0( $785,238.00 $8S3,946.5~ $933,770.00 9.5% Sales Tax $76,026.47 $69,114.40 $74,597.61 $81,124.92 $88,708.15 Total Lump Sum Bid Amoun $876,305.07 $796,634.40 $859,835.61 $935,071.46 $1,022,478.15 •van Ness Construction Bid Subtotal was $796,258.62 as submitted. However, when the bid tabulations were verified the Subtotal changed to $853,946.54 and Sales Tax to $81,124.92 for a revised Total of $935,071.46. The Unit Bid and Total Bid Columns were correct, the Subtotal Prepared by Project Manager: Samantha Harper Date: 6/5/26 summary had a calculation error. HNordland Construction Bid Subtotal was $946,570.00 as submitted. However, when the bid tabulations were verified the Subtotal changed to Reviewed by Eng. Serv. Manager: N/A $933,770.00 and Sales Tax to $88,708.15 for a revised Total of $1,022,478.15. The Total Bid calculation for Bid Item 30 was incorrect. Reviewed by Public Works Director or County Engineer: Eric Kuzma :'..~~~~::--~~ Date: