JEFFCOM 9-1-1 Radio System Improvements Change Order No. 19 and 20
STATEMENT OF ISSUE: Approval and execution of Change Order Request (COR) No. 19 in the amount
of$11,516.00 and COR No. 20 in the credit amount of ($2,203.00) for Buchanan General Contracting
Company (Contractor) for the JeffCom 911 Radio System Improvements.
ANALYSIS: On January 25, 2010, the Board of County Commissioners approved and executed a contract
with Buchanan General Contracting Company, P.O. Box 40069, Bellevue, W A 98015 for the construction of
the JeffCom 9-1-1 Radio System Improvement Project.
The Board of County Commissioners approved COR No. 16 on December 6, 2010 for construction of the City
site and 180' radio tower based on preliminary plans and cost estimates. During construction, it was
determined that some of the grades and related retaining walls needed to be revised to better fit the site
conditions, as directed by the Engineer. COR No. 19 provides for the additional costs associated with the
revised grades.
The initial foundation design for the 180' tower presumed a level site but the actual site is terraced with two
tower legs on a lower step, requiring taller foundations which were addressed in COR No. 18. COR No. 20
provides a credit for the savings by rotating the tower 180 degrees to reduce the amount of reinforced concrete
tower foundation by placing two legs on the upper level and only one leg on the lower step with a longer
foundation.
This is the final phase of construction for the project with separate contracts for the microwave and simulcast
radio systems. The Commissioners separately approved direct purchases of the tower structure itself plus a
shelter for the radio equipment and an emergency generator, all of which will be installed by Buchanan under
COR No 16. Work under this contract will finish mid-May and the radio work in mid-June.
COR No. 19 and 20 were approved by the JeffCom Administrative Board on March 24, 2011.
FISCAL IMPACT: Funds will be provided by the JeffCom Enhancement Fund 121 which was funded by a
2007 bond issue. The total amount of the original contract with sales tax was $364,728.08. Change Order
Requests No. 1 through 18 increased the current approved coSt to $892,024.08. The addition of COR No. 19 in
the amount of$11,516.00 and COR No. 20 in the credit amount of ($2,203.00) brings the new total to
$901,337.08. The total ofCORs 1 through 20 is $536,609.00 or 147.13% of the original contract. The total
projected costs of this project have exceeded the original 2007 bond issue and additional bonds have been
issued to cover the costs.
RECOMMENDATION: Move to approve and execute Change Order Request No. 19 and 20 to the JeffCom
911 Radio System Improvement Contract with Buchanan General Contracting Company.
vk/o
Date
,-
j ~
JEFFCOM 9-1-1 Radio System Improvements
CHANGE ORDER REQUEST No. 19
On January 25,2010, Jefferson County executed a Contract with Buchanan General Contracting Company
(Contractor) for the public works construction of JeflCom 911 Radio System Improvements in the amount of
$364,728.08 including sales tax. That bid did not include the City of Port Townsend site which was added by
COR No. 16. Previously approved Change Order Requests (COR) No.1 through 18 bring the currently approved
project total to $892,024.08 to date. Proposed COR No. 19 in the amount of$II,516.00 (including 8.7% sales
tax) would bring the new total to $903,540.08, a total increase of147.730%.
Change Order Request No 16 provided for Buchanan to construct the 180' radio tower and related facilities at the
City of Port Townsend water reservoir site in the amount of $377,796.00. COR No. 19 provides for revised
ground elevations and retaining walls per direction from the engineer. See the attached letter from Buchanan for a
complete description. This COR No. 19 was approved by the JeOCom Administrative Board on March 24, 2011.
The scope of work for the project is described in the Contract, Amendments to Standard Specifications and on the
Plans that are included in the original Contract. That scope of work is hereby amended as follows:
Provide labor, equipment, materials and supervision to implement the revised site grades and retaining wall
design at the City water reservoir site, all per the provided plans and specifications.
The Contract amount is hereby amended as follows:
On March 21, 2011, the Contractor provided a price quote of$II,516.00 (including sales tax) for COR No. 19
(copy attached) for the extra costs related to the revised site and retaining wall design as described above.
Effective April 1,201 I, the sales tax for all work in Jefferson County was increased to 8.7% which is shown on
the attachments. The total Contract amount is hereby amended to $903,540.08.
There are no changes to any other provisions of the Contract than stated herein.
Executed by the Contractor April 11-. 2011
~(~fW1"('J ~~ ~(' <:.:..
~~~ f
SEAL:
COUNTY OF JEFFERSON
BOARD OF COMMISSIONERS
ed as t;:l fotlll onlY:
j ~pptO" aQ 41)~ \-z.1!) 11
~n~ C l'~:~\lftielO-
) "fferson o.
John Austin, Chair
Phil Johnson, Member
David Sullivan, Member
ATTEST:
Lorna Delaney, CMC
Clerk of the Board
.
;
'~-,"",'
..
'", 7' .. , / ~ '
,..:+ ',.,~.
BUCHANAN
GENERAL CONTRACTING COMPANY
" / '" /
'.. r * '-,; ~ '"
,'~~ '~.. ,
March 21, 2011
Little Construction
2009 4th Street
Port Townsend, W A 98368
Attention: Alex Little
Reference: JEFFCOMM 911
CE21 - Revised Compound Elevations
Dear Alex,
We are pleased to submit a lump sum quotation of$11 ,483.00 to provide all of the labor,
material, equipment and supervision to revise the compound and retaining wall elevations per
the 3/21111 email from Eric Sladky, PB Telecom, Inc. A copy of our breakdown is attached
along with the quote from Sound Retaining Walls. This price does not include sales taxes.
Please issue a change order for this revision. Thank you.
Very Truly Yours,
Buchanan General Contracting Company
Terry Buchanan
Project Manager
Cc: Larry Southwick
PO Box 40069 Bellevue, W A 98015
phone 425462-1326 fax 425462-9468 www.buchanangc.com
BUCHAGC 159CF
Bee labor MalerIaJ Suboonlmclllr TolaJ Notes
CCde O""'ll'lIu.. Unlt TolaJ Unlt TolaJ Unlt TolaJ Coot
GENERAL CONDITIONS
Superintendent 8hr 49.83 397 0.00 0 0.00 0 397
As bull! dI8Wings 015 0.00 0 0.00 0 35.00 0 0
Telephone 0.05 me 0.00 0 225.00 11 0.00 0 11
51'.......... Superintendent 2da 0.00 0 50.00 100 0.00 0 100
Sub~~.we Craft 3da 0.00 0 45.00 135 0.00 0 135
T""""_ lea 0.00 0 25.00 25 0.00 0 25
Construction equipment 0.05 me 0.00 0 490.00 24 0.00 0 24
Pick up truck 0.05 me 0.00 0 615.00 31 0.00 0 31
SmaU lDoIs 0.05 me 0.00 0 490.00 24 0.00 0 24
Fuel and maInlenance 0.05 mo 0.00 0 1275.00 64 0.00 0 64
Fuel adjusImenl 0.05 mo 0.00 0 0.00 0 0.00 0 0
Compound -ll8'x22' 1 sic 0.00 0 0.00 0 0.00 0 0
560 Bad<hoe 6.5 hr 0.00 0 0.00 0 130.00 645 645
lOey Dwnp 7.5 hr 0.00 0 0.00 0 105.00 766 766
310 excaval8 dlrt 47"1 0.95 45 0.00 0 0.00 0 45
217.5 load. haul & dlrt 59"1 0.51 30 2.00 116 0.00 0 146
1.510 rough grade & COIIlJllll'l 142ay 0.45 64 0.00 0 0.00 0 64
campaclor 0.5 da 15.00 8 115.00 68 0.00 0 95
Ke)'IIIone RelaInIng ~ 1 sic 0.00 0 0.00 0 0.00 0 0
_00 heigh of waD for ~ eIev 120 sf 0.00 0 0.00 0 27.75 3330 3.330
560 Bad<hoe 4hr 0.00 0 0.00 0 130.00 520 520
lOey Dwnp Ohr 0.00 0 0.00 0 105.00 0 0
1/0 bnport & pJsce grave/ fcundalIon 10"1 9.25 93 29.50 295 0.00 0 398
310 buy & pJsce drain rock 25"1 3.67 92 35.50 913 0.00 0 1.004
iI _ ..;-
BiIchanan &eneral Conlractlng Co.
Jeft'com 911 . Port Tow.......cI
CE21._Compound_
Labor Adjuslmenl
labor TllllIlS
TolaJ Labor. -. & SUb
~&Fee
SUb TolaJ
8&0. & Inswance
Change E.th....
SeIes Tax
ToIBl WfIh Tax
CE21 - Revised Compound E1evatlons.xls
727
194.62% 643
32.71% 446
1.819
Page 1
Dale: 3/21/11
1.797
o
o
1.797
5.483
o
o
5.483
8.007
643
446
9.095
13.50%
1,228
10.326
267
10,594
923
$11,518
2.59%
8.7%
.
"
..
JEFFCOM 9-1-1 Radio System Improvements
CHANGE ORDER REQUEST No. 20
On January 25, 2010, Jefferson County executed a Contract with Buchanan General Contracting Company
(Contractor) for the public works construction of JeOCom 911 Radio System Improvements in the amount of
$364,728.08 including sales tax. That bid did not include the City of Port Townsend site which was added by
COR No. 16. Previously approved Change Order Requests (COR) No.1 through 18 bring the currently approved
project total to $892,024.08 to date. Proposed COR No. 19 in the amount of$II,516.00 and COR No. 20 in the
credit of -$2,203.00 (including 8.7% sales tax) would bring the new total to $901,337.08, a total increase of
147.126%.
Change Order Request No 16 provided for Buchanan to construct the 180' radio tower and related facilities at the
City of Port Townsend water reservoir site in the amount of$377,796.oo. COR No. 20 provides for rotating the
tower 180 degrees to reduce the amount of reinforced concrete foundation per direction from the engineer. See
the attached letter from Buchanan for a complete description. This COR No. 20 was suggested by the JeOCom
Administrative Board on March 24, 2011. '
The scope of work for the project is described in the Contract, Amendments to Standard Specifications and on the
Plans that are included in the original Contract. That scope of work is hereby amended as follows:
Rotate the tower 180 degrees at the City water reservoir site, all per the provided plans and specifications.
The Contract amount is hereby amended as follows:
On March 31, 2011, the Contractor provided a credit price of -$2,203.00 (including sales tax) for COR No. 20
(copy attached) for the savings related to the rotating the tower 180 degrees as described above. Effective April 1 ,
2011, the sales tax for all work in Jefferson County was increased to 8.7% which is included in the attachments.
The total Contract amount is hereby amended to $901,337.08.
There are no changes to any other provisions of the Contract than stated herein.
Executed by the Contractor April ~ 2011
~CH.~ ~~L- ~.c..
~;~(~g ,
SEAL:
Lpprovea as t3 fee aBly:
4)J,}za1\
COUNTY OF JI:frl<.liKSON
BOARD OF COMMISSIONERS
John Austin, Chair
Phil Johnson, Member
David Sullivan, Member
ArrEST:
Lorna Delaney, CMC
Clerk of the Board
..
.
"
..
,7< ~ '" )"li" ~ "-
,.",,&. <t1~~ ,JiQi <t1~~ .
BUCHANAN
GENERAL CONTRACTING COMPANY
'- .~~~. ~.'" ,%~~. . ~ "-
X ':';~~ 'h.- . ~ ~
March 31. 2011
Little Construction
2009 4th Street
Port Townsend. W A 98368
Attention: Alex Little
Reference: ffiFFCOMM 911
CE20 - Savings for Rotating Tower
Dear Alex.
We are pleased to submit a credit of$2,203.oo for rotating the tower to place two of the legs
on the same elevation as the generator pad per the revised design. A copy of our breakdown
is attacbed.
"
Please issue a change order for this revision. Thank you.
Very Truly Yours.
Buchanan General Contracting Company
Terry Buchanan
Project Manager
Cc: Larry Southwick
PO Box 40069 Bellevue, W A 98015
phone 425 462-1326 fax 425462-9468 www.buchanangc.com
BUCHAGC 159CF
I ~,
I
~
. -,,-~
->
Buchanan General ConInIcIIng Co.
Jeft'com 811 COmmunlcatona
P-' DaI8: 3/31/2011
Revision DaI8:
CE20 -savina for R_na T_
BGC Labor - SUbconlrac:lor ToIIII Noles
Cede Descriaflan QuanlIIv Unit ToIIII Unit ToIIII UnIt ToIIII COst
TOWER FOUNDATION 1 sic 0.00 0 O.DO 0 0.00 0 0
load, haul & dIsposa -5cy 0.00 0 4.DO -20 0.00 0 ~
Rebar. place -1.75 I 0.00 0 0.00 0 579.00 -1,013 -1,013 auncher
shorten long bars lhr 44.19 44 O.DO 0 0.00 0 44
Concrete @calsson 6DOO pal -5cy 0.00 0 110.DO -55D 0.00 0 -55D
PumpIng hourly -1 hr 44.19 -44 O.DO 0 135.00 -135 -179
Pwnplng cy -5cy O.DO 0 0.75 -4 3.75 -18 -23
Labor Adjuslmenl
Labor T....
ToIIII Labor, Ma\BrlaI, & SUb
0.00%
32.71%
o
o
o
o
-574
o
o
-574
-1.167
o
o
-1,167
-1,741
o
o
-1,741
CJverhead & Fee
SUbToIIII
9&0, & Insurance
Change_
WSST
TaIII WIth W8ST
13,50%
2.59%
-235
-1.976
-51
-2,027
-176
($2.203)
6.70%
CE20 -Savings for Rotating Tower, 03-31-11 Page 1