Loading...
HomeMy WebLinkAboutOlympic Peninsula Gateway Sign Project - Public Art Plan - 072726 Department of Public Works 0 Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners From: Josh Peters, County Administrator Agenda Date: July 27, 2026 Subject: Olympic Peninsula Gateway Sign Project - Public Art Plan Statement of Issue: Jefferson County requests Board approval of a Public Art Plan (PAP) for the proposed "Welcome to the Olympic Peninsula" sign at the SR 104 Hood Canal Bridge roundabout. WSDOT requires execution of this PAP as a prerequisite to execution of a subsequent WSDOT Developer Agreement. Once the PAP and Developer Agreements are executed, WSDOT will execute a Maintenance Et Operations Interlocal Agreement (MEtO ILA) with the County. Analysis/Strategic Goals/Pro's Et Con's: This PAP is prepared in accordance with the WSDOT Design Manual and is intended to provide a comprehensive overview of the project's vision, design, community support, and long-term maintenance strategy, ensuring the installation is a safe, durable, and valued community asset. The project directly supports a key objective of the 2024-2029 Olympic Peninsula Tourism Master Plan, which calls for creating a "stronger sense of arrival and welcome" at key gateways throughout the Olympic Peninsula. Fiscal Impact/Cost Benefit Analysis: The artwork has been added to Jefferson County's property insurance through the Washington Counties Risk Pool, for which there is currently a $5,000 deductible for replacement due to loss. Per the required, future WSDOT MEtO ILA, the County will also be required to accept operation, maintenance, and inspection responsibility. TheLodging Tax Advisory Committee (LTAC) has agreed to cover up to $6,500 which includes Risk Pool deductible and Public Works' operation, maintenance, and inspection costs, through an annual set aside of LTAC funding. Recommendation: Staff recommend that the Board authorize the County Administrator and Director of Public Works to sign the Public Art Plan (PAP). Reviewed By: Ifr3/9 Jo P ers, County Administrator Date ax ecs � b1 the�105 r tov G PPP Gourd ti Js e • • s ��CL- (r- Judy Shepherd FINANCE DIRECTOR 1820 Jefferson St., Port Townsend WA 98368 &.9 G (360)385-9231 jfshepherd@co.jefferson.wa.us DIEM () f�Iti To: Josh Peters, County Administrator From: Judy Shepherd, Finance Director Date: 4/29/2026 Subject: SR 104 Monument There are concerns regarding both replacement coverage for the planned State Route 104 public artwork, to be positioned within the roundabout at the Jefferson County end of the Hood Canal Bridge in the event the monument sustains damage, as well as assignment of financial responsibility for future operation, maintenance, and inspection costs. The County's `insurance' coverage will cover the artwork for damage once construction is complete. The artwork has been added to our property insurance through the Washington Counties Risk Pool for which there is currently a $5,000 deductible for replacement due to loss. Any damages less than $5,000 will be required to be covered by the County. The County will also be required to sign an Interlocal Maintenance Agreement with WSDOT accepting operation, maintenance, and inspection responsibility, and as such perform these duties. The County is proposing that the Lodging Tax Fund cover the expense of the Risk Pool deductible, damages up to $5,000, and operation, maintenance, and inspection costs, as the artwork is a symbol marking the entrance to our beautiful Olympic Peninsula. These would not be expenses that would require an award during the annual LTAC RFP process. If there is a need to cover an expense up to $5,000, the recommended reserve would be able to accommodate the expense, and the County would appropriate budget during the County's budget appropriation process. Thank you for your consideration. Respectively submitted,