CONSENT Change Order 1 re Oil City Road culvert
Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Josh Peters, County Administrator From: Eric Kuzma, Public Works Director Agenda Date: August Pa, 2026 Subject: Change Order No. 1 - Oil City Rd Culvert Replacement MP 0.5 - FLAP Project #18021180 Statement of Issue: Change order No. 1 with Olympic Resources of Neilton, WA. Analysis/Strategic Goals/Pro's Et Con's: This change order modifies and changes the original scope by adding removal and hauling of additional trees required for temporary utility relocation. Fiscal Impact/Cost Benefit Analysis: The total amount for Change Order No. 1 is $9,998.50. The contract amount will increase from $38,250.00 to $48,248.50. This contract will be reimbursed by FHWA - Western Federal Lands. Recommendation: Public Works recommends that the Board authorize Change Order No. 1 with Olympic Resources and return a digital copy to Public Works. Department Contact: Josh Thornton, Real Property Specialist, 385-9162. Reviewed By: '1.5/d4 JosCAdmin istrator s, County Ad strator Date JEFFERSON COUNTY Sheet 1 of 1 DEPARTMENT OF PUBLIC WORKS Change 1 Date: 7/29/2026 CHANGE ORDER Order No. Ordered by County ❑X Additional work ordered by County PW2026-023 Contract No. ▪Change proposed by Contractor To: Olympic Resources,LLC Endorsed by: Olympic Resources,LLC PO Box 97 freichael,mason Contractor Firm Name ((�� cc m NelltOrl,WA 98566 ichael g nelson 129.202615.04.33 PDT: Jul Z�7, ZOZV Signature Date owner Title Consent given by Surety:(when required) Project Title Oil City Rd Culvert Replacement MP 0.5— By: FLAP Project#18021180 Attorney-in-fact Date You are ordered to perform the following described work upon receipt of an approved copy of this change order: This change order is for the removal of 12 additional trees to support temporary utility relocation,remobilization of crew/equipment,flagger crew,haul and disposal of felled timber. All work materials and measurement to be in accordance with the provisions of the standard specifications and special provisions for the type of construction involved. ORIGINAL CURRENT ESTIMATED ESTIMATED • r TR CONTRACT CONTRACT NET CHANGE CONTRACT TOTAL tf AMOUNT(incl.9.1%WSST) AMOUNT(incl.9.1%WSST) THIS ORDER(incl.9.5%WSST) AFTER CHANGE(incl.9.1%WSST) • y. t $ 38,250.00 $ 38,250.00 $9,998.50 $ 48,248.50 's. ORIGINAL CURRENT CONTRACT TIME NEW CONTRACT CONTRACT TIME CONTRACT TIME CHANGE(Add/deduct) TIME 7.f_a 3 3 1 t4.+ APPROVAL RECOMMENDED AP ROVA M N ED T-0661hd444 -- 7-29-210 1/1 /4.(. Project Manager Date County Engineer or Publi1Works Director Date APPROVAL RECOMMENDED APPROVED 1z� a Engineering Services Manager Date Chair,Jefferson County Commissioners Date Tree# Type ' approx DBH ' Alive/Dead ' Mist Notes Est BF 1 Alder 16" Alive Starting at the western side,not part of original removal plan 124.7 6"tree is alive 8-9"is dead truck is 6-8'taH, right in fron of another clump(4-5)of small trees that may need to be removed all in the 8"range or less 2 Evergreen 6"&8-9" mixed — (Assumed no timber value) N/A 3 Evergreen 7-8" Alive -- not part of original removal plan 18.3 4 Alder 24" Alive not part of original removal plan 302.3 Pair of dead alders 5 Alder 8-9",9-10" Dead (Assumed no timber value) N/A approximate location of original temp poi loc 6 Alder 4-6" Dead (Assumed no timber value) N/A 7 Alder 8-9" Alive 21 8 Evergreen 9-10" Alive not part of original removal plan 49.5 9 Evergreen 13" Alive not part of original removal plan 93.2 10 Evergreen 16" Alive not part of original removal plan 199.5 140.00' •'W-W 6+39.35 75.00' 6+0800 139.06' 140.00' 5+20.00 Mantmgs,pole plantings 4+85.00 75.00' 3.00.0(i _ r / 7 6+80.45 6+85.00 )+OO.Op 75.00' SS.00' /_ ��` 96.76' 75.00' -1• 30.00' New temp.pole by - RI 8+70.35 70 00 M 2+76.92 4.82.35 5 69' , using Avenza. �/ 6+Is.00 New temp pole e-28.12'4T(LT) by a= 790 00' 0.00' e=01°1,50.00' (LT) •BS.oO64. 55.00' R= � soo�. '� * using Avenza. T- 196.02' .- 15.22' P°pole • • a+so.lo 0 4305 e i�k.oe' ArapoSe i tem \ e-N/*. /r ;h 59.2r 8+00 00 ' 0 # ► f f•.: `ti•: 6+93.00 t 20 00• W 0:-_! - :, , , °cam `t r 47.43 _' i • - ! • __X.-- -'� /r / *25.00 i• �o.21 8+00.00 li , - �• � `-� �� .'.00' •roposed temp pole46, 30.00' ; a 30.00 - �� '�/ M y.j�.. Et a 256. ,iGe r ~•�"• /'/,'n t r 31gp--- _ • I ram!' ------- N31.34'26.8 43 •,. S+O4,94 — 't-- 3+69...• . Slope stake l.m.t•.. 4-1. _ — •. Lima .,. —. 1 '; . 7/ ... %, ' -„,.....rir.--_, _____,-..,--- ,/ { i it—g--- Existing pole ; ; # : Existing pole // -\ . .:,•: vv.,/ ,,,r ii (See sheet 1.3) y.. • NOTE: 1. Tres wNMn the slope stake kmrts are to to 7.29.26 Change Order 1 Final Audit Report 2026-07-29 Created: 2026-07-29 By: Joshua Thornton(JThornton@co.jefferson.wa.us) Status: Signed Transaction ID: CBJCHBCAABAA0dfLJnHBhUTM_J7X3ndV49K0hMm23cEj "7.29.26 Change Order 1 " History t Document created by Joshua Thornton (JThornton@co.jefferson.wa.us) 2026-07-29-9:56:43 PM GMT L7. Document emailed to mgnelson.or@gmail.com for signature 2026-07-29-10:01:15 PM GMT t Email viewed by mgnelson.or@gmail.com 2026-07-29-10:03:27 PM GMT d© Signer mgnelson.or@gmail.com entered name at signing as michael g nelson 2026-07-29-10:04:31 PM GMT 4© Document e-signed by michael g nelson (mgnelson.or@gmail.com) Signature Date:2026-07-29-10:04:33 PM GMT-Time Source:server-Signature Appearance Selected:TYPE 0 Agreement completed. 2026-07-29-10:04:33 PM GMT Q Adobe Acrobat Sign