Department of Public Works
o Consent Agenda
Page 1 of 2
Jefferson County
Board of Commissioners
Consent Agenda Request
From:
Board of Commissioners
Philip Morley, County Administrator
Frank Gifford, Public Works Director'" Y7
To:
Agenda Date:
May 16, 2011
Subject:
Proposed Mernorandum of Understanding with Upper Hoh Road
Interagency Working Group
Statement of Issue:
Jefferson County has been working with partner agencies in an effort to bring
resources to the first twelve miles of the Upper Hoh Road, from U.S. 101 to the
boundary of Olympic National Park. The Upper Hoh Road Interagency Working Group
("Working Group") includes the United States Department of the Interior, National
Park Service (NPS); the United States Department of Transportation, Federal Highway
Administration - Western Federal Lands Highway Division and Washington State
Division (FHWA); and the Washington State Department of Transportation (WSDOT).
The Working Group has drafted a proposed Memorandum of Understanding (MOU) that
lays out background and objectives, statements of shared understanding, a statement
of work, and other provisions. The purpose of the MOU is to encourage interagency
cooperation in the long-term management of the Upper Hoh Road in order to maintain
access for all road users.
Analysis/Strategic Goals/Pros & Cons:
Approximately 85% of the traffic on the Upper Hoh Road is generated by Olympic
National Park visitation, with the Hoh Rain Forest generally recording between
200,000 and 300,000 visitors per year. The first 12 miles of the Upper Hoh Road is
among the most difficult and expensive roadways to operate in Jefferson County and
Federal participation is limited to partial reimbursement for qualifying emergency
events. The use and environmental challenges of this road clearly point to a need
extending beyond the County, particularly in an era when local resources are
diminishing.
Public Works proposes that the County enter into an MOU with Working Group
partners to continue progress towards securing increased assistance from and sharing
certain road management responsibilities with the appropriate Federal and State
agencies for the Upper Hoh Road. The other four partners in the Working Group have
agreed to sign this MOU proposal dated March 18, 2011.
Department of Public Works
o Consent Agenda
Page 2 of 2
Fiscallmpact/Cost Benefit Analysis:
There is no financial commitment proposed in the MOU to or from the partner
agencies. The MOU establishes a framework by which additional Federal and State
resources may be applied to the first twelve miles of the Upper Hoh Road. The
agreement is proposed to last five (5) years, which is the standard tirne period for
MOUs that involve the National Park Service.
Since 1996, the Upper Hoh Road has required over $6 million in emergency repairs and
associated environmental mitigation. The 2012-2017 Transportation Improvement
Program is anticipated to include $2.3 in expenditures for Upper Hoh Road projects.
Recommendation:
The Board is requested to sign the attached five (5) originals of the MOU and return
them to Public Works for further processing. Upon execution by all parties to the
MOU, one (1) signed original will be returned to the Commissioners' office. The
remaining four (4) originals will be distributed to the other four signatories to the
MOU.
Department Contact:
Monte Reinders, P.E., County Engineer
385-9242
Reviewed By:
r_ ~." .
, . (:_./__{-_f-:~_ .~L_:-,;;:- ;,/! (, (7,,-._ (
Philip Morley, ~ounty Admil}t~tPator
L~~
--/ /
"J /:) /~
,_ <...-'i
Date
"
MEMORANDUM OF UNDERSTANDING
UPPER HOH ROAD INTERAGENCY WORKING GROUP
Agreement # G9500100074
Memorandum of Understanding
between
The United States Department of the Interior, National Park Service;
United States Department of Transportation,
Federal Highway Administration - Western Federal Lands,
Federal Highway Administration -Washington State Division;
Washington State Department of Transportation;
and
Jefferson County
This Memorandum of Understanding (MOU) is entered into by the United States Department of
the Interior, National Park Service (NPS); the United States Department of Transportation,
Federal Highway Administration - Western Federal Lands Highway Division and Washington
State Division (FHW A); the Washington State Department of Transportation (WSDOT); and
Jefferson County, collectively referenced as "the Parties," for the purpose of addressing long-
term management issues associated with the Upper Hoh Road, located on the Olympic Peninsula
in the State of Washington.
ARTICLE I - BACKGROUND AND OBJECTIVES
The Upper Hoh Road is located along the fIoh River in several locations such that heavy storm
events have caused significant damage to the roadway on a recurring basis. The Upper Hoh
Road provides the only access into and out of the Hoh River valley north of the Hoh River.
There are no alternate vehicular routes.
The consequence of not addressing the Upper Hoh Road's current condition, current location,
current funding availability, and current management scenario is that access via this route to
landowners and to Olympic National Park is likely to be negatively impacted by temporary or
longer-term road closures. An additional consequence is that potential environmental impacts
are not prevented or mitigated. Response to emergency events and maintenance of the road in its
current location results in the potential for adverse impacts to the Hoh River. Efforts to avoid or
minimize adverse impacts frequently require costly mitigation measures for road managers that
are difficult to implement.
In recognition of the Parties' shared interest in maintaining access to the Upper Hoh Road, the
Parties are collaborating in a work group to cooperatively address the management of the Upper
Hoh Road from Highway 101 to the Hoh Rain Forest Visitor Center. The Upper Hoh Road is
currently operated and administered by Jefferson County from milepost 0 to 12 and by the
National Park Service within the boundaries of Olympic National Park from milepost 12 to 18.
The primary purpose of this MOU is to encourage interagency cooperation in the long-term
management of the Upper Hoh Road in order to maintain access for local residents; businesses;
private, local, state, and federal land managers; the Hoh Tribe; and visitors to the Hoh Rain
Forest within Olympic National Park.
March 18, 2011
....,
MEMORANDUM OF UNDERSTANDING
UPPER HOH ROAD INTERAGENCY WORKING GROUP
Agreement # G9500100074
Interagency coordination is necessary to provide continued access, protect river resources, foster
cooperative relationships, and to share technical expertise. In implementing this MOU, the
Parties shall emphasize quality public service, and efficient and effective expenditure of
available funds.
ARTICLE II - STATEMENTS OF SHARED UNDERSTANDING
All Parties to this Memorandum of Understanding (MOU) recognize that,
1. The Upper Hoh Road is important to a wide range of stakeholders, including visitors to
Olympic National Park, local residents and businesses, public and private land managers, and
the Hoh Tribe.
2. Olympic National Park is a World Heritage Site and International Biosphere Reserve.
Maintaining access to the Hoh Rain Forest, a well-known tourist destination for in-state and
out-of-state visitors, is a priority for many stakeholders.
3. A collaborative approach to road management will help all Parties to make the most effective
use of limited resources in providing ongoing vehicle access on the Upper Hoh Road.
4. A collaborative effort is needed to identify, evaluate, and prioritize necessary management
actions for the road corridor from US Highway 101 to the Hoh Rain Forest Visitor Center.
5. Capital planning and project delivery, road preservation, and emergency repairs for the
Upper Hoh Road are challenging for all Parties due to the difficulty of maintaining, with
limited financial and staff resources, vehicle access within an active river corridor.
6. The dominant mechanism by which the Upper Hoh Road is managed - in response to
emergencies - merits re-evaluation, and that the situation calls for innovative, proactive
approaches to project planning, funding, and implementation.
7. Due to limitations in Jefferson County resources, a status quo arrangement for the
management of the Upper Hoh Road has the potential to result in road closure and/or limited
access for the public to the Hoh Rain Forest.
8. Responding to storm-related emergency events has the potential to result in adverse impacts
to the Hoh River and resident fish populations.
9. Actions to avoid or minimize adverse impacts to the Hoh River and resident fish populations
should be integrated, to the greatest extent possible, into ongoing road management actions.
10. A collaborative planning and analysis approach is needed to determine the feasibility of long-
term road management solutions. This includes the potential to relocate all or portions of the
road outside of the active river corridor, evaluating the potential for changes in jurisdiction,
March 18, 2011
2
~
MEMORANDUM OF UNDERSTANDING
UPPER HOH ROAD INTERAGENCY WORKING GROUP
Agreement # G9500100074
or designating the Upper Hoh Road as a special status road to provide access to additional
funding sources.
11. Funding is needed to support collaborative planning and analysis for managing the Upper
Hoh Road.
ARTICLE III - AUTHORITIES
NPS Authority: 16 U.S.C. S 1- 3 authorizes the National Park Service to document mutually
agreed upon policies, procedures, objectives, and/or assistance relationships that do not involve
funding.
Jefferson County Authority: The Interlocal Cooperation Act (Ch. 39.34 RCW) in this state
contains a broad authorization for anyone or more public agencies to contract with anyone or
more other public agencies to perform any governmental activity or service which each agency is
authorized by law to perform individually. Public agency is defined very broadly as any agency,
political subdivision, or unit of local government of this state. This includes municipal
corporations, special purpose districts, local service districts, any agency of the state government,
any agency of the United States, any Indian Tribe recognized as such by the federal government,
and any political subdivision of another state.
FHW A - Western Federal Lands Highway Division Authority: 23 U.S.C. 204 authorizes the
FHW A to enter into appropriate agreements with Federal agencies, States, and counties.
FHW A - Washington State Division Office Authority: Upper Hoh River Road has a
functional classification as a Major Collector, so WSDOT and FHW A W A Division Office have
the authority to expend Title 23 Chapter 1 FHW A funds on this route (as shown by expenditures
of Emergency Relief funds (ER) in the past).
WSDOT Authority: Chapter 39.34.030 (Revised Code of Washington) authorizes WSDOT to
enter into agreements with public agencies, including an agency of the United States for joint or
cooperative action; see generally, Title 47 RCW for specific WSDOT legal authority.
ARTICLE IV - STATEMENT OF WORK
To the extent appropriate and feasible, as funding allows with respect to each Party's own budget
or funding system, and pursuant to each Party's specific legal authority, the Parties shall carry
out together the following tasks:
1. Regularly attend working group meetings to discuss, coordinate, and improve the long-term
management of the Upper Hoh Road.
March 18,2011
3
MEMORANDUM OF UNDERSTANDING
UPPER HOH ROAD INTERAGENCY WORKING GROUP
Agreement # G9500100074
2. Work in partnership, leveraging funding and personnel to provide resources for capital
improvements and long-term planning for the Hoh River corridor.
3. Within the limits of each Party's respective authorities, the Parties shall coordinate the
obligation of various funding mechanisms related to management of the Upper Hoh Road.
4. Cooperate in the preparation of a long-term management plan for the Upper Hoh Road to
address management options including, but not limited to, the feasibility of relocating all or
portions of the road outside of the active river corridor, potential changes in jurisdiction, or
designation of the Upper Hoh Road as a special status road to provide access to additional
funding sources.
5. Prepare and implement a road corridor management plan to ensure access to the Hoh Rain
Forest, preserve road user and resident access to the road, and to protect river resources. The
Parties shall coordinate planning and management for the Upper Hoh Road with each other and
with stakeholders of the Upper Hoh Road.
6. In conducting planning and management activities for the Upper Hoh Road, the Parties shall
consider potential impacts to the environment and disclose that consideration pursuant to the
National Environmental Policy Act and the National Historic Preservation Act, as appropriate.
7. As funds allow, the Parties shall develop coordinated and standardized interagency data sets,
maps, and GIS; and synthesize and report data relevant to the long-term management of the
Upper Hoh Road.
8. Collect and manage data to identify conservation and protection opportunities and to inform
road management decisions.
9. A primary point of contact for each Party will be established. A list of management offices
and administrators will be maintained; personnel at appropriate levels of each Party who work in
relation to the Upper Hoh Road will be identified.
10. Supplemental and project-specific interagency agreements to implement this MOU will be
executed.
11. Attend regularly scheduled meetings for stakeholders to enhance communications and
cooperation. These meetings should involve road administrators and cooperators, land managers,
nonprofit partners, landowners, state agencies, and others concerned with the Upper Hoh Road.
12. Coordinate with each other to maximize public benefits, to avoid duplication of effort and
public misunderstanding, and to prevent adverse impacts to the Upper Hoh Road and Hoh River
resources.
13. Encourage innovative implementation of the purposes and work elements of this MOU, to
the extent resources and authorities permit.
March 18,2011
4
1.
MEMORANDUM OF UNDERSTANDING
UPPER HOH ROAD INTERAGENCY WORKING GROUP
Agreement # G9500100074
ARTICLE V - TERM OF AGREEMENT
This MOD is executed as of the date of the Party's last signature shown below and shall be in
effect for a period of five (5) years, at which time it will be subject to review, renewal, revision,
or expiration. However, at the end of two (2) years, the Parties to this MOD will conduct an
interim review of its language, tasks, and direction and make any necessary corrections as
mutually agreeable and agreed to in writing by all Parties.
ARTICLE VI - KEY OFFICIALS
A. Key officials are essential to ensure maximum coordination and communication between
the Parties and the work being performed as follows:
1. NPS:
Karen Gustin
Superintendent
Olympic National Park
600 E. Park Avenue
Port Angeles, W A 98362
E-mail: karen gustin@nps.gov
Telephone: (360) 565-3004
Facsimile: (360) 565-3015
2. FHW A-Western Federal Lands Division:
Phy llis Chun
Planning and Program Manager
FHW A Western Federal Lands
610 E. Fifth Street
Vancouver, WA 98661
E-mail: Phyllis.chun@dot.gov
Telephone: (360) 619-7619
Facsimile: (360) 619-7846
3. FHW A- Washington State Division
Dean Moberg
Area Engineer
FHW A Washington Division Office
711 South Capitol Way, Suite 501
Olympia, W A 98501
E-mail: dean.mo berg@dot.gov
Telephone: (360) 534-9344
Facsimile: (360) 753-9889
March 18, 2011 5
.1.
MEMORANDUM OF UNDERSTANDING
UPPER HOH ROAD INTERAGENCY WORKING GROUP
Agreement # G9500100074
4. WSDOT
Kevin 1. Dayton
Olympic Region Administrator
5720 Capitol Blvd. SE, Tumwater, W A
PO Box 47440
Olympia, W A 98504-7440
E-mail: DaytonK@wsdot.wa.gov
Telephone: (360) 357-2605
Facsimile: (360) 357-2601
Neal 1. Campbell
Olympic Region Local Programs Engineer
5720 Capitol Blvd. SE, Tumwater, W A
PO Box 47440
Olympia, WA 98504-7440
E-mail: CampbeN@wsdot.wa.gov
Telephone: (360) 357-2666
Facsimile: (360) 357-2601
5. Jefferson County
County Engineer
Jefferson County Public Works
623 Sheridan St.
Port Townsend, W A 98368
Telephone: (360) 385-9160
Fax: (360) 385-9234
B. Communications - Any communication regarding this Agreement will be addressed to
the key officials identified in Article VI, Section A above.
C. Changes in Key Officials - Permanent change in a key official requires written notice to
the other Parties.
ARTICLE VII - MODIFICATION AND TERMINATION
A. This Agreement may be modified only by a written instrument executed by all the
Parties.
B. Additional parties may be added to this MOD, provided this Agreement is modified
pursuant to ARTICLE VII Section A above.
March 18,2011
6
MEMORANDUM OF UNDERSTANDING
UPPER HOH ROAD INTERAGENCY WORKING GROUP
Agreement # G9500100074
C. Any Party may withdraw from this MOD after sixty (60) days prior written notice to the
other Parties. In the event that one or more Parties provide the other Parties with notice of
its/their intention to withdraw from this MOD, the Parties will meet promptly to discuss
the reasons for the notice and to try to resolve their differences.
ARTICLE VIII - SPECIAL PROVISIONS AND STANDARD CLAUSES
A. Non-Fund Obligating Document. This MOD is neither a fiscal nor a funds obligation
document because it does not mandate the expenditure of any funds by any Party to this MOD.
Any endeavor involving reimbursement or contribution of funds between the Parties of this
MOD will be handled in accordance with applicable laws, regulations, and procedures including
those for Government procurement and printing. Such endeavors will be outlined in separate
agreements that shall be made in writing by the Parties entering into separate agreements and
shall be independently authorized by appropriate statutory authority. This MOD does not provide
such authority. Specifically, this MOD does not establish authority for noncompetitive award to
the cooperator of any contract or other agreement.
B. No Member of Congress to Benefit. Pursuant to the United States Code, Title 41, Section 22,
no member of Congress shall be admitted to any share or part of this MOD, or any benefits that
may arise therefrom.
C. Participation in Similar Activities. This MOD in no way restricts any signatory from
participating in similar activities with other public or private agencies, organizations, and
individuals.
D. Responsibilities to the Act. Nothing in this MOD abrogates the responsibility of any land
managing agency to manage its road resources according to the laws, rules, and regulations
governing its management authority over such lands. This MOD does not create any obligation
on any Party or any employee or representative of any Party to take any affirmative action other
than those listed in Article IV above.
E. Nondiscrimination. During the performance of this MOD, the Parties agree to abide by the
terms of Executive Order 11246 on nondiscrimination and will not discriminate against any
person because of race, color, age, religion, disability, sex, or national origin. The Parties will
take affirmative action to ensure that applicants are employed without regard to their race, color,
age, religion, disability, sex, or national origin.
F. Conduct of Activities. The Parties shall handle their own activities and use their own
resources, including the expenditure of their own funds, in pursuing the objectives enumerated in
this MOD. In implementing this MOD, each Party will be operating under its own laws,
regulations, and policies, subject to the availability of appropriated funds. While acting in
furtherance of the terms and conditions of this MOD, the employees of each Party to this MOD
are deemed to be acting solely on behalf of the Party that employs them and are not employees,
agents or representatives of any other Party to this MOD.
March 18,2011
7
t
'.
.
.
MEMORANDUM OF UNDERSTANDING
UPPER HOH ROAD INTERAGENCY WORKING GROUP
Agreement # G9500100074
G. Existinl.! Authoritv. Nothing in this MOO is intended to alter, limit, or expand any Party's
statutory and regulatory authority.
H. No Enforceable Rights. This MOD does not create any substantive or procedural right that is
enforceable at law or equity against the any Party to this MOD or its officers, agents, and
employees.
I. Severability. If any section of this MOD is found to be unlawful or against public policy, then
all the remaining sections of this MOO shall continue to be valid.
ARTICLE IX - SIGNATURES
IN WITNESS WHEREOF, the Parties hereto have executed this Agreement on the Party's date
last signed below.
FOR THE NATIONAL PARK SERVICE:
Sl....=~
Name: 'Kareh G .
Title:
Suoerintendent. Olvmpic National Park
Date:
of (Y')I H
I
FOR THE FEDERAL ffiGHWAY ADMINISTRATION - WESTERN FEDERAL
LANDS:
Signature:
Name: Clara Conner
Title: Western Federal Land Division Enlrineer
Date: ~ 10,2011
March 18,2011
8
.
.
~
-:.
MEMORANDUM OF UNDERSTANDING
UPPER BOB ROAD INTERAGENCY WORKING GROUP
Agreement # G9500100074
FOR THE FEDERAL IDGHWAY ADMINISTRATION - WASmNGTON STATE
DIVISION:
Signature: ~ ~
Name:
Dan- Mathis
Title:
Wasbinlrton Division Office Division Administrator
Date:
Oro!Ob /2....011
. f
FOR THE WASmNGTON STATE DEPARTMENT OF TRANSPORTATION:
Signature: ~ 9~
Name: Kevin J. Davton
Title: Olvmpic Region Administrator
Date: . JUNt'f 2., 71Jlf
March 18,2011
9
;.
r
.'
~'
.
MEMORANDUM OF UNDERSTANDING
UPPER HOH ROAD INTERAGENCY WORKING GROUP
Agreement # G9500100074
FOR JEFFERSON COUNTY:
::='JObn~~ fU::-
Title: Chair. Jefferson County Board of Commissioners
Date: ---1i1 t( If L~ 1
7
Signature: ~
~DL\
"
Name:
Phil Jobnson
"pproved as t.J form only:
4/ ,jzan
,')ffel'$on Co. ProsecutoJ: OffWo
Signature:
Jefferson County Commissioner
Mo.,} I tOr d()U
{
d /L/L
Title:
Date:
Name: David Sullivan
Title: Jefferson County Commissioner
Date:
~r1-\1 \ ~, ~ol \.
7
March 18,2011