HomeMy WebLinkAbout3-Summary UDC with LinksOmnibus Potential Changes
UDC Chapters:
18.05 Introductory Provisions
18.05.020 Comp Plan, SMP, Sub, SEPA, etc. & purpose of UDC. 18.05.040 DCD duties.
Table 1-1 of 18.05.090 Land Use District are different than Zoning District in UGA. Urban Residential->URDR,
UMDR or UHDR through rezone without Comp Plan amendment
18.10 Definitions
Long list of definitions. Check to make sure are accurate and if we need additional
18.12 Legal Lot of Record Determination and Lot Consolidation
Lot of Record (APN) different than Legal Lot of Record (meets minimum land area (MLA) per WAC 246-
272A-0320..
LLOR eligible for development per JCC 18.12.020(5). Substandard lot that meet MLA & - approved through
admin. Procedures, LAMIRD, UGA, exist d.u or septic system 5 ac in RR or 10 ac in Resource district, non
residential. Maybe add deed history and legal description as criterial for LLOR
18.15 Land Use Districts
18.15.015 Rural Lands ex. a purpose of RR1:5
See Table 3-1 Very long and should include footnote about whether use is subject to performance standards
criteria
18.15.055(3) Allowable density residential densities shall not be construed as minimum lot sizes.
18.15.095 Nuisance forestry developed 1 page disclosure form if people want to encroach upon forestry
setbacks 18.15.150(3).
18.15.455 West End & Brinnon Planning Area expand rural compatible employment opportunities through
home businesses (18.15.460), Cottage Industries (18.15.465), & small scale recreation and tourist use
(18.15.470).
18.15.572 Small scale recreation & tourist Overlay district WaWa Point
18.15.580 Brinnon Sub-area plan
18.18 Irondale and Port Hadlock UGA Development Regulation Implementation
Updated with Middle Housing
18.19 Transitional Rural Development Standards of the Irondale/Port Hadlock Urban
Growth Area
Areas not within 200 feet of sewer collection lines in UGA. UGA zoning and sewer collection lines on GIS
maps. Confusing we have existing and future UGA zoning.
18.20 Performance and Use-Specific Standards
These standards need to be reviewed in addition to Table 3-1. Accessory uses, agriculture and accessory
uses, kennels, forestry conversions, food & beverage stands, home & cottage industries, non-conforming
uses/structure, & small scale tourist recreation.
18.20.030 Ag activities and accessory uses in Table 3-1 list this section in all zoning districts but only allowed
in ag land use districts per 18.20.030(3)(b) and prohibited in all other districts (18.20.030(3)(c)).
18.22 Critical Areas
Updated March 2026
18.25 Shoreline Master Program
SMP periodic update waited till CAO Ord. adopted because utilizes specific version (currently utilizing 08 &
09 CAO). Berk proposed changes reviewed & needs adoption by BOCC & Ecology.
18.30 Development Standards
Table 6-1 setbacks(PL) height, impervious surface, building coverage, & max building size. Note 6 allows front
setback to be reduced if makes lot unbuildable.
Table 6-1 Section 18.30.050 – Density, dimensions & open Space where under maximum density, no
minimum lot size specified if minimum land area req. met.
18.30.060 Grading All grading in Critical Areas may require stormwater permit even if under stormwater
thresholds (18.30.060(4)). In general grading more than 500 c.y. of material requires SEPA unless cat exempt
maintenance of a gravel road and construction of residential driveway (18.30.060(5)).
Stormwater 18.30.070 Show flowchart & 1 page stormwater form from DCD website
18.35 Land Divisions
Mo-chi & Lila will be modifying this section based on their experience
18.40 Permit Application and Review Procedures/SEPA Implementation
DCD made minor modifications to it for compliance with SB 5290 in December 2024. DCD will modify review
procedures to make it less confusing.
Also modify 18.40.420-480 Site Development Review
Include limited SDR process for modifications to existing developed sites. Expand exemption found in
Section 18.40.430(4) JCC to include activities not requiring a stormwater permit.
Reduce/consolidate CUP Approval Criteria in Section 18.40.530 JCC
18.42 Personal Wireless Service Facilities
Not many applications. May make changes if time
18.45 Comprehensive Plan and GMA Development Regulations Amendment Process
Could streamline process.