Loading...
HomeMy WebLinkAbout2026_08_20_PacketBoard of Health Meeting August20,2026 I Jefferson County Board of Health A genda & Minutes bl H It August20,2026 Regular M eeting Agenda Jefferson County Board of Health Thursday, August 20, 2026 @ 2:30 PM Jefferson County Courthouse- Commissioners' Chambers 1820 Jefferson Street, Port Townsend, WA To view agenda, click here: www.co.jefferson.wa.us -Agenda Center - BOARD OF HEALTH - ( date of meeting) - Download To view meeting materials and public comments received, www c.o.jefferson.wa.us -Agenda Center- BOARD OF HEAL TH - ( date of meeting) - (below "Media") This is a hybrid meeting: Virtual and In-Person Attendance You can join this meeting by using these methods: • Zoom Meeting: https://us0Gweb.zoom.us/j/82378389363 This option will allow you to join the meeting live. You will need to enter an email address. If you wish to provide public comment, click on the hand icon at the bottom of the screen to "raise your hand." Participation will be up to the Chair and/or Clerk of the meeting. • Audio-only: Dial: 1-253-215-8782 and use Webinar ID: 823 7838 9363# This option will allow you to listen to the meeting live. If you wish to provide public comment, press *9 to "raise your hand." Participation will be up to the Chair and/or Clerk of the meeting. • In-Person: You are welcome to join the meeting in-person . In the event of technical difficulties, at least one of the methods above will be accessible to the public. Please try all methods first before calling 360-385-9100 to report any issues. Public comment will be accepted and can be emailed to: BOH@co.jefferson.wa.us until 5:00 PM the evening prior to the start of the meeting. AGENDA CALL TO ORDER - Chair MickHager I. Public Comment (10 mins.) Public Comment Periods are dedicated to listening to the public. Each person may address the Board one time during these periods. To ensure equal opportunity for the public to comment, all comments shall be limited to 2 or 3 minutes per person, depending on the volume of public in attendance. II. Approval of Agenda AT A REGULAR MEETING, THE MEMBERS MAY ADD AGENDA ITEMS AND TAKE ACTION ON OTHER ITEMS NOT LISTED ON THIS AGENDA. Americans with Disabilities Act (ADA) Accommodations Provided Upon Request III . A ppro val of M inutes of July 16 , 2026 B oard of H ealth M eeting IV . O ld B usiness and Info rm ation R eport s 1. Jefferson C ounty Public H ealth (JC P H ) R eport (A pple M art ine) (10 m ins.) 2. Jefferson H ealthcare R eport (D r. K ees K olff) (5 m ins.) 3 . I n fe c tio u s D i s e a s e s U p d a te (D r . A ll is o n B e rry ) (1 0 m in s .) V . N e w B u s in e s s 1 . L o c a l S e w a g e M a n a g e m e n t P la n U p d a t e (E m m a E ri c k s o n , C a rt e r E ri c k s o n ) (2 0 m in s .) 2 . O W L 3 6 0 Y C C T P P M in i G ra n t P r e s e n ta tio n (D e r e k F ir e nz e , K a ra B ill in g e r -H e s s o m ) (1 5 rni n s .) 3 . S c o u t in g Am e ri c a Y C C T P P M ini G ra n t P r e s e n ta tio n (L o lo S h e rw o o d ) (1 5 m in s .) 4 . J e ffC o S o c c e r C lu b Y C C T P P M ini G ra n t P r e s e n ta tio n (R u fi n a G a ra y ) (1 5 m in s .) 5 . J e ffe r s o n C o u n ty S u p p o rt s fo r C hi ld r e n w ith A u t is m S p e c tru m Di s o r d e r (D r . M e lin d a B o w e r , C y n d e M a r x , B o nn ie O b r e m s ki ) (1 5 m in s .) V I. Ann o u n c e m e n ts V II . F u tu r e P o te n tia l A g e n d a T o p ic s : R e v ie w o f E n c a m p m e n t P o li c y I m p le m e n ta tio n a n d P u b li c H e a lth O u tc o m e s (Sept.) JCPH Harm Reduction Program: Syringe Exchange Update HB2442 Revenue tool for Local Government Part VIII - Public Health Clinic Property Tax The County Strategic Plan Opioid Settlement spending Olympic Connect, the Community Care Hub model Board of Health 101 Rural Reproductive Health Emergency Fund for Public Health The Child Development Center ADJOURNMENT BY: 4:30 p.m. Next Scheduled Meeting: September 1 7, 2026 2:30 -4:30 PM Jefferson County Public Health Hybrid Meeting AT A REGULAR MEETING, THE MEMBERS MAY ADD AGENDA ITEMS AND TAKE ACTION ON OTHER ITEMS NOT LISTED ON THIS AGENDA. Americans with Disabilities Act (ADA) Accommodations Provided Upon Request ~ JlfeJtson PublicH~ REGULAR M EETING MINUTES Jefferson County Board of Health Thursday, July 16, 2026@ 2:30 p.m. Jefferson County Courthouse - Commissioners' Chambers 1820 Jefferson Street, Port Townsend, WA Hybrid Meeting Board Members Greg Brotherton, County Commissioner, District #3 Heather Dudley-Nollette, County Commissioner, District #1 Celeste Dybeck, Tribal Representative Heidi Eisenhour, County Commissioner, District #2 Amanda Grace, Vice-Chair, Community Stakeholder Dr. Kees Kolff, Public Hospital District #2 Commissioner Monica MickHager, Chair, Port Townsend City Council Gabrielle Vanwert, Consumer of Public Health Staff Members Denise Banker, Community Health Director Dr. Allison Berry, Health Officer Lara Cittadini, CHIP Manager Michael Dawson, Water Quality Manager Carter Erickson, Environmental Health Manager Apple Martine, Public Health Director Jenn Mitchell, Finance Manager Veronica Shaw, Public Health Deputy Director Chair MickHager called the July 16, 2026 meeting of the Jefferson County Board of Health to order at 2:31 P.M. Members Present: Chair Monica MickHager, Members Greg Brotherton, Heather Dudley-Nollette, Celeste Dybeck, Heidi Eisenhour and Dr. Kees Kolff. Staff Present: Staff Members Dr. Allison Berry, Lara Cittadini, Michael Dawson, Carter Erickson and Veronica Shaw. PUBLIC COMMENT Chair MickHager called for public comment. There was none. Member Dudley-Nollette read an email to the Board which expressed appreciation of a Public Health staff member for "Exceptional Caring." APPROVAL OF AGENDA Chair MickHager called for a motion to accept the agenda for July 16, 2026. MOTION: Member Dudley-Nollette moved to approve the agenda. Member Brotherton seconded the motion, which carried by a unanimous vote. Respectfully submitted G. Gilbert Page 1 of3 APPROVAL OF MINUTES Chair MickHager requested a motion to approve the minutes of the June 18, 2026 meeting. M O TIO N : M em ber B rotherton m oved to approve the m inutes. M em ber Eisenhour seconded the m otion, w hich carried by a unanim ous vote. O L D B U SIN E SS A N D IN F O RM A TIO N A L IT E M S 1. Jefferson County P ublic H ealt h (JC PH ) R eport Staff member Shaw, stepping in for the absent staff member Martine, led the JCPH report with a brief discussion of how JCPH is managing over a million dollars in lost funding since July 2025 by holding vacancies, limiting travel, and reducing operating expenses, while still working to fill key positions. Staff member Cittadini, JCPH's CHIP program manager, is forming a "Core Group," an internal volunteer team that will work to map existing community relationships, identifying individuals and organizations that should be represented on a community steering committee. JCPH also continues collaborating with multiple county departments to address the cleanup of the Mill Road encampment. 2. Jefferson H ealthcare R eport At the recent Jefferson Healthcare board member, a guest speaker emphasized the importance of documenting local impacts of state and federal healthcare cuts and preparing the community for major Medicaid changes coming in January. Member Kolff proposed he will provide a slide presentation at the next BOH meeting. Dr. Kolff explained that Jefferson Healthcare's Accountable Care Organization will shift to a partial-risk contract next year, offering potential financial gains if patient care is efficiently managed. Finally, he highlighted that 80% of Jefferson Healthcare patients seen in the past year actively use MyChart, far outperforming other critical access hospitals, and improving communication and personal health management. 3. Infectious D iseases U pdate Dr. Berry reports no severe COVID-19 illness in Jefferson County, no hospitalizations, and no rise in emergency visits; however, wastewater surveillance is currently unavailable due to a courier contract lapse. The national cyclospora outbreak, not yet found locally, has caused thousands of cases in the Midwest. Locally sourced produce remains safe, and should be washed. Health officials advise against consuming prepackaged salads, and note that delayed national detection and response were worsened by widespread public health funding cuts. N E W BU SIN E SS 1. Intellectual and D evelopm ental Di sabili ties County P rogram O verv iew Bonnie Obremski, JCPH's Intellectual and Developmental Disabilities Coordinator, provided a presentation describing the various services available to special needs youth, particularly significant because data shows that rural areas like Jefferson County have higher rates of disability due to factors such as older populations, limited access to preventive or maintenance healthcare, and high-risk industries. Census data indicates about 2,800 county residents evidence cognitive difficulties, but only a small fraction enrolls in state IDD services due to barriers such as lengthy enrollment processes. Jefferson County performs well once people are enrolled, thanks to strong local support and dedicated providers. County-provided services include supported employment (helping people with IDD prepare for, find, and keep jobs beginning as early as high school, with transition services, i.e., transitioning from school to working adult), community inclusion (providing opportunities to engage with the general public in accessible places), and birth to three (services for children who need help reaching developmental milestones). Respectfully submitted G. Gilbert Page 2 of3 D iscussion ensued. During discussion, refe rence w as m ade to a Jefferson County pro duced guide regarding advocacy fo r p e o p le e x p e r ie n ci n g in te ll e c tu a l a n d /o r d e v e lo p m e n ta l d is a b ilitie s . It c a n b e v ie w e d a t: h tt p s ://w w w .c o .je ffe r so n .w a .u s /D o c u m e n tC e n te r/V ie w /2 3 3 7 0 /J a d e -J o in s -a -B o a r d -G u id e -fo r-S e lf-A d v o c a te -B o a rd - M e m b e r s -b y -J C P H -ID D -P ro g ra m 2. CR-103: Clarifying Tribal Representation and Timelines for Modifying Local Board of Health Membership As introduced by Dr. Berry: House Bill 1152 reshaped local boards of health statewide to include broader community representation; recent CR-103 clarified how federally recognized tribes should be seated. Under updated rules, each tribe with reservation or trust lands in the county may appoint a representative, and boards must maintain a balance between elected and non-elected members. Discussion concerned how Jefferson County needs to plan ahead in the event that seats at the board are taken by the Ho, Jamestown S'Klallam, Chemakum and/or other tribes. The board discussed the need to clarify legal definitions of "elected" and "unelected" members, review bylaws, and consider potential sources of additional elected officials or community representatives, including school boards and healthcare providers. Members emphasized flexibility so the board can expand thoughtfully and preserve broad community input. It was recognized that this discussion will need to be continued at another meeting. ANNOUNCEMENTS Staff member Shaw announced that the August meeting would be the final meeting for retiring Clerk of the Board Gilbert. FUTURE POTENTIAL AGENDA TOPICS No discussion. AGENDA PLANNING CALENDAR The Agenda Planning Meeting for the next regular meeting of the Board will be held on August 13, 2026 at 10:30 A.M. The next regular Board of Health meeting will be held as a hybrid meeting on Thursday, August 20, 2026 from 2:30 P.M. - 4:30 P.M. ADJOURNMENT Chair MickHager adjourned the July 16, 2026 Jefferson County Board of Health meeting at 3:59 P.M. until the next Regular Meeting or Special Meeting as properly noticed. JEFFERSON COUNTY BOARD OF HEALTH Monica MickHager, Chair Glenn Gilbert, Public Health Assistant Portions of these minutes were drafted with AI assistance. Respectfully submitted G. Gilbert Page 3 of3 Jefferson County Board of Health IV. Old Business and Information Reports Item 1 Jefferson County Public Health Report [No hand-out] Publ August20,2026 Jefferson County Board of Health IV. Old Business and Information Reports Item 2 Jefferson Healthcare Report [No hand-out] Publ ealth August 20, 2026 · Jefferson County Board of Health IV. Old Business and Information Reports Item 3 Infectious Diseases Update [No hand-out] August20,2026 Jefferson County Board of Health V. New Business Item 1 Local Sewage Management Plan Update al August20,2026 JEFFERSON COUNTY ON-SITE SEWAGE SYSTEM 2027 LOCAL MANAGEMENT PLAN TABLE OF CONTENTS EXECUTIVE SUMMARY 4 Introduction and Background 5 Review of 2007 ass Management Plan 5 Jefferson County Public Health Responsibilities 8 Part 1- Database Enhancement 9 Database Conversion 9 ass Inventory 9 Reports 10 Current Data Transfer Process 10 Data Security 11 Timeline 11 Part 2 - ass Management Areas 11 Clean Water District/Shellfish Protection District 12 Sole Source Aquifers 12 Critical Aquifer Recharge Areas 13 Wellhead Protection Areas 13 Phosphorus and Nitrogen 13 Miscellaneous Areas Not Present 13 Flood-Prone Areas/Floodways 14 Climate Change Considerations 15 Sea Level Rise Vulnerability 15 Jefferson County Sea Level Rise Study-June 2023 16 Assessment of Climate Change Impacts on Brin non Dosewallips Reach 16 Sea Level and Flooding Projections for Areas of Jefferson County 17 Septage Capacity 22 Port Hadlock Wastewater Treatment Facility 22 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 1 of 51 Water Quality Program 23 Pollution Identification and Correction (PIC) 23 Dye Testing 24 WQ Sanitary Surveys 24 WQ Homeowner Financial Assistance 25 Timeline 25 Part 3 - Operation and Monitoring ...........•................................................................................................ 25 OSS Permitting 26 Operational Permits _. 26 Inspection and Pump Report Auditing 26 OSS Inspection Reminders 26 Property Transfer Inspection Reminders 27 Certification of Septic Professionals 27 O&M Inspector Auditing 28 Code Compliance and Enforcement 28 Timeline 29 Part 4 - Homeowner Education 30 Customer Service 30 Homeowner Education Classes 30 Homeowner Inspection Program 31 Timeline 31 Part 5 - Funding Strategy 32 OSS Fee Assessment 32 Clean Water District Funding 32 Supplemental Grants 32 Financial Assistance for Homeowners 33 O&M Rebate Program 33 WQ Rebate Program 34 Timeline 34 Part 6 - Marine Recovery Areas 35 Current Status 35 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 2 of 51 I Timeline 36 Summary 36 2027 LMP Recommendations 37 References 38 Appendix A-Applicable LMP and OSS State and County Regulations 40 Appendix B - Work Item Authorizations 49 Appendix C 51 2027 ass LMP Update BOH DRAFT 08/06/2026 Page 3 of 51 EXECUTIVE SUMMARY In 2005, the Washington State Board of Health adopted Chapter 246-272A-0015 WAC. This chapter required Jefferson County to develop a written Local Management Plan (LMP) for the development and management of all on-site sewage systems (OSS) within its jurisdiction. The regulation established a shared responsibility model between OSS owners and their local public health department. In March 2006, the state legislature enacted RCW 70.118A mandating that counties bordering the Puget Sound to manage OSS in marine areas and designate Marine Recovery Areas (MRAs) where OSS are contributing to marine water quality degradation. The legislation provided greater oversight of existing OSS thereby increasing public health protection by ensuring OSS are inspected as required to determine if they are functioning properly, and repairs are made as necessary. After development by Jefferson County Public Health (JC PH), the LMP was approved by the Jefferson County Board of Health (BOH) in 2007. The Washington State Department of Health (DOH) approved the LMP in 2007. In July 2007, JC PH implemented its LMP which described Jefferson County's OSS program at that time and what improvements wer~ planned fo r the fo llowing years. The LMP was also provided to the Jefferson County Department of Community Development (DCD) and the City of Port Townsend, as they are the entities responsible fo r land use planning and development regulations within Jefferson County. In January of 2024, the Washington State Board of Health adopted updated OSS codes within Chapter 246-272 A WAC. The Chapter now requires LMP updates at least once every five years. Most of the new regulations established during the update became effective on April 1, 2025, except for the Maintenance Service Provider approval requirement (W AC 246-272 A-0340) which became effective on February 1, 2025, and the Property Transfer Inspection requirement (W AC 246-272 A-0270), which becomes effective on February 1, 2027. Since the adoption of the 2007 OSS LMP, JC PH has made substantial progress in its implementation, such as: • Established the Marine Recovery Area (M RA) fo r Hood Canal, • Improved water quality throughout the county via Pollution Identification and Correction (PIC), • Created the OSS Fee Assessment to support operation and monitoring (O&M) activities, • Developed and implemented the O&M program for all existing and future OSS, • Designed and provided OSS education opportunities for homeowners, • Managed grants for a Cost Share program to provide funds to homeowners for OSS repair or replacement, • Converted and configured database software, including successful migration of data from Tidemark to Enterprise Permitting and Licensing (EPL), • Integrated Septic Operations and Monitoring (SOM ) records and Water Quality (W Q) data into the county Geographic Information System (GIS) maps, • Amended and adopted Jefferson County Chapter 8.15 On-Site Sewage Code in April 2025 to reflect the new regulatory OSS codes adopted by the Washington State Board of Health in January 2024. This is an update to JCPH's original 2007 OSS LMP. The update ensures that Jefferson County remains compliant with the new state code requirements while continuing to improve county OSS management and protect water quality. 2027 ass LMP Update BOH DRAFT 08/06/2026 Page 4 of 51 Introduction and Background An LM P is a written management plan required by DOH for each Puget Sound county per Chapter 246- 272A-0015 WAC. The LMP is written by JCPH and provides recommendations and goals for OSS management activities in the county. The intent of.the LMP is to identify and correct failing OSS, reduce and eliminate public health hazards, improve water quality, and reopen previously closed shellfish areas. JC PH can meet these objectives by ensuring that all OSS are properly designed, permitted, installed, operated, monitored, maintained, repaired and decommissioned. Appropriate funding and staffing are essential to support these objectives. Since adopting the 2007 LMP, JC PH developed processes to inventory all existing OSS; identified critical areas including designating the Hood Canal MRA; educated homeowners on septic O&M practices; enforced OSS code requirements; identified water quality sampling sites with high average bacteria i.e. hot spots; identified failing systems and provided support to homeowners in OSS repair processes. JCPH utilized its operational knowledge, technical information, databases, water quality data, DCD data, and input from a group of appropriate interest holders to update the LM P which identifies JCPH's current OSS management objectives. The 2027 Jefferson County OSS LMP is a revised and updated version of the 2007 Jefferson County OSS Management Plan. The 2027 LM P Recommendations proposed to the Jefferson County Board of Health build upon those reflected in 2007 and include actions to meet current and future priorities and improve public health in Jefferson County. JC PH received input from a broad range of interest holders, [JCPH intends to reach out to the fo llowing groups for input including OSS and O&M professionals, shellfish advocates, Tribal representatives, homebuilders, realtors, community representatives, and key Jefferson County staff.] JCPH's review of the 2007 LMP identified necessary updates to ensure compliance with OSS code changes, modifications, and additional requirements adopted by the State and JCC 8.15. In addition, the 2007 LM P does not represent the current technologies, resources, business practices or procedures used by JCPH to manage OSS. JCPH may also need to update other department codes and policies to better align with the recommendations of this LMP. Re v ie w of 2 0 0 7 O S S M a n a g e m e n t P la n 2007 055 LM P Recom m endatio ns S tatus Progressively develop and maintain an JCPH inventories and tracks wastewater systems inventory of all known OSS in operation regulated by the county through a SOM case in the within the county. county's permitting database. Tidemark was the original database used for permits, plans, code cases, and SOM cases. In December 2022, JCPH migrated all data into EPL. EPL is used fo r inventorying and tracking all wastewater systems, customizing oss inventory data, record management, enforcement reports, integration with GIS data, and developing target area statistics. The public has access to all SOM cases and select SOM data via the Customer Self-Service (CSS) Portal. 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 5 of 51 Maintain records required, to include all O&M activities as identified. JCPH uses SOMs to track O&M activities. Starting in May 2010, certified O&M professionals began entering monitoring inspection reports into OnlineRME (RME). Starting in 2014, certified sewage pumpers began entering pump reports into RME. The public has access to all monitoring inspection and pump reports completed by certified professionals via RME. Identify any areas where OSS could pose an increased public health risk, to include marine recovery areas and sensitive areas. WQ projects have evaluated the entire Hood Canal shoreline multiple times to identify failing OSS. Each project had a list of OSS corrections completed. The WQ team conducted field surveys of the entire shoreline of the Hood Canal MRA, from Tala Point to the southern county border, using DOE's PIC protocols. The WQ team used the surveys to determine functionality of the OSS and such surveys are ongoing. WQ utilized Jefferson County Clean Water District (CW D) funds for their initial work. Find existing failing systems and ensure that system owners make necessary repairs. JCPH may identify existing failing systems through several different processes including monitoring inspections, sewage pumping, sanitary surveys, PIC program work, and septic repair/replacement permit applications. The most common process of failure identification is by septic professionals perfo rming work on-site. JCC 8.15 requires all certified septic profe ssionals to report failure of an OSS to JCPH within 24 hours of first identifying the failure. Find unknown systems and ensure that they are inspected and functioning properly, with repair if necessary. JCPH may identify unknown systems through several different processes including sanitary surveys, audits of all property title transfers, building permit application reviews, and monitoring inspection or pump reports. When JCPH identifies a previously unknown system, a septic professional must inspect it to evaluate the system's functionality and determine if it was installed without permits at a time when septic permits were required. Enforce OSS permit applications for O&M risk areas and JCPH's capacity to adequately fund the OSS O&M plan, including ability to locate failing and unknown OSS. Jefferson County requires that all OSS installed after 1970 have a valid septic permit with JC PH. If a system was installed without permits at a time when permits were required, enfo rcement and compliance actions are taken to either retroactively permit the existing OSS or permit a replacement code compliant OSS. JC PH uses materials and system components of the OSS, as well as Assessor records of property development to determine if systems were installed at a time when permits were required. OSS permit application fees cover the cost of permitting review and associated inspections. OSS permit fees are not adequate to fund the O&M program. 2027 ass LMP Update BOH DRAFT 08/06/2026 Page 6 of 51 Initiate Homeowner Septic Inspection Authorization program allowing homeowners to inspect their own septic systems. Jefferson County revised JCC 8.15 OSS in 2012 to allow homeowners to conduct a portion of their own O&M inspections after meeting certain education, training, and authorization requirements. In addition, there are specific parameters for a septic system to be eligible for homeowner inspection. Support replacement of aged and failing OSS in sensitive areas with additional support fo r population growth. JCPH staff provide support to owners of failing OSS through outreach and connecting OSS owners to resources such as funding opportunities. In 2025, the county completed a years-long project with the operational startup of the Port Hadlock Wastewater Treatment facility which will support population growth in the Port Hadlock UGA. Inform and educate homeowners on the operation and monitoring of their OSS. O&M staff provide homeowners information through the JCPH website, social media posts, tabling at community outreach events such as the annual Builders Home. Show, and hosting Septic 101 and 201 classes at community centers across the county. O&M staff are available by phone and email to answer inquiries from homeowners. Conduct a system audit of all known OSS in order to appropriately charge the yearly OSS Assessment Fee for each separate OSS on the parcel. OSS Assessment Fee audit completed in 2025. Audit performed by querying SOM data and Assessor records to identify if JCPH is appropriately assessing the Fee for a parcel. Parameters used to determine if the Fee is required included SOM status and presence of a 'Sewer Flag'. The 2025 Fee audit resulted in documenting the OSS Assessment Fee for all SOMs in EPL (this data was previously kept in external spreadsheet). The 2025 Fee audit identified 601 properties with no Fee that required the Fee, and 95 properties with the Fee that did not require the Fee. Update Shoreline Master Program (SMP) Jefferson County has significant shoreline resources and completed a comprehensive update of the SM P's goals, policies, and regulations consistent with the Shoreline Management Act (SMA) in 2014. The SMP is considered part of the county's Comprehensive Plan and development regulations and is subject to a periodic review schedule in the SMA. The overall intent of the SMP is to protect ecological resources, allow for preferred shoreline uses, and promote public access to enjoy the shoreline. DCD's 2026 Comprehensive Plan update reflects policies in the SMP per JCC 18.25. Goal EN-G-4: Implement JCC 18.25 to protect shoreline functions and processes while allowing appropriate development and uses within the shorelines of Jefferson County. Policy EN-P-4.1: The goals and policies of the Jefferson County SMP, as amended, are considered an element of this Comprehensive Plan and are adopted by reference as 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 7 of 51 if fully set forth herein. Refer to JCC 18.25, development regulations related to the shorelines and how the SMP's goals are implemented. Policy EN-P-4.2: Work cooperatively with the Washington State Department of Ecology (ECY) for Periodic Review and associated updates to the Jefferson County SMP, consistent with state law. Policy EN-P-4.3: Work cooperatively with other jurisdictions, agencies, tribes, ; and organizations to restore previously degraded areas, including coordination to pursue funding that addresses shoreline protection and/or restoration efforts. Establish and maintain the CW D fo r the purpose of shellfish protection district. Establish a stable fu nding source fo r operations and steward the adoption of a Clean Water District management plan. The CW D was created in 2007. The citizen advisory council conducted a financial analysis and prioritized activities. Jefferson County adopted the CWD fee from a tax parcel assessment in 2009, and this fee funds the PIC program. The WQ program continues to track water quality monitoring data collected to determine sensitive area needs. See Appendix C fo r CW D. Inform interested parties about updated WAC 246-272 -0270 requirements. JCPH provides education and outreach to homeowners, real estate professionals, property developers and certified septic professionals regarding the requirement for O&M inspection and maintenance of OSS. Jefferson County Public Health Responsibilities Jefferson County Public Health has the responsibility of managing an estimated 12,000 active OSS. To meet this responsibility, JCPH must: • Develop and implement strategies to locate and repair failing systems. • Maintain a comprehensive inventory of all OSS. • Ensure regular inspections of all OSS. • Identify environmentally sensitive areas throughout Jefferson County, including MRAs. • Establish O&M requirements countywide. • Provide education and outreach to homeowners regarding septic O&M requirements. • Protect public health by enfo rcing state and local codes regulating OSS operation and monitoring, siting, design, permitting, installation, maintenance, repairs and decommissioning. • Confirm that at time of transfer of property title, the OSS has a complete O&M inspection on record that is current with required inspection frequency. • Approval and certification of OSS installers, pumpers, and O&M inspectors. • Incorporate new, applicable data, when appropriate, regarding OSS, community wastewater issues, water quality issues, and coordinate such efforts with other agencies. 2027 ass LMP Update BOH DRAFT 08/06/2026 Page 8 of 51 Part 1- Database Enhancem ent JCPH progressively develops and maintains an inventory of all OSS within the county. Staff maintain OSS inventory data, O&M records, and OSS permitting records in an internal database software (EPL), an external database (RME), and in paper files of septic permitting records. Database Conversion In December 2022, Jefferson County performed a database conversion. JCPH previously used Tidemark Advantage for permitting, land use approvals, compliance cases, and SOMs. County staff mapped and migrated all data in Tidemark into the new EPL database. JCPH uses EPL for all Jefferson County permitting and compliance cases including building, shoreline, road use, subdivision, septic, OSS inventory, food service, and wells. EPL system modules include Permitting and Land Management, Code Enforcement, Licensing and Regulatory, and Customer Self Service. The move from Tidemark to EPL involved numerous configurations of the data for ease of access and utilization of the data for the varied, necessary workflows and processes. The EPL system allows for substantial customization for existing case and new case types, modifying or adding screen elements, and utilizing supportive data tables and specialized data reports. JCPH has purchased/added several additional licenses that provide for an even more robust database. Some data migrated from Tidemark to EPL required clean up after migration. For example, all cases created in EPL are automatically linked to county GIS via GeoRules. GeoRules is a tool that allows GIS integration within an EPL case providing geographic information such as lot size, critical areas, and MRA. Migrated data was not linked to GIS via GeoRules. To effectively inventory all SOMs in the county's MRA, county staff dedicated time to set up GeoRules on approximately 12,000 migrated SOMs. This required opening each individual SOM case in EPL, verifying accuracy of the parcel and address associated with the SOM case, and running GeoRules. JCPH prioritized this effort to have an accurate inventory of SOMs in the MRA and a live GIS link in all SOMs. OSS Inventory The Assessor's Office database shows there are approximately 27,000 improved parcels in Jefferson County. Some of these parcels contain structures that do not produce wastewater and others contain more than one structure producing wastewater. The City of Port Townsend sewer system serves approximately 4,900 ofthese parcels, Olympic Water and Sewer (Port Ludlow) sewer system serves 1,650, and Port Hadlock Wastewater Treatment Facility serves 57. In addition, there are wastewater treatment facilities associated with Indian Island naval base and 2 State parks (Fort Flagler and Dosewallips), and there are 14 active Large On-site Septic Systems (LOSS) in Jefferson County. Therefore, approximately 20,400 parcels are served by OSS or they are uninhabited. I Every OSS or on-site wastewater system (including pit privies or holding tanks) that is regulated by JCPH is assigned a unique SOM case number. Once a SOM case number is linked to a property, it stays the same so long as the property is generating wastewater, even if additional septic permits are issued to repair, expand, modify, or replace the OSS. The SOM case is utilized to track associated septic permits, pumping and inspection reports, minor repairs, waste strength test results, sanitary survey activities, 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 9 of 51 correspondence, compliance and enforcement activities, incentives and rebates issued, and 055 Fee Assessment status. Every SOM number is added to the RME database as the 'Jurisdiction ID'; the SOM number is used as the link for nightly data imports from RME to EPL via a custom application programming interface (API). Inspection report data from RME is imported to EPL SOM cases. The O&M team manages the majority of SOM case creation and SOM data updates. Staff create SOM cases in EPL when a previously unidentified 055 is identified or when new 055 permit is finalized. The WQ team will create new SOM cases for wastewater systems discovered through sanitary surveys. Usually, the WQ team creates new SOM cases in EPL in consultation with the O&M team or has the O&M team create the SOM to ensure consistency of case creation. When staff discover 055 during sanitary surveys, the 055 needs a regular monitoring inspection to determine if the components in the 055 indicate it was installed at a time when permits were required. Each 055 is assigned to a parcel number and linked to the GIS parcel layer. The GIS system does not pinpoint the location of the 055 within the parcel but rather it shows if there is a SOM and the status of that case in EPL. Staff use "asbuilt" or designer reco rd drawings along with physical observations during inspections to verify the system location on a parcel. When an 055 is located on multiple parcels (i.e., the tanks are on parcel A and the drainfield is on parcel B), then the Main Parcel number assigned to the SOM is the parcel where the wastewater is generated (i.e., the location of the structure with plumbing). Some inaccuracies in the 055 location may occur when a parcel number changes due to subdivision of an original parcel and alteration(s) of lot configuration. JC PH does utilize information from other county databases and can create data tables, which ensures consistency and provides the most current data to staff and the public. Examples of the other databases are GIS, county Assessor Office's parcel data, and RME. Staff can export data from EPL into a report to allow fo r further evaluation of needed information. Reports Staff and consultants have built reports that assist staff in data queries. Staff frequently use the SOM enforcement letter reports built into the EPL workflow. SOM enforcement letter reports query Assessor tables, GIS data, and EPL data to create enforcement notices and agreements. Other reports use query tables to extract data needed fo r required or requested reporting fo r DOH Wastewater Management, DOH Shellfish, and internal needs. Staff need additional reports to fu lfill program needs such as GIS data requested by DOH Wastewater Management for LMP reporting, which requires multiple views of data tables and coordination with the county's GIS staff. It will benefit staff to have the ability to pull more reports based on geographic location. Current Data Transfer Process Data is transferred every 24 hours from RME inspection reports to the EPL database. A nightly database job imports new inspection data from the RM E vendor database into a staging table using a linked server connection. The job then transfo rms and inserts inspection data from the staging table into another server database table. A custom API process then uploads the inspection data into EPL into the appropriately linked SOM case. The SOM case status changes based on the inspection findings. EPL calculates and inserts the last and next inspection dates into the SOM case. If records successfu lly import, an update statement is sent to the external vendor database signaling that the inspection data was successfully imported. 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 10 of 51 Data Security Jefferson County's secure data storage and server backup process is as follows: • All data is stored on the county data center and mirrored at a second location. • Database specific backup jobs occur on a nightly basis. • Server backups have an incremental backup nightly with a full backup weekly. Backups are held for 30 days. • Jefferson County follows standard NIST protocols for security and privacy. These are a nationwide standard used by government agencies. System security includes the use of passwords and two-factor authentication. • Security audits are performed by the state once per year. • Application controls are applied by various means. Typically, active directory rights are given by role-based permission. Role is assigned to a user. Application roles are also given to a user with the rights needed to do their job. Changes to application data are documented through history audit records. Tim eline Goal Activities Deadline/ Due Date Im prove the API that • Develop a plan to separate Jefferson and By 2032 imports ass inspection Clallam RM E data sources The current vendor data from RM E to EPL. operates via a linked table that contains data fo r both counties. • Develop a plan to preserve the current API functionality befo re the county implements the move from on-premises servers to vendor cloud data storage and support. • Support RM E vendor's suggestion for the county to utilize their API instead of directly using the current vendor's linked servers. Convert analog processes • Develop ability to enter field data remotely via Ongoing into digital fo rmat tablets with wireless connections. • Develop system to scan forms that will fill in data points in the appropriate database. Part 2 - O SS M ana ge m ent A re a s Jefferson County has identified areas where OSS could pose an increased public health risk or water quality issues. These areas include: o shellfish protection districts, o critical aquife r recharge areas (CARAs), o frequently flooded areas, o properties within 200 feet of a shoreline, o properties within 200 feet of a class 1 or 2 wetland, 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 11 of 51 o water bodies listed on the DOE 303(d) list, and o marine recovery areas. Jefferson County Unified Development Code (UDC) governs the designation of critical areas, also known as environmentally sensitive areas. Critical areas are identified on county GIS maps. GIS attributes are linked to all cases in EPL and are searchable in the database. These attributes are provided via the GeoRules link and are marked in each EPL case. In addition, EPL can flag cases or parcels with a "Hold". Holds provide identification of a unique condition or status on the parcel fo r consideration when permitting or monitoring OSS. Clean Water District/Shellfish Protection District The management of the CW D, established in 2007, continues to protect surface water quality and shellfish beds in eastern Jefferson County. The CW D Advisory Council, established in 2011 , provides oversight fo r current and future CW D projects, and guidance for WQ and O&M activities and functionality. CW D projects are partially funded via a per-parcel fee assessed on land not served by a sewer connection. Jefferson County Clean Water District ni-tt(Ut . I Sole Source Aquifers Sole source aquifers (SSA) are designated by the US Environmental Protection Agency (EPA) pursuant to Section 1424e of the Safe Drinking Water Act of 1974. As defined, a SSA supplies at least 50 percent of the drinking water fo r its service area; and there are no reasonably available alternative drinking water sources should the aquife r become contaminated. Marrowstone Island is the only SSA in Jefferson County. 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 12 of 51 Critical Aquifer Recharge Areas Areas with critical recharging effect on aquifers used for potable water or areas susceptible to reduced groundwater recharge are Critical Aquifer Recharge Areas (CARA) as designated in JCC 18.22.310. Most of Jefferson County's drinking water comes from groundwater supplies, and preventing contamination of groundwater is necessary to protect water supplies. JCC 18.30.0180 outlines OSS requirements and best management practices when in a CARA. Wellhead Protection Areas Wellhead Protection Areas (W HPA) are a primary way to reduce risk of contamination to water sources. Water system purveyors must delineate designated WHPA of Group A public water systems for each groundwater or spring source per WAC 246-290-135. Group A water systems must develop Source Water Protection programs, including WHPA to delineate these zo nes, manage land use, and prevent contamination. Source water protection is a coordinated effort between water utilities, regularity agencies, and the public. DOH documents and maps W HPAs in the Office of Drinking Water (ODW) Source Water Assessment Program map and in the county's GIS CARA layer. Per JCC 18.22 Article Ill, wellhead protection areas are designated as Special Aquifer Recharge Protection Areas (SARPA). JCC 8.15.090 establishes OSS design standards to mitigate nitrogen and bacteria loading fo r wastewater systems located in both SARPA and susceptible aquife r recharge areas (SUSC). SUSC are areas with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to aquifers. The county GIS CARA layer maps the overlay of SARPA + SUSC, indicating additional OSS design requirements in these areas. Phosphorus and Nitrogen Phosphorus is not a contaminant of concern in marine areas; however, it is in Anderson Lake. The phosphorus source for Anderson Lake appears to be internal nutrient loading, not external loading from OSS or watershed drainage. JCPH will need further guidance from DOH or ECY to further develop evaluation criteria. Lake Leland has shown the presence of phosphorus as well and will similarly require further guidance fo r evaluation. There are residences along Lake Leland's shoreline; however, JCPH has not determined if the source is from OSS. ECY's 2013 study on nitrogen indicated nitrogen is not a widespread contaminant of concern in Jefferson County; the county's septic and WQ programs designate areas of concern and work to ensure staff take corrective actions to address failing or deficient septic systems. Jefferson County water quality impaired sites on the 2012 WA 303(d) Category 5 list included two reaches on Chimacum Creek, one reach of Hoh River, Mats Mats Bay, marine waters near Rat Island/Indian Island, Ja ckson Cove, and possibly near the Wooden Boat School property located in Port Hadlock. ECY's WQ atlas link is https://apps.eco logy.wa.gov/waterqualityatlas/wqa/map and provides water quality search capabilities. Sensitive Areas Not Present As of June 2026, the following areas where OSS could pose an increased health risk are not present in Jefferson County: 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 13 of 51 • Up-gradient areas directly influencing water recreation facilities designated for swimming in natural waters with artificial boundaries within the waters as described by the Water Recreation Facilities Act under chapter 70.90 RCW; and • Areas designated as special protection areas under WAC 173-200-090 - wetland areas under production of crops fo r human consumption. Flood-Prone A reas/Floodw ays JC PH is concerned about OSS influenced by sea level rise and river flooding and other hydro logic changes associated with climate change projections. The WQ team collects and tracks data on flooding events at in the lower Duckabush River watershed and the Lazy C in the lower Dosewallips River in Brinnon since these areas are historically hot spots. Frequent flooding in the lower Big Quilcene River watershed has been addressed through voluntary buyouts and the construction in 2026 ofthe long-span, county-owned "Linger Longer" (now "Twana") Bridge. JCPH also recognizes that additional areas of development overlap with FEMA-designated Floodplains or Floodway (Zone AE) that may be subject to inundation during high flows or as a result of channel migration. In some areas, berms consisting of rock, gravel or logs may offer limited, temporary protection from flooding and/or erosion. The vast majority of these structures have been developed without fo rmal engineered designs and provide no guarantee of flood mitigation. As sea level rise worsens and additional OSS wastewater treatment fail as a result, the PIC program will help identify deficient or failing OSS. JCPH will likely need additional staff to handle the increased workload of OSS surveillance and public outreach associated with sea level rise. Since 2003, projects to support LiDAR data, flood models, resiliency planning and engineered design documents, and voluntary buyouts have been funded by the Recreation and Conservation Office (RCO) Salmon Recovery Funding Board (SRFB) fo r the Big Quilcene, Dosewallips, Hoh, Queets, and other floodplains have been implemented by JCPH, Tribes and NGOs through grants amounting to many millions of dollars. Collectively, they support the production and dissemination of geomorphic and hydrologic information and habitat assessments to provide multiple benefits to watersheds and communities by restoring natural floodplain processes using nature-based solutions. Water availability and filtration, flood magnitude and frequency, infrastructure longevity, as well as salmon habitat quality and quantity are tied to these natural processes or their impairments. More info rmation is available by contacting the Floodplains by Design (Ecology) or Washington Coast Restoration and Resiliency (Recreation and Conservation Office) programs or the Hood Canal, North Olympic Peninsula, North Pacific Coast or Quinault Lead Entities for Salmon Recovery (W DFW ). As sea level rise and river flooding become more extensive due to climate change, JCPH anticipates residents living in affected areas may choose not to relocate. Therefo re, to reduce the environmental risk, JC PH and property owners will need to balance wastewater needs in these high-risk areas to reduce public health risk and water quality issues. Current code requires all OSS tanks, pump chambers, and access components to be watertight, and OSS shall be required to be protected from mechanical damage from flood waters. Jefferson County Code has requirements for OSS design and development in flood-prone areas in JCC 15.15 and JC C 8.15, as well as JCC 15.15, JCC 18.22, and JC C 18.25. Washington State (W AC 173-158) does not allow structures or new development to occur within a regulated floodway. Additionally, if homes become substantially damaged as a result of a flood, DCD may not allow the property owner to redevelop; or the property owner may be restricted to limited reconstruction in the Floodway. 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 14 of 51 Targeted statewide efforts such as those through the Washington Coastal Hazards Resilience Network and the Washington Coastal Resilience Project are conducting sea level rise vulnerability work and coastal hazards assessments to assist in developing policy for mitigation of sea level rise, flooding, and erosion. JCPH is fo llowing the guidance and plans as they are developed from this work. Also, JCPH anticipates more studies and guidance from WA DOH with their requirements and ECY's Flood Control Assistance Account Program (FCAAP) work and will develop plans as this guidance and information becomes available. Jefferson County's involvement with the FCAAP program is focused on the Brinnon area, including the Dosewallips River. A Lower Dosewallips Flood Hazard Mitigation Action Plan is scheduled for completion by mid-2027. In part, this document will support next steps for continued implementation of the 2009 Comprehensive Flood Hazard Management Plan for the Dosewallips and Duckabush Rivers. Climate Change Considerations Jefferson County is required to complete its Growth Management Act (GMA) Periodic Update and must also meet the requirements of House Bill (HB) 1181, which includes adding a climate resiliency sub- element to the county's Comprehensive Plan. In 2023, Jefferson County received $300,000 in grant funds from the Washington State Department of Commerce to revise its Comprehensive Plan & Development Regulations by June 30, 2025, to ensure they comply with the GMA as revised by HB 1181 (Chapter 228, Laws of 2023) and required by RCW 36.70A.130(5). For the 2023-2025 biennium, Jefferson County requested that 58% of its allocated climate planning grant funding go toward fulfilling the HB 1181 requirements and 42% go towards completing a comprehensive update to the 1997 Coordinated Water System Plan (CWSP) for Jefferson County. Jefferson County's updated comprehensive plan is scheduled for completion by mid-2026. The Climate Action Committee is a joint committee of Jefferson County and the City of Port Townsend. This committee is responsible for developing strategies to implement the goals specified in Jefferson County Resolution 44-07 /City of Port Townsend Resolution 07-22 via the Climate Action Plan. The city and county adopted the Plan in November 2011 and only addressed recommendations on how to achieve the goal of an 80% reduction in greenhouse gas emissions from 1990 levels by the year 2050. The Climate Action Plan does not address the issues of sea level rise or flooding. Table 3. Sea Level Rise Projections Across the Nort h O lym pic Peninsula SEA LEV EL RISE* I Probability that ! mean sea level will reach or exceed feet at a given year Neah Bay Clallam County Clallam BaylSekiu Clallam County Port Angeles Clallam County l 50% chance ot z 0.6 feet (2050) and <!: 1.3 feet (2100) 5% chance of<!: 0.7 feet 5% chance of<!: 0.7 feet 5% chance of<!: 0.9 feet 5% chance of<!: 1,2 feet (2050) and <!: 2.7 feet (2100) (2050) and <!: 2.7 feet (2100) (2050) and <!: 3.3 feet (2100) (2050) and ~ 3.9 feet (2100) So u rce : 20 15 C lim ate C han g e Pre p ared n e ss P la n fo r N o rth O ly m p ic Pe nin su la Sea Level Rise Vulnerability Sea level rise vulnerability considers sea level rise and storm surge. Where more specific studies have existed for lower watersheds, exacerbated vulnerabilities linked to the combined impacts of riverine flooding and sea level rise are also considered. This vulnerability index refe rences inclusion of the exposure index, which incorporates coastal flooding and erosion, and a sensitivity index, which integrated 2027 OSS LMP U p d a te BOH DRAFT 08/06/2026 P ag e 15 o f 5 1 infrastructure and coastal habitats. JCPH may use vulnerability indexes for considerations of exposure and sensitivity of an area influenced by sea level rise and flooding when permitting and monitoring 055. Sea level rise vulnerability index (from 2023 climate change vulnerability study): o Accounts fo r potential impacts to both the built environment (homes, roads, and critical infrastructure) and the natural environment (coastal habitats); o Uses only publicly available data; o Is based on exposure to both erosion and flooding; o Provides insights about differences in vulnerability between individual parcels in Puget Sound; and, o Enables new insights about the spatial distribution of vulnerability in Puget Sound and helps to prioritize locations where vulnerability is highest. Jefferson County Sea Level Rise Study-June 2023 Jefferson County has shorelines along both the open coast of the Pacific Ocean as well as the Puget Sound; therefo re, planning fo r sea level rise is critical although the rate of sea level rise varies greatly by location due to lsostatic rebound linked to glacial retreat and/or uplift or subsidence associated geologic plate interactions. Jefferson County DCD is tasked with preserving and enhancing "the quality of life in Jefferson County by promoting a vibrant economy, sound communities, and a healthy environment." DCD is taking a proactive approach to determining the potential impacts of sea level rise and identify ing adaptation strategies and actions in response. Assessment of Climate Change Impacts on Brinnon Dosewallips Reach Jefferson County with the assistance of consultant Natural Systems Design (NSD) assessed existing conditions in the lower 1.2+ miles of the Dosewallips River. The assessment fo cused on river conditions including geomorphology, hydrology, channel migration, salmon habitat, and flooding risk to Brinnon. Additionally, the assessment evaluated projected climate change impacts to the project reach. Existing conditions compounded by the climate change impacts result in high probability of adverse effects on the existing built environment during flood events. NSD produced the Basis of Design Report which presents options on mitigating flood risk and increasing habitat in the project area. Natural Systems Design has also produced resiliency plans, including flood and erosion risk considerations, fo r the Lazy C - Powerlines Reach, the Middle Hoh River (Lindner and Fletcher reaches). Tribes and NGOs have done similar work in other watersheds such as the Quinault, Queets, Salmon, Snow and Big Quilcene. The Comprehensive Flood Hazard Management Plan fo r the Big and Little Quilcene Rivers (CFHM P) was updated in 2023. The CFHM P was developed under Washington State's Chapter 86.26 RCW and Chapter 173-158 WAC to: • Reduce flood risks to communities, infrastructure, and natural resources. • Restore and protect aquatic habitat, particularly fo r summer chum salmon and other species. • Improve floodplain resilience through engineered and natural solutions 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 16 of 51 Sea Level and Flooding Projections for Areas of Jefferson County Su tnvel Un111 floortlng liazaul OflSL.:i. lflSLR HlSLR '-ft SLR 11,P..,t♦ Beckett Point • Sea Level Rise Flooding Hazard Q »:" lo:(! .--=?,_ Scala 1 18,056 - r'U~» 1:..«,f~111·~ ;t~,~Z,;i,.,.1,,-:;°f,, .• c~11;;)JaP-:r,v.f1.-w,¥0Jr)a:,.--e""i.:1':7.1 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 17 of 51 Scale 1 72 ,22d ru1r,; l'«U..!4' .,-•Ytw,.rl:1· .. ,., .• ,1.,.·•:;e~r.i- '"·•?' ~,,.,,. J;::~••~•n•,t1 Scala 1 18,05G ,~s --~1 ...:,::u ,::,ia : '.f ":>'l<W°1"f""'ll-;,.~.; .. :.;~--,:-:,;~ -;..;...m,,.., J;.ac.-.:10:,r t1 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 18 of 51 Sell level RIie Flood tng Hazaul 011:il't I lt51.A 2f1Sl='( ~tJSlR Ste:,:,, ... I Y.<l JOO~ Scala 136,112 -T.,. .,~-II')«, ""'6:•..:.. •y Jtru"J'f ;;,, 1.r,;- o--: 1«.1~• 1~11 ~•J'Pla~ h'ltt Jt-.:1 rt,1 -,cn:.rn Sell level m,ui flruxhng HlllllHI Of!SL:i. lflSLR 211SLR ,nsLR luP¥et' T~scaaJl)Nepro'IKieao,1 nn ·;1s.1s· basis. Wll'houl WOff6n1Y (II M Y l,\'P(! e.-,:>ressed or iwpttd Md'.Xiir,g bur 11ot tm,r,W Jo ,m, wano,11y 11s/oth1Wperlorma11Ctt f----------------,------~-------------j merchonMblio1y,orltnessror ony~,wrf)f)!,e Scali! 1 9,028 2027 ass LMP Update BOH DRAFT 08/06/2026 Page 19 of 51 0 ~ 10:0 -=· Scale 1 18,0!iG - fl1""1"~JIJDl'.:..'.f';VJ.:a.¥¥t't'l''lt 117":·~ ._,.,,./r' ~•-1Nf" Jl,1~ftJ"¥tl •:<l ,.,, --==, [ Scale 1 9,028 r-.. ... .r, '""'tc.!ll-.·•·.,.,~·t·t1i1,,,1<F" 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 20 of 51 Sca le 1.4.514 i>;;-.,..,, flKO~.:_:,lo'i::cv ;l(t'♦i11¥">fJ1,:,,·•••W--•l~a:,11-·~;,r1lf',;;,r,,•• ii~ru:.ro· Date 8/3/2026 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 21 of 51 Septage Ca pa city In 2025, the Washington State Association of Local Public Health Officials (WASALPHO) received grant funding to conduct a septage capacity analysis for the state which recommended that the state continue examining septage capacity issues. The report can be found here https://apps.ecology.wa.gov/publications/documents/2507045.pdf. One ofthe key recommendations of the report is to conduct a fiscal analysis of potential infrastructure solutions. As Washington State grows, septage capacity may become a critical limiting factor to development, as well as a threat to public health. In addition, the National Association of Wastewater Technicians (NAWT) fo rmed a task force to develop policy initiatives to address septage capacity issues nationwide. Jefferson County has limited septage capacity, currently approximately 4,000 gallons per day. We applied for, but did not receive, a grant to prepare the engineering documents to expand the current city-owned septage compost facility. The county and state should continue working to address the septage capacity issues by advocating for legislative resources, securing a grant(s) to expand the current capacity in Jefferson County and the state. Port Hadlock Wastewater Treatment Facility In the 1990s, the Washington State Growth Management Act (GMA) required Jefferson County to develop a Comprehensive Plan for managing its growth. This plan identified areas where urban growth should occur and economic activity, higher population density, and infrastructure improvements should be prioritized. In 2002, Jefferson County designated the Port Hadlock/Irondale area as an Urban Growth Area (UGA) because it was already "characterized by urban growth" (RCW 36.70A.110(1)). Under GM A, urban services, including municipal sewers rather than septic systems, are required to allow development typically associated with urban areas. Up until 2025, Port Hadlock area did not have a sewer system or wastewater treatment plant. Local homes, businesses and other facilities depended on individual septic systems that limit growth, urban density and affordable housing development. To accommodate urban level activities of the UGA, future urban zoning has already been approved, but that zoning can only be "turned on" when sewer becomes available to the property. Major land use changes enacted with Phase 1 UGA Sewer System construction: • Existing rural zo ning will be replaced with urban levels of zo ning fo r all properties receiving sewer service located in the Phase I sewer system boundary • Higher density residential development can be provided • Economic and business developments will be allowable • Existing developments can be expanded and grown • Vacant land area on properties that presently contain drain fields or drain field reserve areas will no longer be necessary In the fall of 2025, the Port Hadlock UGA Sewer System became operational. The initial sewer connections located in the Phase 1 area consisted of mostly co mmercial establishments including restaurants, a grocery store, and clinics. Sewer service expansion into areas outside of the Phase 1 service area will likely be a slow process that will rely on property owners bringing sewer into their neighborhoods or if an existing septic system fails and the property meets the provisions for requiring septic to sewer connection. 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 22 of 51 More extensive buildout of the sewer system beyond Phase 1 would benefit from an influx of grant funding to offset the cost of installing the infrastructure. W ater Q u ality Program JCPH established its Water Quality Division in 2007 to enhance and protect the lakes, streams, and marine waters of our county. Our mission is to protect public health by monitoring and responding to threats to water quality fo r protection of human health and wildlife habitat by using available local, state, and federal funding effectively and efficiently. Po llutio n Ide n tifi catio n and Correctio n (P IC) The PIC program screens fo r bacterial pollution on Jefferson County shorelines and identifies the source(s). The primary source of pollution in the county is attributed to failing and deficient OSS. After staff identify the source area(s) of contamination, they investigate hot spot areas and complete sanitary surveys to identify if an OSS is a potential source of pollution. Sanitary surveys are direct outreach to homeowners to provide education and information about the status of their OSS to help correct septic deficiencies. If WQ identifies an issue, staff coordinate with O&M and code enforcement to help provide financial assistance resources (such as rebates, Craft3, REPAH, and Habitat fo r Humanity) to address the OSS corrections required. WQ also coordinates with the OSS team fo r permitting repair/replacement OSS. 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 23 of 51 D y e T e stin g WQ may utilize dye testing to assist in identifying the source of contamination. WQ staff also perform in- person sanitary surveys on suspect properties. If there are issues with the ass, WQ staff will provide financial assistance options to the homeowner for the repair or replacement of ass that are out of inspection compliance, are failing, or have failed. WQ Sanitary Surveys A sanitary survey consists of three sections: a questionnaire, helpful tips for longevity, and visual inspection of septic components. Continual investigation of hot spots and visual inspections of individual parcel suspected systems, along with cooperation from Jefferson County residents, will maintain and improve the water quality within Jefferson County. WQ staff send direct mailings to homeowners of ass in hot spots and other areas of concern. The sanitary surveys are significant, direct contact outreach opportunities for homeowners of high impact ass in order to collect helpful information about their ass and encourage engagement. WQ may also include an ass rebate brochure with their sanitary survey mailings. 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 24 of 51 WQ Homeowner Financial Assistance WQ offers resources on financial assistance to assist homeowners in the repair/replacement of failing/failed OSS which dovetails with the O&M team in areas such as rebates and also coordinates with Craft3 and USDA loans. WQ also coordinates with ECY on Clean Water Act designations of impaired water bodies in Jefferson County (watersheds study). WQ staff help homeowners fill out rebate forms, access OSS records, provide info about septic classes, and provide copies of their last O&M inspection report and asbuilt. Timeline Goal Activities Deadline/ Due Date Expand water quality • Expand the PIC program to include dye testing in Ongoing monitoring. sensitive areas. Develop a dye testing protocol and deploy a pilot project in an area with known water quality issues and suspected failing OSS. • Continue to track water quality monitoring data and activities in areas where OSS may pose an increased public health risk. Support OSS property • Continue education and outreach for OSS Ongoing owners in sensitive areas. property owners in sensitive areas such as Chimacum Creek watershed, Salmon-Snow watershed and Discovery Bay. Collaborate with others • Support development of response plans for the Ongoing performing similar work impact of sea level rise on OSS. across departments and • Continue collaboration with other LHJs in settings agencies. such as PSP LIOs and DOH westside coordinators' meetings. • Continue collaboration with Washington State Association of Local Public Health Officials (WASALPHO) regarding septage capacity work . • Part 3 - Operation and Monitoring The O&M program monitors all active OSS and instructs the public and septic professionals on OSS operations and maintenance requirements. The program inventories all OSS, determines operational status of OSS, enforces OSS code requirements, and performs education and outreach. All septic system permit applications for new systems, repairs, modifications or alteration, and tanks only (connecting to existing systems or community systems) are required to meet septic design standards to facilitate O&M inspections. ✓ Watertight risers to grade on septic tanks and pump tanks 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 25 of 51 ✓ Risers to grade on distribution boxes and other flow splitting components ✓ Monitoring ports to the infiltrative surface on non-conventional systems where applicable ✓ Monitoring ports to distribution pipes for flushing and measuring flows ✓ Cycle/dose counters where a pump is required ✓ Pump run time meters ✓ Audio and visual alarms where a pump is required OSS Permitting O&M staff provide technical assistance and communications to the public and septic professionals on various topics such as property sales, land development requirements, permitting questions, compliance requirements, inspection questions, interpreting local sewage code and policies, and program updates. For septic permitting and design questions, O&M staff refer the customer to OSS staff or to a septic designer. Septic repair permits are tracked by O&M staff to ensure that failing or deficient OSS come into compliance. Operational Permits The county 2025 OSS code update allows for the health officer to require an operational permit for wastewater systems that have an increased public health risk such as holding tanks and experimental OSS. Operational permits will create additional oversight of OSS through the required annual permit renewal and applicable conditions of approval. Inspection and Pump Report Auditing In 2025, JCPH received 2,989 inspection and pump reports submitted by septic professionals to RME. Currently, there is insufficient staffing capacity to review all professional reports. Due to this, inspection and pump reports uploaded into RME by professionals are reviewed only if the report is flagged. Reports are flagged in RME when selected items are noted as deficient. For example, an RME inspection report that answers "no" to the question "effluent level within operational limits" will be flagged. O&M staff review all septic inspection reports as they are received from authorized homeowner inspectors. This 100% audit rate of homeowner inspection reports is in part due to the report submittal method in place. Authorized homeowners have user accounts in EPL CSS portal where they can access copies of their inspection report form and submit their completed inspection reports. Upon receipt of a homeowner inspection report, an automated notification is sent to the O&M staff. Staff then review the inspection report and update the associated SOM case. Unlike professional inspection reports that have an API in place to import data from RME to EPL, O&M staff manually import homeowner inspection report findings into EPL. ass Inspection Reminders O&M and W Q staff mail inspection reminder letters to homeowners on an as needed basis. Inspection reminder letters are set up as a Report in SOM cases in EPL. This Report generates a letter that has property specific information such as the SOM case number, site address, last septic inspection date and 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 26 of 51 the required inspection frequency. These letters are typically sent to homeowners when there is a county process that identifies that a septic system is overdue for a routine monitoring inspection. Prior to 2020, O&M staff would send batches of inspection reminders to homeowners. These batch reminders were sent to OSS overdue for inspection and were targeted to neighborhoods. Neighborhood targeting is intended to both ease the scheduling of inspections fo r professionals and to encourage neighbors to discuss septic monitoring. Batch letters have not been generated or mailed since 2020, due to the Covid pandemic and the EPL database conversion. O&M staff have designed an inspection reminder postcard and use this postcard as the new batch inspection reminder tool. Postcards may receive more engagement than the previously used enveloped letter inspection reminder. O&M staff began mailing out batches of postcards in July 2026. Postcard inspection reminders are sent out to 200-400 homeowners at a time, targeting OSS in the MRA and systems that have never received a professional inspection. AU Hplk .yttema- r9C1ulre lnt:t,.dionsl lf'i'1l Sf P TI C S V llf M S UI IT H A P U M P ~ MUDTOHIIUPICTUANIIUIIUY ~ O lt AV l?Y S YSTl M S N H O TO H S INS'l ClH (UUIY3Vf ARS ""'-• YOUR SEPTIC SYSTEM MAY 81 OU( FOR AN OPERATIONS a MONJTOAINO INSPECTION O o11't Im':;~~:;: ~~dti~'?o7r~l~:-in7i:~!~/°' ur pt i< • Any Rv11il11hle s~ptic reball!s 11ntl/m incentives • lls1 of loc al ccrhlicd sco ne oper atio n & moniloring • ~ 1~"f;ib~~~fl'C Aulho,izcd 10 complotc your own Inspections Vi,i1 j.if !W'f0 n\'.0U ntypubl kh•alth,Qrg/66S / lt11•ot,1rc11••for-Horr,11own11r1 Q11efllontTC111fwo!Nitl.lS! •~co.Jeffenon.-w ~3S5·&11W Property Transfer Inspection Rem inders A current and complete O&M inspection by a certified OSS professional is required when a property is sold or there is a title transfer. O&M staff, review septic inspection records fo r all properties that have been sold or the title transferred. If the sold property is developed, not on sewer service, and lacks a current septic inspection report, a notification is mailed to the current property owner. The notification informs new property ow~ers ofthe required septic inspection frequency. Septic violations may be identified through review of property sales. lfthe sold property is developed and ' '\ there is no record of a valid septic permit, or if there is a deficient inspection report on file for the septic system, O&M staff may initiate the SOM compliance process. See the Code Compliance and Enforcement section below for information on SOM compliance. ' Certification of Septic Professionals JC PH certifies septic professionals to provide services in the county excluding septic designers who are licensed by the Board of Engineers and Profe ssional Land Surveyors (BRPELS). Professionals certified by JCPH are pumpers, O&M technicians, O&M specialists, and installers. Sewage pumpers must be certified to pum p sewage in the county, O&M technicians and O&M specialists who monitor and maintain systems 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 27 of 51 must be certified to work in the county, and any installer who installs OSS in the county must be certified by JCPH. Until 2024, JCPH required septic professionals applying for certification to pass a custom JCPH competency test. JCPH now partners with Washington On-site Sewage Association (WOSSA) who provides and proctors all testing as required for Jefferson County septic professional certifications. WOSSA also offers continuing education classes that meet the requirements for professionals to obtain CEU credits required fo r certificate renewal. County partnership with WOSSA fo r professional certification helps ensure that professionals certified by JC PH are meeting standard benchmarks set by industry professionals across the state. The delegation from the state to the county to certify septic professionals may create a stronger working relationship between the local health department and septic professionals. However, county professional certification programs may also create regulatory boundaries fo r septic professionals who must become familiar with each county's unique septic regulations, as well as obtain certification in all counties where they perform work. This is a logistical and financial burden fo r these profe ssionals and may limit the number of professionals available in smaller jurisdictions. Limited professionals may result in less competitive prices and timely availability for homeowners obtaining OSS pumping, inspections and installations. Septic professional certification by the State Department of Health would help alleviate this problem. · O&M Inspector Auditing JC PH has drafted policy and guidelines to implement routine, randomized perfo rmance audits of authorized homeowner inspectors and certified O&M technicians and specialists. The intent of implementing an audit program would be to ensure homeowner inspectors and professionals meet the minimum perfo rmance standards. The core components of the proposed audit program would be randomized report auditing, database review of inspection reports, site visits to verify report accuracy, and fo llow up actions as required. Code Compliance and Enforcement O&M staff review deficient inspection and pumping reports submitted by certified professionals. Staff triage deficient reports for compliance actions based on the fo llowing enforcement tier structure: SOM enforcement tier list SOM Tier 1 (High Priority) potential for human contact with sewage • Septic system failed - sewage on ground • Septic system failed - sewage backing up into structure • Sewage being discharged on ground or to surface waters • Unsecured tank risers SOM Tier 2 (Moderate Priority) untreated sewage entering environment • Leaking tank • Drainfield not accepting effluent • Effluent level in the tank above normal operating level 2027 055 LMP Update BOH DRAFT 08/06/2026 Page 28 of 51 • UV light or ATU not functioning as intended • OSS installed in groundwater • ass installed without permits • Any structure with unknown disposal of wastewater SOM Tier 3 (Low Priority) all other deficiencies • Un permitted connection to OSS, OSS connections over capacity • Unpermitted com ponents added to permitted OSS • Encroachment • O&M inspection report with deficiencies not listed in Tier 1 or Tier 2, requires correction • Unpermitted outhouse W hen priority violations are identified, O&M staff send a Notice of Voluntary Compliance (NOVC) to the property owner describing the deficiencies and corrective actions required. When the property owner responds to the NOVC, O&M staff provide guidance on co mpliance requirements and necessary steps to resolve the deficiencies. If corrective action is not completed, JC PH may take additional enforcement actions. Depending on the severity ofthe violation, this may include one or more ofthe fo llowing: offering a Voluntary Compliance Agreement, issuing a Notice of Violation with civil penalty, issuing a Notice of Violationa nd order of Abatement, recording a Notice to Title fo r Noncompliance to the property. If an NOV is issued, O&M staff will create a code compliance case (COM ) in EPL to document the enforcement activities. Documenting these activities through the COM facilitates appropriate record retention fo r code enforcement documents and allows fo r staff time tracking fo r cost recovery. The current configuration of EPL does not support tracking fo llow up compliance activities. O&M staff track fo llow up activities via an Excel spreadsheet. To use EPL fo r follow up tracking, additional calendar functions need to be developed by database vendor. Tim eline Goal Activities Deadline/ Due Date Reduce the num ber of OSS • Work to determine motivations and Ongoing that have never had an O&M barriers to O&M inspections. inspection and increase the • Analyze homeowner responses from WQ num ber of OSS that are mailers where social marketing questions com pliant with O&M are used that can result in behavior inspection frequency. change. • Develop and implement enforcement strategies fo r homeowners with OSS who are not current with O&M inspections, especially with systems located in sensitive areas. • Continue to improve inspection reminder program. 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 29 of 51 Develop and implement septic • Develop the proposed audit program to By 2032 inspection audit program. include randomized report auditing, site visits to verify report accuracy, and follow up actions as required. • Develop enforcement guidelines for issues identified during audit of authorized homeowners and certified professionals. Audit financial assurance for • Contact all community OSS managers and By 2032 all community OSS request their financing mechanism data. Determine if funding is appropriate and require additional financial assurance if needed. P art 4 - H om eow ner Ed u cation JCPH staff provide education, outreach and technical assistance to homeowners with septic systems. This comes in the fo rm of social media posts, tabling at community events, answering direct inquiries, and offering in-person septic education classes. Customer Service JC PH offers sanitarian hours every weekday morning to provide OSS technical assistance to the public. Additional resources are available on the JCPH website, including OSS codes and policies, education materials, fo rms and applications, funding resources, FAQs, and useful links for the proper monitoring and operation of OSS. Online submittal of septic incentive and rebate applications, registration for septic homeowner classes, and fee payments are also available through the JCPH website. Customer Self-Service (CSS) portal is a feature of EPL that provides the public with on line access to county permitting and land use approval records, including septic permits and SOM data. County staff can configure which data fields are visible to the public in CSS. These fields include case status, last inspection date, next inspection due date, required inspection frequency, OSS Fee Assessment category, and a link to view professional inspection reports in OnlineRM E. Septic professional certification renewal and homeowner inspection reporting are also available through CSS. Homeow ner Education Classes JC PH offers free in-person classes to educate homeowners about care and use of septic systems and how to complete your own septic inspection. Classes are offered at community centers throughout east Jefferson County. Copies of septic records such as record drawings and recent inspection reports· are provided to homeowners. Homeowners who complete the course may be eligible to become authorized inspectors of their own septic system. 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 30 of 51 Homeowner Inspection Program JCPH allows homeowners with qualifying septic systems to become authorized to complete some of their routine inspections. Inspection by a certified professional is required at a certain frequency based on the type of system (see Appendix C). The program educates homeowners on how septic systems work, why maintenance is important, and what users can do to extend the life of their septic systems. The program also lowers the cost to homeowners to complete regular septic inspections. To become authorized, homeowners must complete a training either online or in person. There are over 1,600 homeowner inspectors currently authorized in Jefferson County. Since the program started, more than 2,300 property owners have completed the training and become authorized. Historically, online training and septic inspection reporting for homeowners was available through the Septic DIV website. This website was developed and administered by a third-party contractor and was integrated with Tidemark database. This website was not secure and JCPH lost access to this website when the contractor was no longer available. Online reporting fo r homeowner inspectors was not available from 2022 to 2025. Development and implementation of homeowner authorization training and reporting through EPL and CSS was completed in 2026. Configuration of the new system required staff to review all homeowner inspection records and transfe r data to Septic Homeowner Authorization (SHOA) cases in EPL. Authorized homeowner data is now tracked through SHOA cases in the Profe ssional License module of EPL. Each authorized homeowner's SHOA case is linked to the SOM case(s) they are authorized to inspect. An authorized homeowner can access their SHOA case through CSS to download blank inspection reports, upload completed inspection reports, and access reference materials to assist in completing an inspection. Tim e line Goal Activities Deadline/ Due Date Develop and • Develop interface in EPL Navigator fo r By July 2027 enhance digital homeowners to train, test and become resources fo r authorized homeowner inspectors homeowners through CSS. • Create an instructional video to assist homeowners with setting up their CSS accounts and submitti ng homeowner inspection reports. • Expand the resources on the JC PH website to offer more visual aid charts and maps to educate the public on water quality and shellfish improvements. 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 31 of 51 Part 5 - Funding Strategy Sustainability and expansion ofthe O&M program requires development of long-term funding options in addition to current fu nding sources. ass Fee Assessment The O&M program is primarily funded by an annual OSS fee, which was established by adoption of Ordinance 05-1103-16. The OSS fee is assessed for all active OSS based on JCC 8.15.055 and collected via property tax statements. JCPH provides an annual report to the county Assessor's and Treasurer's offices detailing the parcels where OSS have been constructed, recently identified, or decommissioned. The Treasurer's office uses this data to apply and collect OSS fees via tax statements. The OSS fee is adjusted annually per Ordinance 12-1209-96, Section 4-Annual Fee Indexing and is based on the CPI-Win September of the current year. Clean Water District Funding Jefferson County established a CWD for shellfish protection in 2007. The CWD encompasses all of east Jefferson County and was implemented due to environmental threats to co mmercial shellfish growing areas. Failing septic systems within the CW D were identified as a primary suspected source of fecal bacteria in area waters. The CW D has a per parcel assessment fee on land not served by a sewer connection. This assessed fee supports the WQ PIC program. Supplemental Grants Jefferson County receives supplemental grant funding from other agencies including DOH and Puget Sound Partnership (PSP). JCPH has a biennial contract with DOH fo r OSS LM P implementation. The funding from this contract supports LM P reporting activities, database maintenance, O&M program administration, education and outreach, staff professional development, and homeowner incentives and rebates. JC PH prioritizes distributing these funds to the homeowner incentive and rebate program; under the current contract, 70% of total funding is allocated to incentives and rebates. PSP is the state agency leading the region's collective effo rt dedicated to improving the health of Puget Sound. JC PH coordinates with PSP and Local Integrating Organizations (LIO) to develop LIO Action Plans focusing on regional needs and priorities to improve management of OSS in our region. In 2024 PSP advocated fo r and secured one-time funds fo r JC PH to implement the LIO Action Plan. JC PH is fu nding education and outreach activities and septic rebates and incentives with PSP grant funding. The septic incentive and rebate program periodically exhausts fu nding, and additional funding is required to keep this program available. 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 32 of 51 O &M Pro g ram Rev en u e , G ran t M o n e y Rece iv ed an d Expe nd itures 2025 Revenue OSS Fee Assessment $364,195 Foundational Public Health Services (FPHS) $88,500* DOH OSS LM P Im plementation contract $11 8,024** PSP OSS Program Improvement agreement $90,645** Total Revenue $661,364 2025 Expenditures ass Fee Assessment $396,211 FPHS $88,500 DOH ass LMP Im plementation $56,390 PSP OSS Program Improvement agreement $0 Total Expenditures $541,10 1 *Total award for all OSS activities **Grant period January 1, 2025 -June 30, 2027 Financial Assistance for Homeowners The high cost of septic repair and replacement is a barrier to septic failure correction. JCPH helps homeowners identify available financial resources to co mplete necessary septic repairs. Staff frequently refer homeowners to Craft3, a nonprofit lender that partners with Jefferson County to provide low- interest Clean Water Loans fo r septic repairs. Funding may also be available to homeowners through Habitat fo r Humanity East Jefferson County, Real Estate Professionals fo r Affordable Housing, and USDA Section 504 Home Repair program. For low-income property owners these resources are often inadequate to fund the replacement of a failed septic system. There is a lack of consistent grant funding available to low-income property owners. JC PH has previously administered septic cost share grant programs for qualifying property owners though grants from EPA National Estuary Program (NEP) and Community Development Block Grants. JCPH plans to partner with Jefferson County Conservation District to provide additional septic cost share grants pending award from ECY. JC PH has limited staff time to administer these grant programs and additional resources are needed to support low-income property owners. JC PH has a Code Compliance Abatement fund that can be used to abate public nuisances. When property owners are unwilling or unable to correct a septic failure that has been declared a public nuisance, JCPH could use an abatement fund fo r septic corrections. Development of an OSS abatement program could enable JCPH to contract with septic professionals to be on call fo r emergency abatement of failing OSS. O&M Rebate Program To promote septic system inspections and maintenance, JC PH provides reimbursement of funds directly to homeowners in the fo rm of O&M incentives and rebates. This program helps cover the cost of inspections, system locates, pumping, maintenance and minor repairs. JCPH updated rebate eligibility requirements in 2025 to require all applicants to have a current O&M inspection to receive funds. In 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 33 of 51 addition, JCPH increased the maximum reimbursement amount from $350 to $1000 to address the increasing cost of services. This program is not accessible to all homeowners because it requires upfront payment for services and has a one to two month wait for reimbursement. Currently the O&M rebate program is funded by the DOH OSS LMP Implementation contract and the PSP OSS Program Improvement agreement. Rebates will be paused when this funding is exhausted. WQ Rebate Program WQ offers septic inspection and maintenance rebates for areas of potential pollution identified during water quality monitoring. A portion of WQ rebates are funded by the Hood Canal Regional PIC (HCRPIC) program. HCRPIC rebates are targeted at Hood Canal areas where there are known water quality issues, such as the Duckabush River watershed. Rebate funds are also provided by the Chimacum-Hadlock PIC Project grant (funded in part by ECY), ending in December 2026. A separate grant is pending from the NEP which is budgeted in part to fund rebates and the setup of a WQ in-house lab. Timeline Goal Activities Deadline/Due Date Identify funding mechanisms • Develop a revolving grant fund to finance Ongoing to provide grant funding to septic repairs. Create and adopt an property owners for septic ordinance that assesses fees to properties repairs. Lack of funding for with OSS that are delinquent on O&M low-income property owners inspection frequency requirements. Fees is a significant barrier to collected from this could be used to fund completing septic repairs. OSS repairs through the revolving grant fund. Expand the incentive and • Explore additional funding sources . Ongoing rebate program to make • Continually increase incentive and rebate septic inspections and reimbursement amounts to keep up with maintenance feasible for the rising cost of professional services. more homeowners. • Consider adopting a Professional Service Agreement (PSA) program similar to Clallam County. Certified septic professionals could opt into a PSA program for septic inspection and maintenance cost reimbursement directly from the county. A PSA program functions like the septic incentive and rebate program but alleviates the need for homeowners to provide upfront payment for services. Develop a septic abatement • Contract with certified septic professionals By 2028 program. to be on call for emergency abatement of failing OSS such as pumping and capping tanks for use as holding tanks. This could be 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 34 of 51 funded through the Code Compliance Abatement fund. Part 6 - Marine Recovery Areas Jefferson County is bound on the north by the Strait of Juan de Fuca and Clallam County; on the north and east by Admiralty Inlet; on the east by Port Townsend Bay, Oak Bay, and the Hood Canal; on the west by the Pacific Ocean; and on the south by Mason and Grays Harbor Counties. Jefferson County has 40 recreational shellfish beaches, 230 miles of marine shoreline, more than 800 lakes with more than 18 miles of lake shoreline, over 18,000 acres of commercial shellfish beds, over 9,000 miles of streams/rivers. There is one incorporated city, Port Townsend, and one Master Planned Resort, Port Ludlow. There are several smaller population centers in eastern Jefferson County, but Jefferson County is primarily rural. Current Status Low dissolved oxygen and fecal coliform bacteria in shoreline areas is a significant issue and may cause degradation to shellfish growing beds. In the early 2000's, data suggested that OSS may be contributing to the low dissolved oxygen in Puget Sound. In response to this, the WA legislature passed legislation that was codified as RCW Chapter 70.118A, which required local health jurisdictions in the Puget Sound region to designate MRAs with the purpose of enhancing local OSS programs in these areas to protect public health and water quality. Jefferson County designated the Hood Canal MRA in order to guide development and management of OSS in the Hood Canal area. JCPH submits a biannual report to WA DOH which parses out data for both countywide and MRA OSS activities. Since designating the Hood Canal MRA, research and studies have determined that properly functioning OSS are not a significant contributor to low dissolved oxygen or fecal coliform bacteria in Puget Sound. Jefferson County's MRA should be reassessed to focus on areas of the county where a deficient or failing OSS may affect water quality. Revising the MRA boundaries will allow JCPH to develop a more targeted approach to OSS development and management in the Hood Canal drainage area. 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 35 of 51 Th tse dllrt ,,. ptOVldtd on an "AS·IS" basis. Without w.,,.ntyol1nytypt, HptHHd Of lmp/lHJ, lnel/JtMQ but not lrmir•d to any warranty as ro thflr ,,.rlorm,r,c1, :;;,~~"o/,,u°:~~~•ufor i-.:'!!!"'!!!!!!!'!!!:""'==="~":'~__,--,-------,~Sca~l~e:~1:5:'.:2~0.8~62~----_::'.'.'.:.~~'.'..j Th6f-..lti1,o11;,....,.,._..b•::t."'_...,..,....,.."'t,;<l~l"l}_..,C~--flt"lllt·f,a,~~•~ Timeline Goal Activities Deadline/Due Date Department • Continue to coordinate activities between O&M ongoing program and W Q program s, share data, collaborate on coordination. projects and com pliance cases. Summary JCPH plans to implement the recommended activities put fo rth in this updated LMP. Implementation and continued expansion of OSS management by JCPH will require continued funding and staffing, with necessary increases in financial sources and staffing. If these increases are not fo rthcoming, the O&M and WQ programs will be limited in their abilities to expand services and may need to consider limiting some services and support to the public. JCPH will continue building on existing efforts and leveraging partnerships to make steady progress towards full implementation of the LMP. 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 36 of S1 2027 LMP Recommendations JC PH makes the following recommendations to Jefferson County BOH to address the current challenges associated with OSS management in Jefferson County: Part 1 Database Enhancement • Support funding and technical assistance to improve OSS inventory tracking, streamline data input, and expand reporting capability. Part 2 OSS Management Areas • Support future phase development of PH sewer fo r both commercial and residential connections. • Advocate for fu nding opportunities for property owners with failing OSS to finance connection to sewer when available. • Request guidance from DOH regarding how to meet their requirement for OSS considerations where sea level rise may impact horizo ntal separation to surface water. • Support state and county agencies in pursuing further research into effects of sea level rise and climate change on OSS and development in the county. • Support data gathering fo r potential OSS alternatives to support areas where sea level rise may impact adequate OSS to surface water separation. • Determine if appropriate to designate Lake Leland as an Environmentally Sensitive Area. Part 3 OSS Operations and Monitoring • Replace vacant staff positions to handle OSS monitoring, education, surveys, data maintenance, and potential additional analysis of MRA designation. • Continue to track water quality monitoring data and activities in areas where OSS could pose increased public health risks. • Bolster the existing code enforcement program. • Advocate for WA State DOH to be the regulatory agency that licenses OSS professionals to improve interjurisdiction licensing. Part 4 Homeowner Education • None at this time. Part 5 Funding LMP Strategy • Advocate fo r sustainable funding resources for property owners to finance repair or replacement of deficient or failing OSS. Part 6 Marine Recovery Areas • Review and revise the Hood Canal MRA boundary. 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 37 of 51 References WAC Chapter 246-272A https://app.leg.wa.gov/WAC/default.aspx?cite=246-272A-0015 RCW Chapter 70.118A On-Site Sewage Disposal Systems-Marine Recovery Areas https://app. leg. wa.gov /RCW /d ispo.aspx ?cite= 70.118A DOH Additional Marine Recovery Area Guidance https ://doh. wa .gov /sites/ defa u lt/fi les/legacy/Docu ments/Pu bs//33 7-085. pdf JC UDC 18,30.180 On-site sewage disposal best management practices in critical aquifer recharge areas. https://www.codepublishing.com/WA/JeffersonCounty/html/JeffersonCounty18/JeffersonCounty1830. html JCC Chapter 8.15 On-Site Sewage Code https://www.codepublishing.com/WA/JeffersonCounty/#!/JeffersonCounty08/JeffersonCounty08.html JCC Chapter 13.04 Connection to PHUGA Sewer System https://www.codepublishing.com/WA/JeffersonCounty/#!/JeffersonCounty13/JeffersonCounty1304.ht ml#13.04 JCC Chapter 18.18 Irondale and Port Hadlock UGA Development Regulation Implementation https://www.codepublishing.com/WA/JeffersonCounty/#!/JeffersonCounty18/JeffersonCounty1818.ht ml#18.18.030 Strait Ecosystem Recovery Network (ERN) https ://www. co. jeffe rson. wa. us/ 107 5/ 4 704/Stra it-Priority-Areas-Project Pollution Identification and Correction (PIC) https://jeffersoncountypublichealth.org/1581/Pollution-ldentification-Correction City of Port Townsend/Jefferson County Climate Action Plan JC Department of Community Development Comprehensive Plan https://www.co.jefferson.wa.us/1835/2025-Comp-Plan-Elements Pacific Coast Marine Resources Committee https://www.co.jefferson.wa.us/1523/North-Pacific-Coast-Marine-Resources-Com Clean Water District https ://www. jeffe rsoncou ntypu bl ichea Ith .o rg/713 /Clean-Water-District Jefferson County Flood Damage Prevention Ordinance No. 18-1120-95 https://test.co.jefferson.wa.us/WeblinkExternal/DocView.aspx?id=181843&dbid=0&repo=Jefferson&cr= 1 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 38 of 51 2023 Jefferson County Sea Level Rise Study https://www.co.jefferson.wa.us/DocumentCenter/View/17291/Jefferson-County-Sea-Level-Rise-Study 2023 Big and Little Quilcene Rivers Comprehensive Flood Hazard Management Plan https://www.co.jefferson.wa.us/DocumentCenter/View/17290/Big-and-Little-Quilcene-Rivers- Comprehensive-Flood-Hazard-Management-Plan Water Utility Coordinating Committee 1997 Coordinated Water System Plan (CWSP) WA DOH BEACH Program https ://doh. wa. gov/ a bout-us/executive-offices/prevention-safety-an d-hea Ith/ e nvi ro n me nta 1-pu bl ic- h ea Ith/ office-en vi ro n menta 1-hea Ith-an d-safety/beach-prog ram The WA DOH supports the Shellfish Safety Information website for the public to access to check current health safety conditions of shellfish beaches and marine areas before harvesting shellfish during the allowed season. As part of the Washington Swimming Environmental Assessment, Communication, and Health program (BEACH), WQ monitors enterococci levels only at Chimacum Beach, Quilcene Marina, and other possible beach locations from May to September. Beach users are warned via signage and the WA DOH website under the BEACH tab if there is an elevated risk for recreational contact illnesses. Jefferson County Marine Resources Committee https://www.jeffersonmrc.org/ The Jefferson County Marine Resources Committee (MRC) identifies regional marine issues, fosters community understanding and involvement, and helps develop support to protect and restore marine resources. Some of the Committee's projects have included forage fish habitat, restoring the native Olympia oyster to Discovery Bay, and removing derelict gear from local waters. The MRC is an advisory group to the Board of County Commissioners (BOCC) and operates under the umbrella of the Northwest Straits Commission. The MRC members are committed to working closely with homeowners, business owners, recreational enthusiasts, commercial and sport fishers to reduce or stop the decline of the marine habitat along the marine shorelines of Jefferson County. 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 39 of 51 Appendix A-Applicable LMP and OSS State and County Regulations WAC 246-272A-0015: (1) The local health officer for each Puget Sound county shall develop a written local management plan to provide guidance to the local health jurisdiction regarding development and management activities for all OSS within the jurisdiction. The department will review the existing OSS local management plans for all Puget Sound counties within two years of the effective date of the rule. If the department determines a plan revision is necessary upon review, the local health officer shall revise the local management plan fo r all OSS within the local health jurisdiction consistent with subsection (2) of this section. (2) At a minimum, the local management plan fo r Puget Sound counties must specify how the local health jurisdiction will: (a) Progressively develop and maintain an inventory including the type and location of all known OSS in operation within the jurisdiction; (b) Identify any areas where OSS could pose an increased public health risk. The following areas shall be given priority in this activity: (i) Shellfish protection districts or shellfish growing areas; (ii) Sole source aquife rs as designated by the EPA; (iii) Areas in which aquife rs used for potable water as designated under the Washington State Growth Management Act under chapter 36.70A RCW are critically impacted by recharge; (iv) Designated wellhead protection areas in Group A public water supplies under chapter 246-290 WAC; (v) Up-gradient areas directly influencing water recreation facilities designated for swimming in natural waters with artificial boundaries within the waters as described by the Water Recreation Facilities Act under chapter 70.90 RCW; (vi) Areas designated as special protection areas under WAC 173-200-090; (vii) Wetland areas under production of crops fo r human consumption; (viii) Frequently flooded areas including areas delineated by the Federal Emergency Management Agency or as designated under the Washington State Growth Management Act under chapter 36.70A RCW; (ix) Areas where nitrogen has been identified as a contaminant of concern including, but not limited to, the marine waters of Puget Sound; (x) Areas where phosphorous has been identified as a contaminant of concern; (xi) Areas where sea level rise may impact adequate horizontal separations to surface water; and (xii) Other areas designated by the local health officer. (c) Identify operation, maintenance, and monitoring requirements commensurate with risks posed by OSS within the geographic areas identified in (b) of this subsection; (d) Educate OSS owners about their responsibilities to perfo rm OSS operation and maintenance, including information fo r owners to complete any inspection required by WAC 246-27 2A-027 0; (e) Maintain reco rds required under this chapter, including all operation and maintenance activities as identified; (f) Enforce OSS owner permit application, operation, monitoring and maintenance and failure repair requirements in WAC 246-272 A-0200 (2), 246-272 A-0260, 246-272 A-0270, 246-272 A- 027 5, and 246-272 A-0280; 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 40 of 51 (g) Describe the capacity of the local health jurisdiction to fund the local management plan, which includes a summary of program expenditures by activity, source of funds, a strategy to fill any funding gaps, and the ability to find failing and unknown systems; and (h) Verify that the local management plan was developed in coordination with the comprehensive land use plan of the entities governing development within the local health jurisdiction. WAC 246-272A-0015 states that local health jurisdictions will: • "Enforce ass owner permit application, operation, monitoring and maintenance and failure repair requirements." WAC 246-272A-0025 Connection to public sewer system states: (1) Upon the failure of an existing ass within the service area of a sewer utility, the local health officer shall: (a) Permit the repair or replacement of the ass only if a conforming ass can be designed and installed, excluding ass designed in compliance with or proposing to use Table X in WAC 246-272A-0280; or (b) Require connection to a public sewer system if the sewer utility allows the connection and has adequate public sewer services available within 200 feet from where the existing building drain connects to the existing building sewer, or where no building drain exists, within 200 feet from where the sewer line begins, as measured along the usual or most feasible route of access. (2) The owner of a structure served by an ass permitted as a repair under Table X in WAC 246-272A- 0280 shall abandon the ass as specified in WAC 246-272A-0300, and connect the structure to a public sewer system when: (a) Connection is deemed necessary to protect public health by the local health officer; (b) An adequate public sewer becomes available within 200 feet of the existing structure, or in cases where no building drain exists, within 200 feet from where the sewer for the building begins, as measured along the usual or most economically feasible route of access; and (c) The sewer utility allows the sewer connection. (3) Local boards of health may require a new development to connect to a public sewer system to protect public health. (4) Local boards of health shall require new development or a development with a failing ass to connect to a public sewer system if it is required by the comprehensive land use plan or development regulations. WAC 246-272A-0270 Operation, monitoring, and maintenance - Owner responsibilities. (l)(k) At the time of property transfer: (i) Provide to the buyer, all available ass maintenance and repair records in addition to the completed seller disclosure statement in accordance with chapter 64.06 RCW for residential real property transfers; (ii) Beginning February 1, 2027, obtain an inspection, as required in WAC 246-272A-0260(5), by a third- party inspector authorized by the local health officer. WAC 246-272A-0340 states: Approval of installers, pumpers, and maintenance service providers. (1) ass installers, pumpers, and maintenance service providers shall obtain approval from the local health officer prior to providing services including, but not limited to, conducting inspections in accordance with WAC 246-272 A-0260 and 246-272A-0270, within a local health jurisdiction. (2) The local health officer shall establish procedures for approving ass installers, pumpers, and maintenance service providers no later than February 1, 2025. These procedures must include, but are 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 41 of 51 not limited to, conducting inspections in accordance with WAC 246-272A-0260 and 246-272A-0270. The local health officer may approve OSS installers, pumpers, and maintenance service providers through reciprocity by other Washington local health jurisdictions. RCW 70-110-040 created MRAs where additional OSS requirements may be needed to minimize OSS impacts on the receiving waters. The intent is to: • Enhance local OSS programs in MRAs by inventorying OSS, requiring the inspection of OSS, repairing failing OSS, developing electronic data systems capable of sharing information regarding OSS and monitoring these programs to ensure that they are working to protect public health and Puget Sound water quality. • The law requires the jurisdiction to establish an MRA where OSS are a significant factor contributing to concerns associated with: Shellfish growing areas that have been threatened or downgraded; Marine waters that are listed on the 303(d) list for exceeding federal Clean Water Act standards for low-dissolved oxygen or fecal coliform bacteria; or Marine waters where nitrogen has been identified as a contaminant of concern. RCW 70A-110-060 has special requirements for local health officers within county MRAs, including to: • "Require that on-site sewage disposal system maintenance specialists, septic tank pumpers, or others perfo rming on-site sewage disposal system inspections submit reports or inspection results to the local health jurisdiction regarding any failing system; and • Develop and maintain an electronic data system of all on-site sewage disposal systems within a marine recovery area to enable the local health jurisdiction to actively manage on-site sewage disposal systems. In assisting development of electronic data systems, the department shall work with local health jurisdictions with marine recovery areas and the on-site sewage disposal recovery area on-site sewage disposal electronic data system must be compatible with all on-site sewage disposal electronic data systems used throughout a local health jurisdiction." JCC Chapter 8.15 states: 8.15.055 055 Assessment Fee (3) An annual O&M fee shall support implementation of the above items and provide support and maintenance of a database system for the records of OSS permitting, installation, O&M and communication with the responsible parties. (4) To implement the requirements of the Jefferson County local management plan as adopted or amended, each ass shall be charged the annual a&M fee as adopted in the department's fee schedule. (5) The department's fee schedule shall be revised on an annual basis concurrent with budget adoption by the board of county commissioners pursuant to Chapter 3.80 JCC. (6) The annual fee shall be collected via the property owner's property tax statement to implement the requirements of this chapter. 8.15.065 -Areas where 055 may pose a significant risk to public health. The health officer may impose additional requirements to an OSS application beyond the minimum established in this chapter and chapter 246-272 A WAC, and may deny the application, in any area where an ass may pose a significant risk to human health and the environment. The health officer shall make the fo llowing findings in their decision: (1) The decision is made as a matter of professional judgment to protect human health and safety, and the environment; 2027 ass LMP Update BOH DRAFT 08/06/2026 Page 42 of 51 (2) The requirements and restrictions contained within the decision are prudent and necessary to prevent or reduce the possibility of failure of an OSS, or to minimize any negative impacts of an OSS upon public health and environmentally sensitive areas; and (3) The determination is based on a review of available science by the department and other agencies with expertise in making their determination. 8.15.090 Design Requirements for all 055 , (7) JCC 18.30.180 establishes best management practices for OSS that are located in special aquifer recharge protection areas that are also located in susceptible aquifer recharge areas as designated by JCC 18.22 .310 . JCC 18.30.180 is no longer consistent with the minimum land area requirements of WAC 246- 272 -0320. Therefore, the fo llowing design standards consistent with Chapter 246-272 A WAC shall preempt the best management practices of JCC 18.30.180 as to mitigating nitrogen and bacteria loading: (a) lfthe property is one acre or larger, the OSS shall not exceed the nitrogen loading limits ofT able XII in WAC 246-272 A-0320. (b) If the property meets the minimum land area of Table XI in WAC 246-272 A-0320: (i) The OSS shall not exceed the nitrogen limits established in Table XII in WAC 246-272 A-0320; (ii) lfthe OSS is located in Type 1 or 2 soils, the OSS shall be designed to treat nitrogen to less than or equal to 30 mg/L prior to final disposal; or (iii) If the OSS is located in Type 3, 4, 5, or 6 soils, the OSS shall be designed with a shallow pressure distribution disposal component, or designed to treat nitrogen to less than or equal to 30 mg/L prior to final disposal if shallow pressure distribution is not feasible. (c) If the property does not meet the minimum land area of Table XI in WAC 246-272 A-0320; (i) The OSS shall not exceed the nitrogen limits established in Table XII in WAC 246-272 A-0320; and (ii) The OSS shall be designed to treat nitrogen to less than or equal to 30 mg/L prior to final disposal. 8.15.120 Sewage Pumper (10 ) The department reserves the right to observe and audit the activities of certificate holders. 8.15.130 O&M Specialist and O&M Technician (8) The department reserves the right to observe and audit activities of certificate holders. 8.15.140 055 Installer (12) The department reserves the right to observe, audit, or inspect the OSS and related activities of OSS installer certificate holders. 8.15.145 Homeowner Inspection Authoriza tion (8) The department reserves the right to observe, audit, or inspect the OSS and related activities of homeowner inspectors authorized to co mplete inspections under this section. 8.15.147 Certificate or Authoriza tion Holders Subject to Suspension or Revoca tion (1) All certificate or authorization holders are subject to established department audit requirements. JC C C h a p te r 13 .0 4 C o n n e c tio n to P H U G A S e w e r S y ste m state s: JCC 13.04.010 Connection - when required or permitted. (1) Under JC C 18.18.060(4) this code describes when sewers will be considered to be "available" fo r the purposes of turning off the transitional rural zoning in Chapter 18.19 JCC for the PHUGA. When sewers are "available," urban growth area standards in Chapter 18.18 JC C apply. JCC 13 .02.01 0 defines "available" and "availability." (2) This section describes areas within the Port Hadlock UGA where the PHUGA sewer system is "available," as described in JC C 13 .02.010 , where individual properties within those areas are required or permitted to connect to the PHUGA sewer system. All individual properties where the PHUGA sewer system is available are permitted to connect to the PHU GA sewer system, provided they pay the required fees. 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 43 of 51 (3) Table 4-1 determines when properties within the PHUGA are required to connect to PHU GA the sewer system. (5) When connecting a new detached ADU to the PHUGA sewer system, all other structures with plumbing on the same property are required to connect to the PHUGA sewer system at the same time. [Ord. 6-25 § 3 (Appx. A); Ord. 9-24 § 3 (App. A (Exh. S)); Ord. 7-24 § 3 (Appx. A)] JCC Chapter 15.15.080 Standards for Flood Hazard Reduction (1) General Standards. In all areas of special flood hazards, the following standards are required: (d) Utilities. (i) All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems; (ii) Water wells shall be located on high ground that is not in the floodway; (iii) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration offloodwaters into the systems and discharges from the systems into floodwaters; and (iv) On-site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding. (e) Subdivision proposals and other development involving: creation of 50 or more lots, or development of an area five or more acres in size, whichever is less. Any proposal under this section shall: (i) Be consistent with the need to minimize flood damage; (ii) Have public utilities and facilities, such as sewer, gas, electrical, and water systems, located and constructed to minimize or eliminate flood damage; (iii) Have adequate drainage provided to reduce exposure to flood damage; and (iv) Generate base flood elevation data if it has not been provided or is not available from another authoritative source. (f) Review of Building Permits. Where elevation data is not available either through the flood insurance study, FIRM, or from another authoritative source (JCC 15.15.050(2)(b)), applications for development in special flood hazard areas shall be reviewed to assure that proposed construction will be reasonably safe from flooding. The test of reasonableness is a local judgment and includes use of historical data, high water marks, photographs of past flooding, etc., where available. Failure to elevate at least two feet above the highest adjacent grade in these zones may result in higher insurance rates. JCC Chapter 18.18 Unified Development Code states: JCC 18.18.060 - Development requirements and performance standards (4) Sanitary Sewer Service. (a) Sewer Service Area. The sewer service area is the same as the 20-year planning boundary of the Irondale and Port Hadlock urban growth area. No development approval shall be given, and no building permit issued, unless the proposed development complies with the provisions of this chapter. For development under this chapter, as a condition of any new development approval or major modification to an existing commercial, industrial, or residential use located within a sanitary sewer service area, as identified in the adopted general sewer plan for the Irondale and Port Hadlock urban growth area, as amended, the property owner must obtain confirmation of sewer availability from the PHUGA sewer system operator prior to development approval. Sewers shall be considered to be available for the purposes of turning off the transitional rural zoning in Chapter 18.19 JCC for the Irondale and Port Hadlock urban growth area as described in JCC Title 13. (b) Areas With Sewer Not Yet Available - Interim On-Site Septic Systems. If the proposed use or major modification is located within the Irondale and Port Hadlock urban growth area but outside of areas where sewer is available, then transitional rural development standards in Chapter 18.19 JCC apply. 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 44 of 51 JCC 18.18.120 - Site plan approval required in the Irondale and Port Hadlock UGA In the Irondale and Port Hadlock UGA prior to the provision of public sewer or public water to a site, any approval fo r a commercial, industrial, mixed use, multifamily, high density residential, or single-family residential subdivision in the ULDR zone is required to include a site plan which: (1) Com plies with the applicable health regulations and other Jefferson County development and building regulations (e.g., critical areas, stormwater management, etc.); (2) Provides fo r sanitary sewer connection and other utilities. The site plan prepared under this section and reviewed and approved by the administrator shall address the fo llowing: buffers, landscaping, traffic accessa nd parking standards, current septic and future sanitary sewer provisions, height and scale in relation to surrounding uses and future uses, vegetation removal, stormwater, potable water, and lot coverage. Development of the site shall be consistent with the approved site plan. Minor modification to the site plan may be allowed by the administrator; provided, that all other regulations and conditions placed on the approval are met. [Ord. 9-24 § 3 (App. A (Exh. 4)); Ord. 9-09 § 2 (Exh. B); Ord. 3-09 § 5 (Exh. G)] JCC 18.25.380 - Flood control structures (1) Policies. (a) The county should prevent the need fo r flood control works by limiting new development in flood- prone areas. (b) New or expanded development or uses in the shoreline, including subdivision of land, that would likely require flood control structures within a stream, channel migration zo ne, or floodway should be prohibited. (c) Construction of new flood control structures should only be allowed where there is a documented need to protect an existing structure and mitigation is applied, consistent with this program. New development should be designed and located to preclude the need fo r such flood control structures. (d) W hen evaluating the need for flood control structures such as traditional levees and/or dams, opportunities to remove or relocate existing developments and structures out of flood-prone areas should be pursued to the maximum extent feasible. Alternative measures, such as overflow corridors and setback levees, that may have less adverse im pact on shoreline ecology should be considered befo re structural flood control measures can be approved. (e) Probable effects on ecological functions and processes should be fu lly evaluated fo r consistency with this program befo re flood control structures are permitted. (f) Flood control structures are a necessary and appropriate means of protecting existing development only when all of the fo llowing are met: (i) The primary use being protected is consistent with this program; and (ii) Nonstructural flood hazard reduction measures are infe asible; and (iii) W here such structures can be developed in a manner that is compatible with multiple use of streams; and (iv) Where shoreline resources such as fish and wildlife habitat and recreation are protected in the long term. (g) W hen proven necessary, flood control structures should be located, designed, and maintained in a manner that: (i) Minimizes adverse effects on shoreline ecology; and (ii) Is compatible with navigation and recreation, especially in shorelines of statewide significance; provided, that public safety and eco logical protection are fully addressed; and 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 45 of 51 (iii) Incorporates native vegetation to enhance ecological functions, creates a more natural appearance, improves ecological processes, and provides more flexibility for long-term shoreline management. (iv) Nonregulatory methods to protect, enhance, and restore shoreline ecological functions and processes and other shoreline resources should be encouraged as an alternative to flood control structures. Nonregulatory methods may include public facility and resource planning, land or easement acquisition, education, voluntary protection and enhancement projects, or incentive programs. (h) The county should continue to develop long-term, comprehensive flood hazard management plans in cooperation with other applicable agencies and persons to prevent flood damage, maintain the natural hydraulic capacity of streams and floodplains, and conserve or restore valuable, limited resources such as fish, water, soil, and recreation and scenic areas. (i) Planning and design of flood control structures should be consistent with and incorporate elements from adopted watershed management plans, restoration plans and/or surface water management plans. (2) Shoreline Environment Regulations. (a) Priority Aquatic. Flood control structures may be permitted subject to the policies and regulations of this program and a conditional use permit if allowed in the adjacent upland environment. (b) Aquatic. Flood control structures may be permitted subject to the policies and regulations of this program and a conditional use permit if allowed in the adjacent upland environment. (c) Natural. Flood control structures are prohibited. (d) Conservancy. Flood control structures may be permitted subject to the policies and regulations of this program and a co nditional use permit. (e) Shoreline Residential. Flood control structures may be allowed subject to the policies and regulations ofthis program and 1a conditional use permit. (f) High Intensity. Flood control structures may be permitted subject to the policies and regulations of this program and a conditional use permit. (3) Regulations. (a) Flood control structures shall be permitted only when there is credible engineering and scientific evidence that: (i) They are necessary to protect existing, lawfully established development; and (ii) They are consistent with Chapters 15.15 and 18.30 JC C and the county Comprehensive Plan; and (iii) Nonstructural flood hazard reduction measures are infeasible; and (iv) Proposed measures are consistent with an adopted comprehensive flood hazard management plan if available. (b) When permitted, flood control structures shall be: (i) Constructed and maintained in a manner that does not degrade the quality of affected waters or the habitat value associated with the in-stream and riparian area; and (ii) Placed landward of the OHW M except fo r weirs, current deflectors and similar structures whose primary purpose is to protect public bridges and roads; and (iii) Placed landward of associated wetlands and designated habitat conservation areas, except fo r structures whose primary purpose is to improve ecological functions; and (iv) Designed based on engineering and scientific analyses that provide the highest degree of protection to shoreline ecological functions or processes; and (v) Designed to allow for normal ground water movement and surface runoff. Natural in-stream features such as snags, uprooted trees, or stumps should be left in place unless they are actually causing bank erosion or higher flood stages; and 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 46 of 51 (vi) Designed to allow streams to maintain point bars and associated aquatic habitat through normal accretion so that the stream can maintain normal meander progression and maintain most of its natural storage capacity. (c) When permitted, dikes and levees shall be limited to that height required to protect adjacent lands from the predictable annual flood unless it can be demonstrated through hydraulic modeling that a greater height is needed and will not adversely impact shoreline ecological functions and processes. (d) Flood control works are prohibited on estuary or embayment shores, on point and channel bars, and in salmon and trout spawning areas, except for the purpose of fish or wildlife habitat enhancement or restoration. (e) Flood control structures and stream channelization projects that damage fish and wildlife resources, recreation or aesthetic resources, or create high flood stages and velocities shall be prohibited. (f) Use of solid waste such as motor vehicles, derelict vessels, appliances, or demolition debris; construction of flood control works is prohibited. (g) Flood control structures shall not adversely affect valuable recreation resources and aesthetic values such as point and channel bars, islands, and braided banks. (h) The county shall require flood control structures to be professionally engineered and designed prior to final approval. The design shall be consistent with the Department of Fish and Wildlife Aquatic Habitat Guidelines and other applicable guidance and regulatory requirements. (i) No flood control structure shall be installed or constructed without the developer having obtained all applicable federal, state, and local permits and approvals, including but not limited to a Hydraulic Project Approval (HPA) from the Department of Fish and Wildlife. (j) Removal of beaver dams to control or limit flooding shall be allowed; provided, that the project proponent coordinates with the Department of Fish and Wildlife and obtains all necessary permits and approvals from the state. (k) To determine that the provisions of this section are fully addressed, the county may require one or more technical studies/reports at the time of permit application for flood control structures unless the county determines that issues are adequately addressed via another regulatory review process. Technical reports required pursuant to this section shall address the following: (i) An analysis of the flood frequency, duration and severity and expected health and safety risks as a rationale and justification for the proposed structure. (ii) A hydraulic analysis prepared by a licensed professional engineer that describes anticipated effects of the project on stream hydraulics, including potential increases in base flood elevation, changes in stream velocity, and the potential for redirection of the normal flow of the affected stream. (iii) A biological resource inventory and analysis prepared by a qualified professional biologist that describes the anticipated effects ofthe project on fish and wildlife resources. (iv) Proposed provisions for accommodating public access to and along the affected shoreline, as well as any proposed on-site recreational features. (v) A description of any proposed plans to remove vegetation and revegetate the site following construction. (I) To ensure compliance with the no net loss provisions of this program, the county may require the proponent to prepare a mitigation plan that describes measures for protecting shoreline and in-stream resources during construction and operation of a flood control structure. The required mitigation shall be commensurate with the value and type of resource or system lost. Mitigation activities shall be monitored by the proponent to determine the effectiveness of the mitigation plan. In instances where the existing mitigation measures are found to be ineffective, the proponent shall take corrective action that satisfies the objectives of the mitigation plan. [Ord. 7-13 Exh. A (Art. VII§ S)] 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 47 of 51 House Bill 1181- Engrossed Second Substitute Sec. 1. (14) Climate change and resiliency. Ensure that comprehensive plans, development regulations, and regional policies, plans, and strategies under RCW 36.70A.210 and chapter 47.80 RCW adapt to and mitigate the effects of a changing climate; support reductions in greenhouse gas emissions and per capita vehicle miles traveled; prepare for climate impact scenarios; foster resiliency to climate impacts and natural hazards; protect and enhance environmental, economic, and human health and safety; and advance environmental justice. (15) Shorelines of the state. For shorelines of the state, the goals and policies of the shoreline management act as set forth in RCW 90.58.020 shall be considered an element of the county's or city's comprehensive plan. 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 48 of 51 Appendix B - Work Item Authorizations 8.15.147 - Table 1 Certificate or Authorized Person W ork Item Pumper O&M Technician O&M Specialist Installer Resident owner M e asu rin g le ve ls of yes yes yes yes yes slu d g e, scu m an d liq u id in ass co m p o ne nts C lea n scree ns yes yes yes yes yes V isua l evaluatio n of ass yes yes yes yes yes co m p o n e nts In sp ect an d re p o rt th e yes yes yes yes yes1 co nd itio n of ass co m p o n e nts, m o n ito rin g po rts an d the su rfa ce ab o ve th e drain fi e ld /d isp o sa l area R eco rd info rm atio n su ch yes yes yes yes yes1 as: cycl e /do se co u nter, o p e ratin g ho u r m e te rs, o r w ater m eters. Exp o se po rtio n s of ass fo r no yes yes yes yes up d ated site plan H yd ro je tt ing yes yes yes yes no Excav ate fo r jettin g yes yes yes yes yes P u m p any tan k/ pump yes no no no no chamber Repair or replace UV light no no yes yes no un its R ep a ir o r rep lace no no yes2 yes2 no co m p o n e nts of a pro p rie tary treatm e nt un it D eco m m issio n in g no no no yes no R e p air or rep lace tig htlin e no yes yes yes yes or cl e an o uts R e p air o r rep lace access no yes yes yes yes3 or in sp e ctio n po rts 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 49 of S1 Excavate to install sweeps no no yes yes no or end caps Install and repair septic yes yes yes yes yes tank lids, risers and baffles Install and repair yes yes yes yes yes distribution box risers Install or adjust flow no yes yes yes no distribution devices in a distribution box Replacing/ Repairing no yes yes yes no existing D-Box/splitter device Replace or repair no no yes yes no manifo lds with same configuration Replace or repair no no yes5 yes5 no manifolds with different configuration Adjust flow in a manifold no no yes yes no Replace pumps with same no yes yes yes no specifications as existing pump Replace floats no yes yes yes no Test high-level alarm no6 yes yes yes yes1 Replace electrical panels no no no no4 no Alter cycle/dose counters no no yes5 yes no or operating hour meters Collect samples for waste- no6 no6 yes no6 no strength sampling 1 If authorized homeowner inspector. 2 If authorized by proprietary product manufacturer, 3 Resident owners may not perform work non-proprietary product portions of the ass. 4 Unless approved by Washington State Labor and Industries requirements. 5 Requires the department's approval prior to altering. 6Unless otherwise approved by the department. 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 50 of 51 Appendix C 8.15.150 -Table 2: Frequency of O&M Inspection Requirements Conventional w/Pump, Pressure Aerobic Treatment Conventional Gravity - No Pump Distribution, Mound, Sandfilter, Other Unit(ATU), Public Domain Technology Proprietary Device Time Frequency of Frequency of Inspection - Every 3 Years Frequency of Inspection - Every Year Inspection - Every Year 05S1 Not Within Risk 05S1 Is Within Risk 0S51 Not Within 0S51 Is Within Risk Category2 Category2 Risk Category2 Category2 All Sites Year 1 N/A N/A HO or OM or DES OM or DES 3OM or DES Year 2 N/A N/A HO or OM or DES HO or OM or DES 3OM or DES Year 3 HO or OM or DES HO or OM or DES HO or OM or DES HO or OM or DES 3OM or DES Year 4 N/A N/A HO or OM or DES OM or DES 3OM or DES Year 5 N/A N/A HO or OM or DES HO or OM or DES 3OM or DES Year 6 HO or OM or DES OM or DES OM or DES HO or OM or DES 3OM or DES Year 7 N/A N/A HO or OM or DES OM or DES 3OM or DES Year 8 N/A N/A HO or OM or DES HO or OM or DES 3OM or DES Year 9 OM or DES HO or OM or DES HO or OM or DES HO or OM or DES 3OM or DES Yearl0 N/A N/A HO or OM or DES OM or DES 3OM or DES Year 11 N/A N/A HO or OM or DES HO or OM or DES 3OM or DES Year 12 HO or OM or DES OM or DES OM or DES HO or OM or DES 3OM or DES Above schedule repeats for the life of the OSS HO= Homeowner with inspection authorization OM = O&M specialist or O&M technician DES = 055 designer 1 OSS - includes all components of an 055 including tanks, transport lines, treatment and disposal components. 2 Risk categories include any one of the following elements: • Setbacks - O5S with components not meeting the current required setbacks to a well or surface water. • Shorelines - 055 with components within 200 feet of ordinary high water. • Floodplain - sites with 055 components mapped by FEMA as being within a 100-year floodplain. • Waiver - OSS with components not meeting the current required setbacks to a well or surface water. • 055 replacement or repairs not meeting current code at the time of permitting. 3 OM or DES= Professionals inspecting proprietary devices shall have authorization by the manufacturer to monitor and maintain these treatment units. 2027 OSS LMP Update BOH DRAFT 08/06/2026 Page 51 of 51 Jefferson County On-Site Sewage System Management Plan Table of Contents Executive Summary Introduction History of On-Site Sewage Management in Jefferson County Legal Authority Part 1: Database Enhancement 1.1 Introduction 1.2 Activities 1.2.1 Current OSS Database 1.2.2 Adding & Updating Records in the OSS Database and Identifying Unknown OSS 1.2.3 Jefferson County's Current O&M Requirements ,.,. 1.2.4 The Current Database System for Maintaining O&M records 1.2.5 Ways in which OSS and O&M are Currently Used within Jefferson County 1.2.6 Additional or Planned Changes (If Made to the Data Systems) 1.3 Resources Necessary to Implement Data Components of Plan 1.3.1 Enhancements to Hardware and Software 1.3.2 Data Personnel 1.4 Timeline 1.5 Summary of Database Activities Part 2: Identification of Sensitive Areas 2.1 Introduction 2.2 Activities 2.2.1 Description of Jefferson County Environment 2.2.2 Current & Past Water Quality Activities 2.2.3 Designating Sensitive Areas 2.2.4 Coordination with Planning Entities within Jefferson County 2.3 State Environmental Policy Act Review 2.4 Resources 2.5 Timeline 2.6 Summary and Prioritization of Activities Part 3: Operation, Monitoring, and Maintenance in Sensitive Areas 3.1 Introduction 3.2 Activities 3.2.1 Current Operations, Monitoring, and Maintenance (O&M) Requirements Common to All Areas in Jefferson County Onsite Sewage Management Plan 8/20/2007 page 1 of 46 3 .2 .2 S e ns itiv e A re a O &M R e q u ire m e n ts 3 .2 .3 E n fo rc e m e nt A c tiv itie s 3.3 Changes and Improvements 3.4 Resources 3.5 Timeline 3.6 Summary Part 4: Marine Recovery Strategy (MRAs) 4.1 Introduction 4.1.1 Definition of MRAs 4.2.1 Legal authority for MRAs 4.2 Activities 4.3 Marine Recovery Area On-Site Strategy (3SHB 1458, Section 5) 4.3.1 Identification of MRA 4.3.2 Evaluation of OSS to Ensure Proper Function 4.3.3 Determination and Repair of Failing Systems 4.3.4 Additional Requirements within MRAs 4.3.5 Identifying Unknown OSS in MRAs and Ensuring Proper Function 4.4 Electronic Data System of OSS within a MRA (3SHB 1458, Section 6) 4.4.1 Reporting Failing Systems in Jefferson County 4.4.2 Ensuring Electronic OSS Data Systems for Each MRA are Compatible within Jefferson County (addressed in Part One) 4.5 DOH Contracts with Jefferson County for Marine Recovery Area 4.5.1 Description of Jefferson County's current capacity and estimated need (personnel, financial assistance, hardware and software, etc.) to meet certain goals 4.6 Resources 4.7 Timeline Part 5: Education, 5.1 Background 5.2 Activities 5.2.1 Current Education 5.2.1.1 Public classes & events 5.2.1.2 Educational Forms & Handouts 5.2.1.3 Links to external resources 5.3 Planned Education 5.4 Current Reminders 5.4.1 Initial Installation Introduction 5.4.2 Periodic Notification 5.5 Planned Reminders 5.6 Measured Effectiveness 5. 7 Resources 5.8 Timeline 5.9 Summary and Prioritization of Activities Onsite Sewage Management Plan 8/20/2007 page 2 of 46 ~p ~e n d ic e s A p p e n d ix A : D a ta b a s e & R e la te d O &M D o c u m e n ts A.1 Map using data from Accela database through Crystal Reports to GIS through Excel spreadsheet- Assigned Work Areas A.2 Map of section of eastern Jefferson County with parcel identification numbers A.3 List of septic system types from Accela database A.4 Webpage with data from Accela database A.5 Examples of Crystal Reports from Accela A.6 Map of portion of eastern Jefferson County of sites with toilets per Assessors database A. 7 List of Parcel tags and Report of a Parcel "tag" A.8 Table 1 - Monitoring frequency requirements per JC 8.15 A.9 Crystal Report on monitoring inspection results A.10 Map of City of Port Townsend Service Area A.11 Map of DOE 303(d) listed sites A.12 Flood Damage Prevention Ordinance Onsite Sewage System requirements A.13 PUD Monitoring Contract example A.14 Current Monitoring Agreement (as of June 2007) A.15 JC Policy 04-01 Evaluation of Existing Systems for Building Permit Application A.16 Septic Pumpers Report A.17 Pollution Identification and Correction Protocol (PIC) Appendix B: General Maps B.1 Jefferson County Jurisdictional Boundaries B.2 Jefferson County WRIAs and water bodies B.3 Population Density B.4 Jefferson County Critical Areas: a) Critical Aquifer Recharge Areas b) Flood zones ESA checklist Appendix C: Education Materials C.1 Assessment tool for education efforts - questionnaire and results References List of Contacts Data Sources Onsite Sewage Management Plan 8/20/2007 page 3 of 46 1E x e c u tiv e S u m m a r}'i As required by Chapter 246-272A WAC, Jefferson County Public Health has completed a Sewage Management Plan (SMP) that describes the on-site sewage program as it now stands in Jefferson County, and what improvements will occur over the next 5 years. Additionally, this SMP describes the obstacles and issues facing Jefferson County as it moves forward to implement the Marine Recovery Areas, as designated herein, in Hood Canal. Jefferson County is embarking on a journey through this SMP that will eventually lead to a stronger and more effective Environmental Health Department, improved water quality throughout Jefferson County, more education opportunities for residents and homeowners about their on-site sewage system (OSS), and improved operation and maintenance for all existing and future OSS. At this time, Jefferson County Public Health has inserted language from this SMP into the soon-to-be-approved Jefferson County On-Site Sewage Code. Additionally, Jefferson County Public Health will submit this SMP to the Jefferson County Board of Health during their July meeting for review. From there, Jefferson County Public Health will hold a public meeting regarding this plan. By August this SMP will be adopted by the Jefferson County Board of Health, and implemented thereafter. Introduction History of On-Site Sewage Management in Jefferson County Permitting began in 1970 Permitting Database began in 1990 Total Number of sites served - approximately 13,500 Total number of sites with septic record - 12,564 # of years of monitoring program - 20 years # of years with pump reports - 7 years Acres of approved shellfish beds - 17,932 Acres of conditionally approved shellfish beds - 78 Acres of prohibited shellfish beds - 1,739 ( closed due to proximity to sewer outfalls and marinas) Acres of restricted shellfish beds - 50 acres out of 8,500 in Discovery Bay, 200 acres elsewhere. Sites on 303(d) list for fecal coliform - Chimacum Creek for the main stem and the mouth, Mats Mats Bay north end. Onsite Sewage Management Plan 8/20/2007 page 4 of 46 Legal Authority In July 2005, the State Board of Health adopted new on-site sewage system (OSS) rules. These required Jefferson County to write a plan for the development and management of all OSS within its jurisdiction. Then, inMarch 2006, the Legislature added a new section to Title 70 RCW relating to the management of OSS in marine areas (Third Substitute House Bill 1458). The intent of the rule and legislation is to provide greater assurance that existing OSS are not causing public health problems, either through inadequate operation and maintenance or outright failure. By writing the Plan, Jefferson County is developing and enhancing processes to: inventory all OSS, identify sensitive areas throughout Jefferson County, including Marine Recovery Areas, establish Operation, Monitoring and Maintenance (O&M) needs in the designated sensitive areas, inform homeowners of needed maintenance and develop procedures for identifying and repairing failing systems. Jefferson County is required to develop and submit this plan to Washington State Department of Health (DOH) by July 1, 2007. Part 1: Database Enhancement 1.1 Introduction Jefferson County utilizes several databases to record and track information on properties/parcels within its jurisdiction. WAC 246-272A-0015 ( 1) contains elements that must be addressed in this plan. This part of the plan details how Jefferson County will meet the following elements: (a) Progressively develop and maintain an inventory of all known OSS in operation within the jurisdiction; (f) Maintain records required under chapter 246-272A WAC including all operation and maintenance activities as identified. 1.2 Activities 1.2.1 Current 055 Database Description The existing database Jefferson County uses for both permitting and monitoring information is Accelas' Tidemark/Advantage, previously known as "Permit Plan". • JC implemented the use of this database in 1990 with a basic program that was customized to meet local needs/requirements. Onsite Sewage Management Plan 8/20/2007 page 5 of 46 • The System is used fo r all perm itting and com plaint cases incl uding building, shoreline, road access/use, subdivision, septic. There are currently 16 case types in the system . • Customization - The system allows substantial customization for existing case types, adding case types, modifying or adding to screen elements, adding supporting data tables. • Capacity -The system has unlimited capacity for additional case types, cases and users. Case types can be designed and added by local staff to meet specific needs such as stormwater, utility, violations. Additional elements can be purchased from the vendor such as web access and wireless. Importing and Exporting Data • Import - Data tables can be populated from other county databases to assure consistency and that the most current data is available to staff and the public. An example of this is the importation from the Assessors AS400 database- the parcel table of Tidemark is updated daily with current owner name and address and legal description as well as land use codes, school district and adding newly created parcels. • Export - Tables can also be exported to other programs/formats. For example a report can be created using Crystal Reports (the Accela reporting tool) which can then be saved in an excel spreadsheet that can be used to create a map. See Appendix A.1 for example. Data Storage & Back-up • All data are stored on an SQL server. • Backup of data occurs daily with 2 weeks of backup retained at all times. • Security • System security is accomplished through the use of passwords. • Security is also controlled by allowing access to only certain parts of the database by different types of users. There is read only as well as a variety of levels that limit access to editing or adding of activities, data entry, etc. Maintenance • The parcel table is updated daily via the AS400 • Correction or updating of parcel numbers occurs as staff is notified by the Assessors Office that changes have occurred. This system is imperfect and dependent on staff availability and knowledge to accurately correct all cases associated with the previous parcel numbers. • Correction of data is done as staff identifies it. The daily update of the parcel table only impacts new cases entered. The existing cases are "historic" and can only be corrected manually. If an error was identified that impacted a group of cases that have some common characteristic or field such as everything that was in planning area 7 that needed a specific Onsite Sewage Management Plan 8/20/2007 page 6 of 46 c o r r e c t io n t h a t c a n be do n e th ro u g h a s p e c ia l sc rip t by th e sy ste m ad m in is tra to r o n ly . T h is pro te c ts th e in te g rity of c a s e da ta . • A us e rs g ro u p th a t in cl u d e s m e m b e rs fr o m a ll de p a rtm e n ts tha t us e the sy s te m is c o n v e n e d re g u la rly -m o n th ly to qu a rt e rly a s ne e d s cha n g e . • T h e da ta b a se a d m in is tra to r att e n d s m o st us e r gro u p m e e tin g s a n d gu id e s po ss ib le c ha ng e s to the sy s te m . T h is pro v id e s c o n s is te n c y a c ro ss d iff e r e n t c a se ty p e s fo r a c tiv itie s/a c tio n s bu t a llo w s fo r c a s e in d iv id u a liz a tio n a s ne e d s a ris e . N u m b e r o f R e c o rde d O S S a n d T o ta l O S S • A c c o rd in g to th e A sse ss o r's A S 4 0 0 da ta b a s e the re a re 18 ,5 8 8 im p ro v e d pa rce ls in Je ff e rs o n C o u n ty . S o m e of th e s e co nta in stru c tu re s tha t do no t p ro d u c e w a s t e w a t e r a n d s o m e c o n ta in m o re tha n o n e struc tu re pro d u c in g w a s t e w a t e r . F u rt h e r a n a ly s is m a y b e w a r r a n t e d . A p p r o x im a t e ly 3 ,8 8 0 o f t h e s e p a r c e ls a r e s e r v e d b y t h e P o rt T o w n s e n d s e w e r s y s t e m a n d 1 ,1 6 0 a r e s e r v e d b y t h e P o rt L u d lo w s e w e r s y s t e m . T h e r e fo r e , a s s u m in g t h e r e m a in in g p a r c e ls a r e s e r v e d b y a n o n s it e s e w a g e s y s t e m , the re a re a p p ro x im a te ly 13 ,5 0 0 O S S in J e ff e rs o n C o u n ty . • A s o f J u n e 2 0 0 7 ·th e re a re 11 ,3 6 4 s e ptic re c o rds in th e A cce la da ta b a s e a n d a p p r o x im a t e ly 1 ,2 0 0 pa p e r re c o rd s to be e nte re d . • T h e D a ta b a s e co n ta in s re c o rds fo r s e v e ra l c a te g o rie s o f sy s te m s : • "K no w n S y s te m s " fo r w h ic h pe rm its w e re is s u e d be tw e e n 19 7 0 a n d 2 0 0 6 . T he s e c o u ld be ne w , re p a irs/up g ra d e s , o r e x p a n s io n s . • "U n k no w n S y s te m s fa ll in to tw o c a te g o rie s 1: ✓ Sites for which only a sanitary survey was conducted, no other permit record exists. These consist of visual observations and reflect what the resident described to the inspector. ✓ Sites where systems were installed before 1970, prior to permit requirements, for which an evaluation of the existing septic system (EES) were completed. These vary in the level of detail of evaluation. Some identify detailed system component locations and some include only inspection of the tank and a visual inspection of the probable drainfield location. • A status is assigned for each case and can be reported ✓ A=approved to install, ✓ F=finaled/complete, ✓ C=Cancelled, ✓ N=Not finaled (either installed before permit requirements and only an EES has been done, a monitoring inspection was completed, or the system was permitted but no record of completion is on record), Onsite Sewage Management Plan 8/20/2007 page 7 of 46 ✓ V=violation (system has major noncompliance issues and the owner has been notified in writing), ✓ !=incomplete (some portion of the system is not yet installed or a condition of the permit has not been met. • Based on the above information there may be up to 1,000 parcels that have septic systems for which we have no knowledge at all. These could be categorized as "assumed", an OSS that has no records but through GIS analysis and OSS can be assumed to exist on a parcel. Reporting the Location of OSS Each system is tied to a parcel#, a tax id#, and is linked to the GIS parcel layer, See Appendix A.2 for sample. • The system does not pinpoint the location of the OSS within a parcel. "Asbuilt" or record drawings are used along with physical observations during inspections to verify system location on a parcel. • Some inaccuracies occur when a parcel number is changed due to subdivision or alteration of lot configuration. See maintenance section above. Calculating OSS Age The case number reflects the year the system was permitted, i.e. SEP75-00001 was the 1st case entered/permitted in 1975. • The date the system was finaled/completed is recorded to the case and can be reported. This may not reflect the date the system was put into use as there may not have been a building connected to a completed system. • Historic data - Individual Cases retain all historic data from the time the case was added to the database. Data can be changed or added to an individual case but is not modified when updates of owner or other elements are updated to the parcel data table creating a stable/historic record. • A Septic case consists of an individual onsite sewage systems that most commonly includes the tank/s, treatment unit (if required) and disposal component. An OSS that serves a separate residence will have a separate case unless it shares all system components including the tank/s. • If a component is added, a treatment unit or if a new drainfield or tank is required, a new case number is assigned and all old case info is physically filed to the new case and cross referenced in the electronic case record as well as the paper file. • All information regarding an individual system is contained in the SEP case including monitoring data. Onsite Sewage Management Plan 8/20/2007 page 8 of 46 C apacity to R epo rt O S S T ype • T he type of a s s is recorded fo r each case that is perm itted. U n p e r m itt e d /u nknow n system s are assum ed to be conventio nal gravity f e d a n d re c o r d e d a s s u c h . • A d d iti o n a l fi e ld s a r e u s e d to f u rt h e r cl a s s if y th e a s s type . T hese ide ntify if th e O S S is re s id e n t ia l o r c o m m e r c ia l, in d iv id u a l o r c o m m u n ity , a lt e rn a t iv e o r c o n v e n t io n a l. • S e p t ic s y s t e m s ty p e s a r e cl a s s ifi e d in th e d a t a b a s e , s u c h a s "c o n v e n t io n a l tr e n c h " o r "s a n d fi lt e r/p r e s s u r e tr e n c h /g r a v e ll e s s c h a m b er" ,see Appendix A.3 for full list. Data Fields Used In Permitting and the a&M Database Systems for which a permit was issued contain the following information at a minimum: ✓ Primary parcel number ✓ Size of lot ✓ # of gallons designed/approved or number of bedrooms ✓ Type of system- conventional trench, mound, tank only, there are 84 combinations. ✓ The length, width, depth of disposal component ✓ Soil type and application rate of sewage to the soils ✓ Water supply serving structure/site ✓ Size of septic tank or trash tank if present ✓ Previous evaluations-septic permits, wet season evaluation, subdivision review ✓ Waiver/variance applied for and whether state or local Many data points from the onsite sewage cases are available for viewing on the Jefferson County website. See Appendix A.4 for example. Reporting and Evaluating the Data • Crystal Reports provides a high degree of flexibility in reporting database information. Reports can be generated by defining parameters by land area (lot size), system type, soil type, land use zoning, staff, etc. Examples are provided in Appendix A.5 • GIS layers can be created by exporting data from the permitting data base and intersecting them with data from other sources. For example a map was created that showed all the parcels that the AS400 lists as having toilet facilities with the parcels that we have some record of an onsite sewage system. This may allow us to see how many and where parcels were located for which we have no records. See Appendix A.6. Further assessment of this particular Assessor field revealed that it is not consistently filled out so will not provide an accurate representation of unknown systems but the concept of using other databases info to inform our evaluation of areas is useful. Onsite Sewage Management Plan 8/20/2007 page 9 of 46 1.2 .2 A d d in g a n d U p d a tin g R e c o rd s in th e 0 5 S D a ta b a s e & Id e n ti fy in g U n k n o w n 0 5 S Methodology of Adding Records All ass records and permit data generated since 1991 have been entered into the database as part of the permitting process. Paper records exist for cases back to 1969. Additionally the following methods are used to create a case and add data on other existing systems: • Cases are added as previously unknown systems are evaluated and assigned a number - SEPyr-00000. Jefferson County Code 8.15 and Policy 04-01 dictate when systems will be evaluated. This process brings those unknown systems into the records and the monitoring program for future periodic monitoring. • Cases for which some paper record exists are actively added when the connection can be verified and tied with a high degree of certainty to a parcel. Through a grant from the Washington State Department of Ecology a substantial effort was made in 19--- Many records were entered including several large subdivisions along the waterfront. An emphasis was placed during this time on entering the records along the shoreline. Approximately 1,200 paper records have yet to be entered. Some of these will be very difficult because there are no identifying elements; no addresses, no property dimensions or plot plan and no detailed location information. These will be retained in the existing filing system, "section, township, and range" category, until some future assessment provides a high degree of certainty and allows them to be attached to a parcel. Updating Existing Records • Cases for systems that connect to sewer are cancelled. • Monitoring report data is entered into the case file for an ass. • As parcels are subdivided or combined a report must be generated and the cases manually updated. This is a cumbersome but essential process. Corrections and changes are made at the time a subdivision is completed or as inconsistencies are observed. See Maintenance section above. Relationship between cases • Each case type (building, septic) stands alone and can be formatted and added to without altering or interfering with other case types. Additional "pages" or "fields" can be added to a case as needs arise, i.e. a field for GPS latitude/longitude, a "page" for pumper reports or sampling data at a parcel or system can be added to the septic case. • Links can be made between cases where needed through activities or data tables. For example completing an activity in the building case such as "final approval" can add an "a&M inspection required" activity to the associated septic case, or if there is a well on the site as identified through Onsite Sewage Management Plan 8/20/2007 page 10 of 46 the U tility S e rv ic e R e v ie w (o u r w e ll s e a l in s p e c tio n c a s e ) c a se th is da ta c a n b e in cl u d e d a u t o m a tic a lly w h e n the se p tic c a s e is e n te re d . • C a s e s c a n b e g ro u p e d t o g e t h e r b y a p ro je c t n u m b e r . • A ll c a s e s a s s o c ia t e d w it h a p a r c e l c a n b e v ie w e d t h r o u g h s t a n d a r d s e a r c h t o o ls . • In d iv id u a l p a r c e ls c a n b e "t a g g e d " w it h s p e c ia l in fo r m a t io n s u c h a s "s h e llfi s h p ro t e c t io n d is t r ic t", "fr e q u e n tl y fl o o d e d ", o r "v io la t io n ". T h e s e t a g s c a n p la c e a h o ld o n a p a r c e l t h a t k e e p s f u rt h e r p e r m it s fr o m b e in g is s u e d , t h e y c a n p r o v id e a w a rn in g /in fo a s t o t h e s t a t u s /c o n d it io n o n t h e p a r c e l f o r c o n s id e r a t io n w h e n p e r m itt in g o r e v a lu a t in g a p a rt ic u la r a r e a , o r a r e p o r t c a n b e r u n t o id e n t if y a ll c a s e s w it h a p a rt ic u la r t a g . See Appendix A.7 for example) 1.2.3 Current Operations and Monitoring Requirements In 1987 Jefferson County Board of Health signed an MOU with the Jefferson County PUD#1 to monitor all "alternative" onsite sewage systems in Jefferson County. Approximately 1,000 systems were under monitoring contract requirements at the time of code revision in 2000. Systems were monitored based on system type ( complexity) every year to two years for the first 5 years and then every 10 years thereafter. September of 2000 - Jefferson County Code 8.15.150 Onsite Sewage Code was revised. It requires that all onsite sewage systems be monitored periodically at the schedule adopted in Table 1. See Appendix A.8 for Table 1. • New systems • Conventional gravity or pump to gravity permitted as of 9/2000 are subject to a permit condition that states the required monitoring frequency. For sites over 1 acre, greater than 200' from a shoreline and not subject to a waiver, the system must be monitored every 6 years. Sites less than one acre, systems less than 200' to a shoreline or subject to an approved waiver must be monitored every 3 years. It is the responsibility of the property owner to contract with a private provider or the Health Department for the monitoring. • All other systems are subject to a permit condition that requires entering into a contract for monitoring the system with an approved monitoring entity. The frequency varies from 1 to 3 years based on the above criteria. The currently approved entity is the Jefferson County PUD #1. The contract must be signed prior to final approval of the onsite sewage system permit. • All systems generating waste water of greater than residential strength must be inspected annually per permit condition and/or contract. Onsite Sewage Management Plan 8/20/2007 page 11 of 46 • E x is tin g sy s te m s • J e ff e rs o n C o u n ty C o d e 8 .15 .15 0 (6 ) re q u ire s th a t a ll e x is tin g sy s te m s no t c u rre n tly un d e r a P U D m o n ito rin g c o n tra c t s h a ll b e e n te re d in to th e m o n ito rin g pro g ra m a t th e e a rlie s t o f th e fo llo w in g d a te s : ✓ At time of sale ✓ Upon Application for certain building permits as per Policy 04-01 adopted by the BOH ✓ Identification that the site is in an Marine Recovery Area as designated by the JCBOH Recording Monitoring data • A Monitoring Report is completed after each inspection on forms developed by the Health Department. • Inspections by the PUD are entered directly into the database and they enter an activity for the next required inspection • Private certified O&M Specialists submit the report and Environmental Health Staff enter the data into the database and enters an activity for the next required inspection. • Pumper reports are currently submitted to the Health Department but are not entered into the database. These reports do not currently constitute a valid monitoring inspection since they only evaluate the tank. • Monitoring inspection reports submitted by private contractors provide the following information at a minimum: ✓ Parcel Number; ✓ Name, Mailing address, and phone number of the property owner; ✓ Site address; ✓ System type; ✓ System details such as depth of scum and sludge, condition of baffles, screens, electrical controls, pump operation, ponding, drainfield disturbance, etc. ✓ Description of whether or not a problem was identified; ✓ Description of action/s needed; ✓ Date of inspection; ✓ The inspectors name, address and phone number. • The same information is supplied by the PUD. • Ten points of information are entered into the database: ✓ Date of inspection ✓ ID of inspector (Health Dept, Private, PUD) ✓ Was there a problem identified? ✓ Did the septic tank need to be pumped? ✓ Did the pump chamber need to be pumped? ✓ Was infiltration into the system (tanks) noted? ✓ Was there a problem with the electrical controls? Onsite Sewage Management Plan 8/20/2007 page 12 of 46 ✓ Was residual pressure noted as the end of the lines? ✓ Was there any disturbance observed in the area of the system components? ✓ Notes Generally, a yes answer denotes that action is required, excepting in the case of noting the presence of residual head. The last area is for comments/explanation of conditions. It may be noted here that the house has not been occupied for some X amount of time, explain that the alarm was not working, the drainfield has a driveway over it, etc. 1.2.3 Monitoring Inspection Tracking and Record Maintenance The same database is used for tracking O&M as for permitting. The monitoring information for a system is simply another "page" of the OSS case. • Since 2000 every inspection has been entered. • Records from 1988 to 2000 are filed in individual files at the PUD and copies are on file at the Health Department. • The Database creates a report identifying which systems are due for inspection. Any time period can be specified, i.e. due in the month of December, due in 2007. The report can be broken down additionally by planning area. ' • The database creates an inspection report and mailing labels based on the criteria specified above. • These lists can be used to send inspection reminders, general system maintenance info, etc. • O&M providers, designers and pumpers are required by JC Code 8.15 to report "failure" with 24 hours to the local jurisdiction. • Letters are sent where major defects or problems are noted on the inspection report. 1.2.4 Evaluating Monitoring Inspection Data • Reports are developed from the data including general statistics on number of inspections completed for a specified period of time in a specific area. They can also detail areas of problems, how many tanks needed to be pumped, etc. These can be crossed with system type, planning areas, watershed areas, proximity to shoreline, designer or any other parameter that has been entered into the system. See Appendix A.9 for an example. • Information from these reports is provided to the Board of Health and informs decisions on funding, allocation of staff resources, policy development and code revisions. Onsite Sewage Management Plan 8/20/2007 page 13 of 46 1.2.6 Changes proposed/planned Jefferson County is working on the following as time and funds allow: Planned changes to Data system • Add database activity to document all notices sent to property owner as follow-up to monitoring inspections. • Add "page" to case file for inspections other than complete monitoring inspection such as a pumpers report. • Develop ability to enter data remotely-wireless connection. • Develop system to scan forms that will fill in data points in data base. • Continue to improve the updating of case files as parcel numbers change. Planned changes to monitoring program • Develop mechanism to inform holders of current PUD monitoring contracts that monitoring is now required by private contractors due to PUD decision not to continue their participation in the monitoring of individual onsite sewage systems. • Develop enforcement mechanism for unsatisfactory, incomplete or absent monitoring report for both homeowner and certified persons. • Develop system for certifying homeowners to monitor their own systems. • Develop system that will allow monitoring professionals to enter data into the system. 1.3 Resources Necessary to Implement Data Components of Plan 1.3.1 Enhancements to Hardware and software Upgrade database to newer version that allows online reporting. Development of an online reporting system for O&M Inspectors. Obtain equipment required to enter data remotely through a wireless connection. 1.3.2 Data Personnel An increase in the time required for entering data is anticipated during the switch from PUD inspections to private sector prior to the implementation of the online system. Staff time is required to develop the reports, add necessary fields to cases, and coordinate with the database administrator regarding online reporting and access to the system. Onsite Sewage Management Plan 8/20/2007 page 14 of 46 1.4 Timeline The following timeline outlines prioritized activities to enhance the O&M database: Goal Activities Deadline Complete database records Enter records Ongoing for all existinq paper files Upgrade database Coordinate with Accella December 2008 Purchase upqrade Create reports and forms Assign and train staff on Ongoing necessary to implement database and reporting private monitoring program system. Create reports and forms Complete transfer of PUD Revise Code, develop Ongoing monitoring to Private agreements, contact Inspectors existinq system owners Develop online reporting Create Report and Funding required. system coordinate with database administrator to imolement Part 2: Identification of Sensitive Areas 2.1 Introduction This section describes how Jefferson County identifies sensitive areas where OSS could pose an increased public health risk. It describes how this information is integrated into the OSS program and how Jefferson County Public Health coordinates with other local planning processes regarding sensitive areas. The physical and demographic characteristics of Jefferson County are provided here. This part of the plan satisfies the following elements of WAC 246-272A-0015 (1 ): (b) Identify any areas where OSS could pose an increased public health risk. The following areas shall be given priority in this activity: • Shellfish protection districts or shellfish growing areas; • Sole source Aquifers designated by the US EPA; • Areas in which aquifers used for potable water as designated under the Wa. State Growth Management Act, Chapter 36.70A RCW are critically impacted by recharge; • Designated wellhead protection areas for Group A public water systems; • Up-gradient areas directly influencing water recreation facilities designated for swimming in natural waters with artificial boundaries within the waters as described by the Water Recreation Facilities Act, Chapter 70.90 RCW; Onsite Sewage Management Plan 8/20/2007 page 15 of 46 • A re a s de s ig n a te d by th e de p a rt m e n t o f e c o lo g y a s s p e c ia l p ro te c tio n a re a s un d e r W A C 17 3 -2 0 0 -0 9 0 , W a te r q u a lity sta n d a rd s fo r g ro u n d w a te rs o f th e sta te o f W a s h in g to n ; • W e tla n d a re a s u n d e r pro d u c tio n o f c ro p s fo r hu m a n c o n s u m p tio n ; • F re q u e n tly flo o d e d a re a s in cl u d in g a re a s de lin e a te d b y th e F e d e ra l E m e rg e n c y M a n a g e m e n t A g e n c y a n d o r a s de s ig n a te d u n d e r th e W a . S ta te G ro wt h M a n a g e m e n t A c t, C h a p te r 3 6 . 7 0 A R C W ; • A re a s w h e re nitro g e n ha s b e e n id e n tifi e d a s a c o n ta m in a n t o f c o n c e rn ; a n d • O th e r a re a s d e s ig n a te d by th e lo c a l he a lth o ff ic e r su c h a s M a rin e R e c o v e ry A re a s . (i) A s s u re th a t th e P la n w a s de v e lo p e d to c o o rd in a te w ith th e Je ff e rs o n C o u n ty C o m p re h e n s iv e P la n . 2.2 Activities 2.2.1 Description of Jefferson County Environment Jurisdictional Boundaries Jefferson County is bounded on the north by the Strait of Juan de Fuca and Clallam County, on the north and east by Admiralty Inlet, on the east by Port Townsend Bay, Oak bay and the Hood Canal, on the west by the Pacific Ocean and on the south by Mason and Grays Harbor Counties WA. See Appendix B.1 for map of Jefferson County. Annual precipitation in eastern Jefferson County ranges from 18" in the northern part to 70" in the southeastern part. Land Use- • 1808 square miles, 18th largest of WA. State 39 counties. The Olympic National Park and National Forest comprise approximately 65% of the 1.16 million acres of land. • Nearly 96% of the population resides in eastern Jefferson County. • There are more than 250 miles of marine shoreline, more than 367 miles of river and stream shoreline and more than 18 miles of lake shoreline in eastern Jefferson County. See Appendix B.2 for map of water bodies. • There is one incorporated city, Port Townsend, and one Master Planned Resort, Port Ludlow. • There are several small population centers as noted below but Jefferson County is primarily a rural county. Demographics • Population- between 1980 and 2002 the population increased by two- thirds, from 15,965 to 25,953. Since 1980 Jefferson County population growth has generally exceeded that of Washington State. • The largest sources of employment are the Health Care and Social Assistance sector with 18% of county wide employment and the Onsite Sewage Management Plan 8/20/2007 page 16 of 46 A c c o m m o d a tio n a n d F o o d S e rv ic e s e c to r w ith 14 %. 2 Marine trades and education are strong elements in the community as well. • With a total land area of 1808 square miles the population density is just 14.4 people per square mile but given that the Olympic National Park and National Forest comprise 1,175 square miles that leaves just 633 square miles for the population to reside, resulting in a population density of approximately 41 people per square mile. Population3 Census Designated Total population 2000 Estimated pop. By 2016 Place Jefferson County 25953 39,397 (Watterson Report) Port Townsend 8325 Port Hadlock 3467 Port Ludlow 1953 Marrowstone 876 Brinnon 831 Quilcene 632 West End 599 • Race and Ethnicity- 91 % white non-Hispanic in 20004 (Washington State is about 79% white non-Hispanic) • Education- nine out of 10 adults had a high school education or more in 2000, three out of ten had 4 or more years of college. Less than half of the 18-34 year olds reported some post-secondary education. 5 • Poverty - The term characterizes people and households which may lack the financial resources to meet basic needs such as food, clothing and housing. It is generally measured by the annual federal poverty index. From 1989-1999 the proportion of all Jefferson County residents living below 100% of the federal poverty index decreased by 3% from 14% to 11 %. However, the poverty rate among families increased from 9% to 11 % during this period. At below 200% of the federal poverty index a household is considered low income and is eligible for assistance. The 2000 US Census identifies 28% of Jefferson County residents as low income.6 • Household income- Jefferson County median income is at about 80% of the state average. By the late 1990's increases in housing prices were nearly the same as the state resulting in an "affordability gap". 7 • Jefferson County's median age is 47.1, older than in Puget Sound, Washington State and the US. 8 Drainage • Storm water - In 1999 the county adopted the DOE Stormwater Manual for the review and implementation of stormwater projects. In 2006 the Jefferson County Stormwater Management Plan was adopted. Onsite Sewage Management Plan 8/20/2007 page 17 of 46 • W a te r s h e d pla n n in g ha s be e n c o m p le te d fo r th re e o f Je ff e rs o n C o u n tie s w a te rsh e d s . ✓ Quilcene -Dabob - plan completed 1989 ✓ Ludlow - plan completed 1994 ✓ Discovery Bay- plan completed 1998 • Jefferson County is involved in planning for Water Resource Inventory Areas (WRIA) See Appendix 8.2 for map of boundaries. ✓ WRIA 17-Quilcene-Sno Basin ✓ WRIA 16-Dosewallips-Skokomish ✓ WRIA 20-Soleduck-Hoh • Geology and Soils vary from excessively well drained to poorly drained. Eastern JC consists of relatively low, rolling to moderately steep, glacial terraces and long, narrow valleys in the northern sections. The southern section consists of moderately steep to steep glacial terraces and very steep, rough, broken mountain foothills that drop to the shoreline. 9 Population density Residential and commercial lands were largely formed along historic transportation corridors. 10 The north eastern quadrant of the county including the communities of Port Townsend, the Tri-area (Port Hadlock, Chimacum, Irondale), and Port Ludlow contain over 76% of the population. See Appendix 8.3 for population density 1990. Water supply • Surface water is the water supply for the City of Port Townsend and those in their service area of approximately 9,000 people. The water is supplied from the Big Quilcene and Little Quilcene Rivers. The watershed protection is supplemented by an MOU between the City of Port Townsend and the US Dept. of Agriculture, the US Forest Service and the Olympic National Forest. See Appendix A.10 for Port Townsend water service area map. ✓ Ground water is the primary supply for the remaining 17,000+/- residents. ✓ Group A Public water supplies- 71 systems ✓ Group B Public water supplies- 123 systems ✓ A mix of individual drilled and dug wells, springs and surface waters serve the remaining population. Water Quality • Ground water quality is good- shallow or poorly constructed water supplies may experience coliform contamination, some public water supplies have occasional coliform present samples, and some areas have high chloride (conate and sea-water intrusion), iron and/or manganese concentrations. • Surface water quality varies from good to threatened; some water bodies are on the Washington State 303(d) list. A map depicting 303(d) listed water bodies in Eastern Jefferson County is found in Appendix A.11. Onsite Sewage Management Plan 8/20/2007 page 18 of 46 • F o r the ye a r 20 0 6 G ro u p A the S ta te D O H re p o rt e d no ac ute c o lifo rm vio la tio n s a n d 5 no n-a c u te vio la tio n fo r gro u n d w a te r. T he re w e re no vio la tio ns re p o rt e d fo r s u rf a c e w a te r. 2.2.2 Current and Past Water Quality Activities The division of Water Quality is housed within the Environmental Health Division and is responsible for evaluating water resources. They coordinate efforts where State or local water quality monitoring results indicate a threatened or degraded status. They are involved in the following activities to assure the continued health of ground and surface waters. • Land conservation and preservation - Through its Conservation Futures Fund, Jefferson County contributed to the protection of more than 150 acres of open space in East Jefferson Coutny. Projects totaling an additional 230 acres were awarded funding in 2007 but have not been implemented. The conservation futures tax levy collections, authorized under RCW 84.34.230, are an important means of retaining community character and accomplishing open space policies and objective of the Jefferson County Comprehensive Plan. Projects include wildlife corridors, viewscapes, sustainable forestry and agriculture, or culturally significant lands such as the Chimacum Creek Estuary, Sunfield Farm (a school and community farming project), the Quimper Wildlife and Tarboo Creek corridors and the Tamanawas Rock Sanctuary. Fee-simple acquisitions are held by Jefferson County or the City of Port Townsend. Conservation easements are created and held in Partnership with the Jefferson Land Trust. • Salmon Recovery Planning is accomplished via the Hood Canal Coordinating Council Lead Entity and recently formed North Pacific Coast Lead Entity. The lead entities offer a local process for developing and ranking salmon recovery projects for the Salmon Recovery Funding Board (SRFB) review and funding. Jefferson County has protected and restored 75 acres of floodplain and adjacent uplands in the lower Dosiwallips River for the purpose of salmon recovery via Secure Rural Schools Title Ill, SRFB, and WS DOE funds. Future acquistions may also include flood- prone parcels on the Duckabush River. • Shellfish Biotoxin monitoring and education- The County has a volunteer program for collection of shellfish samples during the months of May to September. Beaches are posted as necessary and news releases and public information are published in the local newspaper seasonally. • The Jefferson County Marine Resources Committee (MRC) is a citizen- based effort to identify regional marine issues, foster community understanding and involvement, recommend positive action, and develop support to protect and restore marine resources. The Committee's projects include sponsoring research on forage fish habitat, restoring the native Olympia oyster to Discovery Bay, and removing derelict gear from local waters. The MRC is an advisory group to the Board of County Commissioners and operates under the umbrella of the Northwest Straits Onsite Sewage Management Plan 8/20/2007 page 19 of 46 C o m m is s io n . T h e M R C m e m b e rs a re c itiz e n v o lu n te e rs w h o a re c o m m itt e d to w o rk cl o s e ly w ith o th e r c o m m u n ity m e m b e rs -h o m e o w n e rs , bu s in e ss o w n e rs , re c re a tio n a l e n th u s ia s ts , c o m m e rc ia l a n d s p o rt fis h e rs - to re d u c e o r sto p th e d e c lin e o f th e m a rin e ha b ita t in o u r e c o lo g ic a lly ric h c o rn e r o f th e w o rld . • C h im ic u m C re e k P ro je c t - P o rt io n s o f C h im a c u m C re e k a re o n W S D O E 3 0 3 (d ) list fo r e x c e e d in g fe c a l-c o lifo rm a n d te m p e ra tu re lim its . J C P H h a s pa rt n e re d w ith th e J C C o n s e rv a tio n D is tric t to re s to re w a te r q u a lity th ro u g h o u t th e w a te rs h e d a n d brin g th e e n tire stre a m in to c o m p lia n c e . P rim a ry a c tiv itie s o f th e re s to ra tio n w o rk in cl u d e : ✓ Agricultural best-management practices; ✓ Sanitary surveys of residences with septic systems; ✓ Riparian buffer fencing and tree-planting; ✓ Water quality monitoring; ✓ Public education and outreach • Discovery Bay Project- Fifty acres (of 8,500 acres in Discovery Bay) of commercial shellfish-growing area in Discovery Bay have been downgraded to Restricted as of May 2007, due to elevated fecal-coliform levels in the marine water. JCPH is the lead entity on the Closure Response Plan to identify and control sources of bacterial pollution in Discovery Bay and the Salmon-Snow watershed. This includes: ✓ Monitoring fresh and marine waters to help identify pollution sources; ✓ Conducting sanitary surveys of shoreline and streamside residences with septic systems; ✓ Tracing and eliminating illegal discharges; ✓ Fencing livestock out of waterways and building off-stream waterings; and ✓ Providing outreach and education to area residents. • WRIA 16 (Skokomish-Dosiwallips) watershed management plan was completed in July 2006. The planning unit is currently developing a detailed implementation plan that will result in a road-map for turning plan recommendations into reality. • WRIA 17 (Quilcene-Snow) planning unit completed it's watershed management plan in January 2006. A detailed implementation plan is being developed and in-stream flow rule making for the WRIA is being pursued by the WS DOE and its contractors. • WRIA 20 (Sol-due/Hoh) watershed management plan is nearing completion for drainages in the west end of Jefferson County. The plan may be approved in the fall of 2007. • Beach monitoring - As part of Washington Swimming BEACH (Beach Environmental Assessment, Communication, and Health) program, JCPH monitors enterococci levels at Chimacum Beach and Quilcene Marina from May to September. The Port Townsend Marine Science Center also monitors the swimming beach at Fort Worden. This allows us to warn Onsite Sewage Management Plan 8/20/2007 page 20 of 46 be a c h us e rs, bo th th ro u g h sig n a g e a n d th e B E A C H w e b p a g e , if the re is a n e le v a te d ris k fo r re c re a tio n a l-c o n ta c t illn e ss e s . • La k e M o n ito rin g - D u e to re c e nt blo o m s of to x ic c y a n o b a cte ria (b lu e - g re e n a lg a e ) in a re a la k e s , JC P H is m o n ito rin g pu b lic -a c ce ss la k e s fo r to x ic c y a n o b a c te ria th ro u g h o ut the g ro w in g s e a so n . La ke s a re m o n ito re d vis u a lly un til the be g in n in g s of a blo o m a re s e e n , a t w h ic h tim e sa m p le s a re ta k e n fo r la b o rato ry id e ntifi c a tio n of s p e c ie s an d to x in s . La b re s u lts s h o w in g h ig h c e ll c o u n t s o f po te n tia lly to x ic s p e c ie s , o r d ire c t to x in d e t e c ti o n s , t r ig g e r w a rn in g s o r cl o s u r e s p o s t e d a t t h e la k e s a n d o n th e J C P H w e b p a g e . 2.2.3 Designating Sensitive Areas Areas Where OSS May Pose an Increased Threat to Public Health Jefferson County has identified areas where OSS may pose an increased threat to public health; however, it is important to note that there is currently no data that indicates the relative contribution of OSS to degraded water quality in sensitive areas. The areas that have been identified are as follows: • Critical Aquifer Recharge Areas - Jefferson County has delineated Critical Aquifer Recharge Areas in the Unified Development Code.11 These are considered when evaluating land use permit applications. Standards as described in the UDC 18.30.180 are applied to onsite sewage systems in these areas that address the treatment and removal of nitrogen from the waste stream. ✓ Sole Source Aquifers as designated by the US EPA- Marrowstone Island has been classified as a sole source aquifer and is classified as a Critical Aquifer Recharge Area ✓ Group A well head protection areas • Frequently Flooded Areas - Areas that are defined as being in the 100 year floodplain per the Federal Emergency Management maps are required to meet special standards for the onsite sewage system. These standards are intended to assure that treatment continues when the area is flooded. See Appendix A.12 for specific language in code. • Properties within 200 feet of a shoreline • Properties within 200 feet of a class 1 or 2 wetland • Water bodies listed on the DOE 303(d) list for fecal coliform excedences • Shellfish Protection Districts if used to target limited/specific areas • Marine Recovery Areas Jefferson County will add to this list if data show that OSS pose increased public health risks in an area of the county. The Jefferson Water Quality Division tracks water quality monitoring activities in the county and assists in coordinating efforts to diagnose problems and take corrective actions. Onsite Sewage Management Plan 8/20/2007 page 21 of 46 M e th o d s fo r Id e n tifyin g S e nsitive A re a s in Je ff e rso n C o u n ty Je ff e rso n C o u n ty U n ifie d D e ve lo p m e nt C o d e (U D C ) go ve rn s the de sig n a tio n of e nv iro n m e nta lly se n sitive a re a s in cl u d in g C ritica l A q u ife r R e cha rg e a re a s, W e tla n d s , a n d a re a s w ith in the 10 0 yr flo o d pla in . A cco rd in g to th is se ctio n the C o u n ty w ill de sig n a te the lo catio n a n d exte n t of e nviro n m e n ta lly se nsitive a re a s "b a se d up o n be st ava ila b le in fo rm a tio n fr o m q u a lifie d pro fessio n a l so u rce s". M a p s a re ava ila b le via ha rd co py a n d the C o u n tie s w e b site at www .co .je ff e rso n .w a .u s . T h e se m a p s are fo r a d viso ry pu rpo se s o n ly . E n v iro n m e nta lly se nsitive are a s th a t are no t m a p p e d bu t tha t m e e t the crite ria are still re g u la te d an d are a s tha t a re m a p p e d bu t do no t m e e t th e crite ria a re no t reg u la te d . D e sig n a tio n of en yiro n m e n ta lly se n sitive a re a s is pa rt o f the C o u n tie s U n ifie d D e ve lo p m e n t C o d e , a la n d use co d e , a n d is no t co n n e cte d to th e lo ca l o n site se w a g e co d e 8 .15 exce p tin g th a t the lo ca l co d e do e s re q u ire co m p lia n ce w ith othe r sta te an d lo ca l co d e s. A re a s m a y a lso be de sig n a te d ba se d o n te stin g re su lts o r listin g by an o th e r ag e n cy if re vie w e d a n d a p p ro ve d by the JC B o a rd of H e a lth . A re a s excl u d e d fr o m co n sid e ra tio n • Je ff e rso n C o u n ty ha s no up -g ra d ie nt a re a s dire ctly in flu e n cin g w a te r re cre a tio n facilitie s de sig n a te d fo r sw im m in g in na tu ra l w a te rs w ith a rtificia l bo u n d a rie s w ith in the w a te r as de scrib e d by the W ate r R e cre a tio n Fa cilitie s A ct. • Je ff e rso n C o u n ty do e s no t ha ve an y w e tla n d a re a s un d e r pro d u ctio n fo r cro p s fo r hu m a n co nsu m p tio n . 2.2.4 Coordination with planning departments within jurisdiction • Land use and development applications including subdivision, building, and stormwater are reviewed by Environmental Health Division staff for compliance with state and local onsite sewage code and policies. • Environmental Health Division staff is included in the meeting notices for planning documents such as the Shoreline Master Program, the Flood Damage Prevention Ordinance, the Unified Development Code (includes sections on activities in and around areas identified as environmentally sensitive such as wetlands, critical aquifer recharge, salt water intrusion zones). • Local planning codes, Comprehensive Plan and implementing ordinances are reviewed by Environmental Health Division staff for compliance/consistency with state and local onsite sewage codes and policies. • Environmental Health Division and/or Water Quality Division has staff on the following committees ✓ Utility Coordinating Committee - drinking water ✓ Marine Resource Committee Onsite Sewage Management Plan 8/20/2007 page 22 of 46 ✓ Water Resource Inventory Committees, 16, 17, 20 ✓ Shoreline Master Program Advisory Committee • This plan and the local onsite sewage code are provided to Jefferson County Development Review staff for comment. 2.3 State Environmental Policy Act Review The Washington State Environmental Policy Act requires state and local agencies to consider likely environmental consequences from proposed policy and implementation. Jefferson County's OSS Management Plan will undergo a SEPA Review in which Jefferson County Environmental Health Division will use a checklist to determine if there are any significant adverse impacts from the newly adopted plan. 2.4 Resources Jefferson County is currently working with a consultant to do a Clean Water District for all of eastern Jefferson County. The consultant is responsible for public outreach and education regarding the Clean Water Plan and developing the framework for funding options. 2.5 Timeline Goal Activities Deadline Develop mapping tools to Coordinate with JC Ongoing facilitate provision .of Information Services to information to homeowners develop maps and OSS designers Complete adoption of Clean Coordinate with Consultant December 2008 Water District to provide stable funding source for ongoing assessment of water quality and corrective actions 2.6 Summary and Prioritization of Activities Essential to completing the tasks and goals outlined in the plan is the adoption of the Shellfish Protection District to provide a stable funding source. The Water Quality Division will work to track water quality monitoring data collected in the county to determine sensitive area needs. Onsite Sewage Management Plan 8/20/2007 page 23 of 46 Part 3: O peration, M onitoring and M aintenance in Sensitive Areas 3.1 Introduction This section of the plan will review existing operations, monitoring and maintenance requirements in Jefferson County. It will also review considerations for areas identified in this plan as environmentally sensitive. Considerations include initial installation standards as well as ongoing O&M standards. Enforcement of these standards will be discussed. This part of the plan is intended to fulfill the following elements of WAC 246- 272A-0015 (1) Developing the written plan and (7) Implementing the plan. (1) (c) Identify operation, maintenance and monitoring requirements commensurate with risks posed by OSS within the geographic areas identified in (b) of this subsection; (g) Enforce OSS owner permit application, operation, monitoring and maintenance and failure repair requirements defined in WAC246-272A- 0200(1 ), 0270, 0275 and 0280 (1) and (2). (h) Describe the capacity of the local health jurisdiction to adequately fund the local OSS plan, including the ability to find failing and unknown systems. (7) (a) Ensure additional maintenance and monitoring of the OSS; (b) Provide dedicated easements for inspections, maintenance, and potential future expansion of the OSS; (c) Place a notice to title identifying any additional requirements for OSS operation, maintenance and monitoring; and (d) Have an inspection of the OSS at the time of property transfer including the preparation of a "record drawing" if necessary. 3.2 Activities 3.2.1 Current operations, monitoring and maintenance requirements in Jefferson County. Monitoring Requirements The advisory group involved in the local code revision of September 2000 recommended a risk based approach to the monitoring requirements. They determined that sites that are adjacent to the shoreline and whose system is within 200' of the shoreline would require a higher monitoring frequency than others. The group also required a higher frequency where lot size is less than 1 acre. It requires that all onsite sewage systems be monitored periodically at the schedule adopted in JCC 8.15 Table 1. The requirements are as follows: Onsite Sewage Management Plan 8/20/2007 page 24 of 46 • C o n v e ntio n a l g ra v ity o r pu m p to g ra v ity pe rm itt e d as o f 9/2 0 0 0 a re s u b je c t to a pe rm it co n d itio n th a t sta te s the re q u ire d m o n ito rin g fr eq u e nc y . F o r s it e s o v e r 1 a c r e , g r e a t e r t h a n 2 0 0 ' fr o m a sh o re lin e a n d no t s u bje c t to a w a iv e r t h e s y s t e m m u s t b e m o n it o r e d e v e r y 6 y e a r s . S it e s le s s t h a n o n e a c r e , s y s t e m s le s s t h a n 2 0 0 ' t o a s h o r e lin e o r s u b je c t t o a n a p p ro v e d w a iv e r m u st be m o n ito re d eve ry 3 ye a rs . It is the re s p o n s ib ility of th e pro p e rt y ow ne r to c o n tra c t w ith a priv a te pro v id e r o r th e H e a lth D e p a rt m e nt fo r th e m o n ito rin g . • A ll othe r sy s te m s a re su b je c t to a pe rm it c o n d itio n th a t req u ire s e nte rin g in t o a c o n t r a c t fo r m o n it o r in g t h e s y s t e m w it h a n a p p ro v e d m o n ito rin g e n t it y . T h e fr e q u e n c y va rie s fr o m 1 to 3 ye a rs ba s e d o n the a b o v e crite ria . T h e c u r r e n t ly a p p ro v e d e n t it y is t h e J e ff e r s o n C o u n t y P U D #1 . T h e c o n t r a c t m u s t b e s ig n e d p r io r t o fi n a l a p p ro v a l o f t h e o n s it e s e w a g e s y s t e m p e r m it. • A ll s y s t e m s g e n e r a t in g w a s t e w a t e r o f g r e a t e r t h a n r e s id e n t ia l s t r e n g t h m u s t b e in s p e c t e d a n n u a lly p e r p e r m it c o n d iti o n a n d /o r c o n t r a c t. Im p le m e n t a t io n o f M o n it o r in g R e q u ir e m e n t s T h e m e t h o d s o f im p le m e n t in g t h e m o n it o r in g r e q u ir e m e n t v a r y w it h t h e s y s t e m t y p e a n d w h e n it w a s p e r m itt e d /in s t a ll e d . • S y s t e m s b e in g p e r m itt e d c u r r e n t ly : • C o n v e n t io n a l g r a v it y s y s t e m s o r p u m p t o g r a v it y a r e s u b je c t t o a p e r m it c o n d it io n t h a t s t a t e s t h e m o n it o r in g r e q u ir e m e n t s . • C o n t r a c t s h a v e b e e n r e q u ir e d fo r a ll n o n -c o n v e n t io n a l s y s t e m s u p t o J u n e 2 0 0 7 . T h is c o n t r a c t w a s w it h t h e J e ff e r s o n C o u n t y P U D a n d w a s r e c o r d e d t o t h e p ro p e rt y . See Appendix A.13 for example of contract. PUD staff completed the required periodic inspections as required by the code and entered the information into the database or an owner could have a certified O&M Specialist complete the inspection and submit the report to the PUD for recording and entering the information. The PUD has determined that they will no longer be doing the monitoring of on-site sewage systems as of January 2008. In anticipation of this change, as of June 2007, the PUD is no longer completing and recording a contract on installed systems. The current practice is that a "Monitoring Agreement" is recorded to the property that states the owners responsibility to have the system monitored at the frequency required in the local code, Table 1. See Appendix A.14 for an example of the agreement. • A notice is placed to the title where monitoring/maintenance are required by a manufacturers authorized representative. • Systems permitted or installed prior to O&M requirements adopted either in 1987 or in 2000 are enrolled in the monitoring program beginning at the following times: Onsite Sewage Management Plan 8/20/2007 page 25 of 46 ✓ Time of Sale ✓ Application for certain building permits per JC Policy 04-01 See Appendix A. 15 for policy. ✓ When site is identified as being in a Shellfish Protection District or a Marine Recovery Area ✓ Identification that an ass is used as a community OSS ✓ Identification that the system has received a waiver or variance from on-site sewage codes. Additional System Monitoring Septic Pumpers are required to submit a report on a form approved by Jefferson County following system pumping. See Appendix A.16 for sample. This report identifies: ✓ General condition of the septic tank ✓ Sludge and scum measurements ✓ Indications of flow back from the drainfield (may indicated problem with effluent infiltration into the soils or seasonal influence of ground water) ✓ General condition of the pump chamber if present ✓ Other comments as necessary Permit Review and Design Standards • Review for proximity to environmentally sensitive areas (ESA) is completed for septic applications for new systems, repairs, modifications or alteration and tanks only (connecting to existing systems or community systems). ESA's include critical aquifer recharge areas, wetlands, shorelines and flood plains as well as others regulated through the Jefferson County Unified Development Code. See Appendix B.4 ESA mapping and checklist. • All applications include a site inspection to verify site conditions. • Design standards apply to all systems to facilitate monitoring and maintenance of onsite sewage systems. ✓ Watertight risers to grade on septic and pump tanks ✓ Risers to grade on distribution boxes and other flow splitting arrangements ✓ Monitoring ports to the infiltrative surface on non-conventional systems where applicable. ✓ Monitoring ports to distribution pipes for flushing and measuring flows ✓ Cycle/dose counters where a pump is required ✓ Pump run time meters ✓ Audio and visual alarms where a pump is required 3.2.2 Sensitive Area O&M Requirements Onsite Sewage Management Plan 8/20/2007 page 26 of 46 3.2.3 Enforcement Activities Jefferson County has limited resources for enforcement and operates on the general concept of "voluntary compliance". In other words once a property owner is notified of a deficiency or problem we make every effort to enable the owner to comply without aggressive enforcement actions. Education is a strong component of this system, both on a community wide and site specific basis. Information and Guidance Many opportunities exist for homeowners to obtain information about the status of their OSS. The strength of this portion of our system is essential in the long term success and acceptance of monitoring requirements. A homeowner who understands where their system is and how it works understands the value of monitoring it on a periodic basis to assure proper function. Several opportunities exist for the homeowner in this area. ✓ The "record drawing" and basic O&M info is provided at the time of installation, ✓ All onsite sewage case records are being scanned for access by the homeowner or other public, ✓ Classes are held regularly through out the community (see Education section for full discussion), ✓ Staff is available everyday to answer questions, provide existing records and guidance to a property owner, ✓ Monitoring reports and follow-up letters, when necessary, are provided to homeowners and buyers, ✓ County "data base tools" are accessible on the public website. These link to permit information where a homeowner can see when the last inspection was done and when the next one is due. ✓ Written information/ pamphlets are available in the office and can be mailed, ✓ The public health website contains access to all pamphlets and forms. Compliance Review There are several opportunities for review of the status of monitoring of a system. ✓ All building permit applications are reviewed for compliance with the conditions of the onsite sewage permit. If an inspection of the system is required or if major items required correction based on the last monitoring report the building permit approval will be withheld until the required inspection or corrections are satisfactorily remedied. ✓ Most land use applications are reviewed by the Health Division for compliance with conditions of the OSS permit. Similar action results as above if non-compliance is noted. ✓ Submitted monitoring reports are reviewed. If major items are noted as a "problem" - surfacing sewage, high level of effluent in tank or drainfield, etc. a follow-up letter is sent to the owner requiring corrective action. The permit may be placed in a "violation" status until corrections are made. Onsite Sewage Management Plan 8/20/2007 page 27 of 46 ✓ Inspectors (O&M Specialist or Designers) are contacted if any inconsistencies with previous information is noted. Enforcement Tools • WAC246-272A includes in the definition of failure non-compliance with standards stipulated in the permit. • JGC 8.15 defines violation to include cases when: ✓ An authorized person fails to submit the required reports to the Health Division ✓ A certified or licensed person fails to report with 24 hours any non- functioning onsite sewage component that could result in human contact with sewage ✓ An owner fails to complete required O&M inspections • JGC 8.15 provides for the use of civil penalties for violation of the code up to $513.00 per day for each continuous day until corrected. A ticket is the tool to utilize this section. • JGC 8.15 provides for criminal penalties. • Certificate holders (local Installers and O&M Specialists) are subject to administrative enforcement actions that may include suspension and revocation of certificate after a hearing with the Health Officer or Board of Health. • Property owners are subject to administrative enforcement that includes placement of a Notice to Title "if the Health Officer finds than an owner has failed to comply with the requirements of this regulation, AND all administrative remedies have been exhausted, AND the case has been forwarded to the Jefferson County Prosecuting Attorney for further action, the Health Officer may record a Notice of Potential Uncorrected Violation finding on the title of the property with the Jefferson County Auditor." • JGC 8.15 provides for abatement actions where all other tools have failed to result in compliance and there is clear evidence of public health risk. 3.3 Changes and Improvements to O&M and Design Monitoring requirements will be updated to comply with current state WAC246- 272A. Jefferson County will continue to assess this program and adopt more stringent monitoring requirements if evidence establishes the need. The operations and monitoring section of the local onsite sewage code is being revised at this time and will be removed from JGC 8.15 to a stand alone document. During this process the requirements of WAC246-272A-0270 (1 )(d)(I) and (ii) will be met. We will assure a complete evaluation of the system components and/or property to determine functionality, maintenance needs and compliance with regulations and any permits at least once every three years for all systems consisting solely of a septic tanks and gravity OSS and annually for all other systems unless more frequent inspections are specified by the health officer. Onsite Sewage Management Plan 8/20/2007 page 28 of 46 A s y s te m to e n a b le ho m e o w n e rs to be c o m e c e rt ifi e d to in s p e ct the ir ow n sy s te m is e n v is io n e d . T h e re w ill be so m e lim ita tio n s to th is tha t re la te to in s p e ctio n s re q u ire d at tim e of sa le , w he re the re a re no re c o rd s fo r th e sy s te m , w h e re no 3rd party monitoring has been done or where the site is in a Marine Recovery Area. These details will be addressed in the revisions. Monitoring and maintenance inspections • An inspection is required at the time of sale. Jefferson County does not currently have the capacity to track all home sales. Two improvements are targeted in this area. ✓ Creation of a report from existing databases to list all home sales and compare it with monitoring inspection reports submitted. ✓ Currently the code simply states that inspection is required at the time of sale. The goal is to modify this language to require the seller to submit proof of a current monitoring report by an authorized person prior to the transfer or sale of property. • Septic pumpers are required to submit a report for each tank/s that are pumped. Our goal is to develop a system to enter this data into the system to recognize the value of this maintenance activity on the system and provide the info for the permanent record. • Develop a certification system for homeowners to complete some of the inspections on their own system. • Enable homeowner to see the data that is entered from the inspection reports. • Develop a system to randomly audit monitoring reports to assure maximum consistency between inspectors and accuracy in reported observations. Permit Review and Design Standards Currently practices are adequate to protect the sensitive areas and allow monitoring and maintenance of systems. Enforcement Activities Efforts will be prioritized as noted: ✓ Sensitive areas as described in 2.2.3. ✓ Sites where monitoring reports identified problems that indicate failure. ✓ Sites where monitoring reports identified problems that are likely to result in failure. 3.4 Resources Jefferson County does not have additional resources to comply with most of the above referenced changes and improvements. We are currently involved in establishing a Shellfish Protection District, "Clean Water District" for all of east Jefferson County. A consultant has been retained to complete this process. Onsite Sewage Management Plan 8/20/2007 page 29 of 46 C o m p le tio n of th is w o rk w ill a llo w fo r m a n y of the re q u ire d o ng o in g ele m e nts to be suc ce ssfully ca rrie d o u t as w e ll as th e id e n tifie d cha n g e s an d im p ro ve m e n ts. 3.5 Timeline Goal Activities Deadline Develop report to facilitate Coordinate with JC December 2008 tracking of home sales and Information Services and monitoring reports received the JC Assessors office on data access Complete adoption of Clean Consultant retained to December 2008 Water District to provide complete all activities and stable funding source for public information ongoing assessment of components for adoption water quality and corrective actions Expand use of existing Coordinate with database December 2009 permitting database to administrator enter pumping reports Develop system for Coordinate with JC December 2009 accessing monitoring Information Services records in database for the Division and Database public administrator Adopt revisions to O&M Create revised code December 2008 section of local code language, review by advisory group and BOH 3.6 Summary Jefferson County will work aggressively to complete the revisions to the operations and monitoring section of the onsite sewage code and move to adoption of the new code. Subsequently a homeowner certification process will be developed and implemented for those interested in this approach. Jefferson County will continue to review siting, design and monitoring requirements for OSS in areas where these systems pose an increased risk to the public health. Emphasis will continue to be placed on informing homeowners about their systems and creating opportunities for them to properly operate and maintain their systems. Part 4: Marine Recovery Areas 4.1 Introduction 4.1.1 Definition of MRA s A Marine Recovery Area, as defined under RCW 70.11 BA.020, is " ... an area of definite boundaries where the local health officer, or the department in Onsite Sewage Management Plan 8/20/2007 page 30 of 46 c o n s u lta tio n w ith th e he a lth offi c e r, de te rm in e s tha t ad d itio n a l re q u ire m e nts fo r ex is tin g o n -s ite se w a g e dis p o sa l sy s te m s m a y be ne c e s sa ry to re d u c e po te n tia l fa ilin g sy s te m s o r m in im iz e ne g a tiv e im p a c ts of o n -s ite se w a g e dis p o sa l sy s te m s ." 4.1.2 Legal authority for MRAs In July 2005, the State Board of Health added a new requirement in the revised On-Site Sewage Systems WAC 246-272A regulations. Washington's local health officers must plan for the development and management of all OSS within their jurisdiction. This planning requirement clarifies and strengthens OSS management practices in sensitive areas as defined by the Areas of Special Concern under the previous regulation. More detailed planning requirements apply to the twelve counties bordering Puget Sound. The new regulations require Puget Sound local health officers to: • Develop or enhance an OSS database • Identify sensitive areas within the jurisdiction • Designate Marine Recovery Areas • Identify Operation and Maintenance (O&M) requirements for sensitive areas • Provide education and reminders • Enforce OSS requirements • Describe capacity to fund OSS plan The 2006 legislation directed the Department of Health and Jefferson County's health officer (as well as the other 11 Puget Sound counties) to take further actions to reduce fecal coliform bacteria pollution and the degradation and loss of marine life in Hood Canal and other marine waters in Puget Sound caused by low-dissolved oxygen conditions. DOH directed the agencies to reduce the input of human-influenced nutrients, especially nitrogen, into marine waters. Marine Recovery Areas (MRAs) must be designated when the Jefferson County health officer determines that existing OSS are a significant factor contributing to concerns associated with the degradation of shellfish growing areas, marine waters listed by the Department of Ecology (Ecology) for low-dissolved oxygen levels or fecal coliform bacteria, or marine waters where nitrogen has been identified as a contaminant of concern. The legislature directed Jefferson County's health officer to develop an on-site strategy for marine recovery areas that must specify how Jefferson County will do the following by July 1, 2012, and thereafter: • Find existing failing systems and ensure that system owners make necessary repairs, and Onsite Sewage Management Plan 8/20/2007 page 31 of 46 • F in d un k no w n sy ste m s a n d e n s u re th a t th e y a re in s p e cte d a n d fun c tio n in g pro p e rly , a n d re p a ire d if ne c e s sa ry . T h e m a rin e re c o v e ry a re a o n -s ite stra te g y w ill be in c o rp o ra te d in to J e ff e rs o n C o u n ty 's O n -site S e w a g e P ro g ra m M a n a g e m e nt P la n . T he re m a y be ad v a n ta g e s to pre pa rin g th e strate g y firs t so it c a n be us e d in the de v e lo p m e nt of the m a n a g e m e nt pla n . A ft e r the P la n ha s be e n a p p ro v e d by the lo c a l bo a rd o f he a lth , th e he a lth off ic e r m u s t s u b m it a c o p y of the P la n to D O H an d to all e n t itie s re s p o n s ib le fo r la n d us e pla n n in g an d de v e lo p m e n t re g u la tio ns in J e ff e r s o n C o u n t y fo r r e v ie w . D O H w ill r e v ie w t h e P la n fo r c o m p le te n e ss . 4.2 Activities Other than routine O&M of OSS in all Jefferson County, there have not been any extraordinary activities to the writing of the plan regarding O&M. 4.3.1 Identification of MRA There were two main components considered when Jefferson County established a Marine Recovery Area in Hood Canal: the marine areas as described in the statute (ARZ-1) and land areas with on-site sewage systems that may affect water quality in those marine areas. The first step was to utilize the best available scientific and technical data in an analysis of potential geographic boundaries. The second step was to present data on both water quality and the status of on-site systems to the health officer, the Jefferson County BOH, and the advisory group for MRA designation. The three data sources required for consideration are: 1) Shellfish growing areas that have been threatened or downgraded by DOH, 2) Marine waters that are listed by Ecology for low-dissolved oxygen or fecal coliform (303(d) list), and 3) Marine waters where nitrogen has been identified as a contaminant of concern by the local health officer. Shellfish growing areas that have been threatened or downgraded by DOH. Each growing area contains a series of sampling stations. Samples are collected over time from each station and tested for fecal coliform to determine water quality at those locations. The results of these fecal coliform tests drive the classification of the growing areas according to National Shellfish Sanitation Program (NSSP) standards. When these standards are not met, a shellfish growing area is downgraded to a lower category. The four classifications, from best to worse, are "Approved," "Conditionally Approved," "Restricted" and "Prohibited." If water quality at one or more sampling stations indicates worsening water conditions over time but has not yet exceeded NSSP standards, those sampling Onsite Sewage Management Plan 8/20/2007 page 32 of 46 statio ns m ig h t re c e iv e a sta tus o f "C o n c e rn e d " o r "T h re a te ne d ." A "T h re a te n e d " statu s m e a n s tha t a po rtio n of th e gro w in g a re a w ill be do w n g ra d e d if w a te r qu a lity do e s no t im p ro v e o r w o rse n s . T h re a te n e d w a te r qu a lity at sta ti o n s in H o o d C a n a l w a s o n e of the c o n s id e ra tio n s w he n d e te rm in in g the M RA o u tlin e d in this P la n . A no the r c o ns id e ra tio n w a s th e do w ng ra d e of a g ro w in g are a . W he n a po rt io n of a g ro w in g a re a cha n g e s to a w o rse cl a s s ifi c a tio n it is co n s id e re d "D o w n g ra d e d " a nd is in cl u d e d in th e de te rm in a tio n of a M a rin e R e c o v e ry A re a . T he S h e llfi s h pro g ra m pu b lis h e s a n n u a l re p o rt s of g ro w in g a re a s lis tin g a ll the do w ng ra d e s a nd th re a te n e d a re a s fo r th e ye a r. A ny g ro w in g a re a w ith a cl a s s ifi c a tio n of "C o n d itio na lly A p p ro v e d ," "R e stric te d ," o r "P ro h ib ite d " s h o u ld be co n s id e re d in a n M R A a n a ly sis w ith th e un d e rs ta n d in g th a t a g ro w in g a re a w ith o ne of th e se de s ig n a tio n s w o u ld no t a u to m a tic a lly le a d to a n M RA , bu t w o u ld be a v e ry s ig n ifi c a n t re a so n fo r s u c h c la s s ific a ti o n . M a rin e w a te rs th a t a re liste d by th e D e p a rt m e nt of E c o lo g y un d e r s e ctio n 30 3 (d ) fo r lo w -d is so lv e d ox y g e n o r fe c a l c o lifo rm ba c te ria . A no th e r w a y th e M RA in Je ff e rso n C o u n ty w a s id e ntifi e d is the lis tin g o n the D e p a rt m e nt o f E c o lo g y 's 30 3 (d ) lis tin g fo r lo w -d is s o lv e d ox y g e n a n d fe c a l c o lifo rm ba cte ria . M a rin e w a te rs w h e re nitro g e n ha s be e n id e n tifi e d a s a c o nta m in a n t of c o n c e rn by the lo c a l he a lth off ic e r. R C W 70 .11 B A.0 4 0 (1) (c ) d ire c ts th e lo c a l he a lth off ic e r to pro p o s e a m a rin e re c o v e ry a re a fo r th o s e la n d a re a s w h e re e x is tin g o n -site se w a g e d is p o sa l sy ste m s a re a sig n ifi c a n t fac to r c o n trib u tin g to c o n c e rn s a sso c ia te d w ith m a rin e w a te rs w h e re nitro g e n ha s be e n id e n tifi e d a s a co n ta m in a nt of c o n c e rn by the lo c a l he a lth off ic e r. H o w e v e r, un lik e (1)(a ) an d (b ), in R C W 70 .1 1 8 A.0 4 0 (c ) the re are no state w id e m o n ito rin g da ta fo r nitro g e n in m a rin e w ate rs to he lp in the de te rm in a tio ns of a po s s ib le M RA . T h e s ta tute re q u ire s J e ff e rso n C o u n ty to m a ke a ju d g m e nt a b o u t m a rin e a re a s kn o w n to be at ris k fr o m nitro g e n c o n ta m in a tio n a n d c o n s id e r th e po te n tia l c o n trib u tio n fr o m a s s to the pro b le m . A t th is tim e , Je ff e rso n C o u n ty c o n s id e re d th e lo w -d is so lv e d o x yg e n is s u e s in H o o d C a n a l s ig n ifi c a n t e no u g h to cl a ss ify H o o d C a n a l a s a M RA , bu t w e are d u b io u s a b o ut th e c o rre la tio n be tw e e n a s s s a n d lo w D O . H o w e v e r, as th e nitro g e n /lo w d is s o lv e d ox y g e n is s u e s be c o m e cl e a re r w ith m o re da ta , it m a y be ne c e ss a ry fo r the he a lth off ic e r to c o n s id e r de -cl a s s ifyin g the a re a . 4.3.2 Evaluation of 05S to Ensure Proper Function In the Hood Canal MRA, Jefferson County will conduct a field assessment of existing ass along the entire Hood Canal shoreline from Tala Point to the southern county line using the Ecology-approved Protocol for Pollution Identification and Correction (PIC) See Appendix A.17 for the P/C protocol. Onsite Sewage Management Plan 8/20/2007 page 33 of 46 B e fo re c o n d u c tin g fie ld w o rk, th e o bje c tiv e s of th e s ite vis its (s u rve y ) w ill be d e fi n e d . G e n e r a ll y , th e s u rv e y s w ill be us e d to de te rm in e fun c tio na lity of the O S S . F ie ld w o rk w ill in cl u d e do o r-to -d o o r sa n ita ry s u rv e y s , re s id e nt in te rv ie w s , ed u c a ti o n , dy e te stin g as ne c e ss a ry , an d s u rf a c e w a te r m o n ito rin g to id e n tify failin g sy s te m s a n d pro v id e ba s e da ta fo r m e a s u rin g s u c c e s s . Je ff e rso n C o u n ty w ill utiliz e C C W F fun d s to c o n d u c t this w o rk ov e r a 3-4 ye a r pe rio d . E v e n if a n ev a lu a te d sy s te m is fo u n d to be fun c tio n a l, bu t no t O &M fr ie nd ly , Je ff e rs o n C o u n ty w ill ad v is e ho m e o w ne rs to in s ta ll O &M c o m p o n e nts (s u c h a s ris e rs o n a ll ta n k s a n d at the d-b o x , m o n ito rin g po rt s a t ne a r an d dis ta l e nd s of dra in fi e ld le g s , tim e rs an d c o u n te rs fo r s y s te m s w ith pu m p s an d o utle t ba ffl e filte rs fo r a ll s e ptic ta n k s) in o rd e r to pro v id e th e ho m e o w ne r w ith the m e a n s to c o n d u c t m o re th o rou g h O &M in s p e ctio n s o n th e ir s y s te m . Je ff e rs o n C o u n ty w ill pu rsue gra n t fun d in g to pro v id e fi n a n c ia l as s is ta n c e to ho m e o w ne rs to pe rf o rm up g ra d e s o n the ir sy s te m s , a s w e ll as w o rk w ith S h o re B a n k E n te rp ris e s o r othe r fin a n c ia l in s titutio n s to a ss is t w ith fun d in g th e s e up g ra d e s . 4.3.3 Determination and Repair of Failing Systems If an OSS is identified as failing per the definition of failure in WAC 246-272A and in Jefferson County's local OSS code, the homeowner will be provided with information about ShoreBank Enterprises low-to-no interest loan program to repair their failing OSS. Information about other financial assistance options will be provided when known. If voluntary compliance cannot be obtained, then further enforcement action will be taken, up to and including abatement. All repaired OSS in the designated MRA will be required to meet current state and local code, and will be O&M friendly. All repaired OSS that require pumps will also be required to have timers and counters, meet manufacturers O&M requirements, meet State Recommended Standards and Guidance (RS&Gs), and have monitoring ports installed throughout the system. Repaired systems in a designated MRA will have to strictly follow Jefferson County O&M requirements. Active and aggressive enforcement of the O&M requirements will be mandatory in the designated MRA. 4.3.4 Additional Requirements within MRAs A current monitoring inspection report by a cerified 3rd party must be on file prior to a property sale within the MRA boundary as in other areas of the county. Additionally, Jefferson County will require the following for any new OSS installed within designated MRAs: Standard gravity and pump-to-gravity OSS For new standard ~ravity and pump-to gravity system located within a designated MRA, a certified 3r party O&M Specialist must conduct an O&M inspection at the third year of operation (the 1st inspection). After the third year, an O&M inspection will be required every 3 years and/or at the time of sale. All standard Onsite Sewage Management Plan 8/20/2007 page 34 of 46 an d pu m p -to -g ra v ity sy s te m s to be in s ta lle d w ith in a de sig n a te d M R A w ill be in s ta lle d w ith a &M fr ie nd ly m o n ito rin g po rts , ea s ily a c c e ss ib le lid s w ith ris e rs , an d o u tle t ba ffle fi lte rs. A lte rn a tiv e a n d pro p rie ta ry sy s te m s A ll ne w a n d ex is tin g alte rn a tiv e a n d pro p rie ta ry sy s te m s in a de s ig n a te d M RA w ill ha v e to m e e t th e fo llo w in g a d d itio n a l re q u ire m e nts : 1) T im e rs a n d c o u n te rs w ill be m a n d a to ry o n a ll s y ste m s . 2 ) S tric t ad h e re nc e to a ll m a n u fa c tu re rs O &M re q u ire m e n ts , a n d S ta te R S &G s , w ill be re q u ire d fo r a ll pro p rie ta ry sy s te m s . 3 ) S t r ic t a d h e r e n c e to , a n d e nfo rc e m e nt of, the O &M s c h e d u le w ill be m a n d a to ry . 4.3.5 Identifying Unknown OSS in MRAs and Ensuring Proper Function Each year, Jefferson County identifies previously unknown systems through established practices. Information on these systems is added to the database and, over time, the percentage of unknown systems within Jefferson County is reduced. In order to find all ass within the Marine Recovery Areas by 2012, Jefferson County will employ the following strategy. This strategy operates programmatically for all parcels within the designated MRA as well as on the individual properties. Jefferson County's strategy develops a prioritization of activities with potentially high-risk situations taking precedence. The following outline lists Jefferson County's MRA on-site strategy: ✓ Within each newly defined MRA, Jefferson County will develop a known, assumed and unknown OSS data set using parcel data and permitting data as is currently in progress for countywide O&M monitoring. ✓ Jefferson County will identify property owners and request information regarding their OSS by mail or in person. This may include as-builts, O&M records, building permits or other pertinent information. ✓ Jefferson County will prioritize the developed areas within a MRA where ass data is missing in order to identify why the data gaps exist and prioritize work efforts (such as conducting sanitary surveys) to fill in those data gaps. ✓ Jefferson County will update the electronic database and paper records as new information becomes available. As required by RCW 70 .11 BA.060(2), Jefferson County will assure that the data compiled within the MRA will be compatible with the OSS data systems used throughout Jefferson County. Once the Jefferson County BaH and the community agree with the strategy herein, Jefferson County will begin to conduct field assessments of existing ass within the MRA. Before conducting fieldwork, the objectives of the site visits (survey) will be defined. Generally, the surveys will be used to determine functionality of the ass. Fieldwork will include door-to-door sanitary surveys, resident interviews, education, dye testing as necessary, and surface water Onsite Sewage Management Plan 8/20/2007 page 35 of 46 m o n ito rin g to id e ntify fa ilin g sy s te m s a n d pro v id e ba se da ta fo r m e a s u rin g s u c c e ss . F e c a l c o lifo rm ba c te ria c o n ta m in a tio n fr o m othe r s o u rce s s u c h as sto rm w a te r ru n o ff an d a n im a l w a ste (in cl u d in g fr o m ho b b y fa rm s ) w o u ld be us e ful in fo rm a tio n fo r fu rt he r in v e stig a tio n . T he Je ff e rso n C o u n ty M RA stra te g y a d d re sse s c itiz e n pa rt ic ip a tio n v ia ed u c a tio n eff o rt s . T he s e eff o rt s in cl u d e pu b lic m e e tin g s , d ire c t m a ilin g s , pre s s re le a se s , ne w s p a p e r art icl e s , pu b lic in fo rm a tio n ad v e rtis e m e nts, c o m m u n ity ev e n ts (fairs , m a r k e t s, etc .), w o rks h o p s o n o n -site se w a g e sy ste m O &M , pro v id in g h o m e o w n e r s w it h c o p ie s o f t h e ir O S S r e c o r d s , a n d pro v id in g te c h n ic a l ad v ic e a n d in fo r m a t io n b ro c h u r e s o n O S S m a in te n a n c e . J e ff e r s o n C o u n t y w ill m a n a g e O S S d a t a w it h in t h e M R A via th e ex is tin g O &M d a t a b a s e s y s t e m . T h e s t r a t e g y a d d r e s s e s d a t a m a in t e n a n c e in re la tio n to e n s u r in g t h a t O S S s a r e n o t f a ilin g w it h in t h e M RA s . D a t a m a in t e n a n c e in cl u d e s : r e p o r t c o lle c t io n , d a t a e n t r y , v e r ifi c a t io n o f d a t a a c c u r a c y , e n s u r in g t h a t d a t a is s h a r e a b le , m e c h a n is m s in p la c e t o r e c o v e r c o s t s , li n k in g O &M r e p o rt s t o p a r c e l d a t a , a n d t h e a b ilit y t o fo llo w -u p w it h p r o b le m s t h a t a r e id e n t ifi e d . O &M d a t a w ill a ls o b e u s e f u l in t h e p e rf o r m a n c e e v a lu a t io n o f O &M p r o v id e r s w it h in t h e ju r is d ic t io n . 4.4 Electronic Data System of OSS within a MRA (3SHB 1458, Section 6) 4.4.1 Reporting Failing Systems to Jefferson County Report Submission An OSS maintenance specialist, septic tank pumper, or other person performing O&M on an MRA' will submit reports to Jefferson County Public Health via mail. Eventually, online submissions via a web-based system will be available. Unsatisfactory Reports When a report is submitted as "unsatisfactory" by an O&M specialist, the record will be tagged within the database. The tagging may be linked to any prescribed actions. Unsatisfactory reports in any area will place the record on a notification list where the owner will be sent a notification that such a report is on file, details of the issue that caused the report, and instructions on what is needed to address the concern. This notification will include a mail-back form for the homeowner to fill out how the issue was resolved. The homeowner will continue to receive such reports until the issue is resolved and updated in the database. Additional Activities & Tools Needed in Finding Failing Systems Currently, Jefferson County is planning on hiring staff and the tools necessary to follow-up with unsatisfactory reports, up to and including technical advisory visits. Enforcement activity beyond notification and tagging of the case will not be pursued for non-failing unsatisfactory reports. Onsite Sewage Management Plan 8/20/2007 page 36 of 46 C o o rd in a tio n w ith D O H J e ff e rs o n C o u n ty w ill be w o rk in g w ith th e D O H to de v e lo p co m m o n fo rm s a nd pro to c o ls to fac ilitate the s h a rin g o f da ta o n M RA s. 4.4.2 Ensuring Electronic 05S Data Systems for Each MRA are Compatible within Jefferson County (addressed in Part One) OSS data systems for the Hood Canal; MRA is compatible within Jefferson County. Jefferson County will work with other agencies, as applicable, that maintain OSS data to ensure that the data systems are as compatible as possible. 4.5 DOH Contracts with Jefferson County for Marine Recovery Area 4.5.1 Jefferson County's current capacity and estimated need (personnel, financial assistance, hardware and software, etc.) to meet certain goals Jefferson County will not be able to meet the goals outlined in this Plan without financial assistance to provide more personnel and software. Specifically: 1) Additional long-term and stable funding for additional Full Time Employees (FTEs) to conduct sanitary surveys of OSS in the Hood Canal MRAs is needed. Without additional personnel, the needed sanitary survey work in the Hood Canal MRA cannot be performed. Funding sources could include local and state funding, or a combination of both. Current funding levels do not allow for increased FTE to conduct the necessary work outlined herein. 2) Workspace is a severe limitation for the Jefferson County EH department. A stable funding source will be needed to include funding for renting more work space to add FTE. Until a new or additional workspace can be identified and secured, adding FTE is not possible. 3) Additional and short-term funding must be secured to complete the document scanning task that must be done as soon as possible. A full time FTE for approximately one year would be enough to complete the task. 4) More funding is needed to have the current database upgraded to meet the reporting expectations of DOH. The funding source would be used as- needed to perform customized data retrieval/queries for OSS in the Hood Canal MRA. If DOH can secure funding and contract with Jefferson County for these high priority items, then implementing this Plan would be possible within given timeframes. Otherwise, this Plan will not be able to be implemented and the goals outlined herein will not be achieved. Onsite Sewage Management Plan 8/20/2007 page 37 of 46 4.6 R eso urces Puget Sound Partnership, Ecology and DOH will continue to provide technical assistance to Jefferson County on issues related to the shellfish protection districts and closure response strategies. 4.7 Timeline The following timeline outlines the steps necessary to develop and implement a Marine Recovery Area strategy: Requirements Activities Deadline 1. Define MRA Boundaries 1. Jefferson County within Jefferson County proposes a MRA in Hood (RCW 70.11 BA.040) Canal within Jefferson 1. July 1, 2007 County jurisdiction 2. Present data on both water quality and the status of OSS to BOH, BOCC, OSS Technical Advisory Groups, WRIA 17, and Closure Response Teams. 2. July 19, 2007 2. Develop MRA OSS By July 1 2012, Jefferson Strategy for Designated County will find existing Strategy due by MRAs failing OSS and repair July 1, 2007 (RCW 70.11 BA.050) those systems to code and locate/identify unknown OSS and ensure that functionality. 3. Require O&M Jefferson County will utilize Professionals to Report on existing OSS electronic Ongoing all Failing Systems Found data systems and will Within MRAs (RCW maintain records for all 70.11 BA.060) OSS within designated MRAs. 4. DOH Responsibilities DOH will: (RCW 70.11 BA.070) • Review Jefferson County's Sewage Sewage management Plan Management Plan for due to DOH by completeness July 1, 2007 • Within 30 days, approve the MRA Strategy or suggest changes DOH will assist Jefferson Onsite Sewage Management Plan 8/20/2007 page 38 of 46 County in: • Enhancing OSS electronic data systems via funding 5. DOH Contracts with Jefferson County details Jefferson County to steps towards the Implement the Plan progressive improvement July 1, 2012 (RCW 70.118A.080) of: • Increasing the percentage of OSS represented in the database accurately • Increasing the percentage of OSS receiving inspections within the appropriate service intervals • Finding failing OSS and making needed repairs • Finding and inspecting unknown oss 6. Financial and Technical The Department of Ecology Assistance shall provide financial and (RCW 90.48.595) technical assistance to July 1, 2007 Jefferson County for Pollution Identification and Correction programs within current and future designated MRAs. ShoreBank Enterprises or other financial institutions will provide low-to-no interest loans to homeowners with failing OSS to repair their OSS. Priority will be given to low- income and financially distressed homeowners 7. 3SHB 1458, Sec. 11 DOH report to Legislature (this section not codified) on progress made toward December 31, 2008 MRA designation and strategy implementation Onsite Sewage Management Plan 8/20/2007 page 39 of 46 4.8 Sum m ary Jefferson County will embark on an aggressive and encompassing effort to identify existing OSS within designated MRA, determine functionality, and assure proper records about the OSS is recorded on an enhanced and easily-queried database system. Part 5: Education This part of the Plan describes the OSS education activities that the Jefferson County Environmental Health Division conducted prior to the establishment of the new state law, and the activities that the Division plans to conduct to support the provisions of this Plan. This section relates to the following elements of WAC 246-272A-0015(1 ): d) Facilitate education of homeowners regarding their responsibilities under this chapter and provide operation and maintenance information for all types of systems in use within the jurisdiction; e) Remind and encourage homeowners to complete the operation and maintenance activities as identified; and h) Describe the capacity of the local health jurisdiction to adequately fund the local OSS plan, including the ability to find failing and unknown systems. 5.2 Activities 5.2.1 Current Education Program The following section details the current methods Jefferson County Environmental Health uses in educating the public about the risks of OSS to public health. JC Code 8.15.150 ( 4) states that the Health Officer shall be responsible to make available written guidance on the proper maintenance and operation of the OSS to the owner. Information shall be made available at the Health Division and the JC Department of Community Development locations and shall be mailed on a periodic basis to owners of OSS by the Health Officer or his/her designated representative. This is fulfilled by workshops, mailings, web accessible pamphlets and links, and written information at selected locations as detailed below: 5.2.1.1 Public classes & events Analysis of monitoring reports informs development of class content as well as highlighting areas for which we need to develop additional written or web available material. Crystal Reports allows us to evaluate monitoring information in relation to other fields within the Accela database. Reports can be generated Onsite Sewage Management Plan 8/20/2007 page 40 of 46 by de fi n in g pa ra m e te rs by tim e pe rio d of in s p e c tio n , in s p e c to r, pro b le m id e ntifi e d , la n d a re a (lo t s iz e ), sy s te m ty p e , s o il ty p e , da te of in sta lla tio n , etc . • C la s s e s a re pro v id e d to ho m e o w ne rs th ro u g h A sso c ia tio n m e e ti n g s , a d v e rt is e d e v e n t s a n d a s p a rt o f o t h e r g r o u p s s u c h a s W S U s ' W a te r W a t c h e r s , R e a lt o r s t r a in in g s , a n d S h o re S te w a rd s . F ro m 20 0 1-2 0 0 5 , 5 1 cl a s s e s /w o r k s h o p s w e r e p ro v id e d t o 1 ,2 9 1 p a r ti c ip a n t s . • P a rt ic ip a t io n in s c h o o l s p o n s o r e d e v e n t s s u c h a s c a re e r da y s a n d s c ie n c e cl a ss e s . • C la ss e s sp o n s o re d a n d he ld lo c a lly a re pro v id e d to o ns ite se w a g e p r o f e s s io n a ls -d e s ig n e r s , in s ta lle rs, pu m p e rs a n d O &M S p e c ia lists . T he se r a n g e fr o m t r o u b le s h o o t in g sy s te m pro b le m s , e le c tric a l c o n tro ls , drip ir r ig a t io n s s y s t e m s a n d c o d e r e v is io n s . • T V - v id e o -A 3 0 m in u t e s p o t w a s p r o d u c e d f o r t h e lo c a l c a b le sta tio n o n w a t e r q u a lit y a n d O S S . • P u b lic W o rk s h o p s co o rd in a te d w ith othe r w ate r qu a lity im p ro v e m e nt pro g ra m s su c h a s th e H o o d C a n a l S a n ita ry S u rve y P ro je ct. • A s pa rt of th e H o o d C a n a l S u rv e y P roje c t J e ff e rs o n C o u n ty s ta ff ha s c o nd u c te d 3 0 s ite v is its fo r "s e pti c s of c o n c e rn ". T h e se s it e s are in the v ic in ity o f s a m p lin g s it e s t h a t h a v e e -c o li h it s . T h e s e s ite v is its c o n s ist of re v ie w in g th e O S S w ith the o w n e r, pro v id in g th e m a c o p y of a n y re co rd s w e ha v e o n th e ir s ite a n d pro v id in g te c h n ic a l as sis ta n c e to the ow n e rs of the sy ste m . D y e te s ts a re a ls o us e d in s o m e ca s e s to dia g n o se pro b le m s . H o m e o w ne rs a re pro v id e d w ith sy ste m o p e ra tin g in fo rm a tio n a n d re p a ir fi n a n c in g o p tio n s . 5.2.1.2 Educational Handouts, Technical Assistance • Professional and technical staff are available for site specific and general information regarding OSS. • Pamphlets on: ✓ "Taking Care of Your Septic System" ✓ "Getting Approval on Your Property" ✓ "Rate Your Septic System Knowledge" ✓ "Septic Tank Additives" ✓ "Inspecting Your Septic Tank" ✓ "Myths and Truths About Septic Systems" ✓ Low interest loan programs ✓ Understanding and Caring for Your X System (provided by DOH) • Direct mailing - At the time of system installation, upon completion: ✓ Conventional systems - Since 2000 - The current owner is sent an "asbuilt/record drawing", a sticker with installation info and "do's and don'ts", a pamphlet on caring for the system, and a memo from the Public Health Department. ✓ Non-conventional systems - The designer is required to provide the "asbuilt/record drawing", the installation report and an operations Onsite Sewage Management Plan 8/20/2007 page 41 of 46 and m a intenance m anua l that is specific to the ir system to the ow ne r. • M o nitoring inspectio n repo rt s are pro vided to the propert y ow ne r upon com ple tio n of each inspectio n by the inspecting entity. • Scanned R ecords - Jefferson C o unty has begun an extensive , long term project to scan all onsite sew age records. T his w ill allow a reductio n in the use of paper copie s and facilitate the pro visio n of records to ow ne rs and othe r interested part ie s. W hile the entire record is scanned only a portio n is placed on a site that is availa ble to the public. It consists of: ✓ initial application, ✓ permit and conditions, ✓ approved design, ✓ "asbuilt/record" drawing and report, ✓ soil logs 5.2.1.3 Webpage and Links to external resources • Jefferson County Public Health Webpage provides the above pamphlets in pdf format, forms, owner and professional information, lists of currently certified installers and O&M Specialists. • Links to external websites are located on Jefferson County's Environmental Health webpage including: WSU Cooperative Extension and Jefferson County Conservation District, King County Metro, WS DOH, Northwest Onsite Training Center (Puyallup). (see appendix for screen shots) 5.3 PLANNED EDUCATION Response to homeowner classes targeted to properly operating and maintaining their systems is extremely positive. Workshops were given to several homeowner groups from September-October 2002. A postpaid postcard was sent to 85 workshop participants in May of 2003 with seven questions regarding the workshops. The goal of these workshops is to modify or reinforce best practices regarding operation of their septic system. Questions ranged from the basic - "was the workshop useful?" to "describe one thing you do differently as a result of attending the workshop". The return rate was 37 %. On a scale of 1-10, 10 being the best, 85% rated it 8 or higher, 94% felt it should be continued, 97% shared the info with others and 88% listed at least one thing they do differently. See Appendix C.1 for questionnaire and results) • Future educational/outreach possibilities include: increasing the number of public advertisements, general educational mailings, and operations and maintenance classes. Four to seven classes per year are planned. Class size ranges from less than 10 to more than 60. • One of the local designers has developed a homeowner open book "quiz" that he requires the homeowner to take and pass prior to signing off on the system installation. The quiz can be answered entirely from his design and Onsite Sewage Management Plan 8/20/2007 page 42 of 46 the ho m e o w ne r m a n u a l he pro v id e s . H e ha s s u g g e ste d the c o u n ty c o n s id e r m a k in g th is a re q u ire m e n t fo r a ll s y ste m s . • T he fo llo w in g bro c h u re s/pa m p h le ts a re in d e v e lo p m e n t fo r "H o w to H ire a S e p tic D e s ig n e r" a n d "U n d e rsta n d in g Y o u r In s p e c tio n R e p o rt ". 5.4 Current Reminders 5.4.1 Initial Installation Introduction • Direct mailing - At the time of system installation, upon completion: ✓ Conventional systems - Since 2000 - The current owner is sent an "asbuilt/record drawing", a sticker with installation info and "do's and don'ts", a pamphlet on caring for the system, and a memo from the Public Health Department. ✓ Non-conventional systems - The designer is required to provide the "asbuilt/record drawing", the installation report and an operations and maintenance manual that is specific to their system to the owner. 5.4.2 Periodic Notification A post card is used to remind homeowners that an inspection is due. When major items of concern are noted on the inspection report a follow up letter is provided to the owner with a list of licensed designers or installers, whichever is necessary based on the conditions noted. 5.5 Planned Reminders Jefferson County plans to continue the practice of sending reminder notices to homeowners to conduct or hire a professional to conduct O&M on their OSS. Based on feedback from the advisory group we plan do develop a series of brief, concise materials that review do's and don'ts, trouble shooting system problems and others items as they are identified. The scanning project will allow all homeowners to access their permit documents information on-line. This process has been underway for over a year, and records for cases from 2000-2002 are available now. 5.6 Measured Effectiveness of Targeted Outreach The postcard questionnaire was a useful tool and provided valuable information as to what elements of the classes was most effective. This tool will be used in this context and with other outreach methods in the future. 5.7 Resources Current resources for educational outreach include county funds for further homeowner education and systemic reminders for O&M inspections. Additional resources needed to implement activities as outlined in Part 5 include: Onsite Sewage Management Plan 8/20/2007 page 43 of 46 1. A dd itio n a l fun d in g to de v e lo p an d s e nd re m in d e rs , po s ta g e co sts , sta ff c o sts , an d m is c e lla n e o us c o sts to tra c k a n d dis s e m in a te in fo rm a tio n ; 2 . A dd iti o n a l fu n d in g to as s is t Je ff e rs o n C o u n ty in de v e lo p in g m a te ria ls fo r ed u c a tio n pre se n ta tio n s , o u tre a c h s e ss io n s , etc . M a y in cl u d e fun d in g fo r vid e o pro d u c tio n , bro c hu re s , pa m p h le ts , an d othe r m a te ria ls . 3 . A dd itio n a l fun d in g to hire a M a s te rs -tra in e d ed u c a tio n/o u tre a c h s p e c ia list to ass u re pro p e r m e ssa g in g a b o u t O &M . 5.8 Timeline The following timeline outlines prioritized activities to conduct education and outreach efforts regarding O&M of OSS: Goals Activities Deadline Educate homeowners on • Classes ongoing. their responsibilities and • Published articles in provide O&M information local papers for all types of systems in • Develop written and web use in Jefferson County available info fWAC 246-272A-0015(1 )l Remind and encourage Reminder postcards ongoing. homeowners to complete O&M inspections fWAC 246-272A-0015(1 )l Joint community classes Continue to respond to Schedule already confirmed with WSU Co-op Extension requests as contacted. for 2007. Target special education • Develop education Updating education materials to residents in materials in consultation materials and initiating sensitive areas and Marine with newO&M public events and classes Recovery Areas requirements for shall occur in the sensitive areas subsequent months after • Update O&M database establishing sensitive areas to place educational and MRAs and their notifications on O&M associated O&M details. schedule for sensitive area and MRA residents • Host educational activities in sensitive areas and MRAs. Onsite Sewage Management Plan 8/20/2007 page 44 of 46 5.9 S um m ary and P rio ritizatio n of A ctiv ities Jefferson County will continue its current program and plans to augment its OSS O&M education program in providing educational materials, reminders and notification, holding public meetings and classes, attending and presenting at homeowner's meetings and community events independently and jointly with WSU Cooperative Extension, and providing access to resources for community and O&M specialists. The number of classes and reminders and the date when records will be available online is controlled by available funding. References 1 The Washington State Legislature defines "unknown system" as an OSS that was installed without the knowledge or approval of the local health jurisdiction, including those that were installed before such approval was required. 2 www .ofm.wa.gov/datebook/county 3 US Census 2000 4 2003 Health of Jefferson County, Jefferson County Health and Human Services 5 Ibid. 6 Ibid. 7 Ibid. 8 Jefferson County Housing Action Plan, adopted Oct. 2006 9 Soil Survery US Department of Agriculture Soil Conservation Service, 1975 10 Jefferson County Surface Water Management Plan, adopted 2006 11 UDC, adopted 2000 List of Contacts Linda Atkins R.S., Environmental Health Specialist 3, Jefferson County Public Health Mike McNickle M.P.A.,R.S., Deputy Director, Jefferson County Public Health Jim Pearson, Lead author on JC Surface Water Management Plan, Jefferson County Public Works Michelle McConnell, JC Associate Planner, Lead for Shoreline Master Program Update Doug Noltemeier, Senior GIS Analyst, JC Central Services Dept. Pat Perriman, Cartographer/GIS Analyst, JC Assessor/ JC Central Services Dept Brent Butler, Jefferson County Lead Associate Planner, Lead on Port Townsend and Jefferson County Housing Action Plan, 2006 Onsite Sewage Management Plan 8/20/2007 page 45 of 46 D a ta S o u rc e s Health of Jefferson County 2003, Analysis by Dr. Christiane Hale, PhD, MPH and Kellie Ragan MA. Editor Kellie Ragan MA. Technical Editor Dr. Tom Locke, JC Health Officer. Behaviorial Risk Factor Surveillance System (BRFSS) 2001 Jefferson County Comprehensive Plan, 1998 and 2004 update. Watterson Report, January 1995. Referenced in Comprehensive Plan page 3-3. 2000 US Census Jefferson County Onsite Sewage Code 8.15 Jefferson County Onsite Sewage Policies Jefferson County Unified Development Code (UDC) adopted 2000 Onsite Sewage Management Plan 8/20/2007 page 46 of 46 Jefferson County Board of Health V. New Business Item 2 OWL 360 YCCTPP* Mini Grant Presentation [No hand-out] Healt * Youth Cannabis & Commercial Tobacco Prevention Program A ugust2 0 ,2 0 26 Jefferson County Board of Health V. New Business Item 3 Sc outing A m e ric a Y C CTPP Mini Grant Presentation [No hand-out] It A ugu s t2 0,2 026 J e ffe rso n C o u n ty B o a rd o f H e a lth V . N e w B u s in e s s Ite m 4 J e ff C o S o c c e r C lu b Y C C T P P M in i G ra n t P re s e n ta tio n [N o h a n d -o u t] bl He August20,2026 Jeffe rso n C ou n ty B oa rd of H e alth V . N ew B u siness Item 5 Je fferson C ou n ty S uppo rt s for C hildre n w ith A utism S pectrum ID iso rder alt August20,2026 ~ PublicH~ Jefferson County Programs Highlight Presentation H ighlighted prog ra m s: • School Autism Medical Review Team (SMART) • Intellectual and Developm ental Disabilities (IDD) Fo c u s: Illuminating how these programs support children who are or may be experiencing Autism Spectrum Disorder (ASD). T o d a y w e 'll re v ie w : • W h a t/W h o is SMART • How SM ART serves residents • Lifelong supports for residents with ASD Introducing: C y n de Marx Jefferson County Coordinator for: • Children and Youth with Special Health Care Needs (CYSHCN) • School Medical Autism Review Team (SMART) Contact: CMarx@co.jefferson.wa.us or 360-385-9431 W h a t is S M A R T ? A state-supported partnership between: • Schools • Medical providers • Community partners To improve local access to ASD assessments P a rtic ip a tio n Ste p s : • A fam ily connects with their school district or a birth-three services provider • A sch o o l a n d /o r B -3 p ro v id e r d o cu m e n ts developmental concerns • A s a p p ro p ria te , sch o o l/p ro v id e r re fe rs fa m il y to SM A R T (Cynde M arx) • SMART contacts fam ily to gather information • SMART collaborates with school/provider to review information • SM A R T m a tc h e s child with a local provider for ASD evaluation • SM A R T p ro v id e s fa m il y w it h in fo rm a tio n a b o u t a d d it io n a l re so u rce s Origins and Trajectories: • SMART began in Lewis County in 2010 • Jefferson County's team launched in 2024 with a single provider • The Jefferson team expanded in 2025 by adding a second provider, Dr. Bower • The Jefferson team continues to slowly grow while building community trust C o m m unities do better w h e n system s w ork tog eth e r to pave clea r path s to th e su p po rts e v eryon e needs to th rive. Introducing: Dr. Melin-da Bow er • Naturopathic Doctor at Jefferson County Public Health • Center of Excellence (COE) for Autism Evaluation Dr.B o w e r's SM ART Role • Completed Autism Spectrum Disorder COE training in Dec. 2024 with support of SM ART • Accepts SM ART referrals for ASD evaluations for patients with Medicaid insurance • Encourages all school districts to join the team, learn more about ASD evaluation, and communicate about children who may benefit from an evaluation Intellectual & Developmental Disabilities (IDD) Coordinator Bonnie Obremski • Moved to Jefferson County in 2014 • Began at Jefferson County Public Health as a communications specialist in 2021 • Moved to IDD Coordinator role for the county in Nov. 2024 Contact: BonnieO@jefferson.wa.us (360) 385-9410 Supports funded by the state and county are available for residents with an IDD diagnosis, who meet all eligibility criteria. No-cost supports may include but are not limited to: • Birth to Three services • In -school w orkplace readiness supports for ages 14+ • Caregiving & family- supports • H o u sing sup p orts • Th e rap ies • A ssistive technolog ies • C o m m un ity inclu sio n • Sup p orte d e m p loym e nt Call to Action • Tell families, schools, providers about SMART and services for residents with intellectual/developmental disabilities • Encourage providers to participate in SMART training Thank You! C'-• u, C 0 ·- I u, a, ::, 0 Je fferso n C o u n ty B o a rd of H e a lth V I. A n n o u n c e m e n ts A u g u st2 0 ,2 0 2 6 J e ffe rs o n C o u n ty B o a rd o f H e a lth V II. A g e n d a P la n n in g I August20,2026