MEMORANDUM OF UNDERSTANDING (MOU)
MILL ROAD LIFT STATION
WHEREAS, the City of Port Townsend (City), a Washington municipal corporation, and
Jefferson County (County), a political subdivision of the State, agree to this Memorandum of
Understanding (MOU) (each a Party and together the Parties); and,
WHEREAS, the Parties agree to work together to collaboratively advance common
interests related to economic development, provision of government services, affordable
housing, and protection of public health and safety; and,
WHEREAS, the City is developing a sanitary sewer lift station project (Mill Road Lift
Station), as depicted in Exhibit A, as part of necessary infrastructure improvements to provide
sewer service within the Port Townsend Urban Growth Area (UGA); and,
WHEREAS, the intent of this MOU is to document the Parties' roles and responsibilities
in supporting the Mill Road Lift Station's real property acquisition and development strategy;
and,
WHEREAS, the Mill Road Lift Station will provide sewer to areas previously zoned for
development within the Port Townsend UGA; and,
WHEREAS, the planned Mill Road Lift Station will service the City's proposed 320-unit
mixed -income housing project known as Evans Vista. Planning for the Evans Vista development
was initiated by the City in November 2023 in response to the local housing crisis, a shared city -
county priority to address; and,
WHEREAS, in 2023, the City received $1.65M from the Washington State Department of
Commerce (Commerce) in grant funding to assist in the Mill Road Lift Station and associated
piping. In 2025, the City also received notice of award for a $2.5M Community Grant from the
U.S. Environmental Protection Agency (EPA). The City Capital Facilities Plan and General Sewer
Plan includes an estimated $2.OM of City funds to be recovered through local facilities
connection charges from benefiting properties; and,
WHEREAS, the County owns land near the City's Evans Vista project, located within the
Port Townsend UGA. The City and County agree that the Mill Road Lift Station was designed to
serve this area that includes the Caswell Brown Village Supportive Housing site; and,
WHEREAS, the County commissioned a feasibility study for extending sewer into the
Glen Cove light industrial area entitled, Glen Cove Growth Alternatives, Existing Utility
Page 1 of 4
Mill Road Lift Station MOU
Conditions and Infrastructure Extension Analysis; and,
WHEREAS, the County and City have agreed to consider extending sewer service into
Glen Cove subject to Growth Management Act requirements and available fundings; and,
WHEREAS, the County, in consultation with incorporated cities as required under RCW
36.70A.110, holds designation authority over urban growth areas within its boundaries; and,
WHEREAS, in 2025, the City initiated engineering analysis for siting the Mill Road Lift
Station on tax parcel #001161001 or #001162001 as the preferred location for the Mill Road Lift
Station. This property is owned by the County and is within the unincorporated portion of the
Port Townsend UGA. The area is depicted in Exhibit A; and,
WHEREAS, the City is performing environmental review for the project and will serve as
the SEPA lead agency; and,
WHEREAS, this MOU expresses the intention of the Parties to mutually support and
work together to support the Mill Road Lift Station, as well as to continue to work together to
formalize the collaborative interests discussed below.
NOW THEREFORE, the Parties agree that:
The County agrees to sell or exchange Tax Parcel #001161001 (Property) to the City
following due diligence acceptable to the City, including required environmental review
and entitlement acquisition. If infeasible and as an alternative location for the Lift Station,
the County agrees to grant a perpetual easement for the lift station on Tax Parcel
#001162001 of adequate size to accommodate lift station equipment and operations
(Estimated max size 25,000 sf) subject to consultation with, and concurrence of, the
current leaseholder of this parcel.
The Parties agree to satisfy Commerce and EPA acquisition requirements for the Property,
including the Relocation Assistance and Real Property Acquisition Policies Act of 1970
(Uniform Act), as amended and implementing federal or state regulations, policies, and
guidance. The City, as the utility developer, shall be financially responsible for all fair
market acquisition, leasehold valuation damages, and relocation costs required under the
Uniform Act. The areas needed for the improvements as illustrated in Exhibit A are not
currently occupied. The County agrees to not allow occupation of these properties so that
relocation assistance would be unneeded, as the City is not planning for relocation costs
and associated delays.
3. The Parties understand and agree that state and federal environmental review must
occur prior to Property acquisition negotiation, including review under the National
Environmental Policy Act (NEPA).
4. The County agrees to authorize the City to apply for all necessary entitlements for the
Page 2 of 4
Mill Road Lift Station MOU
Property, including a conditional use permit.
The City agrees to provide the County with a copy of the appraisal opinion of value for the
Property.
The Parties agree to use the appraisal opinion of value as the basis for the agreed upon
purchase price for the Property.
The County agrees to grant a perpetual easement to the City 50 feet in width for city
access, ingress, egress, utilities, power, and communications across Tax Parcel
#001162002 and Tax Parcel #001162001 at either no cost to the City or at fair market
value in compliance with the Uniform Act. The general boundaries are depicted in Exhibit
A. As lease terms allow the county to "design and construct a road" across parcel
#001162001, siting in the preferred location would require consultation with the
leaseholder to clarify and reserve a utility corridor for third -party city utility mains, power,
and communications in addition to the access road.
8. The City agrees to provide a service stub -out for the Caswell Brown Village Supportive
Housing and the County's Tax Parcel 001162001. All applicable connection fees shall be
due at the time of connection.
9. The City agrees to construct a service road, at their cost, within the easements provided
to the City to access and service the Mill Road Lift Station. Such service road may be
utilized by the Jefferson PUD subject to future substation siting as agreed upon between
the County and the Jefferson PUD. The easement will include a designated corridor for
underground power necessary to serve the lift station and future substation. This is
depicted in Exhibit A.
10. The Parties agree to cooperate with the Jefferson County Public Utility District #1 for a
future substation on Tax Parcel ID 001162002.
11. Nothing in this MOU authorizes or commits either party to the extension of sewer
beyond the current Urban Growth Area. Any such proposal would require separate
agreements and all applicable planning, environmental, and legal review.
12. The terms and conditions in this MOU are agreed to by the Parties, but are contingent
upon final execution of a purchase and sale agreement approved by representatives of
the parties with the authority to bind a party. For the County only the Board of County
Commissioners has authority to bind the County or authorize a representative to bind
the County.
[SIGNATURES FOLLOW ON NEXT PAGE]
Page 3 of 4
Mill Road Lift Station MOU
IN WITNESS WHEREOF, the Parties have executed this MOU as of the date signed by the last
Party.
For the City of Port Townsend:
Steve King
Acting City Manager
For Jefferson County:
- PIMADAW
Josh D. Peters
County Administrator
8/25/2026
Date Date
Approved as to Form: Approved as to Form:
August 2S, 2026
Austin Watkins Philip C. Hunsucker
City Attorney Chief Civil Deputy Prosecuting Attorney
Page 4 of 4
Mill Road Lift Station MOU
IN WITNESS WHEREOF, the Parties have executed this MOU as of the date signed by the last
Party.
For the City of Port Townsend: For Jefferson County:
Steve King Josh D.Peters
Acting City Manager County Administrator
i rZ g ( z (9 8/25/2026
Date Date
Approved as to Form: Approved as to Form:
" A gust 25, 2026
in Watkins Philip C. Hunsucker
City Attorney Chief Civil Deputy Prosecuting Attorney
Page 4 of 4
Mill Road Lift Station MOU
CONTRACT REVIEW FORM L
Clear Form
(INSTRUCTIONS ARE ON THE NEXT PAGE)
CONTRACT WITH: CITY OF PORT TOWNSEND
Contract No: i�&) W
k(1'
Ito
Contract For: MOU FOR INSTALATION OF A SANITARY SEWER LIFT STATION ON MILL RD
Term: IN PERPITUITY.. NON -BINDING
COUNTY DEPARTMENT: COUNTY ADMINISTRATOR
Contact Person: JOSH D. PETERS
Contact Phone: X130
Contact email: JDPETERS@CO.JEFFERSON.WA.US
AMOUNT: TBD
Revenue:
Expenditure:
Matching Funds Required:
Sources(s) of Matching Funds
Fund #
Munis Org/Obj
TBD
PROCESS: Exempt from Bid Process
Cooperative Purchase
Competitive Sealed Bid
Small Works Roster
Vendor List Bid
RFP or RFQ
Other:
APPROVAL STEPS:
STEP 1: DEPARTMENT CERTIFIES COMP NC TH JC 3 5.080 AND CHAPTER 42.23 RCW.
CERTIFIED: N/A: F■ � ` 7 i -
Si�g t re Date
STEP 2: DEPARTMENT CERTIFIES THE PERSON OPOSED FOR CONTRACTING WITH THE
COUNTY (CONTRACTOR) HAS NOT BEEN DEQARRET � B� FEDERAL, STATE, OR LOCAL
AGENCY. 1 /;T
CERTIFIED: 11 N/A: F
Signature
STEP 3: RISK MANAGEMENT REVIEW (will be added
-7 I_ -
Date
ically through Laserfiche):
Electronically approved by Risk Management on 8/17/2026.
STEP 4: PROSECUTING ATTORNEY REVIEW (will be added electronically through Laserfiche):
Electronically approved as to form by PAO on 8/17/2026.
DPA Luther reviewed and approved on 8-18-2026.
STEP 5: DEPARTMENT MAKES REVISIONS & RESUBMITS TO RISK MANAGEMENT AND
PROSECUTING ATTORNEY(IF REQUIRED).
STEP 6: CONTRACTOR SIGNS
STEP 7: SUBMIT TO BOCC FOR APPROVAL
0
W
z
Z
Q
U
JEFFERSON COUNTY
BOARD OF COUNTY COMMISSIONERS
CONSENT AGENDA REQUEST
TO: Board of County Commissioners
FROM: Josh D. Peters, Countv Administrator
DATE: lt
SUBJECT: APPROVAL OF SIGNATURE AUTHORITY: authorizing the County
Administrator to sign a Memorandum of Understanding with the City of Port
Townsend re: installation of a sanitary sewer lift station on Mill Road
STATEMENT OF ISSUE:
The City of Port Townsend is developing a sanitary sewer lift station project ("Mill Road Lift Station") as
part of necessary infrastructure improvements to provide sewer service within the Port Townsend Urban
Growth Area (UGA), including within the unincorporated portion of the Port Townsend UGA along Mill
Road. The city desires to enter into a Memorandum of Understanding (MOU) with the county regarding the
location of the proposed Mill Road Lift Station, as depicted in Exhibit A to the MOU (attached).
ANALYSIS:
The intent of this non -binding MOU is to document the parties' roles and responsibilities in supporting the
Mill Road Lift Station's real property acquisition and development strategy. The city has selected specific
county -owned property as its preferred location for the Mill Road Lift Station. The proposed MOU
references the intention to enable city sewer service to the county -owned property under lease to OlyCAP
for operation of the Caswell -Brown Village (CBV) temporary housing facility. Staff believes that it is in the
best interest of the county to enable construction of the Mill Road Lift Station at the preferred site in order to
foster housing development in the area, sewer service to CBV (which would provide for full build -out
potential for that location, and potentially sewer service to other appropriate sites in the Glen Cove area.
For context, refer to the Whereas clauses in the attached MOU. The county's Community Development
Director, Public Works Director, Central Services Director, and Chief Civil Deputy Prosecuting Attorney
have reviewed the proposal, as has the Port Townend City Council.
FISCAL IMPACT:
TBD
RECOMMENDATION:
Authorize the County Administrator to sign the attached MOU with the City of Port Townsend.
REVIEWED BY:
Josh eters, County Administrator Date
EXHIBIT A
7 T11
t ,
41 f s 'F
r
r +
t
Caswell -,r> ,•. yly...' �,+�,
••y ,a2 " �1�� ` l Brown �"� ;} L._'Y ?' E ""`}4•.t`4. r .' 7
`"�.. Property„
r3 A is w• >��* R .Y�Y s* �'4 � ' .X .
�. _ E ✓a Y
S *a
e �•.
� IiF•u rip � ,. i ,,, ^,
Proposed gravity t•
:* Alternative Lift Station
and force sewer .
mains and water location corridor, Tax w•
Parcel001162001
service
L
I^ Ate, �' zr�f�. '4r F •. • � qR �.
Proposed 20'�;"" ;' •.
utility/access road
easement to be
acquired by the City
Easement to include Approx. 'R_
PUD authorization for ar y=� footprint * Syr
i�
,'` proposed JPUD�
use.
+�
1 t '` substation
City to acquire utility
authorization/easement =,
from PUD I Preferred sewer lift
L
station location
t �
X
..
Tax Parcel #001161001 to be acquired by the City
4
a
Y 'Q p k
9/9/2025, 7:58:47 AM
PT2024 Street Names 1:4,514
■ 0 0.03 0.06 0.12 mi
Red: Band-1 Tax Parcels � ® �. 0 0.05 01 0.2 km
Green: Band 2
City of Port Townsend, Maxar
Blue: Band 3
Web AppBuilder for ArcGIS