Loading...
HomeMy WebLinkAboutWashington State Department of Transportation Olympic Discovery Trail Change Order 5 - Anderson Lake Connection - 092126 AIM WWashington State A17 Department of Transportation Change Order Contract Number Contract Title Federal Aid Number 18019893 Olympic Discovery Trail- Anderson Lake Connection STBGR-2016(030) Change Order Number Change Description Date 5 Work within SR20 right of way 9/11/2026 Prime Contractor/Design-Builder Seton Construction Inc. ✓ Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications Change proposed by Contractor/Design-Builder Change Description See attached. Verbal Approval Given By I Verbal Approval Date Working Days+/- John Fleming,Jefferson County Public Works 8/10/2026 0 Original Contract Amount Current Contract Amount Est.Net Change Thi C.O. Est.Contract Amount $3,782,268.93 $4,673,475.31 $43,252.50 $4,716,727.81 ,/ Approval Recommended Approved Approved Project Engineer .." -- ---46 Approving Authority per C.A.Agreement 9/11/2026 i1KItar),4 Date Date ✓ Approval Recommended Other Ap Require Digitally signed by Gairrett Orelup DN:C=US, Gairrett Orelup E=gairrett@setonconstruction.com, q// 7i,&CN=Gairrett Orelup Date:2026.09.14 tr3:5 58-0700'' By Prime Contractor gnature Date C l3raM try, 0,/L9(4-- BO CC Date Representing WSDOT Form 140-005 Page 1 Revised 04/2015 JEFFERSON COUNTY Contract# 18019893 Sheet 2 of 2 DEPARTMENT OF PUBLIC WORKS Change Date: 9/11/2026 CHANGE ORDER ESTIMATE Order No. 5 NEW BID ITEMS-GROUP 1(Trail) Bid Item Unit Bid No. DESCRIPTION Unit Amount Qty Unit Bid Total GROUP 1(Trail)CO 05 New Bid Item Added Total $0.00 EXISTING BID ITEMS DELETED-GROUP 1(Trail) Bid Item Unit Bid No. DESCRIPTION Unit Amount Qty Unit Bid Total GROUP 1(Trail)CO 05 Ex.Bid Item Deleted Total $0.00 EXISTING BID ITEMS ADDED-GROUP 1(Trail) Bid Item Unit Bid No. DESCRIPTION Unit Amount Qty Unit Bid Total GROUP 1(Trail)CO 05 Ex.Bid Item Added Total $0.00 ESTIMATED NET CHANGE GROUP 1(Trail)SUBTOTAL: $0.00 NEW BID ITEMS-GROUP 2(SR-20) Bid Item Unit Bid No. DESCRIPTION Unit Amount Qty Unit Bid Total Project Temporary Traffic Control-Additional work 4B to incorporate WSDOT changes LS $ 9,750.00 1 $ 9,750.00 Rectangular Flashing Beacon System-Additional 21B work to incorporate WSDOT changes LS $ 32,600.00 1 $ 32,600.00 GROUP 2(SR-20)CO 05 New Item Total $ 42,350.00 EXISTING BID ITEMS DELETED-GROUP 2(SR-20) Bid Item Unit Bid No. DESCRIPTION Unit Amount Qty Unit Bid Total 23 Ductile Iron Pipe Culy. 12-in. Diam.-CO 4 LF $ 95.00 -30 $ (2,850.00) GROUP 2(SR-20)CO 05 Ex.Bid Item Deleted Total ($2,850.00) EXISTING BID ITEMS ADDED-GROUP 2(SR-20) Bid Item Unit Bid No. DESCRIPTION Unit Amount Qty Unit Bid Total GROUP 2(SR-20)CO 05 Ex.Bid Item Added Total $0.00 ESTIMATED NET CHANGE GROUP 2(SR-20)SUBTOTAL: $ 39,500.00 9.5%Sales Tax $3,752.50 ESTIMATED NET CHANGE TOTAL: $ 43,252.50 Department of Public Works O Consent Agenda Page 1 of I Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Josh Peters, County Administrator From: Eric Kuzma, Public Works Director Agenda Date: September 21, 2026 Subject: Change Order No. 5, Olympic Discovery Trail- Anderson Lake Connection Project, County Project No. 18019893, County Road No. 850200, Federal Aid Project No. STBGR-2016(030), RCO Project No. 20-1745 Statement of Issue: Change Order No. 5 with Seton Construction for the Olympic Discovery Trait- Anderson Lake Connection Project, County Project No. 18019893. Analysis/Strategic Goals/Pro's Et Con's: This project is for construction of a new approximately 3.2 mile-long segment of the Olympic Discovery Trail between Milo Curry Road and Anderson Lake State Park. Change Order No. 5 changes the original contract due to revisions to the crossing at State Route 20 (SR-20). These revisions are to the crosswalk signal lights, associated culvert, and temporary traffic control during construction. Fiscal Impact/Cost Benefit Analysis: This change order will increase the current contract amount by $43,252.50 from $4,673,475.31 to $4,716,727.81 (includes 9.5% WSST on `Group 2' items). The construction portion of this project is funded with WA State Recreation and Conservation Office WA Wildlife and Recreation Program- Trails grant (WWRP) and Federal Highway Administration Surface Transportation Block Grant (STBG). The portion of the trail running along Jefferson Transit's Four Corners Road frontage was funded by Transit. There are sufficient grant funds to cover this Change Order amount. Recommendation: Public Works recommends that the Board execute two originals of Change Order No. 5 with Seton Construction and return one original to Public Works for further processing. Department Contact: John Fleming, P.E., Project Manager, 385-9217. Reviewed By: Jos a ers, County Administrator Date °I I ("1 (a4