Loading...
HomeMy WebLinkAboutSargent Engineers, Inc. Little Quilcene River Bridge Replacement Amendment 4 - 092126 Washington State �1 Department of Transportation Supplemental Agreement Organization and Address Number 4 Sargent Engineers,Inc. Original Agreement Number 320 Ronlee Ln NW Olympia,WA 98502 LQBR-2022 Phone: (360) 867-9284 Project Number Execution Date Completion Date August 15, 2022 December 31, 2027 Project Title - New Maximum Amount Payable Little Quilcene River Bridge Replacement $741,058 Description of Work Work consists of preparing revised abutment and retaining wall designs, and associated updates to the Plans, Specifications, and Estimate. The Local Agency of Jefferson County Public Works desires to supplement the agreement entered in to with Sargent Engineers,Inc. and executed on August 15. 2022 and identified as Agreement No. LQRB-2022 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: I Section 1, SCOPE OF WORK, is hereby changed to read: Preparation of secant pile abutment design, revised retaining wall design, supporting hydraulic and geotechnical engineering, and updated Plans, Specifications, and Estimate as described in Exhibit B. II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: No change III Section V, PAYMENT, shall be amended as follows: The cost of this supplement is $130,404 increasing the Maximum Amount Payable to $741,058. as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. r II pp By: Jessica Soward By: (ir in &'', , C 1' &CC ()MI.& Consultant Signature Approving Authority Signature Approved as to form only: /I-/ Z(4, 09-10-2026 Date DOT Form 140-063 Jeremiah L ether, Revised 09/2005 Civil Deputy Prosecuting Attorney Exhibit "A" Summary of Payments Original Subconsultants Aspect Watershed Estimated Costs _ Sargent Consulting Science Clearway Skillings Total NHR Labor Cost $ 186,403 $ 25,664 $ 39.823 $ 124,100 $ 86.376 $ 462,366 Direct Non-Salary Costs $ 94 $ 20,507 $ 173 $ 30,610 $ 8,564 $ 59,948 Total 1 $ 186,497 $ 46,171 $ 39,996 $ 154,710 $ 94,940 1 $ 522,314 Supplement#1 Subconsultants Aspect Watershed Estimated Costs Sargent Consulting Science Clearway Skillings Total NHR Labor Cost $ - $ - $ - $ - $ 6.849 $ 6,849 Direct Non-Salary Costs $ - $ - $ - $ - $ 105 $ 105 Total 1 $ - $ - $ - $ - $ 6,954 1 $ 6,954 Supplement#2 Subconsultants Aspect Watershed Estimated Costs _ Sargent Consulting Science Clearway _ Skillings Total NHR Labor Cost $ - $ - $ - $ - $ 5,870 _ $ 5,870 Direct Non-Salary Costs $ - $ - $ - $ - _$ - $ - Total 1 $ - $ - $ - $ - $ 5,870 1 $ 5,870 Supplement#3 Subconsultants Aspect Watershed Estimated Costs Sargent Consulting Science Clearway Skillings _ Total NHR Labor Cost $ 19,282 $ - $ 6,496 $ - $ 49,738 $ 75,516 Direct Non-Salary Costs $ - $ - $ - $ - $ - $ - Total 1 $ 19,282 $ - $ 6,496 $ - $ 49,738 I $ 75,516 Supplement#4 Subconsultants Aspect Watershed Estimated Costs Sargent Consulting Science Clearway _ Skillings _ Total NHR Labor Cost $ 96,980 $ 23,823 $ 9.601 $ - $ - _ $ 130,404 Direct Non-Salary Costs $ - $ - $ - $ - $ - $ - Total 1 $ 96,980 $ 23,823 $ 9,601 $ - $ - 1 $ 130,404 Original + Supplement#1 +Supplement#2+ Supplement#3+ Supplement#4 Subconsultants Aspect Watershed Estimated Costs Sargent Consulting Science _ Clearway Skillings Total NHR Labor Cost $ 302.665 $ 49,487 $ 55,920 $ 124,100 $ 148,833 $ 681,005 Direct Non-Salary Costs $ 94 $ 20,507 $ 173 $ 30,610 $ 8.669 $ 60,053 Total 1 $ 302,759 $ 69,994 $ 56,093 $ 154,710 $ 157,502 1 $ 741,058 SARGEN1 Exhibit A Prime Consultant Cost Computations Little Quilcene River Bridge Replacement Abutment Redesign & Retaining Wall Adjustment Sen. Project Project Design Principal Engineer Engineer Engineer Task Cost Total Labor Rate: $249.28 $196.89 $152.43 $112.73 Task 1 - Project Management Project Coordination 40 $9,971 Task 1 Subtotal 40 0 0 0 $9,971 Task 8 - Plans, Specification, and Estimate 8.4 Plans, Specifications, and Estimate Abutment Layout 12 24 $7,717 Abutment Design 24 24 $10,708 Retaining Wall Layout 8 16 $5,144 Roadway Grading Update 8 16 $5,144 Channel Grading Update 4 8 $2,572 Quantities 24 24 $10,708 Updated Plans 58 116 $37,297 Updated Estimate 4 8 $2,572 Updated Specifications 8 16 $5,144 Task 8 Subtotal 150 252 0 0 $87,008 Total Labor Hours 190 252 0 0 Direct Salary $78.50 $62.00 $48.00 $35.50 Overhead (187.56%) $147.23 $116.29 $90.03 $66.58 Profit (30%) $23.55 $18.60 $14.40 $10.65 Total Labor Rate: $249.28 $196.89 $152.43 $112.73 Total Labor Cost $47,364 $49,616 $0 $0 $96,980 Direct Costs &Subconsultants Mileage $0 Task 2 - Geotechnical Design (Geosyntec Consultants) $23,823 Task 3 - Hydraulic Design (Watershed Science & Engineering) $9,601 $33,424 Total for Abutment Redesign & Retaining Wall Adjustment $130,404 Prepared by: JSS Page 1 9/1/2026 Little Quilcene Bridge Supplemental Geotechnical Evaluation Project Management Plan Job Number: TBD Date Authorized: TBD Project Manager: AJH Budget: $ 23,823 Overhead Rate 226.80% Target Completion Date: TBD Profit 30.00% Labor Budget Basis in Hours AJH KDS SW JL CVS Project Senior Other Job Classification Principal Professional Technical Editor Administrator Designer Direct NTE Direct Hourly Labor Rate 89.18 56.55 45.43 50.14 65.55 Total Labor Charges Work Element NTE All-Inclusive Hourly Race: $118.1,' $20431 :..$16209 .$1*80 $133.✓1 Budget (ODC) Subs Task I•Supplemental Geotechnical Evaluatior 34.5 49.5 6 4 5 8 23,823 Geosyntec Consultants,Inc. Page Ioll OMo,WnE PronernQ20000 ho,eas1110095_lide Qukene 9,4geiConvact Vrnpmai MweroMMP Template Up:=e_20260T-I4..hr .? WATERSHED Estimate of Professional Services SCIENCE ,, ENGINEERING Prepared for: Sargent Engineers 506 2nd Ave, Suite 2700 Project: Little Quilcene Seattle,WA 98104 Design Changes Support Tel. (206) 521-3000 Date: August 27, 2026 Prepared By: Kaleb Madsen Hours TASK DESCRIPTION Orin Sr.Eng.1 Sr.Geom Staff Eng. Jr Eng. Clerical Totals Design Changes Support 1 Hydraulic Analysis/Update 2 8 $1,708 2 Scour Evaluation 1 2 6 _ $1,643 3 LWM Design Revision 1 8 $1,475 4 Design and Hydraulic Iterations 1 4 12 $3,039 5 Report Update 2 4 $1,086 6 Admin 2 2 $650 Total Hours and Direct Labor Cost(DL) I 2.0 I 13.0 I 0.0 I 38.0 I 0.0 I 2.0 Labor Rate($/hr)(WSDOT Approved OH 146.862%,30%profit on DL) $245.65 $232.37 $185.90 $155.36 $119.51 $92.52 TOTAL LABOR COST $491 $3,021 $0 $5,904 $0 $1851 $9,601 Direct txpense uetaii Units Rate Cost Mileage $0.725 $0 Total $0 Cost Summary Total Labor $9,601 Total Direct Expenses $0 Total $9,601 Exhibit B Scope of Work Little Quilcene River Bridge Replacement: Abutment Redesign & Retaining Wall Adjustment OBJECTIVE The objective of this supplement is to provide the professional services necessary to provide revised abutment and retaining wall designs for the replacement of the Little Quilcene River Bridge in Jefferson County. The abutment design will utilize drilled secant shafts to support the bridge and approach roadway embankment at both ends of the bridge. The drilled shafts will be designed to withstand the design scour event without the need for additional scour protection, which will minimize construction impacts on adjacent private properties. The retaining walls that are planned at the NW and SE quadrants of the bridge will be updated to fit with the secant shaft abutment design, and the retaining wall at the NW quadrant will be shifted towards the roadway centerline. The channel grading will be modified at the NW quadrant of the bridge to remain within the existing County R/W. The project hydraulic and geotechnical analyses and reports will be updated for the new abutment configuration and channel grading. The Plans, Specifications, and Cost Estimate will be updated accordingly. DURATION The development of the abutment and retaining wall designs, and completion of the associated changes to the PS&E (90%) are anticipated to require approximately four weeks. Completion of the Final PS&E (100%) is anticipated to take approximately one week following County review of the 90% PS&E. SERVICES The Consultant will perform all services and furnish all materials necessary to accomplish the following work items: TASK 1—PROJECT MANAGEMENT (Sargent) This task includes the additional project management required for the abutment and retaining wall revisions. TASK 2—GEOTECHNICAL ENGINEERING (Geosyntec Consultants) This task includes the additional geotechnical analysis necessary to inform the proposed secant shaft foundation design. The geotechnical engineering tasks include: 1. Meet with the design team to understand the revised foundation concept, design constraints, and to collaborate on the details of the revised foundation design. Up to four 1-hour meetings are assumed for coordination and collaboration related to the secant shaft foundation design. Little Quilcene River Bridge Replacement Exhibit B Scope of Work Page 1 of 3 2. Develop recommendations for shaft sizes, shaft overlap, minimum embedment depths along with axial capacity charts,geotechnical parameters for lateral shaft design (LPILE inputs), and lateral earth pressure considerations. 3. Complete detailed geotechnical analyses and design for the secant shaft foundation concept in general accordance with applicable Washington State Department of Transportation (WSDOT) and American Association of State Highway and Transportation Officials (AASHTO) criteria. 4. Provide geotechnical support for the development of construction specifications for the secant shaft foundation. Up to 6-hours of support are assumed. 5. Prepare a revised Draft Geotechnical Report containing the results of the supplemental geotechnical analyses and secant shaft foundation recommendations.The Revised Draft Geotechnical Report will build on the previously developed Draft Geotechnical Report from 2023 with appropriate updates. After receiving comments on the Revised Draft Geotechnical Report and resolution of those comments, prepare a Final Geotechnical Report supporting final design of the project. Deliverables: Revised Draft and Final Geotechnical Report(PDF electronic file). TASK 3 - HYDRAULIC ENGINEERING (Watershed Science & Engineering) This task includes the additional hydraulic engineering services to support the updated bridge abutment design and channel grading. The hydraulic design tasks include: 1. Update the project HEC-RAS 2D hydraulic model to reflect the updated bridge design, which will rely on secant shaft walls to protect the bridge foundations and approach fill, and will remove the currently proposed riprap countermeasures. Review hydraulic results to note the impacts on 100-year water surface elevations and channel velocities. 2. Update scour estimates to reflect the updated design. Provide updated maximum scour elevations to Sargent to support the design depth and extents of the secant pile walls. 3. Revise the design layout for large woody material (LWM) installations to accommodate the redesigned abutments and surface grading, and to limit scour and erosion risk along the modified west abutment. WSE will provide updated LWM concept sketches to Sargent for incorporation into the project plan set. 4. Alterations to the channel grading, surface roughness, and configuration of the LWM structures are expected to produce changes in the design water surface elevations. WSE will work with Sargent to refine the design to maintain adequate freeboard and to maintain project compliance with no-rise requirements for work within the regulatory floodway. 5. Update the hydraulic design report to include the final design analysis and recommendations. WSE will submit a draft of the final report for review. Upon receipt of comments, WSE will prepare a final report. Deliverable: Updated Draft and Final Hydraulic Report, with WSBIS scour code (PDF electronic file). Little Quilcene River Bridge Replacement Exhibit B Scope of Work Page 2 of 3 TASK 8- PLANS, SPECIFICATION AND ESTIMATE (PS&E) This task includes the additional engineering services to prepare a revised abutment design utilizing drilled secant shafts and revised retaining wall layouts. The stream channel grading will also be updated, and any necessary changes to the LWM will be made. The design calculations, project quantities, cost estimate, plans, and technical specifications will also be updated to include the new design elements. 8.4 Plans, Specifications and Estimate (Sargent) The Consultant will prepare updated structural design, plans, specifications, and cost estimate for the bridge replacement to include the revised abutment design and retaining wall layouts. The following tasks will be completed to provide an updated PS&E: 1. Prepare a new abutment layout to utilize drilled secant shafts for support. 2. Prepare the structural design of the abutments per the requirements of the AASHTO LRFD Bridge Design Specifications and the WSDOT Bridge Design Manual. The drilled shafts will be designed to withstand the design scour depth without scour protection. 3. Revise the NW and SE retaining wall layouts to conform with the secant shaft abutment configuration. Shift the location of the NW retaining wall closer to the roadway centerline to maintain the wall and wall construction activities within the existing R/W, and make associated changes to the roadway corridor design. 4. Adjust the channel grading design in at the NW bridge corner to remain within the existing R/W. 5. Prepare plans for the secant shaft abutment design and make associated revisions to the other plan sheets. 6. Prepare updated specifications for Division 3 thru 9 of the Special Provisions using WSDOT General Special Provisions to include the new design elements, and to align with the 2026 WSDOT Standard Specifications. 7. Provide an updated Engineer's estimate of quantities, construction costs, and bid items to include the new design elements, and to align with the 2026 WSDOT Standard Specifications. Deliverables: 1. 90% PS&E Submittal: o Updated Drawings— pdf 11x17 electronic file o Updated Specifications—electronic, word format o Updated Cost Estimate—electronic, excel spreadsheet format 2. 100% PS&E Submittal: o Stamped Drawings— pdf 11x17 electronic file, electronic AutoCAD file o Stamped Specifications (Divisions 3-9)—electronic, word format, and stamped cover sheet in PDF format o Cost Estimate—electronic, excel spreadsheet format o Bid Item List—electronic, excel spreadsheet or word format Little Quilcene River Bridge Replacement Exhibit B Scope of Work Page 3 of 3 Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Josh Peters, County Administrator From: Eric Kuzma, Public Works Director S Agenda Date: September 21, 2026 Subject: Supplemental Agreement No. 4 with Sargent Engineers, Inc. for Little Quilcene River Bridge Replacement, County Project No. 18020970, Federal Aid No. BRS-Q161(010) Statement of Issue: Supplemental Agreement No. 4 with Sargent Engineers, Inc. of Olympia, Washington for the Little Quilcene River Bridge Replacement. Analysis/Strategic Goals/Pro's a Con's: The Little Quilcene River Bridge, located at Center Road MP 14.62, is classified as structurally deficient and has load restrictions for single unit trucks. Replacement of this bridge is of high importance because Center Road is Jefferson County's main north-south route for freight mobility and the travelling public. Public Works was awarded federal funding for bridge replacement in 2021. Sargent Engineers was hired by Public Works in 2022 for bridge design, and is currently working on PSEtE and permitting for the bridge replacement. This supplement provides for re-design of the bridge foundations, and associated revisions to the Plans, Specifications and Estimate. Public Works determined that the foundation re-design was the only way to achieve construction funding authorization in 2026 and preserve 100% federal funding for project construction. Fiscal Impact/Cost Benefit Analysis: The cost of this supplement is $130,404, which will increase the maximum amount payable under this agreement from $610,654 to $741,058. This will be funded at 100% by FHWA. Recommendation: Public Works recommends that the Board execute the one original of the Supplemental Agreement with Sargent Engineers, Inc., and return to Public Works. Department Contact: Mark Thurston, P.E., Project Manager, 385-9210. Reviewed By: --- ici›.),t) 6( isvid6,- Josh eters, County Administrator Date CONTRACT REVIEW FORM Clear Form (INSTRUCTIONS ARE ON THE NEXT PAGE) CONTRACT WITH: Sargent Engineers,Inc. Contract No:Paii, 6,4 /ct Contract For: Little Quilcene River Bridge Replacement Term: December 31, 2027 COUNTY DEPARTMENT: Pubic Works Contact Person: Mark Thurston/Chris Spall Contact Phone: ext.210/ext.208 Contact email: mthurston@co ietlerson.wa us/cspall@co lellerson.wa us AMOUNT: $130,404 PROCESS: Exempt from Bid Process Revenue: 18033320.333133.20970 Cooperative Purchase Expenditure: 18059500.41.000 Competitive Sealed Bid Matching Funds Required: No Small Works Roster Sources(s) of Matching Funds Vendor List Bid Fund# RFP or RFQ Munis Org/Obj ✓ Other: Consultant Supplemental Agreement APPROVAL STEPS: STEP I: DEPARTMENT CERTIFIES COMPLIANCE WITH JCC 3.55.080 AND CHAPTER 42.23 RCW. CERTIFIED: Ill N/A:7 9/2./. 6, Signature Date STEP 2: DEPARTMENT CERTIFIES THE PERSON PROPOSED FOR CONTRACTING WITH THE COUNTY (CONTRACTOR) HAS NOT BEEN DEBARRED BY ANY FEDERAL, STATE, OR LOCAL AGENCY. CERTIFIED: El N/A: ! 1 �7i-eeGc.#7- 9/z/z , Signature Date STEP 3: RISK MANAGEMENT REVIEW (will be added electronically through Laserfiche): Electronically approved by Risk Management on 9/10/2026. STEP 4: PROSECUTING ATTORNEY REVIEW (will be added electronically through Laserfiche): jD lectronically approved as to form by PAO on 9/10/2026. PA Luther reviewed and approved on 9-10-2026. STEP 5: DEPARTMENT MAKES REVISIONS & RESUBMITS TO RISK MANAGEMENT AND PROSECUTING ATTORNEY(IF REQUIRED). STEP 6: CONTRACTOR SIGNS STEP 7: SUBMIT TO BOCC FOR APPROVAL 1 411 Washington State Department of Transportation Supplemental Agreement Organization and Address Number 3 Sargent Engineers,Inc. Original Agreement Number 320 Ronlce Ln NW Olympia,WA 98502 LQBR-2022 Phone: (360) 867-9284 Project Number Execution Date Completion Date August 15, 2022 December 31, 2027 -- --___._--.----.__--- Project Title New Maximum Amount Payable Little Quilcene River Bridge Replacement $610,654 Description of Work Work consists of preparing Large Woody Material design, revised stormwater design, and associated updates to the Plans, Specifications, and Estimate. The Local Agency of Jefferson County Public Works desires to supplement the agreement entered in to with Sargent Engineers, Inc. and executed on August 15.2022 and identified as Agreement No. LQRB-2022 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: Preparation of Large Woody Material design, revised stormwater design, and updated Plans, Specifications, and Estimate as described in Exhibit B. II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: The completion date is extended to December 31. 2027 III Section V, PAYMENT, shall be amended as follows: The cost of this supplement is $75,516 increasing the Maximum Amount Payable to $610,654. as set forth in the attached Exhibit A, and by this reference made a p rt of this supplement. If you concur with this supplement and agree to the changes as e above, please sign in the Appropriate spaces below and return to this office for final action. By: Jessica Soward. Sargent Engineers B r,' , __ fltW4 /6104 Consultant Signature u ority Signature Approved as to form only PRE-APPROVED CONTRACT 02 282023 _ Date DOT Form 140-063 Phttp C Hunsucker, Revised 09/2005 Chief Cnri Deputy Prosecuting Attorney IVWashington State Department of Transportation Supplemental Agreement Organization and Address Number 2 Sargent Engineers,Inc. Original Agreement Number 320 Ronlee Ln NW Olympia,WA 98502 LQBR-2022 Phone: (360) 867-9284 Project Number Execution Date Completion Date August 15, 2022 December 31,2026 Project Title New Maximum Amount Payable Little Quilcene River Bridge Replacement $535,138 Description of Work Work consists of preparing legal descriptions for temporary and permanent easements. The Local Agency of Jefferson County Public Works desires to supplement the agreement entered in to with Sargent Engineers.Inc. and executed on August 15,2022 and identified as Agreement No. LQRB-2022 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: Preparation of written property acquisition descriptions as described in attached Exhibit B. I I Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: No change III Section V, PAYMENT, shall be amended as follows: The cost of this supplement is $5,870 increasing the Maximum Amount Payable to $535,138. as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action.By: Jessica Soward, Sargent Engineers By: `[G1 6,146,1 r sultant Signature p ving u my ignature Date Approved as to form only PRE•APPROVEO CONTRACT 0212812023 DOT Form 140-063 Philip C Hunsucker. Revised 09/2005 Chief Civil Deputy Prosecuting Attorney Washington State �� Department of Transportation Supplemental Agreement Organization and Address Number I Sargent Engineers,Inc. Original Agreement Number 320 Ronlee Ln NW Olympia,WA 98502 LQBR-2022 Phone: (360) 867-9284 Project Number Execution Date Completion Date August 15, 2022 December 31, 2026 Project Title New Maximum Amount Payable Little Quilcene River Bridge Replacement $529,268 Description of Work Additional topographical survey and basemapping as described in Exhibit B. The Local Agency of Jefferson County Public Works desires to supplement the agreement entered in to with Sargent Engineers. Inc. and executed on August 15, 2022 and identified as Agreement No. LQRB-2022 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: I Section 1, SCOPE OF WORK, is hereby changed to read: Additional topographical survey and basemapping as described in attached Exhibit B. II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: No change III Section V, PAYMENT, shall be amended as follows: The cost of this supplement is $6,954 increasing the Maximum Amount Payable to $529,268. as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. By: Jessica Soward, Sargent Engineers By. Chair BOCC /41014-4-(1 A"141- 4-&--------- Consultant Signature / / / 9 Approving Authority Signature Date Approved as to form only: PRE-APPROVED CONTRACT 02/28/2023 DOT Form 140-063 Philip C.Hunsucker, Revised 09/2005 Chief Civil Deputy Prosecuting Attorney Local Agency A&E Professional Services Negotiated Hourly Rate Consultant Agreement Agreement Number: LQBR-2022 Firm/Organization Legal Name(do not use dba's): Sargent Engineers, Inc. Address Federal Aid Number 320 Ronlee Ln NW, Olympia, WA 98502 BRS-Q161 (010) UBI Number Federal TIN 600560818 91-1273873 Execution Date Completion Date August 15, 2022 December 31 , 2026 1099 Form Required Federal Participation ❑ Yes ❑■ No 0 Yes ❑ No Project Title Little Quilcene River Bridge Replacement Description of Work Work consists of preparing a Preliminary Design Report, selecting a preferred alternative for bridge replacement, and then preparing final PS&E and obtaining environmental permits for the replacement of the Little Quilcene River Bridge on Center Road in Jefferson County. Tasks will include topographical and right-of-way surveying, geotechnical investigation, hydrology/hydraulic analysis, permitting feasibility analysis, wetlands assessment, cultural resources report, permitting, and PS&E preparation. Q Yes n No DBE Participation Maximum Amount Payable:522,314.00 Li Yes ❑ No MBE Participation ❑ Yes ❑ No WBE Participation ❑ Yes ❑ No SBE Participation Index of Exhibits Exhibit A Scope of Work Exhibit B DBE Participation I Exhibit C Preparation and Delivery of Electronic Engineering and Other Data Exhibit D Prime Consultant Cost Computations Exhibit E Sub-consultant Cost Computations Exhibit F Title VI Assurances Exhibit G Certification Documents Exhibit H Liability Insurance Increase Exhibit I Alleged Consultant Design Error Procedures Exhibit J Consultant Claim Procedures LQBR-2022 Local Agency A&E Professional Services Agreement Number Negotiated Hourly Rate Consultant Agreement Revised 02/01/2021 Page 1 of 34 For purposes of this AGREEMENT, "ESI" means any and all computer data or electronic recorded media of any kind, including "Native Files", that are stored in any medium from which it can be retrieved and examined, either directly or after translation into a reasonably useable form. ESI may include information and/or documentation stored in various software programs such as Email, Outlook, Word, Excel, Access, Publisher, PowerPoint, Adobe Acrobat, SQL databases, or any other software or electronic communication programs or databases that the CONSULTANT may use in the performance of its operations. ESI may be located on network servers, backup tapes, smart phones, thumb drives, CDs, I)VDs, floppy disks, work computers, cell phones, laptops, or any other electronic device that CONSULTANT uses in the performance of its Work or SERVICES hereunder, including any personal devices used by the CONSULTANT or any sub-consultant at home. "Native files" arc a subset of ESI and refer to the electronic format of the application in which such ESI is normally created, viewed, and /or modified The CONSULTANT shall include this section XX "Records Maintenance" in every subcontract it enters into in relation to this AGREEMENT and bind the sub-consultant to its terms, unless expressly agreed to otherwise in writing by the AGENCY prior to the execution of such subcontract. In witness whereof, the parties hereto have executed this AGREEMENT as of the day and year shown in the "Execution Date"box on page one (1) of this AGREEMENT. Sig • Date - 427/1Ati SfiS/22, Signature t 7 /aSeh 1-at / r e aA &cC Date Any modification, change, or reformation of this AGREEMENT shall require approval as to form by the Office of the Attorney General. Approved as to form only: r' c 4"'"'` August 9, 2022 Philip C. Hunsucker, Date Chief Civil Deputy Prosecuting Attorney LQBR-2022 Local Agency A&E Professional Services Agreement Number Negotiated Hourly Rate Consultant Agreement Revised 02/01/2021 Page 14 of 14