Washington State Department of Transportation Olympic Peninsula Visitors Bureau - 090826
0 Washington State Department of Transportation Developer&Address&Email Steve Shively,PM.OPVB/OPTC Special Projects Developer / Local info@olympicpeninsula.org P.O.Box 670 Port Angeles,WA 98362 Agency Agreement Construction by Developer Local Agency&Address&Email Eric Kuzma,Deputy Public Works Director,Jefferson County At Developer Expense 623 Sheridan Street, Port Townsend,WA 98368 EKuzma@co.jefferson.wa.us Agreement Number Section/Location Exhibits GCC 1342 Port Ludlow Olympic Peninsula Gateway Sign Project Public Art Plan State Route No. Control Section No. Region 104 1630 Olympic Surety Bond Work Hours $0 See General Permit This Agreement is made and entered into between the Washington State Department of Transportation (WSDOT),the above named organization(Developer),and the above named governmental entity(Local Agency), hereinafter, referred to individually as the"Party"and collectively as the"Parties." Recitals 1. The Developer wishes to construct an intersection and/or related improvements within WSDOT's rights-of-way. 2. WSDOT, Local Agency, and Developer now wish to define responsibility for construction and maintenance of the proposed improvements. Now Therefore, by virtue of Title 47.50 RCW and Title 47.24 RCW it is mutually agreed between the parties hereto as follows: 1. WSDOT agrees to grant the Developer permission to construct the work within WSDOT right-of-way described in Exhibit A at the location described in Exhibit A , both attached hereto and by this reference made a part of this Agreement. 2. The Developer agrees to construct the project as shown on Exhibit A , at 100 percent Developer expense and responsibility. Exhibit A is attached hereto and by this reference made a part of this Agreement. The responsibility of the Developer for performance, safe conduct, and adequate policing and supervision of the project shall not be lessened or otherwise affected by WSDOT's approval of plans, specifications, or work, or by the presence at the worksite of WSDOT's representative(s), or by compliance by the Developer with any requests or recommendations made by such representative(s). 3. Any change of work from that shown on Exhibit A must be approved by WSDOT prior to beginning such work. Plan revisions may be required by WSDOT if design standards change between the time of the Agreement approval and the beginning of construction. 4. Upon receipt of this Agreement by the Developer WSDOT may request a construction schedule showing critical dates and activities that will lead to the timely completion of the work required under this Agreement. Failure by the Developer to provide the construction schedule within 30 days may cause cancellation of the Agreement. Cancellation of this agreement will not lessen the Developer's responsibility to reimburse WSDOT for those costs agreed to by item 13. DOT Form 224-063 Revised 01/2026 Page 1 of 6 •Previous Versions Obsolete• 5. Prior to beginning of construction, a preconstruction conference shall be held with WSDOT, Local Agency, Developer, and the Developer's contractor. 6. Should the Developer choose to perform the work outlined herein with other than its own forces, a representative of the Developer shall be present at all times unless otherwise agreed to by the Region Administrator.All contact between WSDOT and Developer's contractor shall be through the representative of the Developer. Where the Developer chooses to perform the work with its own forces, it may elect to appoint one of its own employees engaged in the construction as its representative. Failure to comply with this provision shall be grounds for restricting any further work by the Developer within WSDOT right-of-way, until said requirement is met. The Developer, at its own expense, shall adequately police and supervise all work on the project by itself, its contractor(s), subcontractor(s), agent(s), and others, so as to not endanger or injure any person or property. 7. Work within WSDOT right-of-way shall be restricted to the above specified hours and no work shall be allowed on the right-ofway Saturdays, Sundays, or Holidays, unless otherwise authorized by WSDOT. 8. In the construction and/or maintenance of this facility, the Developer shall comply with the "Manual on Uniform Traffic Control Devices for Streets and Highways", current edition. Any closures or restrictions of the highway shall require a WSDOT approved traffic control plan. 9. All material and workmanship shall conform to the Washington State Department of Transportation Standard Specifications for Road, Bridge, and Municipal Construction, current edition, and shall be subject to inspection by WSDOT. 10. All disturbed right-of-way shall be seeded, fertilized, mulched, and protected from erosion. 11. The Developer shall provide an executed surety bond acceptable to WSDOT in the amount stated above. The bond shall: Be signed by a surety that is registered with the Washington State Insurance Commissioner and appears on the current authorized list published by the Office of the Insurance Commissioner. Be conditioned upon faithful performance of the Agreement. Guarantee that the surety shall indemnify and defend WSDOT against any loss resulting from the Developer's failure to faithfully perform all the terms under this Agreement. Guarantee that the Developer or the contractor of the Developer shall pay all laborers, mechanics, subcontractors, and materialmen, or any person who provides supplies or provisions for carrying out the work. The surety bond shall remain in full force and effect until released in writing by WSDOT. WSDOT will recover from the Developer and its sureties such damages as WSDOT may sustain by reason of the Developer's failure to comply with the provisions of this Agreement. 12. The Developer shall obtain and keep in force for the duration of the work under this Agreement, public liability and property damage insurance with companies or through sources approved by the State Insurance Commissioner pursuant to Title 48 RCW. WSDOT and Local Agency shall be specifically named as an insured in a policy with the same company which insures the Developer or by an endorsement to an existing policy. The amount of coverage shalt be not less than a single limit of $1,000,000 for bodily injury, including death and property damage per occurrence. The Developer shall furnish WSDOT proof of insurance prior to undertaking any work covered by this Agreement. 13. The Developer shall reimburse WSDOT for all actual direct and related indirect costs necessitated by this Agreement. Such costs include, but are not limited to, agreement preparation, plan review, and construction inspection. The Developer agrees to make payment for the work to be done by WSDOT within thirty (30)days from receipt of billing from WSDOT. Payment not made within thirty(30)days after receipt of billings shall bear interest at the rate of one percent per month or fraction thereof until paid pursuant to RCW 43.17.240. DOT Form 224-063 Revised 01/2026 Page 2 of 6 •Previous Versions Obsolete• 14. WSDOT shall have ownership and control of the completed facility within WSDOT right-of-way and related traffic signal induction loops outside WSDOT's right-of-way, all subject to final acceptance by WSDOT with the exception that the Developer, their assigns, and successors, shall be responsible for the construction and maintenance of the private connections and appurtenances between the shoulder line of the highway and the right-of-way line inclusive of surfacing and drainage,when applicable. Future construction or maintenance within the areas of responsibility by the Developer, their assigns, and successors which will affect the traffic signal induction loops, and related appurtenances shall require WSDOT review and approval. The Local Agency shall be responsible for continued ownership and maintenance of the completed facility outside of WSDOT right-of-way within right-of-way that the Local Agency has interest. 15. The Local Agency, if applicable, hereby grants and conveys to WSDOT the right of entry upon all land which the Local Agency has interest, within or adjacent to the right-of-way of the highway,for the purpose of maintaining and if necessary, reconstructing said traffic signal induction loops, and related appurtenances. 16. Any breach of the terms and conditions of this Agreement, or failure on the part of the Developer to proceed with due diligence and in good faith in the construction and maintenance work provided for herein, shall subject this Agreement to be canceled and, at the option of WSDOT, may require the Developer to remove all or part of the facilities constructed hereunder at the Developer's sole expense. 17. General Provisions 17.1 Indemnification: 17.1.1 To the fullest extent permitted by law, the Developer,will protect, defend, indemnify, and save harmless WSDOT, its officers,officials, employees, and agents, while acting within the scope of their employment as such, from any and all costs, claims,judgments, and/or awards of damages (both to persons and property), arising out of, or in any way resulting from, the Developer's negligent acts or omissions with respect to the provisions of this Agreement. The Developer will be required to indemnify,defend,or save harmless WSDOT if the claim, suit, or action for injuries, death, or damages (both to persons and property) is caused by the sole negligence of the Developer. Where such claims, suits, or actions result from the concurrent negligence of the Parties, their agents, officials, or employees, and/or involve those actions covered by RCW 4.24.115, the indemnity provisions provided herein will be valid and enforceable only to the extent of the negligence of the indemnifying Party, its agents, officials, or employees. 17.1.2 The Developer agrees that their obligations under this section extend to any claim, demand, and/ or cause of action brought by, or on behalf of, any of their officers, officials, employees, or agents. For this purpose only, the Developer, by mutual negotiation, hereby waives, with respect to WSDOT, any immunity that would otherwise be available against such claims under the Industrial Insurance provisions of Title 51 RCW. 17.1.3 This indemnification and waiver will survive the termination of this Agreement. 17.2 Disputes: The Parties shall work collaboratively to resolve disputes and issues arising out of, or related to, this Agreement. Disagreements shall be resolved promptly and at the lowest level of hierarchy. To this end, following the dispute resolution process shown below shall be a prerequisite to the filing of litigation concerning any dispute between the Parties: 17.2.2 The representative, as shown herein designated in this Agreement shall use their best efforts to resolve disputes and issues arising out of or related to this Agreement. The representatives shall communicate regularly to discuss the status of the tasks to be performed hereunder and to resolve any disputes or issues related to the successful performance of this Agreement. The representatives shall cooperate in providing staff support to facilitate the performance of this Agreement and the resolution of any disputes or issues arising during the term of this Agreement. 17.2.3 A Party's representative shall notify the other Party in writing of any dispute or issue that the representative believes may require formal resolution according to this Section. The representatives shall meet within five(5)working days of receiving the written notice and attempt to resolve the dispute. DOT Form 224-063 Revised 01/2026 Page 3 of 6 •Previous Versions Obsolete• 17.2.4 In the event the representatives cannot resolve the dispute or issue,the entity, and WSDOT's Region Administrator, or their respective designees, shall meet and engage in good faith negotiations to resolve the dispute. 17.2.5 In the event the entity and WSDOT's Region Administrator, or their respective designees, cannot resolve the dispute or issue, the entity and WSDOT shall each appoint a member to a Dispute Board. These two members shall then select a third member not affiliated with either Party. The three-member board shall conduct a dispute resolution hearing that shall be informal and unrecorded.All expenses for the third member of the Dispute Board shall be shared equally by both Parties; however, each Party shall be responsible for its own costs and fees. 17.3 Assurances: The Parties agree that all activity pursuant to this Agreement shall be in accordance with all applicable federal, state, and local laws, rules, and regulations as they currently exist or as amended. 17.4 Interpretation: This Agreement shall be interpreted in accordance with the laws of the state of Washington. The titles to paragraphs and sections of this Agreement are for convenience only and shall have no effect on the construction or interpretation of any part hereof. 17.5 Amendments: This Agreement may be amended only by the mutual written agreement of the Parties executed by personnel authorized to bind each of the Parties. 17.6 Waiver: A failure by a Party to exercise its rights under this Agreement shall not preclude that Party from subsequent exercise of such rights and shall not constitute a waiver of any other rights under this Agreement unless stated to be such in writing signed by an authorized representative of the waiving Party and attached to the original Agreement. 17.7 All Writings Contained Herein: This Agreement contains all of the terms and conditions agreed upon by the Parties. No other understandings, oral or otherwise, regarding the subject matter of this Agreement shall be deemed to exist or to bind the Parties. 17.8 Venue: In the event that either Party deems it necessary to institute legal action or proceedings to enforce any right or obligation under this Agreement, the Parties agree that any such action or proceedings shall be brought in the superior court situated in Thurston County, Washington unless filing in another county is required under any provision of the Revised Code of Washington. Further, the Parties agree that each shall be responsible for its own attorneys'fees and costs. DOT Form 224-063 Revised 01/2026 Page 4 of 6 •Previous Versions Obsolete• 17.9 Working days: Working days for this Agreement are defined as Monday through Friday, excluding Washington State holidays per RCW 1.16.050. 17.10 Independent Contractor: Both Parties shall be deemed independent contractors for all purposes, and the employees of each Party and any of its contractors, subcontractors, consultants, and the employees thereof, shall not in any manner be deemed to be the employees of the other Party. 17.11 Subcontracting: "Subcontractor" means one not in the employment of a Party to this Agreement, who is performing all or part of those services under this Agreement under a separate contract with a Party to this Agreement. The terms "subcontractor"and "subcontractors" mean subcontractor(s) in any tier. Except as otherwise provided in the Agreement, the Developer shall not subcontract any of the contracted services without the prior approval of the Agency. The Developer is responsible to ensure that all terms, conditions, assurances, and certifications set forth in this Agreement are included in any and all Subcontracts.Any failure of the Developer or its Subcontractors to perform the obligations of this Agreement shall not discharge the Developer from its obligations under this Agreement. 17.12 Site Security and Safety: While on WSDOT premises, the Developer, its agents, employees,or subcontractors shall comply with WSDOT safety and security policies and regulations. Including requirements for the prevention of transmission of communicable diseases such as Covid. 17.13 Audit and Records: During the progress of the Work and for a period of not less than six years from the date of final payment. The Developer shall maintain the records and accounts pertaining to the Work and shall make them available during normal business hours and as often as necessary, for inspection and audit by WSDOT, state of Washington, and/or federal government and copies of all records, accounts, documents, or other data pertaining to the Work will be furnished upon request. The requesting Party shall pay the cost of copies produced. If any litigation,claim,or audit is commenced, the records and accounts along with supporting documentation shall be retained until any litigation, claim or audit finding has been resolved even though such litigation, claim or audit continues past the six-year retention period. 17.14 Severability: If any term or condition of this Agreement is held invalid, such invalidity shall not affect the validity of the other terms or conditions of this Agreement. 17.15 Authority to Bind: The signatories to this Agreement represent that they have the authority to bind their respective organizations to this Agreement. DOT Form 224-063 Revised 0112026 Page 5 of 6 •Previous Versions Obsolete• 18. Counterparts and Electronic Signature 18.1 This Agreement may be executed in counterparts or in duplicate originals. Each counterpart or each duplicate shall be deemed an original copy of this Agreement signed by each Party, for all purposes. Electronic signatures or signatures transmitted via e-mail in a"PDF"may be used in place of original signatures on this Agreement. Each Party intends to be bound by its electronic or"PDF"signature on this Agreement and is aware that the other parties are relying on its electronic or"PDF"signature. In Witness Whereof, the parties hereto have executed this Agreement as of the party's date signed last below. Olympic Peninsula Visitors Bureau Washington State Department of Transportation Signature: 03397�1-3433-2d1c-41Cf2-8a9o- � <._._v_ Si "Signature: Ott By: Steve Shively By: Sarah Ott Print Name Print Name Title:_Olympic Peninsula Tourism Commission,Special Projects Title: Interim Asst Region Administrator-Maintenance&Operations Date: August 7.2026 Date: 9/21/2026 tfferson County � Signature:����/� L ��'-. - NOW By: Gre9 &- 4 Print Name Title: CI'w"+' &)Cc �� / Date: 4Z Approv-. - o .• only: ���2, 08-14-2026 Jeremia Lu"er Jefferson County Civil Deputy Prosecuting Attorney DOT Form 224-063 Revised 01/2026 Page 6 of 6 •Previous Versions Obsolete• GCC 1342 EXHIBIT A Olympic Peninsula Gateway Sign Project _ - _ - Public Wil ' fl • , # p►pIn'u1a Art Plan V i r. -- -----„,„, r1 a kp ',/ii i . . . ji, di, #/ifi .sco A . /IC /,. 1 4 oti 4 1,,/ rillt , jd (n'riktintrisiNif 4 _ F � t " Mann 2026 GCC 1342 EXHIBIT A Public Art Plan Olympic Peninsula SR104—Hood Canal Gateway Roundabout Port Ludlow,Washington Date:April,2025 Prepared for:Washington State Department of Transportation (WSDOT) Prepared by:Olympic Peninsula Visitors Bureau(OPVB)and the Olympic Peninsula Tourism Commission,in partnership with Jefferson County,Washington Table of Contents 1. Signature Page 2. Project Overview 3. Project Proponent,Ownership,and Funding 4. Site Context and Location 5. Artistic Vision and Design Intentionality 6. Stakeholder Engagement and Community Process 7. WSDOT Chapter 950 Design Criteria Compliance 8. Maintenance,Inspection,and Lifecycle Plan 9. References 10.Appendices 1.0 Signature Page Public Art Plan Review and Approval This Public Art Plan for the Olympic Peninsula SR104 Gateway Roundabout is hereby approved. County Administrator Jefferson County,WA p,.' li1�!lu 7 29 26 Josh D.Peters,AICP,County Administrator Date Public Works Director Jefferson County,WA CO• 7 / 28 / 26 Eric Kuzma Date GCC 1342 EXHIBIT A Olympic Peninsula Vjsitors Bureau ....--,... .c77,4:1 X`` 6/25/2026 Steve Shively,PM.OPVB/OPTC Special Projects Date Washington State Department of Transportation(WSDOT) Interim Regional Administrator 's 4,_o& Aug 6, 2026 /-/— Troy Cowan Date State Bridge and Structures Architect M 3 a /__/202 7 Matthew J.Rochon,PE AIA Date Region Landscape Architect Dg, Igned by T ylc M Neie Taylor McNeill o- ?o�-EHS TaYo McNe11 Date t026.08.06 13:01:44 07'00 VO 0O / 06 2026 —/— Taylor McNeill,PLA Date Interim Region Traffic Engineer e _ signed by Justin R Belk Just i n R B e v _ -US,E=belkj@wsdot.wa.gov,O=Traffic lions OU=WS00T OR,CN=Justin R Belk , 08 06 2026 2026 08.06 11:44:46-07'00' Justin Belk Date GCC 1342 EXHIBIT A Regional Local Programs Engineer Yr� 8 / 4 / 2026 John Ho,PE Date Assistant State Traffic Design&Operations Manager Sett Davis Digitally signed by Scott Davis 4 13:30:16-07'00' /—/Scott Davis,PE Date Development Services Engineer Andrew Larson Digitally signed by Andrew Larson mate:2026.08.03 13:16:41-07'00-/-I— Andrew Larson,PE Date 2.0 Project Overview The Olympic Peninsula SR104 Gateway Roundabout project introduces a landmark "Welcome to the Olympic Peninsula"public art installation at a critical entry point to the region.Located at the western terminus of the Hood Canal Bridge on State Route 104,the project transforms a newly constructed roundabout into a memorable gateway that strengthens regional identity and enhances driver safety.The art installation serves as a visual anchor that calms traffic while creating a powerful sense of arrival for the nearly 6.9 million vehicles that pass through this location annually[1]. This Public Art Plan(PAP) is prepared in accordance with the Washington State Department of Transportation(WSDOT) Design Manual M22-01.23,Chapter 950,"Public Art" [2].It is intended to provide a comprehensive overview of the project's vision,design, community support,and long-term maintenance strategy,ensuring the installation is a safe, durable,and valued community asset.The project directly supports a key objective of the 2024-2029 Olympic Peninsula Tourism Master Plan,which calls for creating a"stronger sense of arrival and welcome"at key gateways throughout the Olympic Peninsula [3]. GCC 1342 EXHIBIT A Vehicular Scale ci...mr to th+1 Olympic Peninsula SR t0e WMGaend Mrssoge SR 104 vn EmtEed l4aoge 'T..`....._. Iv 7 a, t 00,4 doll Revr,111 0/If 1,10040146o1 .s .. ti�w+ SR 104 locOthon Site Ptnn GCC 1342 EXHIBIT A Development: MATRiIIAL$ The Gateway Sign should use materials and fabrication methods appropriate for the chetah of the Olympic Peninsula.with iconography A - Felinea!rd slur, ssam cabinet with developed to tie into the local cattalo.*and/or environmental conditions painted finish WMP1)and thrat.gh hole where p'ac,d with pare" El - Febncated dimensional copy with painted finch IUP4)secured to cabinet — C - Curt through art panel with pairnted "° hnish(MP2)secured to inside of cabinet through hole 3 Plan View 0- Fabricated aluminum side caps and integrated First surface denensianal pattern with painted finish rc iMP2Xfl -�' ---`-s+--'-f E - Cast concrete base support Welcome to a= ;. Olytryk P nun r1i t s - COLORS: SAM MP2 U.tih*wa Pone AbttTtioe.Pe1r✓$ tta49:aamo, l+te t1ML*ara..n Leeer jy ><n."Palest ptthrwa aunt 7 L' /ems.anew" YrR47tl:t Lga+a +e * - .aria atria worm tyoaa tnluy dad Respect• Our Homelands l'J I Gateway Monument Side A 2 Side View-Typical 3.0 Project Proponent, Ownership, and Funding This project is a multi-agency partnership,demonstrating broad regional investment in the cultural and economic vitality of the Olympic Peninsula. • Project Proponent&Owner:The Olympic Peninsula Visitors Bureau(OPVB)is the lead agency.As the official DMO(Destination Marketing Organization),representing tourism in Jefferson,Clallam,Grays Harbor and Mason Counties,and assumes all responsibility for the design,fabrication and installation.Jefferson County is owner of the artwork.The County assumes responsibility for the maintenance,and liability associated with the artwork,as to be detailed in the Interlocal Maintenance Agreement with WSDOT. GCC 1342 EXHIBIT A • Project Management&Coordination:The Olympic Peninsula Visitors Bureau (OPVB)is managing the project,coordinating stakeholder engagement,and administering project design,fabrication and installation related funds. • Funding Sources:The project is made possible through a diverse funding coalition, including: - A$50,000 Tourism Regeneration Grant from the State of Washington Tourism (SWT) [1]. - Lodging Tax Advisory Committee (LTAC)funds from both Jefferson and Clallam Counties. - In-kind contributions,such as the installation of an electrical junction box by Jefferson County Public Works during the roundabout's construction. • Estimated Project Cost:The total estimated cost for the artwork,including design, fabrication,and installation,is approximately$100,000. 4.0 Site Context and Location • Location:The artwork will be installed in the central island of the newly constructed roundabout at the intersection of SR 104 and Paradise Bay-Shine Road safety improvement,near Port Ludlow in Jefferson County,Washington.[6] • Milepost: 11.27 • Coordinates:47°52'03.9"N 122°38'21.5"W • Site Description:The installation site is the 80-foot-diameter,hardscaped central island of a single-lane WSDOT roundabout.The design and placement of the artwork have been carefully planned to integrate with the roundabout's function and landscape design,maintaining all required sight distances and safety clear zones as specified by WSDOT and the Federal Highway Administration(FHWA). 5.0 Artistic Vision and Design Intentionality The design for the Olympic Peninsula Gateway was developed by the collaborative team of sky design and CREO Industrial Arts,selected through a competitive Request for Proposal (RFP) process. Concept Statement "Our proposed gateway sign is designed as both a landmark and a gesture of welcome — rooted in the Olympic Peninsula's natural beauty and cultural heritage. Inspired by the Olympic Peninsula Tourism Master Plan (2024-2029), the sign celebrates the traditions, GCC 1342 EXHIBIT A stories, and environment of the region, offering visitors and residents a meaningful introduction to this extraordinary place. Emerging from the landscape, semblance of the vertical concrete form, (faux Matthews Paint - MP04929 — Amory Semi Gloss), evokes permanence and resilience. It serves as a contemporary nod to local infrastructure and bridge-building traditions, while framing a dynamic window that visually connects to the land beyond.At its center, a painted steel panel depicts native flora— in this case, the red cedar—whose silhouette allows light and shadow to play through, creating a layered and ever-changing experience. Stamped relief along the sides draws from the coastal carving traditions of indigenous communities, referencing the artistry seen in local canoes and throughout nature. Developed collaboratively with consultation of all nine federally recognized tribes of the Olympic Peninsula,tourism and government partners." [4] Materials and Symbolism Each material was selected for its symbolic meaning,durability,and connection to the Olympic Peninsula: • Concrete:Painted aluminum cabinet represents strength,legacy,and permanence, echoing the region's significant bridge-building traditions. • Western Red Cedar:The use of a cut steel panel depicting a cedar tree silhouette honors a keystone species of immense cultural reverence to the Coast Salish peoples, representing storytelling,craft,and resilience. • Copper:The typography paint color references a material historically valued in the region for trade and tradition,symbolizing transformation and enduring connection. Illumination The artwork will feature subtle,ground-mounted uplighting designed to wash the faces of the cabinet,highlighting the welcome message and central art piece.The lighting will be carefully specified and positioned to prevent glare,driver distraction,and light spillage, adhering to all WSDOT and FHWA standards for roadway illumination(5.150 nits). GCC 1342 EXHIBIT A Wit WeftOurt Go«Avila imiamme - _ ' ,i,,( ,ends,ai„n& Groord t•ehtu p 6.0 Stakeholder Engagement and Community Process This project is founded on a robust and inclusive community engagement process,modeled after the successful approach used for the SR305 Johnson Parkway Art Plan [5].The process was designed to ensure the final artwork reflects the diverse values and heritage of the entire Olympic Peninsula. Welcome Signage Steering Committee A representative steering committee was convened to guide the project from conception to completion.This committee includes a broad cross-section of community leaders,ensuring diverse perspectives are integrated into every stage of the project. Name Affiliation Ann Burkhart Consultant, Pomona Woods Alexis Arrabito President,Quimper Events Collective Barbara Hanna Communications Manager,City of Sequim Marsha Massey Executive Director,Olympic Peninsula Visitors Bureau Loni Greninger Vice Chairwoman,Jamestown S'Klallam Tribe Debbie Wardrop Consultant,Jamestown S'Klallam Tribe Events Renee Rux Enterprise Director,Quileute Tribe Jessica Wiersma VP Marketing, Black Ball Ferry Line Diana Smeland President,Ludlow Associates Greg Brotherton Commissioner, Dist.3,Jefferson County BoCC GCC 1342 EXHIBIT A Sarah Copley VP,Puget Sound Express Shelly Leavens Director of Communications,City of Port Townsend Steve Shively Project Manager,Gateway Visitor Center Andrew Larson,PE Development Services Engineer,WSDOT(Ex-Officio Liaison) Tribal Consultation Honoring the deep Indigenous heritage of the Olympic Peninsula is a core project principle. The committee includes representatives from the Jamestown S'Klallam and Quileute Tribes and has engaged in ongoing consultation with all nine federally recognized tribes on the Peninsula. Representatives of Hoh,Quileute,Makah,Quinault,Lower Elwha Klallam, Jamestown S'Klallam,Port Gamble S'Klallam,Skokomish,and Squaxin Island provided inspirational dialogue around the Klallam language phrase"7an7a t'ayaxw"(You Are Welcome Here)and design motifs inspired by many of the nine tribes carving traditions all aided design considerations that are directly represented in outcomes of this collaborative process.Ultimately,the cedar tree and the"Enjoy and Respect Our Homelands,"and"Until Our Paths Cross again"elements were endorsed by all consultation participants. Community Assessment and Planning The project originated from a data-driven community planning effort.The 2024-2029 Olympic Peninsula Tourism Master Plan,which involved extensive input from community members,businesses,and government and tribal partners,identified the need for enhanced gateway experiences,essential to visitors arriving on,and traveling around the Olympic Peninsula.This project directly implements that recommendation,transforming a strategic priority into a physical landmark.[3J 7.0 WSDOT Chapter 950 Design Criteria Compliance This Public Art Plan is designed to meet all requirements of WSDOT Design Manual Chapter 950.The following sections document the project's compliance with the specific criteria outlined in Section 950.04. • Acceptable Public Art Features(950.04(1)):The project consists of an appropriately-scaled sculpture,concrete foundation and hardscape surface treatments,which are listed as acceptable features.The design is fully compliant with all corridor guidelines. • Unacceptable Public Art Features(950.04(2)):The artwork explicitly avoids all unacceptable features: - It is a static sculpture with no kinetic elements. - Lighting is subtle and designed to prevent glare,flashing,or driver distraction.Illumination engineered at 5.150 nits. - The design has undergone engineering review to ensure it poses no safety risk. - It is appropriately scaled for its context within the roundabout island. GCC 1342 EXHIBIT A - Materials have Matthews To Match low-sheen,semi gloss finishes to prevent high reflectivity. - The theme is a welcoming gesture rooted in regional heritage,with no potential for negative public reaction. - It does not resemble a traffic control device. - It contains no advertising. • Community Support: Extensive documentation of community and stakeholder support accompanied this project throughout.From our steering committee, consisting of US and Canadian leadership,from two counties(Clallam and Jefferson) and four cities(Port Townsend,Sequim,Port Angeles and Forks),and all nine federally recognized tribes around the Olympic Peninsula.The project is a direct result of community planning and has been guided by a diverse steering committee with broad stakeholder updates offered at regular milestones throughout the design process. • Safety and Security:The artwork is located in the center of a roundabout,inaccessible to pedestrians,and without constructed access via supplied catwalk or ladder,and it does not create an attractive nuisance.Its placement preserves all required sightlines for motorists,and its presence is intended to improve safety by calming traffic. • Maintenance Access:A interlocal maintenance agreement will be created between Jefferson Co.and WSDOT,establishing safe access by authorized personnel without requiring lane closures under normal conditions. 8.0 Maintenance, Inspection, and Lifecycle Plan • Jefferson County,as the owner,assumes full responsibility for the long-term care of the artwork,per the terms of the Public Art Permit and all subsequent lnterlocal Agreement(s). • Responsible Agency:Jefferson County Public Works. • Routine Maintenance:The County will perform routine cleaning and inspection to ensure the artwork maintains structural integrity and aesthetic quality. GCC 1342 EXHIBIT A • Inspection:In addition to the County's inspections,WSDOT may inspect the artwork as part of its standard procedures.Jefferson County will be responsible for addressing any issues identified by WSDOT within 90 days of notification. • Vandalism and Repair:Through internal inspection and response to external notification a plan is in place for prompt graffiti removal and repair of any damage. • Liability and Insurance:Jefferson County will indemnify WSDOT from all liability and will maintain a general liability insurance policy naming the State of Washington and WSDOT as additional insureds, per the terms of the Public Art Permit and a future Interlocal Maintenance Agreement. • Removal or Relocation:Should future roadway modifications require the artwork's removal,Jefferson County will bear all costs associated with its removal,storage,or relocation. 9.0 References [1] State of Washington Tourism.(2024).Tourism Regeneration Grant Final Submittal: Olympic Peninsula Welcome Signage.Olympic Peninsula Visitors Bureau.>link [2]Washington State Department of Transportation.(2024,September).Design Manual M 22-01.23, Chapter 950:Public Art.>link [3]Olympic Peninsula Tourism Commission.(2024).Olympic Peninsula Tourism Master Plan 2024-2029.>link [4] sky design&CREO Industrial Arts. (2025).Olympic Peninsula Sign Proposal.>link [5] City of Poulsbo.(2020,April).SR305 Johnson Parkway Art Plan.>link [6]Washington State Department of Transportation.SR 104-Paradise Bay-Shine Road Intersection Safety Improvements>link 10.0 Appendices • Appendix A: Final Design Renderings and Scale Drawings • Appendix B:Structural Calculations and Engineering Details • Appendix C:Stakeholder and Tribal Consultation Summaries • Appendix D: Insurance Memo from Jefferson County • Appendix E:Sign project team responses to initial WSDOT drawings(file/ S R 104HoodCanalSh ine RAB_C enterlslandSign Rev00_0 RTrafficSM E_RSC R.XLS) •u SBNSY BESDemIE Ia PDATEO>ER TESLNERNOJ MO OS I IXOW`RU - TA-TENOR NCN�LLCNRIATEO FREESTANDING OGUBIE SIDED SKN'MIN DATED 429]Ots ICREO ARTS •NNTEC FW&s AND MOUNTED TO CONCRETE FOOLING ON MIT •ARNIMEDAMPED FOR EARANA110NG RECEIVED Imo, 1iNVX •aPPRDNED FOR EARRITA7IDN BRINEAIFA: ESE NBWI: 4d MD m•vODFY'REE.N1ERNC?v ml00-FAB .T ALA. ,m S41OO R AST LEISi. PS.INTERNAL ar.�ro. RAT cur 1a B'- i� MC-RiO FOP ROO Si.PPORT ,Si.'B.R'Ai>>•E GAP11C I RENEW OF SIN3E'.AYER TREi Iems • 7---. r- ,‘, ,_ .�� u�AT'.D•'ER NTERNA.AS&RLI MITES ,. ,., i itAW Jiff IL T pawn Ii` 4S Q'?OE'YEW .gwaiF ic]ltua■ ABWCAi ED TAME E RALF ROM*MR Naas :E."Ir 12/f3A MGR 4 '1`- GA" MT Q11 Tv0'-- t 0 GROW E 'n"RAT CET -ABYCATEO MUABM M CAOiA V^pBFTcO \J } Welcome to the- �flj ^ 7 R?it'} 1� / `_ _ �i - 'EITERSTar Olympic -.:T-F:Al qlT 4lUA1YJIJItT ictc `/ .,aarED®ANC PIN TACM E0 ! uSURFA^.E VISIBLE SEAMS 2 LAYERS OF ON AEWMUM'MOO WEAN' B�a BE'WEENSECTIONS - 91AAM Plant. 0ARN.:MC:..• • 'AST@ED'OP AND BOTTOM IN' 1 FMBAICARO ' _ 'V DMENSA0NAi RALE VONOR0*$PANELS r1'� TREE ELEMENT �— •' .. SbE ti ABL.'AlEO AEUA6p:M SIDE s:MS PAN cap �—PAINTED® W.O. 1MT MTh 1,97FIA Ui BEAN'.,`+OPANY yP. rs ARpoReu i * Bli -. Z EA GEOTC ROMS AND AWES® 'mi ,A,‘„,..G, co "..ilk 11110121111AL MU =FIATCut i'-✓ 0• c NOW MAL , CAMAY .) ya • © \.uMLET"""°T915 AMASS Enjoy and Respect Until Our Paths- D " al rwFi �Our Hojnelands CrossAgain SINS NMI UM NINE) _EXP'SSED WICAETFECOING i.ASKs.WW1 OESIGNE1 BY RE0 AND _ •. • 3AET Br DTiN.15 I Y1E1.fTNT G IS MA0 1N•EYPOSED C _ ., „, -... a - - i MMMI Gill �FRONT NE W-EAST EIEVA'.I_'. -�SGE VIEW•1,Y 3+•."I(LEW-MST EEGYATGN �'xNF le .p �Y.F la-ro ,om 11) 01 OF 12 CREOaa ss � A A O O�.{�+ma'C :irly REMOVABLE TOP vAm AND INSTALLATION ORDER Sau DAR- ORa25 C CONCRETE mow. n O rOESIGN r! AND Ew M rEONK Er mo. IMAM Ir c P E MANAGER' 1) (A 6'Srx STEEL/F M YRCr EMEO N M%I[orE. MOB B. �'PJn•ko N C NT EA SPACER FOR KRAAL on raa Euarex REM S: pp) moe ®HI@.25 IXeaYr .�)!1_ BOTTOM CAR SECTION WIN RAT CUT LETTERS cm1007.1511 �II T EdIIT) (BD 121R25 N . ' Z MOOLE CARNET SEC0015.EER A RIGHT O ( FABRICATED aAAFN5101MlirHELEMENTFNf Ei Hi ( © TW COW SECTION'MN FAT cur LETTERS 0 - ;� 5a vans WITH RAT COT RwKn cRAnNC UErARcxr ^ "" I1 II a Ca I'. rn waie.441,01mt W ORATIONS,y ° SECTIONS&EIC HOOOwro1ECT GATEWAY I• 111 �7 B 1 O I SCE AOORESS SR is&SHINE RD A PORE MOW.WA 98365 (HOOD CANAL BRIDGE) I1431111 00E159 TASK/:006451101 efVeIUO RS ®EXPLODED VIEW�,,,� ROUNDABOUT SIGN art (1) 02 CC 12 r l r.llf 6061AtWINIIM CREO ARTS sawB[ruu 1RAMN } MfR4N / 6-1� / .� I-III / 71 711X 6961 ALIRMIM -1'r.._-. 'T �sT'�M1 SF 11/2 a.iwl31.195 ( ANGLE SIRPORTNNCNEO . vnel a.sum rn IP A ' J• fOR AOJUS1AIM SUBMITTAL DATE©iGP SEC00N 6SIO STEEL PRE ^ ^ :101 - - k- v1'10.N0'188 SS N%DDM 1' • MACE MANAGER: (MCP 666 WIN .` ,, GSM. ' SS MTWASHERS NO(ET MA • d 4p ! REMOVABLE altalibli / Ilia 1002.151N 9 p^uU ' • r GAIVANNEO STEEL PO ANGLES ! , - (ym70o72s IN � I '0 ®v 16.25 m �� BOEtt Bk1NREN @AME SECMmS y•- YI•-1016/Bd SS IQBOIlS ' (MMCA`9ZI9BAB63) I � � /�'\ • 16a l J ®BorroM SECTION ,SECTION DETAIL6ENf.t 4i-'d —.1. If W W 1 L- CLDI-/WWW - CD 1A'-16 I ssm STEEL PEE ELEVATIONS 1 (xMI) It twit SECTIONS&DETAILS' R'd � T&- 14710 e16R55 NU BOLTS T PROXCT D OA • !ARACs921MN•WwIM .. .. . . �E, HOOD CANAL • (2)MEL ERRS SS FLAT wAS1ERSA oHE%MBS ,�i GATEWAY • 1 ONFC1 FWD T1 ie U!•61 A{uWUM • W CONCRER M ei SUPPORT ®' r K 6s 3'616.riT561$SNF%BnTS1111 SR1P185NINERO — SITE ADDRESS I PACO 92314665S)WON SS armo ,i � ELK WASHERS ANO INSEAM INTO FRAME T' PORT LHDLOW.WA�3G5 __ s6 ( r e r.1Er(a1NIAIRMI '���i.�.J�I�.L (HOOD CANALBRIOGE) j- - _ L MUM Mg FRAME / i 10Ba: oB6u9 `1 - BOOS BE11WDIFRA1Mi SWAMIS ! =• TAW'006459/01 / 6.11k 36 10 sr 18E SS LET PITS P; i' (MAC.6219BAB6$ �.. ___ _L_-1) ELEMENT v.RS ROONOABOUT SIGN OMODED NEW ®FRONT VIEW � ;`,r-.d J 3 OTY. (1) 030P12 — — — — CREOARTS CARNET FRAM[ : ■'II-: MUM MA ANGLE �, ��, 6 STO STEEE Pfl1 ( 11111111 I' I Yf OU1&0 SS TARO BOETS SUBMITTAL DATE r.. I c-w u ! ' DRAWN BY Irll ---. Ilrl slit 1'VZ pNellap {dl11_I' '� I ;�, \ - \ - PROJECT OT MANAGER: _ \\\��- .. . . ■r—r. : REVISIONS: ®TOP SECTION ..—_—___..—_- C,ID 1COa251N 3 am 1007.251N ®121625.IN / - 94. / 11.1P.r- /`) Welcome Olympic Ry�t,�t,�h�e,1a 1 �� MAP0 ElEVAB011 CO 0\ PH \/ IFNLM r 57D SEgt PPE*Am��\ -r MWMEESSr /\ U[U 2, 6. \, TM • "ESIAP ELEVATIONS • Le. 9•0- Ar 1Zl WT001R \. Acw.ua[uavrr SECTIONS&DETAILS' 7CEFARl1NCETM Tj/P D PROJECT • j and Respect ) rro70.0SEo X HOOD LANAI �-- j Cur Homelands I \ i s - I GATEWAY --C9 ilt2.TL-z __Zr on i z-n- SITE ADDRESS -� I' SR 104 8 SHINE RD I- 5.r \ ' PORT LUDLOW.WA 98365 WIPED J i _ DONSCURA� (HOOD CANAL BRIDGE) AWNED - Sd • - — CONC.h-7100 PS 100x C06459 sumo i IY l TO 1ASM0-00649E01 I _ \d '— aEMEM ID. -4, zO NM }- -,f ZOOM .- -4 zdon A` ROUNDABOUT SIGN GFRON1xT Y1E,a W NEW 1 v..`. _ CC...VIr FRONTsE NEW OSCE NEW 4 :x u-ro $ xxeu_,.Q CITY: (1) 04 IY 12 CREO ARTS ARNIMA.NIN SUBMITTAL CATE 092625 DRAWN BY. JENH ( PROJECT MANAGER: CASEY B REVISIONS: 02o1042.29 JH ®100715 JH lit NNT ITOU CONCRETE ARO SIGN C®1216.2S JH OAAON YWREW YNL n w 9 A N 1B BEAL WELD x T — lla J` GRIND SMOOTH i Tm R ELEVATIONS7.4 Rj SECTIONS&DETAILS' PROJECT HOOD CANAL • GATEWAY OTOP NEW 117 TIN7t 6061 ALUMNA SPACER MOM /?WI 6N FOR*Mt RUNOFF SITE AOORESS. z 10 VIEW 50T111M NOON.ON TOP OF MOM FOR RENAL. WIN SIDES SR 104&SHINE RD SET N RACE VOIR CONSTRUCTION ANON PORT LUCLOW.WA 98365 (HOOD CANAL BRIDGE) JO9* 006159 TASK*IN16159701 ELEMENT ID RS ROUNDABOUT SIGN OTT (1) 05 OF 12 "'---'—f 7- -l',T,lir 601I nmurluul A�RN�AlRAME CREO ARTS ppp C z,J',vr6D6lwcwM ... � _ i�i •liA9NUM ME4EtaJlC,ED `un FOR ADJUSlMEITr �p.�a ' • 1�� PORNO MIRARIlAE CLEAT ""SFDy ~• ��p I ' • �I Iw64uwEE4 N0EE5 SUBMITTAL DATE, '! Jiff H. "1mm' tl_J•-®Wai RB/wAaE TOR w•ears DRAWN ev. r G1lMMRl STEEL ,I 'PO MOB MTH 1 !11�77 PROJECT MANAGER "� 1?4Da A1?IONG R 1 CASEY R. _ ,H MIME IME REMS@N5. _J ___r MMCI5!!9M»IA I ME11G 01.25 NI 725 ®1216151N r t 7.IE+ROR)SO CORNER , BOTTOM CABINET-FRONT 'Z',BOTTOM CABINET�BACK '-.DEJN1 vw AEWNUM ANGLE J SC 9 k REM US a 0IRA SS NES_i ,J S. ,I,TO r w iL 4R — 74779219RAK667 RCN SS /'� - -7• _-- RAT NASKRS An HEN MRS t J 117-1611 I/719-0 S5 HEX 912 pact 92014R555)MTN SS 1 i RAT WASNEA AND MOWED WOMAN —1 MOMNCR AE0AN3!M CLEAr W ® WIER 162E.IIz SS Ni MS WO I1R Vr AIOAANIAI �!.� ------------- RUSH1007014 Y+ Lama I i •s'.OETAE v6W NJ / _._ r, r �i XAI[,,,z.ra 1?60M Al1MIlYNAN 1624,VC SS/NREA1EE1 • MIL PITCH !ARM 5(201 MVO E-1-1 STUDS pd TO ATTACH TREE ELMER '1 I /� • ALIIMNIM EERERS • —�d• X i as r.B •®. IN MOUNTED i0 AR6AlI ' • — �.® VAN ACME AER6NF J r4t �0�#ty'�� • ! IlI � 1 O COW SFC1l1N OEgt .,�F■ ELEVATIONS ,� !\TTOPVIEW REMOMRE 70 "�'r� __—__� 4 'a z GAEVANREo51R1; OTOP VIEW FRAME_ rDP=ANEt 2EMOWO/ORCENRrr SECTWNS8DETAILS' PICK ANGLES WAX STxE'-r- PROJECT-. D 1,r.1J.,1?LOW HODD CANAL R vi' 1' 111 SS TWO ear y t BAT GATEWAY 7J I- �� AMNaRM O&AP MAT N16x 1GllllD®y�d Respect ' 'MMMIIIIIIIIIIIIMEMNIMMIIIIMMII mom. SSRR 1M&SANE RD ARO COMP Oar Homell 1 PORT LIA)low.WA 98365 i A901IOE 4111N I (N(bO CANAL BRIDGE) rz r1i• i FOR SSW RON JWf-OOCr159 ' TASKS COSE59TOi 4EM FEUSN TO BOTTOM EEEMENT0RS �� ALUMINUM cum =. bill_ ''• O ROUFDl30UT SIGN CNONTvIEW CSi0ENEW �FRONTVEMEFRAME FRONTANDPACXPAMLS —' OTY (1) 4A(?-i'+ 5 SGIF 1?-iC G ffNFUY.it REMCNED FOR DAM 06 9F 12 o, ,� t- s--�-11 CREO ARTS Ei'ii) 1iI ii rm ' xrsueF.tIrr,�DArE ON 26.25 DRAWN BY I •.—■. ■—■ Ovan OETAe PROJECT MANAGER'. Yne:Nr ra CASEY A. I' �OP W[ MOP VIEW 8 g- RENSIONS: YNL yr-r> OM 1402.25 AV 1'-f}ERAME REMOVABLE r 6wYANUlo • REMOVABLE iSTULPKHJHS YAM ®1C.012S R1 I 2'GMMANIIIDSMI ER tl.A 1?tdGSS ®t2,16.5)N PCB ANGLES M IN • • 'fir— lJ DM UT • MeassrwNea, t • �MEMCr 9l19BAT.RR • VA1M IOte.lR 1NN5 • raj.lit 1061 `,' (;)AXON VIEW AUAMI M RAWYa, 1�Ytif Nt5 _ r.r+INI061 i • !\.1J 7- _---.tlr..—.. .. MAME Z.NWN6350 CORNER fl} W --II•— 2 UMRM ANGLE NOTCHED • I C FOR ADIOS]■ ;� ; MOURCH ALUMINUM OEM ;cif t • I I n' •`7 7E2RQEANAGEIQEG • • FOR 34'Bars •- ; X . IM4 TW 4.-44 IdWbL MUMMA CLEAT I _ _ -- fJP ..-_ -- r} '-- -- - eLN1 telt.L7ANMS I. ii .- F1fVATRNdS CO I I Il ©I SECTIONS&DETAI� r__ • PROJECT- D �� y,: HOOD GNAT �! J GATEWAY 7.T•Ur WSOGLNER ONAIL wrr,t vS-ra AIUNNUA MIMEf-.L 1 r ➢a-"1o.'o-168 SS MtWATS - 7 i SITE ABORESS. 1, iR_ IMCi 9z19ABfiq WRIST SS i SR 104&SHINE RD (' -I.-- - MiWA51F76 ANOKA NUrs • I .—. yr•t6.l lR lea SS2 H MTPORT LtIDLGW.WA 9R365 MUCH SZ AAS651 NM SS ! I (HOOD CANAL BRIDGE) I MT WA6IE11AINrNREA�DMRINNIE 1 JOB*006159 --_._.--' _-Q 7I1'-M.r IBA ffl[e Bdrs �.--.-- 1 - TAW,O05ryfTDl MAT MASHERS MOMmo .A.-- t ' ,1-.-...l,G A-*-- 're Io R$ I EurwAsxERSArBNuwrs a l'"-" r v t� EMMIll 1- �L�w-mlRxeBLrs I I I ROUNDABOUT SIGN L..--.—.-- J ALIT I M eEEnw `---- � OOETTAR. -.__. —.--..— FRONT NEW (1FRONTV1EW 6SIBENEW Ott. (1) T suu:ll'r-ro . SUJFYr-ra 4 SLAM Pr.� 6 YAFif.Sr 07 0P 12 A ftrE..'0.6 INDUSTRIAL ADO A SECOOKHAVER -- OF 10 MU ARTS 1,4•ALLIPMNIM TREE \ r-- ----) r x 3'.HY 6061 AE11100110 lan itildfieral St —ED SOWED IRAN A MOO.Wain ;....M.14...valt...11. I'a 4'a Ite Gov MUNI womenen,,worso. ROO*AMC*95412A644) I WROF.D R.WAKED.MARE SUBPAITTAL OATE DOUBLE Mr-16 SS NIX NUTS • • : ; ..::' 1111111 : • 09.26,2S • 0 n-—1_479 - • ' [fl . ' ••• *1.11•••-• 112,13.2 LE"SS HEY BOtT , • 11. ' DRAWN&K- IEFT H WITH FLAT WASHERS AP=0 HEX MIT PROJECT,ANAGE, 1• .is j . 1 : . . ; ; 1.31..Ifir 6051 ALUMINUM ---•- SO TUBE CASEY B. 3,8,16 316 STARBISS STEEL I : It"-.11i. .1 REVISIONS: EO T KLEURNBUC PAW*YarT878) ' •••- C 1002.25 RI .• (0 Dr 0361 ALUMINUM TREE I I' I • MB 10.07 25 JH I . ' IZ , 0313 12,62SJH : •-.. ' TiTh7DE AIL VIEW (4 rASECTION DETAIL i . i 1 \ , -.. WIT-TE x 3 344.316 STAINLESS STEEL (2)ur 6061ALURSIUM IKE MIAOW •. i ".,••-",--..„.• MEET•LETT HAND IMOD G) MAC*301151947) IN DIA I I WI SS EH HEX 9:04f1 BOLTS C) • -- . . . . ---. • ,i--. ..1- IA'a I 0161 MDMINUM RAT BAR TAB. _,...",3-.. • WOW MSS WRE EWE • WIND TO NNE ELEMENT 0,0 0 . i 1 I • WO DOABLE AMOCO. — ; _.. I i I SLEEVES LiTI : , . 2' I CO E ! 4.5" "--.'''''aj,-..-' ' ''''.: • I I 3.• : -P. ler 5061 i -...., -........-- I .: ""'• ,Z)-<-:-- - ®,,,,,DLTAILITEW, ;L PLIAWIUM I\ta) - • • 1 KATE M !MAWR SIOE OF MENG TREE k-__. __.i FOR UT a)DETALL VIEW X BOLTS I ---------------i...,' ' n • ' oil •'''.7--...-• ' BETWEEN SECOND LAYER - EXPLODED AKA NEW-KT S \..:7_,,SEALE r=ro• ..4 C.'- RIJN TAr SS WIRE ROPE ROM 1 I (-1-V.41CIPV3IEW TOP TO BOTTOM no r so TUBE • , ,,4, KIR SEMITE I...,, I,• ,,...:".el‘k % KOTIONAL S TREW%LVAIL BE .'..,.• — : f1: \ W 2 / P. 14 1 ELEVATIONS SECTIONS 8 DETAI.L4S'. - , TT I.1 1 I • . - ---- CDOETAL VIEW HOOD CANAL - . ;1 1.,__ED VAL 117...a a- GATEWAY i ‘; • J 1 r r t vr ON 1114ISS WHE ROPE SITE ADDRESS, I SR . HT STIM3M phmc.3461146) 104&SHINE RD WITH THROE AND CRAW , SLEEVES PORT LUDLOW.WA 98365 ! 3••MI ALUMINLAI (HOOD CANAL BRIDGE) I 1/0-16 I T 304 SS LIEWIG EVE 4-----KATE THREADED I IT.* . (PAW*33045115) * 0 D (EN 1/2".13 BOLTS JOH* 06,6459 Elm--15 SS HU WITS e 0 o TASK..006459T01 I o o * ELEMENT ID L RS Ilk ROUNDABOUT SIGN . II. i • ®DETAII....VIEWr, Kr 6061 ALUMNA.KAN r-OPART DETAIL WOOED NTO HOAK orr- (1) ,,:.jSCALL114-a., 08 CP 12 1 I r.p--Tl�' S _ -----}----. f-- 7.r.1KERBt CREOA�rs ALUMINUM MAME m.o ■[ ^ - --' 2'.r.vr 6I63 SO OCOA ER awn vA SEroPMfS OMUIMN OANfAF BYNDTCNEO ;NtNowR .... N u: m EMNNf SCREWS I REMOA9E2'UYA/ ED STEEL MEWS ! I I� I NE'LIFAPN[[ROLES FOR IN'B RSIMNT NTA DATE IXTS *XIS DRAWN BY ,RT3aA TIONG STEEL 1 I reu OET - _ 4 PROJECT 1MANAGEN � i . CAW S9DII11102251 AlM ` \ ____ } I , w te ,I,/ ®1216151NOly " �.. _ A 1f1111.LI I'1 tllh�lc phi ptynpI ` �► GJ ampal CAB MN7.r.T/rR WEE II `?'SOO,vT-r4 PLUAIW NqE 1. r Yi'-,O a4WLV STEM HEX BOLTS. n O�CABINET-FRONT REMOVABLE FRONT FACE OTOP CABINET•BACK AATOP CUM FON —.M . RAT MMSIERS ND NFx VAS `/ VAIN TONFROM SWCMs SSTMl ROPE 0 SS AI i ';,/ fLATW l?FEFlFp BOLT WITH MACMIE SCREWS h1—,r l71 FUT WASTER AO RIMMED WTO FRAME -'_ — - . Yr_TO.T 117 GMv sTEFE MEX OOtn, CA)�, ; III 'II0 FORTCOCIZIONiwFENYCTS IONS IV t [..j' , ®_ _ ,ODETK VEVVr m ._ RAT CUT AME/AM ''� MOLE r.r.TN AMU RRACAETS . .. Efl�6 I ! TIE MEE FODAMNT x 1.Mr B 6 162/.YA'SS THREADED I or 03 .. ALUMINUM DTO SURFACE L1IJ r' � �'III�P- ®T ' SECTIONS 8 DETAILSI 4 scut¢-.a ®SEC1 °ETA& ®TOP VIEW RNA _ TOP mat%MOMp FOR curer PRODC TO YAM,y.-rr T NAM VT-rr H000 CANAL GATEWAY i Rt f a.RL' y_ s I_ * SHE ADDRESS. • • • N i -- SR T018 SHINE RD 111 OPEN SLOES PORT LUDLOW,WA 98X5 Wellcome t©the (MOD CAM BRIDGE) TASK* 036459101 � . eaROtGRT4CT N ) FIflAEN RS TD: a 4 tRf W[FN MOONS (` —.J ROUNDABOUT SIGN ®FRONT WEW S SIDE NEW ®FRONT NEW FRAME FRONT AMMO,PANELS OTT: (1) YME��Z-ra' SCMI 1,, 6 YILL TT->r *MOM TOR CLAMP( 09 CR 12 1.71T CREO ARTS HJ Ht °/ e REMWABLE2-GALVA/11M ,o, p -/-+- 1.4 FRAMf '1 STEEL MC/MIES WITH ,wisrLLw. .wets ��,, 8\ r`� .11,11?LONG STEEL R'" \ Mtll�l, IT SOU MUWlA SW SUBMITTAL DATE' t`, ` ? FRONT MMISDfS 0926.2S D/UYEASa Lr.l t? PRAWN BY. 2 6061 NU/MUM MTW kRN isk'kALL AMUNOBACN a FRWE PROJECT MAIL66ER. ii CASPI ($1 • o , tclikz , :,1 r150' k\''),,,,\\\X ; ® NvEWOAXONVIEW r-y �� .SECTION OFTAI ` . `J `3i \\ rweuz-ra x stxl.Nrs scuE.NfS \t t i ,— T - - --..-.- .. RI UYFRSMFfr,lit7 6061 MWNAI6MT 9AR AU AMMO BACK OF FRAME ELEVATIONS ClEAT —� (t ------� SECTIONS A DETAILS [V( 1T 5052 SHUT MMMA. D sffs.TOP WORM PROJE11000CANL r,r,la'cow Mwnuu GATEWAY 5a 1118E fRAA1E.;Iv 7 73 SR104&SH S SR1D6ASHit[65 i PORT WOLOW,WA 98365 r2EN (HOOD CANAL BRIDGE) \ rT .--- :E \ . -------- FRaroOE TER It. JOB. 036159 CM ONA!fll2 MEW MAIN 2 MOW -0N21ERC%1' TAW/ 0064SM NO RAT BAR ACROSS (,SECTION DETAIL (SIDE VIEW (BACK YEW BOTTOM IOR CURT (FROHI VIEW `�scNF.,r.,a aEAENTIT RS 3 511,1I=,•c 4 suaE:is=Fa 5 r...,rr.,n ROUNDABOUT SIGN YTY (N) t0 OF 12 , A.--1'Si.--}—B. 4014E1E001H=6946rR41I5O1t01 4 11 iNB04TIlYt E1 ■�■ . =• CREOARTS 1171 L�1iN I i::t:i). ��• PROJECT MANAGER. fASFY B 0 1OPV W O5,.PVW4 ®1OC225 AI ®t00725M 1I \ ... an 12162VAI @AXO I.VIEW • l JJ ��JJ `/ CO MEAL LIAM=W OST 17270 N Nt1007 0 Mr M = 03 RIMS I . ELEVATIONS M nussr N SECTIONS&DETAILS' PROX61 D 14000 CANAL GATEWAY SITE ADDRESS SR 104&SLIM RD PORT LUDLOW.WA 9E365 ).750 (N000 CANAL BRIDGE) OTOP VIEW NM WTWO IOBa-006169 'x1.tK.rrr yr ammi1 MESIto OO6459IOl w.i:.......- -' ELEMENT ID RS I ROUNDABOUT SIGN I DFRONT VIEW FRONT NEW WY (1) YNE re-r4 OW•14. r! 11 OF 12 am CREOA s tlRttl11i I•••00N F.ULryIYI �- aONsfIWYiSIY f? L SUBMITTAL GATE �%26.25 r j fir ,+ 1IXUWN BY. ( PROJECT926.25MANAGE1. R __,I.:. uarB. REWS101a: CM 10.02151R ®FRONT VIEW GM 100125 JM 2 GY r.ra ® an12162S1R 1? 0 �'--"� FOR 3/(BOLTS " C3 'CD AKDN vow �_._.J Oswt ers W N m x 2 } 1. t ELEVATIONS ,,�� SECTIONS&DETAILS' +— 1 PROJECT D HOOD CANAL L GATEWAY i. C�I SITE ADDRESS. SR 104 A SHINE RD O O PORT LUDLOW,WA 98365 (HOOD CANAL BRIDGE) JOB* 006159 nTOUwEW 7.;-,v1'BOOSRARPCdMNRMai TASKS'006/59101 JseEr_+a U IWSEts ®DETAt �' Scvf en!SWOEMENT b:RS ROUNDABOUT SIGN QIN (1) 12 OF 12 CREO ARTS WM1.4A,.. SUBMITTAL DATE 09.2A25 DRAWN BY IEFF N PROTECT MANAGER: .E'- REVISIONS: OM 10.02.25114 GOO,tioT 25 ix ''.,.'.. r �_:___ I - selH®J QsW OM tczs Ix 1 -r �. C) ___-__ i pnki 0_ L I. -1 >�uffiw __ _� ; QI�BN009� to m `— Ir�'t' • EllvanatisW1 f i AlF ;*r, — SECTIONS a DETAILS' PROJECT 1.F , j • - O.j — - L - HOOD CANAL .7-... s- _-' �..- GATEWAY • SITE ADDRESS. SR 104&SHINE RO PORT LUDLOW.WA 98365 (HOOD CANAL BRIDGE) JOBS:006159 TAU*.BBW59T0T ELEMENT BY RS 1OPART DETAILS ROUNDABOUT SIGN Fait:Nis ODE CO CUT OF 12 — A 16' Y DOUBLE/••/'•VC6061PM CREUA°s 0 . ANGLE&PORES•(I)WELOEO IN BETWEEN iRMf a•INn1 fAMII �I ANomREA&EwNw�TWAEN17 l3.1 17 S9 HEJteat 51ANIl1Al DATEI II S I �/ NM FLAT WASIf6S AND NEx MN 09.16nO DRAWNe• .�' iiiiii---t, / 1 '7�' ••• 176E61 ALUMNUMNArz Iffi M. " 1 ! 11 •_� �- WEIOEO IN MAME AND MONO PROTECT"A!, L 1--1'�DI� . •17-13.w-BCl1 EASE16 \ \ �� := \ `- :::V-_J I OETAILr.EW ` I S (1)x$ECIgN Er.rpS Atl. up ErrLT611 AWFW1REF Vf 6061 ALUMINUM IRFF ELEMENT REVISIONS ®10022 5JN Qm 1067 25 JN 0 • (NI 17,131117 SS EN NIX SORT BOLLS --------- Mlle•7E61 ALUMINUM RAT BAR iMIS 0 VIEWED 7018[E EIELEI'il a, `/J •4Z W I BB�� j TKC WAWA* y+ VIKEADEO N.) - z secs L J ,DR> _ 9a' r -O ---_---'� �DETAR VEW 90' C,\a MOOED AW NY[W-Ni S. 5 SGNNY.re CAXai VIEW CT •O 1 Tv / sew Ars �; _....- ,I. J 1 - -- 1 1� ELEVATIONS -�- SECTIONS A DETAILS' t Ir.. vo iJ v PROJECT > it ,tom DETAYL VEIN %5 NODD GANILL t/a�Q.rV�� �vulyr_1c GATEWAY 10 - 1 1.61. -- SITE ADDRESS �� ��. A �� SR IM B SHINE RD PORT LUDLOW WA S -"1vurziNREADED 6081 ALUMINUM (HOOD CANAL BRIE 3 FOR l.'7-t3 BOLTS AbI 006669 0 0 0 T.K. DO64591D1 �fRONT VEW 4 ■ MT Kr RS 2 1v.L 1,,.,0 T SIGN \ @PART DETAIL /76061 ALUAMAN RATE (1) 4 MAU,rr., wElOED INTO FRAME 08 0E 12 1 Olympic Peninsula Gateway Sign Landscaping sky design (Rev3-11/18/2025] Locally sourced regional stone. VV//''1 t/J/ .F 3 0.3"' '-6" '� .94-.� 9-0 26'9l-6` C> WW. 2 2 6- 1.6 4'a 44 . fit X y V w,y-�- A 1'n 1-3'z 2-3' CO D .......:XV9- ' APP. 1 OlynPsc Peninsula Gateway Sign-Stone Plxement Detail Measvmients provafeE asaug� .o..o sc., sonene of exposed store m .4.01110.11111111. • ti.BAYSE PLATE • �, n • ...v....:LI.a... w 7 ,' r 1 IL ; -r-t- - { ] -- CONNECTNA/ , 61.1 wo.. .n. 11eal,a�.... ELLEVATKIN_-- SIDE ELEVATION._-. Kxs. NOTES ..ls 1, SS. c WKI.M..17.10...1.1...E9.6 ro..E.�Km 1 .,u.Km...�.,. "01..,.K„OAACC.a. .Oma. .411I y 5 E�4 •AV.4%.MG O w.s..a.. `�-.T Y .►-allM VA.+.aasc 9 m...Ae .Y v..� Oda . .. a AaK DATE SIGNED:0M2101091' �* g IS A M O.wR8.1.44.AO - ry Kum"'"*".a YES714.3.1.. .CCO.['AT.1 A. ........uruese�..n+ AN v071.011.AW ...w .1 1.F..M..OMW.:O....1a..pF3K... AI. O� .dallia mE.11..Y9'..ORtlI66.4.7 C.S o ble..1.11 APUrin UNOF.O SO..AMA.NEP TN T..RX.MM W10.041Ka.Y 0.0. 11.11..1.1.M AM O 9.1 71.11111. -V4—eOR— 11. Al..a.vC..E K9.i.I1UE@HYwm.0 EYIY KQ111f190.F...L ..F.lO. 06 at¢.m.[ ... uM4.F.. m ..9 .1.4 Mr]]/r,f�rr..Y....9+..n An.r_w.... wJf•46Y . ..t..MN6 ..AO.Fi MmP. .... M..=a Nrmro soon oaufwL awTSI�wY . _ r...`...W]E.0.4rtA GA.l.1 n.now r.r;....wKm.u.m.. � � �. .o.vna..>a i ..1 . � Eu s11»0n0 Ha r.rsor PICOMYl1l�E3NFF GCC 1342 EXHIBIT A • Appendix C:Stakeholder and Tribal Consultation Summaries Welcome Signage Steering Committee A broadly representative steering committee was convened in spring 2025 to guide the project from conception to completion.This committee includes a cross-section of community leaders,ensuring diverse perspectives are integrated into every stage of the project.Extensive RFP and jury phases lead to the identified design and fabrication selection of west coast industry leaders. Name Affiliation Location Ann Burkhart Consultant,Pomona Woods Port Ludlow Alexis Arrabito President,Quimper Events Collective Pt.Townsend Barbara Hanna Communications Manager,City of Sequim Sequim Marsha Massey Executive Director,Olympic Peninsula Visitors Bureau Port Angeles Loni Greninger Vice Chairwoman,Jamestown S'Klallam Tribe Blyn Debbie Wardrop Consultant,Jamestown S'Klallam Tribe Events Port Ludlow Renee Rux Enterprise Director,Quileute Tribe La Push Jessica Wiersma VP Marketing,Black Ball Ferry Line Victoria,BC Diana Smeland President,Ludlow Associates Port Ludlow Greg Brotherton Commissioner,Dist.3,Jefferson County BoCC Quilcene Sarah Copley VP,Puget Sound Express Pt.Townsend Shelly Leavens Director of Communications,City of Port Townsend Pt.Townsend Steve Shively Project Manager,Gateway Visitor Center Pt.Townsend Andrew Larson,PE Dev.Services Engineer,WSDOT(Ex-Officio Liaison) NLA Tribal Consultation Honoring the Olympic Peninsula's Indigenous heritage is a core project principle,and the design was developed through exceptional,Peninsula-wide collaboration among representatives of all nine federally recognized tribes.Tribal leaders and cultural advisors provided sustained guidance on language,symbolism,and cultural integrity— grounding the welcome message in the Klallam phrase"?an?a e'ayaxw"(You Are Welcome Here)and vetting motifs informed by the region's distinct carving traditions. Through this collective,high-leadership review,the committee refined and advanced the final elements—most notably the cedar-tree form and the intivational messages"Enjoy and Respect Our Homelands"and"Until Our Paths Cross Again."These components reflect shared direction from consultation participants and represent a unified,tribally vetted expression of welcome,respect,and place. Consultation participants(by tribe): Hoh Tribe;Jamestown S'Klallam Tribe; Lower Elwha Klallam Tribe; Makah Tribe; Port Gamble S'Klallam Tribe; Quinault Indian Nation;Skokomish Indian Tribe;Squaxin Island Tribe;Quileute Tribe. Community and Civic Engagement Throughout the process stakeholder updates and opportunity for comment have occurred. The Olympic Peninsula Tourism Commission has regularly highlighted sign progress as a standing meeting agenda item.During the solicitation of RFP respondents for sign design and fabrication the theme of a"Gateway Welcome Sign"was intertwined in the general GCC 1342 EXHIBIT A public perception of roundabouts as a traffic control devise at SR104's Hood Canal Bridge Shine&Paradise Roads and,to a lesser degree,to the roundabout construction being part of an Olympic Region managed massive WSDOT back-to-back project workloads in 2023,2024 and 2025 construction projects related to mitigating fish passage barriers and improving highway safety.No recorded comments against a sign,merely expressed opions related to the roundabout project at this location,and presumptions related to future traffic flow through this vital transportation corridor.Below are documented Community and Civic Engagement related to this project. Jurisdiction Jurisdiction BodyMeeting date(or Record Where mentioned set record date) type (page/timestamp) Agenda Document text(mentions"Welcome Sign... Local Jefferson Record received packet/ Government County LTAC 09/09/2025 supporting SR104&Paradise Road Traffic Circle") document (Jefferson County Test) Port Headline:"SR104 roundabout complete... Regional/ News(local (article date not Online Townsend intersection of SR 104 and Paradise Bay print media Leader reporting) shown in snippet) news brief Road"(Portland Tribune) Regional/ Sequim News(local Jun 12,2024 Community Mentions SR-104/Hood Canal Bridge+ print media Gazette reporting) (contextual) briefs WSDOT roundabouts(SR-19/SR-104 and Shine/Paradise Bay)(Seauim Gazette) Regional/ Sequim News(local Jul 17,2024 "On State Route 104...crews will build two media Gazette reporting) News story new roundabouts...at SR 19...and at Shine printp g) (contextual) Road/Paradise Bay Road"(Sequim Gazette) Regional/ Opinion Nov 10,2022 Opinion Mentions"SR 104 Hood Canal Bridge" print media Forks Forum (archived) (contextual) article (Forks Forum) Regional transportation Executive Agenda Packet includes discussion touching SR-104 PRTPO 21-Feb-2S packet corridor/gateway context(SR-104 appears org(corridor Board (PDF) with"gateway role")(Sauarespace) context) Regional Technical Agenda "SR 104/SR 3 Hood Canal Bridge transportation PRTPO Advisory 20-Nov-25 packet Corridor...From SR 19 to Port Gamble..." org(corridor context) Committee (PDF) (PRTPO) Local Clallam Planning Meeting Includes"Hood Canal Bridge to Olympic Government County Commission 1-Oct-2S agenda Discovery Trail(0DT)"proiect line item (AgendaCenter) (PDF) (Clallam County) GCC 1342 EXHIBIT A 4,�goN c , � o Judy Shepherd ,4 FINANCE DIRECTOR 1820 Jefferson St.,Port Townsend WA 98368 z i r9c,.14�.w (360)385-9231 jfshepherd@co.iefferson.wa.us . , To: Josh Peters. County Administrator From Judy Shepherd, Finance Director Date 4/29/2026 Subject: SR 104 Monument There are concerns regarding both replacement coverage for the planned State Route 104 public artwork, to be positioned within the roundabout at the Jefferson County end of the Hood Canal Bridge in the event the monument sustains damage, as well as assignment of financial responsibility for future operation, maintenance, and inspection costs The County's 'insurance' coverage will cover the artwork for damage once construction is complete The artwork has been added to our property insurance through the Washington Counties Risk Pool for which there is currently a $5.000 deductible for replacement due to loss Any damages less than $5,000 will be required to be covered by the County The County will also be required to sign an Interlocal Maintenance Agreement with WSDOT accepting operation, maintenance. and inspection responsibility. and as such perform these duties. The County is proposing that the Lodging Tax Fund cover the expense of the Risk Pool deductible, damages up to $5,000, and operation, maintenance, and inspection costs, as the artwork is a symbol marking the entrance to our beautiful Olympic Peninsula These would not be expenses that would require an award during the annual LTAC RFP process. If there is a need to cover an expense up to $5,000, the recommended reserve would be able to accommodate the expense, and the County would appropriate budget during the County's budget appropriation process. Thank you for your consideration. Respectively submitted. Project: CAT-raffle\Design\_Projects\SR 104\SR104-SRMP 11.47-Hood Canal Shine RAB\[Project Tracking Review Template-Copyxlsx)SRxx MPxx Project DocTrack'IBI REVIEWER NOTES: Submittal: Center Island Sign Rev00 Submitted Due On 10/16/2025 10/29/2025 Date [Page)File Name Comments WSDOT Reviewer Designer Comment Response Required 10/23/2025 15.47 11(RS-Roundabout Sign El Please coordinate Kumiko lzawa-OR JeffCo.Go Pub.Wrks Dir.Eric Kuzma 8 WSDOT Agreements Engineer-Per Andrew 10 07 25_WC20251030.pdf with the Development Traffic Design Larson)are finalizing ILA for signature :o '3 26-Steue. Services Office to prepare the 0 maintenance C) agreement. n 10/28/2025 15:43 1 RS-Roundabout Sign1 [1DRW-For information Dylinn Wentz-OR Jimmy Scarborough P.E.Electrical Engineering Mngr.jeffpud.org ref.to(NESC)rule co 10.07.25_WC20251030 pdf from PA PEO-There Traffic Operations 234C requires 3.0 feet(neutral)and 8.0 feet(phase conductors)for sign not readily -A are overhead power (SIGNS/PMS) accessible(via permanent ladder catwalk,etc.). Based on the full WAC 296-468 relate lines(see below)that to WA L81,there are no additional WA L81 amendment that imposes a more restrictive m cross directly over the minimum clearance for a sign from adjacent neutral/phase overhead conductors than center of the RAB. NESC Rule 234C.The week of 12-15-2025 Jimmy personally measured the overhead X wires at the site of the proposed 16 foot tall sign."The heights 1,(Jimmy) measured werM Comment to ensure at 47°F no wind. The neutral was at 26 and the phase conductors were at 32'."The the design team is (NESC)rule 234C required minimum clearnce of 19 feet(neutral)and 24 feet(phase ULO _ aware,and should be conductors)are well within acceptable distances from possible sign interferance. --+ noted in the plans. Contracted sign installer has PUD's contact details for ordering temporary power Might have to shutdown and lock-out during installing if necessary.'7' 42:72'o Se%-' D consider relocation of j these lines again. 1 10/29/20259.18 (1)RS-Roundabout Sign DRW-For information Dylan Wentz-OR ALL SURFACES PRIMED,PAINTED W/ACRYLIC POLYURATHANE PAINT; t0.07.25_WC2025t030.pdf from OR Area 3 Traffic Operations CLEARCOATING Maintenance-All (SIGNS/PMS) NOTE POWDER HAS LIMITED PALETTE 8 LIMITS ABILITY FOR FUTURE TOUCH aluminum should be UPS IF NEEDED sealed and powder _ coated. 111'7i sky Agreed.ins should oe parted and sealed.However.CREO to confirm. 10/29/2025 15:38 [1)RS-Roundabout Sign DRW-clarify-per OR Dylinn Wentz-OR Suggest CREO review(link)and clarify which WSDOT sub program design element(s) 10.07.25_WC20251030.pdf Area 3 maintenance- Traffic Operations this sign is subject to(Steve 1031) MASH Testing (SIGNS/PMS) httos://wsdoLwa.00v/oubications/manualslfulltext/M22-01/1105.pdf Requirements (11i7]sky CREO to respond. FOOTING AS DESIGNED IS TO LEVEL THE SURFACE AS REQUIRED,ALL WHILE THE PORTION OF THE FOOTING ABOVE GRADE ON ONE SIDE,WILL BE BEHIND BOLDERS(9 PLACED AROUND PERMITER,PER THE 9 TRIBES ON THE PENISULA) SO THAT NO PORTION OF FOOTING IS ACCESSIBLE FROM ROAD,NOR ANY PART OF THE RAISED ROUDABOUT 10/29/2025 9:20 [1)RS-Roundabout Sign DRW-clarify-per OR Dylinn Wentz-OR 10.07.25_WC2025t030.pdr Area 3 maintenance- Traffic Operations Suggest CREO review(link)and clarify which WSDOT sub program design element(s) MASH Testing (SIGNS/PMS) this sign is subject to(Steve 1031) https:lwsdot.wa.govlpublications/manuals/fujttext/M22-01!1105.odf Requirements [11.7]sky CREO to respond_ ^ 1 CREO n 1105.01 No impact to roadway design,such as lane widths,shoulder widths,alignmentsv clear zone,etc. 1105.02:No changes to any existing elements 1105.02(1) Nothing to report on decorative monument 1105.03-No changes to roadway/path m 1105.04:No Changes with new decortive structure X 1105.05:NA-Decorative monument does not apply to WSDOT performance metrics 10/29/2025 9'22 j3j RS-Roundabout Sign DRW-clarify-per OR Dylinn Wentz-OR 111i7]sky we oelieve the pick eyes should be removed they are not necessary after the tO.07.25_WC20251030-pdt Area 3 maintenance- Traffic Operations sign has seen installed.-however.CREO to respond. �1 Ease of maintenance- (SIGNS/PMS) Pick eyes should stay CREO: on structures The pick eyes are in place for installation purposes&can be removed once the sign is installed 10/29/2025 9:24 13]RS-Roundabout Sign DRW-clarify-per OR Dylinn Wentz-OR CONFIRMED-All HRDWR SS 10.07.25_WC20251030.pdf Area 3 maintenance- Traffic Operations All hardware should (SIGNS/PMS) [11 I]sky Agreed. be stainless- dissimilar metal reaction with steel or galvinzed 10/29/2025 9:26 15]RS-Roundabout Sign DRW-clarify-per OR Dylinn Wentz-OR [11,71 sky CREO to respond. 10.07.25_WC20251030.pdf Area 3 maintenance- Traffic Operations channel should be (SIGNS/PMS) CREO O&M report will detail cleaning proceedures wider surface will Structure engineered as designed collect dirt 0^ C) 10/29/2025 9:28 [5]RS-Roundabout Sign DRW-clarify-per OR Dylinn Wentz-OR (2)6"DIA STD STEEL PIPE DIRECT EMBED IN CONCRETE -PER DESIGN 10.07.25_WC20251030.pdf Area 3 maintenance- Traffic Operations (A) how is this secured to (SIGNS/PMS) [11/7)sky CREO to respond. Jta the concrete m x+ 10/29/2025 9:25 [8]RS-Roundabout Sign DRW-clarify-per OR Dylinn Wentz-OR ALL HRDWR SS 1 10 07 25_WC20251030.pdf Area 3 maintenance- Traffic Operations stainless (SIGNS/PMS) [11/7]sky Agreed. 03 10/29/2025 9:29 (9]RS-Roundabout Sign DRW-R-per OR Dylinn Wentz-OR ALL HRDWR SS 10.07.25_WC20251030.pdf Area 3 maintenance- Traffic Operations stainless (SIGNS/PMS) 111/7]sky Agreed. 10/29/2025 9:32 [I 1]RS-Roundabout Sign DRW-clarify-per OR Dylinn Wentz-OR SS MECH FASTENERS-PER DESIGN 10.07.25_WC20251030.pdf Area 3 maintenance- Traffic Operations how is this skin (SIGNS/PMS) [11'T sky CREO to respOOO. attached 10/29/2025 9:30 [13]RS-Roundabout Sign DRW-clarify-per OR Dylinn Wentz-OR 5-1/4"Cap 10.07.25_WC20251030.pdf Area 3 maintenance- Traffic Operations Font size and size of (SIGNS/PMS) [11/17]:sky Font height and leading is message noted on the first page of the shop drawings with full size layouts provided to Creo for manufacture. 10/29/2025 9:31 [13]RS-Roundabout Sign DRW-R-per OR Dylinn Wentz-OR [I1 r7)sky CREO to respond. 10.07.25 WC20251030.pdf Area 3 maintenance- Traffic Operations should state top side (SIGNS/PMS) CREO O&M Report will detail sections bottom section Oct 30,2025,4.20 PM "TM:NOTE the impact Timothy McCall Issue resolved within WSDOT-[2/19/2026 Thanks for following up.My concerns have of views angles from been addressed.No further concerns from my end) the new CCTV camera with the addition of the l J larger sign."' ..a 2/19/2026 Kumiko and Dylinn Dylinn Wentz-OR The signs lighting will be powered from the service source at the center RAB.[2/19/26- (a have sign illumination Traffic Operations Steve) clarification (SIGNS/PMS) N m X 00 H D GCC 1342 EXHIBIT A SR104 Shine RAB Gateway Public Art Plan v6.23.2026 - Signed Final Audit Report 2026-08-06 Created: 2026-08-06 By: Jennifer Wirkus(jennifer.wirkus@wsdot.wa.gov) Status: Signed Transaction ID: CBJCHBCAABAAbOrNg_QsQgtup544Pw7yua6jZ-HQFyUk "SR104 Shine RAB Gateway Public Art Plan v6.23.2026 - Signe d" History (dp Document digitally presigned by Justin R Belk(belkj@wsdot.wa.gov) 2026-08-06-6:44:46 PM GMT-IP address: 198.238.213.151 'o Document digitally presigned by Taylor McNeill(mcneilt@wsdot.wa.gov) 2026-08-06-8:01:44 PM GMT-IP address:198.238.213.151 Document created by Jennifer Wirkus(jennifer.wirkus@wsdot.wa.gov) 2026-08-06-8:59:06 PM GMT-IP address: 198.238.213.151 L + Document emailed to Troy Cowan (troy.cowan@wsdot.wa.gov)for signature 2026-08-06-9:02:01 PM GMT Ti' Email viewed by Troy Cowan(troy.cowan@wsdot.wa.gov) 2026-08-06-9:02:31 PM GMT-IP address: 104.47.64,254 Q Document e-signed by Troy Cowan (troy.cowan@wsdot.wa.gov) Signature Date.2026-08-06-9:07 07 PM GMT-Time Source.server-IP address: 198.238.213.154-Signature Appearance Selected: IMAGE Agreement completed. 2026-08-06-9:07.07 PM GMT Q Adobe Acrobat Sign O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Josh Peters, County Administrator From: Josh Peters, County Administrator Agenda Date: September 8, 2026 Subject: Olympic Peninsula Gateway Sign Project - Developer / Local Agency Agreement Statement of Issue: The Board is requested to approve and execute the attached WSDOT Developer Agreement (GCC1342) for the "Welcome to the Olympic Peninsula" sign to be located within the SR 104 Hood Canal Bridge roundabout right-of-way. This agreement incorporates the previously Board-approved Public Art Plan (approved July 27, 2026) as Exhibit A, defining the design, technical specifications, and ongoing maintenance standards for the project. Analysis/Strategic Goals/Pro's Et Con's: Approval formalizes the tri-party agreement authorizing construction of the Olympic Peninsula Gateway Sign between Jefferson County, WSDOT, and the Olympic Peninsula Visitor Bureau (OPVB). The project complies with WSDOT highway design and safety standards, authorizes temporary and permanent occupancy within state right-of-way, and establishes clear long-term jurisdictional responsibilities so construction can proceed. Fiscal Impact/Cost Benefit Analysis: Approval carries no initial capital outlay for Jefferson County. Ongoing routine maintenance, repairs, and state right-of-way compliance costs are the sole long-term County obligation to be established in a forthcoming interlocal agreement (ILA) and will be fully supported through dedicated Lodging Tax Advisory Committee (LTAC) funds. Recommendation: Staff recommends the Board approve and authorize the Chair to sign WSDOT Developer Agreement GCC 1342. Department Contact: Josh Thornton, Real Property Specialist 385-9162. Reviewed By: 61hig Josh eters, County Administrator Date CONTRACT REVIEW FORM Clear Form (INSTRUCTIONS ARE ON THE NEXT PAGE) Pg46;a6, CONTRACT WITI-1: WSDOT/Olympic Peninsula Visitors Bureau Contract No: GCC 1342 Contract For: Dev. Agreement- Oly. Pen. Gateway Sign Term: Perpetual I Ongoing Maintenance COUNTY DEPARTMENT: PUBLIC WORKS Contact Person: JOSHUA THORNTON Contact Phone: 360-385-9162 Contact email: jTHORNTON@CO.JEFFERSON WA.US AMOUNT: 0 PROCESS: —7 .0o Exempt from Bid Process Revenue: N/A Cooperative Purchase Expenditure: N/A Competitive Sealed Bid Matching Funds Required: N/A Small Works Roster Sources(s)of Matching Funds N/A , Vendor List Bid Fund # N/A RFP or RFQ Munis OrgiObj N/A Other: APPROVAL. STEPS: STEP I: DEPARTMENT CERTIFIES IPLIANCE WITH JCC 3.55.080 AND CHAPTER 42.23 RCW. CERT!Fl ED: r N!A:11 Signature Date STEP 2: DEPARTMENT CERTIFIES THE PERSON PROPOSED FOR CONTRACTING WITH THE COUNTY (CONTRACTOR) HAS NOT BEEN DEBARRED BY ANY FEDERAL, STATE, OR LOCAL AGENCY. CERTIFIED: N/A: /a6 Signature Date STEP 3: RISK MANAGEMENT REVIEW(will be added electronically through Laserfiche): I/Electronically approved by Risk Management on 8/17/2026. STEP 4: PROSECUTING ATTORNEY REVIEW (will be added electronically through Laserfiche): 'Electronically approved as to form by PAO on 8/14/2026. DPA Luther reviewed and approved on 08-14-2026. STEP 5: DEPARTMENT MAKES REVISIONS & RESUBMITS TO RISK MANAGEMENT AND PROSECUTING ATTORNEY(IF REQUIRED). STEP 6: CONTRACTOR SIGNS STEP 7: SUBMIT TO BOCC FOR APPROVAL