Loading...
HomeMy WebLinkAboutCONSENT Bid Award Memorial Field Phase 2 Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Josh Peters, County Administrator From: Eric Kuzma, Public Works Director v Agenda Date: October 5, 2026 Subject: Award of Contract, Memorial Athletic Field Infrastructure Renovation Project, Phase 2 (Retaining Wall and Goal Post), County Project No. 17521350, RCO Project # 24-1768 Statement of Issue: Award of Contract to Eaglemount Excavation, of Port Townsend, Washington for their bid of $46,553.93 for the above referenced project. Phase Two of the project includes installing a retaining wall, installing new football goal posts, and widening the access ramps. Analysis/Strategic Goals/Pro's Et Con's: The Public Works Department has completed checking the bids and has investigated the qualifications of the lowest bidder including Bidder responsibility criteria of RCW 39.04.350. Bidder verification documentation is attached. Fiscal Impact/Cost Benefit Analysis: The Bid amount is $46,553.93. This project is 70% RCO funded, and 30% Jefferson County Construction and Renovation Funds. Recommendation: Public Works recommends that the Board authorize the Award of Contract to Eaglemount Excavation. and authorize the County Engineer to execute necessary change orders for the project for up to 10% of the contract amount of $4,655.39, or an aggregate total of $51,209.32, by signing the attached document and returning it to Public Works for further processing. Department Contact: Matthew Tyler, ext 129 Reviewed By: CVIC Josh eters, County Administrator Date c,z,€,ON C. ' Department of Public Works 623 Sheridan Street 1 Port Townsend,WA 98368 v Jefferson County, Washington 360-385-9160 %_ DATE: September 29,2026 TO: Board of County Commissioners FROM: Eric Kuzma,Public Works Director SUBJECT: AWARD OF CONTRACT Memorial Athletic Field Infrastructure Renovation Project,Phase 2(Retaining wall&Goal Posts) County Project No. 17521350 In the matter of awarding a construction contract for the above-referenced work: • The Call for Bids was issued by the Board of County Commissioners on August 12,2026. • The MRSC Small Works Roster Process was utilized. • Five bids were received by the September 3,2026 deadline. • The Public Works Department has completed checking the bids and has investigated the qualifications of the lowest bidder including Bidder responsibility criteria of RCW 39.04.350(1). • Bid tabs are attached for reference. The Public Works Department recommends that the construction contract be awarded to the lowest responsive and responsible bidder: Eaglemount Excavation,Washington for their bid amount of$46,553.93 Memorial Athletic Field Infrastructure Renovation Project, Phase 2,County Project# 17521350 and, authorize the County Engineer to execute change orders for the project, due to unforeseen conditions only,for up to 10%of the contract amount,or$4,655.39 Approved Greg Brotherton Date Chair,Board of County Commissioners Attached: Bid Tabulations Bidder Verification Summary LOW TO HIGH BID ORDER 0 -1 m 7 � O m D m D_ d o 90 c -0 Z =3. C) 3 0 a CD a) m a S Z 0 v o 73 z . D 0 * O zi O 73 c co 7.1 " 3 D I co 3 — —I IA co BID AMOUNT(W/O Sales Tax) w 0 0 w CT y to T Z t (1) °a C X APPARENT LOW BIDDER A 3 0 D BIDS ENTERED IN BID TABULATION SHEET cu o ADDENDUMS ACKNOWLEDGED BY CONTRACTOR CD o N PROPOSAL SIGNED 13 S cu Cl) is co N A co L and I Account ID �1 N N 7 S. n m 00 03 7 m 5%PROPOSAL BOND INCLUDED x m 14 d g' 0m WA STATE UNIFIED BUSINESS IDENTIFIER NO.(UBI): w w httpsalsecure.Ini.wa.gov/verifyl °° 0 co y en eleSTATE EXCISE TAX REGISTRATION NO.(MAY BE SAME AS UBI): ww https:Ilsecure.dor.wa.gov/gteunauthl_I#7 0. c.W Link at bottom of LNI verification page to C) r m m CONTRACTOR LICENSE NUMBER r e 0 CONTRACTOR'S LICENSE EXPIRATION DATE: o N N tittps://secure.lni.wa.gov/verify/ -<m CONTRACTOR LICENSE VERIFIED ON L&I WEBSITE cn https://secure.lni.wa.gov/verifyl > 2 o L&I INDUSTRIAL INSURANCE PREMIUM STATUS: cl ^ https://secure.lni.wa.gov/verify/ z CONTRACTOR CHECKED ON L&I DEBARRED CONTRACTORS LIST: o http:/Iwww.lni.wa.gov/TradesLicensing/PrevWage/AwardingAgencies/Deba N rredContractors/default.asp L&I CONTRACTOR TRAINING VERIFICATION per RCW 39.04.350(1)(f) m (effective July 1,2019)Included on LNI Verification page: https://secure.lni.wa.gov/verify/ Memorial Field Infrastructure Replacement Project#17521350 Bid Tabulation Phase 2, Retaining Wall, Goal Posts, &Access Improvements 11-Sep-26 Bidder Bid Nordland Const NW $ 119,300.25 Van Ness Const $ 96,734.49 SOCO Construction $ 70,080.00 Eaglemount Exacv. $ 46,553.93 Engineers Estimate $88,000.00