HomeMy WebLinkAboutADDITIONAL: Request for County Logo BoatHavenRepairsBoat Haven Marina
Improvement Plan
One of every five jobs in Jefferson To sustain local moorage options, connections, new water and fire
County is directly or indirectly
and to keep the marine trades
protection, new lighting, and new
tied to the Port of Port Townsend.
thriving, it's time to face up to
galvanized pilings and rings.
The Port's economic engine is the
upgrades of the Boat Haven
Boat Haven Marina and its
Marina.
However the rest of the marina —
connected Boat Yard. Parts of the
what's called the Commercial
Boat Haven Marina, however, are
Today, the Boat Haven is really
Basin, the C and D docks, the
aging and obsolete. The early
two marinas. The largest set of
linear dock and the fuel station
marina was built almost ioo
floating docks, called the A/B
dock — date from the mid-196os.
years ago. The "new" marina was
docks, were replaced in 2010-
They were untouched by those
built over 6o years ago.
2011. Those boaters enjoy new
improvements.
wood floats, new electrical
•-.
•�y C DOCK �• LINEAR DOCK
00M ill Did
1j t l L i
r rr rani rw� "r
"-'' '"' -, ,
FUEL DOCK
COMMERCIAL NEW DOCK GANGWAYS
BASIN DOCKS
- r a
T
. 7 i
. pit ! Z�
i
VIII ,V1
♦i
I�
�,
,40
investingin the marine trades & boatingcomMI-1111ty
Each color represents part of the project. Replacement of each dock would be done during the few months when on -water work is allowed. The project, if approved
and funded, could be permitted by 2029 with construction occurring in 2030, 2031, 2032 and 2033. It is unknown yet in what order this work would be done.
Dock Replacements for
The replacement of any floating dock
New dock gangways
Dredging
D Dock
system includes: New floating concrete
Existing gangways to C, D,
The Port may dredge some parts of
docks. Replacement of creosoted pilings
Commercial docks involve a pier &
p
the interior of the marina, too en u
p p
C Dock
with galvanized steel pilings. New piling
short gangway. The gangway can be
new space for safe boating.
Linear Dock
rings. New marine electrical service,
g
so steep at low tide it is unsafe for
including transformers and on -dock
many. New gangways would attach
Fuel Dock
pedestals. New potable water pipes.
the shore to the floating dock, be
Commercial Basin docks
New fire suppression system.
much longer and less steep for ADA
compliance.
Investing in the boating public &marine trades
A few years ago, internationally
recognized consulting firm Martin
Associates did an economic
analysis of the local and regional
impact of marine trades activity to
the Jefferson County economy.
Among other things,
the study found:
11,154 jobs are a direct
outgrowth of the marine trades in
Jefferson County.
1 Those marine trades jobs
support over 1,000 additional jobs
here. Between the marine trades
and the jobs they support, over 20
percent of the county's job base
I"- on the marine trades.
Yes to 20% of local jo
EacTEAM
piefferson
P LA D
Jeffe...on —ounty
V Public uli lily ois[nc�
"The Boat Haven Marina i�
the engine that powers
most of the Port's
economic Benefits. All of
Jefferson County has a
stake in its upgrades."
Eron Berg,
Port Executive Director
1 The marine trades support
over $336 million per year in
economic value. That includes
$276 million of sales revenue for
direct marine trades work.
services. That includes $ 5 5 million
in personal income for direct
marine trades jobs.
1 $12.6 million paid in state or
localtaxes.
Funding options for this $35
million project include grants,
moorage revenue, Port property
taxes and consideration of a third
(and final) Industrial Development
District (IDD) levy, such as the one
that allowed replacement of the
Point Hudson breakwaters.
1 The marine trades pay over The Port Commission and Port
$135 million in personal income or staff welcome the guidance of
local consumption of goods and residents. www.PortofPT.com
We're all in this together!
cityofPort*
JN r T 1 ' .J 1 d -,a%
rf
o '11PTMTA