Loading...
HomeMy WebLinkAbout081511_ca05 Department of Public Works o Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request From: Board of Commissioners Philip Morley, County Administrator Frank Gifford, Public Works Director ;} tJ To: Agenda Date: August 15, 2011 Local Agency Agreement Supplement with the Washington State Dept. of Transportation (WSDOT), Upper Hoh Road Emergency Repair, MP 7.7-8.0, X01781, Federal Aid Project No. ER-0801(025) Subject: Statement of Issue: The attached Local Agency Agreement Supplement with WSDOT is necessary in order to proceed with completion of the Upper Hoh Road, MP 7.7 to MP 8.0 emergency repair project. Analysis/Strategic Goals/Pro's 8: Con's: Between December, 2004 and January, 2008 Public Works performed emergency repairs at Upper Hoh Rd. MP 7.7 to MP 8.0 under Federal Aid Project No. 's ER-0501 (015) and ER-0801 (025), constructing a total of 1,400 lineal feet of armored bank protection. Remaining work consists of mitigation required by the Washington State Dept. of Fish 8: Wildlife (WDFW). Mitigation will be satisfied by replacing the culvert at Alder Creek Tributary, Upper Hoh Road MP 2.15, with aWDFW-approved, fish passable structure. A Local Agency Agreement Supplement is necessary in order to fund acquisition of an easement from the Washington State Dept. of Natural Resources. Fiscal Impact/Cost Benefit AnalYSiS: This supplement will increase the Preliminary Engineering funding from $233,000 to $257,000. This will be funded at 86.5% by the Federal Highway Administration and 13.5% by a combination of Rural Arterial Program (RAP) funds, and County road funds. Recommendation: The Board is requested to sign the Local Agency Agreement Supplement, and return to Public Works. Department Contact: Monte Reinders, County Engineer, 385-9242. ~4 Date Aft Washington State Department of Transportation Local Agency Agreement Supplement Agency Supplement Number Jefferson County 3 Federal Aid Project Number Agreement Number CFDA No. 20,205 ER-0801(025) LA-6569 (Catalog of Federal Domestic Assistance The Local Agency requests to supplement the agreement entered into and executed on January 31, 2008 All provisions in the basic agreement remain in effect except as modified by this supplement. The changes to the agreement are as follows: Project Description Name Upper Hoh Road MP 7.7 to MP 8.0 Emergency Repair Length 0.3 Termini Milepost 7.7 to Milepost 8.0 Description of Work ? No Change Emergency Repairs at Upper Hoh Rd. MP 7.7 to 8.0 were completed in 2008. Remaining work consists of environmental mitigation for placement of riprap in the Hoh River, as required by the Washington State Dept. of Fish and Wildlife. Reason for Supplement As mitigation for the emergency repairs, the culvert at Alder Creek Tributary, Upper Hoh Road MP 2.15, will be replaced with a WDFW-approved fish passable structure. This supplement is for a Washington Dept. of Natural Resources (DNR) right-of-way plat. Construction of the project will require a permanent easement from DNR. This will require county staff time and hiring a surveying consultant to prepare the survey and right-of-way documents. Does this change require additional Right of Way or Easements? ® Yes ? No Estimate of Fundi ng Type of Work (1) Previous A reement/Su I. (2) Supplement (3) Estimated Total Project Funds (4) Estimated Agency Funds (5) Estimated Federal Funds PE a. Agency 223,000.00 24,000.00 247,000.00 33,345.00 213,655.00 86.5 % b. Other c. Other Federal Aid d. State Participation 10,000.00 10,000.00 1,350.00 8,650.00 Ratio for PE e. Total PE Cost Estimate (a+b+c+d) 233 000.00 24 000.00 257,000.00 34,695.00 222,305.00 Right of Way f. Agency -no % .Other Federal Aid h. Other Participation Ratio for RW i. State j. Total RNV Cost Estimate (f+g+h+i) G - A&C, tag a Offit %,e _J U Construction k. Contract 9 IL 11 "s V711L -- - 489,933.00 89,933.00 89,933.00 1. Other Contract 86.5% (ER) 160,107.00 160,107.00 21,614.00 138,493.00 % m. Other Federal Aid n. Other Agency 86.5% ER 24 137.00 24 137.00 3,258.00 20 879.00 Participation o. A enc 40,863.00 40,863.00 40,863.00 Ratio for CN . State Total CN Cost Estimate k+l+m+n+o 715 040.00 715 040.00 24 872.00 690 168.00 r. Total Project Cost Estimate (e+i+a) 048,040,001 24,000.00 1 972,040.00 59,567 fift 912,473.00 The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions. Agency Official By Title Washington State Department of Transportation By Director of Highways and Local Programs Date Executed DOT Form 140-041 EF Revised 0312011